TWI818854B - Floating tube group and floating scaffolding - Google Patents

Floating tube group and floating scaffolding Download PDF

Info

Publication number
TWI818854B
TWI818854B TW112101400A TW112101400A TWI818854B TW I818854 B TWI818854 B TW I818854B TW 112101400 A TW112101400 A TW 112101400A TW 112101400 A TW112101400 A TW 112101400A TW I818854 B TWI818854 B TW I818854B
Authority
TW
Taiwan
Prior art keywords
floating
tube
floating tube
main
matching
Prior art date
Application number
TW112101400A
Other languages
Chinese (zh)
Inventor
陳宗男
Original Assignee
陳宗男
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陳宗男 filed Critical 陳宗男
Priority to TW112101400A priority Critical patent/TWI818854B/en
Application granted granted Critical
Publication of TWI818854B publication Critical patent/TWI818854B/en

Links

Images

Abstract

一種浮管組及浮棚架,浮管組與浮棚架皆具有相互縱橫搭接組合的主浮管與配合浮管,並以綁繩綁設固定,其中,主浮管之搭接部設有沿著主浮管長度方向間隔排列的複數第一卡槽,以及位於相鄰兩第一卡槽之間的第一卡榫,配合浮管之組接部設有複數第二卡榫,以及位於相鄰兩第二卡榫之間的第二卡槽,主浮管之搭接部與配合浮管之組接部相互搭接時,利用第一卡榫嵌設於位置相對應第二卡槽,第二卡榫嵌設於位置相對應的第一卡槽中,使主浮管與配合浮管之間藉由相互錯位的卡合構造,使主浮管與配合浮管搭接組合後具備良好的結合穩固性,主浮管與配合浮管之間不會相對滑移。A floating tube group and a floating scaffolding. The floating tube group and the floating scaffolding both have main floating tubes and matching floating tubes that are combined vertically and horizontally and are tied and fixed with ropes. The overlapping portion of the main floating tubes is There are a plurality of first latching grooves arranged at intervals along the length direction of the main floating tube, and a first latching tenon located between two adjacent first latching grooves, and a plurality of second latching tenons are provided at the assembly portion of the floating tube, and The second latching groove is located between two adjacent second latching tenons. When the overlapping portion of the main floating tube and the assembly connecting portion of the mating floating tube overlap each other, the first latching tenon is embedded in the corresponding second latching groove. groove, the second tenon is embedded in the corresponding first groove, so that the main floating tube and the matching floating tube are overlapped and combined through a mutually offset engaging structure. It has good combination stability and there will be no relative slippage between the main floating tube and the matching floating tube.

Description

浮管組及浮棚架Floating tube group and floating scaffolding

本發明係關於一種能漂浮於水上,適用於養蚵等水產養殖領域的浮棚架及其浮管組。 The invention relates to a floating scaffold and its floating pipe group that can float on water and are suitable for aquaculture fields such as oyster farming.

在養蚵等水產養殖作業中,養殖業者會在水上架設浮棚架,藉由漂浮於水上的浮棚架來綁設的蚵苗串,浮棚架除能提供養殖業者作業時能漂浮水上的載體,並利用浮棚架使垂掛在浮棚架上的蚵苗串皆能垂入水中成長,且待蚵苗成長後能便於養殖業者採收。 In aquaculture operations such as oyster farming, farmers will set up floating scaffolds on the water to tie strings of oyster seedlings on the floating scaffolds. In addition to providing farmers with a way to float on the water during their operations, the floating scaffolds A carrier is used, and a floating scaffold is used so that the strings of oyster seedlings hanging on the floating scaffold can be dropped into the water to grow. After the oyster seedlings grow, they can be easily harvested by farmers.

目前已知的浮棚架組成構造,其主要包含多數相互縱橫排列之浮管,每一浮管皆為中空密閉的圓柱狀管件,所述浮棚架並在上層浮管與下層管之間的每一浮管交錯搭接部分透過綁繩綁設方式固定,使所述浮棚架維持其矩形架體構造,並能漂浮在水面上。 The currently known floating scaffold structure mainly includes a plurality of floating tubes arranged vertically and horizontally with each other. Each floating tube is a hollow and sealed cylindrical pipe. The floating scaffold is between the upper floating tube and the lower tube. The staggered and overlapping parts of each floating tube are fixed by tying ropes so that the floating scaffold maintains its rectangular frame structure and can float on the water.

前述現有的浮棚架的整體組成構造中,雖能利用縱橫排列的管件與管件之間以綁繩綁設固定,但是,相互縱橫搭接的浮管與浮管之間因係平滑面接互抵接,在綁繩綁設固定的過程中,上下搭接浮管之間容易相對滑移之情形,導致浮棚架的浮管經綁繩綁固後容易有浮管歪斜偏位的問題,浮棚架難以呈現組合穩固的矩形架體型態,導致浮棚架定點設置於水面上,漂浮在水上的浮棚架容易有平穩性不足或式結構強度上的缺陷等問題。 In the overall structure of the existing floating scaffold mentioned above, although the pipe fittings arranged vertically and horizontally can be tied and fixed with ropes, the floating pipes overlapping each other vertically and horizontally are connected with each other due to smooth surfaces. During the process of tying and fixing the floating tubes with ropes, the upper and lower overlapping floating tubes tend to slip relative to each other, causing the floating tubes of the floating scaffold to become skewed after being tied with ropes. It is difficult for the scaffolding to form a stable rectangular frame shape, which results in the floating scaffolding being installed at a fixed point on the water. Floating scaffolding floating on the water is prone to problems such as insufficient stability or defects in structural strength.

本發明之目的在於一種浮棚架,解決現有浮棚架中相互縱橫交錯的浮管與浮管之間的搭接構造易發生浮管滑移偏位,導致浮棚架的整體組合結構強度的缺陷及平穩性不足等問題。 The object of the present invention is to provide a floating scaffold that solves the problem that the overlapping structure between the crisscrossing floating tubes in the existing floating scaffold is prone to slippage and misalignment of the floating tubes, resulting in a deterioration in the overall structural strength of the floating scaffold. Problems such as defects and insufficient stability.

為了達成前述目的,本發明所提出的浮管組係包括一主浮管以及至少一配合浮管,所述配合浮管與所述主浮管相互縱橫交錯地搭接,並以一綁繩綁設固定,其中:該主浮管具有一浮管本體,所述浮管本體的周壁形成至少一搭接部,所述搭接部具有一搭接面,所述搭接面設有沿著該主浮管長度方向間隔排列的複數第一卡槽,以及每二相鄰的所述第一卡槽之間具有一第一卡榫;所述配合浮管具有一管體,所述管體的周壁形成至少一組接部,所述組接部包括一抵接面,所述抵接面設有複數第二卡榫,以及每二相鄰的所述第二卡榫之間具有一第二卡槽,所述配合浮管及所述抵接面能抵接於所述搭接部的搭接面,且所述第一卡榫能嵌設於位置相對應所述第二卡槽,所述第二卡榫能嵌設於位置相對應的所述第一卡槽中。 In order to achieve the above object, the floating tube system proposed by the present invention includes a main floating tube and at least one matching floating tube. The matching floating tube and the main floating tube are crisscrossed and overlapped with each other, and are tied with a tying rope. Set to be fixed, wherein: the main floating tube has a floating tube body, the peripheral wall of the floating tube body forms at least one overlapping portion, the overlapping portion has an overlapping surface, and the overlapping surface is provided along the There are a plurality of first clamping slots arranged at intervals in the length direction of the main floating pipe, and there is a first clamping tenon between each two adjacent first clamping slots; the matching floating pipe has a pipe body, and the pipe body The peripheral wall forms at least one set of connecting parts. The connecting part includes a contact surface. The contact surface is provided with a plurality of second tenons, and there is a second second tenon between each two adjacent second tenons. The mating floating tube and the contact surface can abut against the overlapping surface of the overlapping portion, and the first latch can be embedded in the position corresponding to the second latch groove, so The second latching tenon can be embedded in the corresponding first latching groove.

為了達成前述目的,本發明提出的浮棚架係包括:多支主浮管以及多支配合浮管,所述配合浮管與所述主浮管相互縱橫交錯地搭接,並於每一搭接位置皆以一綁繩綁設固定,其中:所述主浮管皆具有一浮管本體,並於所述浮管本體的周壁形成多個搭接部,每一所述搭接部具有一搭接面,所述搭接面設有沿著所述主浮管長度方向間隔排列的複數第一卡槽,以及每二相鄰的所述第一卡槽之間具有一第一卡榫;所述配合浮管皆具有一管體,並於所述管體的周壁形成多個組接部,每一所述組接部包括一抵接面,所述抵接面設有複數第二卡榫,以及每二相鄰的所述第二卡榫之間具有一第二卡槽,所述配合浮管能所述抵接面抵接於所述主浮管位置對應的所述搭接面,並藉由所述第一卡榫嵌設於位置相對應所述第二卡槽,所述第二卡榫嵌設於位置相對應的所述第一卡槽中,使所述配合浮管搭接定位於所述主浮管上。 In order to achieve the aforementioned objectives, the floating scaffold system proposed by the present invention includes: a plurality of main floating pipes and a plurality of combined floating pipes. The matching floating pipes and the main floating pipes are crisscrossed and overlapped with each other, and each overlap is The connection positions are tied and fixed with a tie rope, wherein: the main floating tubes each have a floating tube body, and multiple overlapping portions are formed on the peripheral wall of the floating tube body, and each of the overlapping portions has a An overlapping surface, the overlapping surface is provided with a plurality of first clamping grooves arranged at intervals along the length direction of the main floating tube, and a first latch is provided between every two adjacent first clamping grooves; The matching floating tubes each have a tube body, and a plurality of assembly parts are formed on the peripheral wall of the tube body. Each of the assembly parts includes a contact surface, and the contact surface is provided with a plurality of second clips. There is a second slot between each two adjacent second tenons, and the contact surface of the matching floating tube can contact the overlapping surface corresponding to the position of the main floating tube. , and by the first latching tenon being embedded in the second latching groove corresponding to the position, and the second latching tenon being embedded in the first latching groove corresponding to the position, the matching floating tube The lap is positioned on the main float tube.

藉由前揭浮管組與浮棚架的整體組成構造的發明,其至少具備以優點: Through the invention of the integral structure of the front-opening floating tube group and the floating scaffold, it at least has the following advantages:

1、增進主浮管與配合浮管搭接構造的結合穩固性:本發明之浮管組及浮棚架,係除以相互縱橫搭接組合的主浮管與配合浮管,搭配綁繩綁設固定之組合構造外,進一步利用主浮管之搭接部設有沿著主浮管長度方向間隔排列的複數第一卡槽,以及位於相鄰兩第一卡槽之間的第一卡榫,配合浮管之組接部設有複數第二卡榫,以及位於相鄰兩第二卡榫之間的第二卡槽,主浮管之搭接部與配合浮管之組接部相互搭接時,利用第一卡榫嵌設於位置相對應的第二卡槽,第二卡榫嵌設於位置相對應的第一卡槽中,使主浮管與配合浮管之間藉由相互錯位的卡合構造,使主浮管與配合浮管搭接組合後具備良好的結合穩固性。 1. Improve the joint stability of the overlapping structure of the main floating pipe and the matching floating pipe: the floating pipe group and the floating scaffolding of the present invention are composed of the main floating pipe and the matching floating pipe that are combined vertically and horizontally with each other, and are tied with tying ropes. In addition to the fixed combined structure, the overlapping portion of the main floating pipe is further used to provide a plurality of first clamping grooves spaced along the length direction of the main floating pipe, and first clamping tenons located between two adjacent first clamping grooves. , the assembly part of the mating floating tube is provided with a plurality of second latching tenons, and a second latching groove located between two adjacent second latching tenons. The overlapping part of the main floating tube and the assembling part of the mating floating tube overlap each other. When connecting, the first latching tenon is embedded in the corresponding second latching groove, and the second latching tenon is embedded in the corresponding first latching groove, so that the main floating tube and the mating floating tube are connected by each other. The misaligned snap-in structure ensures good stability when the main float tube and the mating float tube are overlapped and combined.

2、增進浮管組與浮棚架的整體結構強度和漂浮於水上的平穩性:承上所述,本發明之浮管組及浮棚架中之主浮管與配合浮管相互縱橫搭接的組合構造中,利用主浮管之搭接部中之第一卡榫嵌設於配合浮管位置相對應之第二卡槽中,配合浮管則以組接部中之第二卡榫嵌設於主浮管位置相對應的第一卡槽中,使主浮管與配合浮管之間藉由相互錯位的卡合構造,使主浮管與配合浮管搭接組合後能有助增進彼此間的結合穩固性,進而增進浮管組與浮棚架的整體結構強度,且有助提升浮管組與浮棚架漂浮於水上的平穩性。 2. Improve the overall structural strength of the floating tube group and the floating scaffold and the stability of floating on the water: Based on the above, the main floating tube and the matching floating tube in the floating tube group and the floating scaffold of the present invention overlap each other vertically and horizontally. In the combined structure, the first latch in the overlapping part of the main floating tube is embedded in the second latch corresponding to the position of the mating floating tube, and the mating floating tube is embedded in the second latch in the assembly part. It is located in the first slot corresponding to the position of the main floating pipe, so that the main floating pipe and the matching floating pipe have a mutually offset engaging structure, so that the main floating pipe and the matching floating pipe can help to improve the efficiency after overlapping and combining. The solid combination between them enhances the overall structural strength of the floating tube group and the floating scaffold, and helps improve the stability of the floating tube group and the floating scaffold floating on the water.

本發明之浮管組及浮棚架中,還可進一步令主浮管鄰近所述搭接部的外周壁設有至少一綁繩卡槽,藉由綁繩卡槽提供綁繩嵌入定位的部位,使綁設於主浮管與配合浮管搭接處的綁繩更能穩固定位,不易滑移鬆脫。 In the floating tube group and the floating scaffold of the present invention, the outer peripheral wall of the main floating tube adjacent to the overlapping portion can be further provided with at least one tying rope slot, and the tying rope slot provides a place for the tying rope to be embedded and positioned. , so that the tying rope tied at the overlap between the main floating pipe and the matching floating pipe can be positioned more firmly and is not easy to slip and loosen.

10:主浮管 10: Main float tube

11:浮管本體 11: Floating tube body

12:搭接部 12: Overlapping part

121:第一卡槽 121:First card slot

122:第一卡榫 122:The first tenon

13:綁繩卡槽 13:Tie rope slot

20:配合浮管 20: Match the floating tube

21:管體 21:Tube body

22:組接部 22: Assembly and connection department

221:第二卡榫 221:Second tenon

222:第二卡槽 222: Second card slot

30:固定件 30: Fixtures

圖1是本發明浮管組的第一實施例局部立體示意圖。 Figure 1 is a partial perspective view of the first embodiment of the floating tube group of the present invention.

圖2是圖1所示浮管組第一實施例的局部立體分解示意圖。 FIG. 2 is a partially exploded schematic perspective view of the first embodiment of the floating tube group shown in FIG. 1 .

圖3是圖1及圖2所示浮管組第一實施例的局部側視剖面示意圖。 FIG. 3 is a partial side cross-sectional schematic view of the first embodiment of the floating tube assembly shown in FIGS. 1 and 2 .

圖4是本發明浮管組的第二實施例局部立體示意圖。 Figure 4 is a partial perspective view of the second embodiment of the floating tube group of the present invention.

圖5是圖4所示浮管組第二實施例的局部側視剖面示意圖。 FIG. 5 is a partial side cross-sectional schematic view of the second embodiment of the floating tube group shown in FIG. 4 .

圖6是本發明浮管組的第三實施例局部立體示意圖。 Figure 6 is a partial perspective view of the third embodiment of the floating tube group of the present invention.

圖7是圖6所示浮管組第三實施例的局部立體分解示意圖。 FIG. 7 is a partially exploded perspective view of the third embodiment of the floating tube group shown in FIG. 6 .

圖8是圖6及圖7所示浮管組第三實施例的局部側視剖面示意圖。 Figure 8 is a partial side cross-sectional schematic view of the third embodiment of the floating tube assembly shown in Figures 6 and 7.

圖9是本發明浮管組的第四實施例局部立體示意圖。 Figure 9 is a partial perspective view of the fourth embodiment of the floating tube group of the present invention.

圖10是圖9所示浮管組第四實施例的局部側視剖面示意圖。 Fig. 10 is a partial side cross-sectional schematic view of the fourth embodiment of the floating tube group shown in Fig. 9.

圖11是本發明浮棚架的一實施例俯視平面示意圖。 Figure 11 is a schematic top plan view of an embodiment of the floating scaffolding of the present invention.

如前揭發明內容所述,本發明係包括一種浮管組與一種浮棚架,以下分別對本發明的浮管組和浮棚架的具體構造提出說明。 As mentioned in the foregoing summary of the invention, the present invention includes a floating tube group and a floating scaffold. The specific structures of the floating tube group and the floating scaffold of the present invention are described below.

如圖1、圖4、圖6及圖9所示,其揭示本發明浮管組的數種實施例,由圖中可以見及,所述浮管組包括一主浮管10以及至少一配合浮管20,所述配合浮管20與所述主浮管10相互縱橫交錯地搭接,且每一所述配合浮管20與該主浮管10的搭接部12位皆以一固定件30予以固定,所述固定件30可以選用綁繩、束帶等可撓性元件或是其他固定元件。該浮管組能作為一浮棚架的一部分,並能與浮棚架中之其他相互縱橫搭接的主浮管10與配合浮管20結合一體。如圖1、圖6所示,本發明浮管組中,複數所述配合浮管20可皆搭接於該主浮管10的上側,而為雙層疊置型態組合構造;或者,如圖4及圖9所示,複數所述配合浮管20皆以上下相對方式搭接於該主浮管10的上側及下側,為三層疊置型態組合構造。 As shown in Figures 1, 4, 6 and 9, several embodiments of the floating tube group of the present invention are disclosed. As can be seen from the figures, the floating tube group includes a main floating tube 10 and at least one matching Floating tube 20, the matching floating tube 20 and the main floating tube 10 are overlapped with each other in a criss-cross direction, and the 12 overlapping portions of each matching floating tube 20 and the main floating tube 10 are fixed with a fixing member. 30 to be fixed, and the fixing member 30 can be a flexible component such as a rope or a strap or other fixing components. The floating tube group can be used as a part of a floating scaffold, and can be integrated with other main floating tubes 10 and matching floating tubes 20 in the floating scaffold that overlap each other vertically and horizontally. As shown in Figures 1 and 6, in the floating tube group of the present invention, the plurality of matching floating tubes 20 can all be overlapped on the upper side of the main floating tube 10 to form a double-layer stacked combination structure; or, as As shown in FIG. 4 and FIG. 9 , the plurality of matching floating tubes 20 are overlapped with the upper and lower sides of the main floating tube 10 in an up-down and opposite manner, forming a three-layer stacked combined structure.

如圖1、圖4、圖6及圖9所示,該主浮管10可為截面呈圓形或方形等多邊形的封閉式中空管件,如圖2至圖3、圖5、圖7至圖8及圖10所示,該主浮管10具有一浮管本體11,並於該浮管本體11周壁形成一或多個搭接部12,所述搭接部12具有一搭接面,並在所述搭接面設有沿著該主浮管10長度方向間隔排列的複數第一卡槽121,每二相鄰的所述第一卡槽121之間具有一第一卡榫122。如圖1、圖2、圖4、圖6及圖9所示的實施例中,該主浮管10還可進一步於浮管本體11鄰近所述搭接部12的外周壁設有至少一綁繩卡槽13,所述固定件30為綁繩或束帶時,所述固定件30能卡設於綁繩卡槽13定位。 As shown in Figures 1, 4, 6 and 9, the main floating pipe 10 can be a closed hollow pipe with a circular or square cross-section, as shown in Figures 2 to 3, 5, 7 to 8 and 10, the main floating tube 10 has a floating tube body 11, and one or more overlapping portions 12 are formed on the peripheral wall of the floating tube body 11. The overlapping portion 12 has an overlapping surface, and A plurality of first locking grooves 121 are provided on the overlapping surface at intervals along the length direction of the main floating tube 10 . A first locking tenon 122 is disposed between each two adjacent first locking grooves 121 . In the embodiment shown in Figures 1, 2, 4, 6 and 9, the main floating tube 10 can further be provided with at least one tie on the outer peripheral wall of the floating tube body 11 adjacent to the overlapping portion 12. When the fixing part 30 is a rope or a strap, the fixing part 30 can be locked in the rope fixing slot 13 for positioning.

如圖1、圖4、圖6及圖9所示,所述配合浮管20可為截面呈圓形或方形等多邊形的封閉式中空管件,如圖2至圖3、圖5、圖7至圖8及圖10所示,所述配合浮管20具有一管體21,並於所述管體21的周壁形成至少一組接部22,所述組接部22包括一抵接面,所述抵接面可以形成凹入所述管體21周壁的內凹面,所述抵接面設有複數第二卡榫221,以及每二相鄰的所述第二卡榫221之間具有一第二卡槽222,所述配合浮管20及所述抵接面能抵接於所述搭接部12的搭接面,且所述第一卡榫122能嵌設於位置相對應所述第二卡槽222,所述第二卡榫221能嵌設於位置相對應的所述第一卡槽121中。 As shown in Figures 1, 4, 6 and 9, the matching floating tube 20 can be a closed hollow pipe with a circular or square cross-section, as shown in Figures 2 to 3, 5, 7 to As shown in Figures 8 and 10, the matching floating tube 20 has a tube body 21, and at least one set of connecting parts 22 is formed on the peripheral wall of the tube body 21. The connecting part 22 includes a contact surface, so The contact surface may form an inner concave surface that is recessed into the peripheral wall of the tube body 21. The contact surface is provided with a plurality of second tenons 221, and there is a first tenon between each two adjacent second tenons 221. In the two latching grooves 222, the matching floating tube 20 and the contact surface can abut against the overlapping surface of the overlapping portion 12, and the first latching tenon 122 can be embedded in a position corresponding to the second latching groove 222. Two latching slots 222, the second latching tenon 221 can be embedded in the corresponding first latching slot 121.

如圖1至圖3、圖6至圖8所示的實施例,複數所述配合浮管20可皆搭接於該主浮管10的上側與下側中之一,而為雙層式搭接組合構造。亦即所述搭接部12設於該主浮管10的上側,所述組接部22設於所述配合浮管20的下側,使配合浮管20能搭設於主浮管10上側。 As shown in the embodiments shown in FIGS. 1 to 3 and 6 to 8 , the plurality of matching floating tubes 20 can be overlapped with one of the upper and lower sides of the main floating tube 10 to form a double-layered overlap. Connected combination structure. That is to say, the overlapping portion 12 is provided on the upper side of the main floating tube 10 , and the assembly portion 22 is provided on the lower side of the matching floating tube 20 , so that the matching floating tube 20 can be set up on the upper side of the main floating tube 10 .

或者,如圖4至圖5及圖9至圖10所示的實施例,複數所述配合浮管20是以每二配合浮管20上下相對地搭接於該主浮管10的上側及下側,而為三層式搭接組合構造。亦即,主浮管10於上下相對應位置各設有搭接部12,部分配合浮管20的組接部22設於所述配合浮管20的下側,其餘配合浮管20的組接部 22設於所述配合浮管20的上側,使每二配合浮管20能以組接部22上下相對地搭接在主浮管10上下側的搭接部12。 Or, as shown in the embodiments shown in FIGS. 4 to 5 and 9 to 10 , the plurality of matching floating tubes 20 are overlapped on the upper and lower sides of the main floating tube 10 with each two matching floating tubes 20 facing up and down. On the other side, it is a three-layer overlapped combination structure. That is to say, the main floating tube 10 is provided with overlapping portions 12 at corresponding upper and lower positions, and the assembly portions 22 of some of the matching floating tubes 20 are provided on the lower side of the matching floating tubes 20 , and the rest of the matching floating tubes 20 are assembled. department 22 is provided on the upper side of the matching floating tube 20 so that each two matching floating tubes 20 can overlap the overlapping portion 12 on the upper and lower sides of the main floating tube 10 with the assembly portion 22 facing up and down.

如圖11所示,其揭示本發明浮棚架的一種實施例,由圖中可以見及,所述浮棚架包括多支主浮管10以及多支配合浮管20,該多支主浮管10係間隔平行排列,該多支配合浮管20也呈間隔平行排列,且該多支配合浮管20與該多支主浮管10相互縱橫搭接組合,且每一所述配合浮管20與所述主浮管10之搭接部12位皆以一綁繩綁設固定。使本發明的浮棚架能漂浮在水面上,提供養殖業者作業時漂浮水上的載體,並利用浮棚架使垂掛在浮棚架上的蚵苗串皆能垂入水中成長,且待蚵苗成長後能便於養殖業者採收。 As shown in Figure 11, it discloses an embodiment of the floating scaffold of the present invention. It can be seen from the figure that the floating scaffold includes a plurality of main floating pipes 10 and a plurality of combined floating pipes 20. The tubes 10 are arranged in parallel at intervals, and the multiple combined floating tubes 20 are also arranged in parallel at intervals, and the multiple combined floating tubes 20 and the multiple main floating tubes 10 are overlapped and combined with each other vertically and horizontally, and each of the matching floating tubes 20 and the overlapping portion 12 of the main floating tube 10 are tied and fixed with a binding rope. The floating scaffolding of the present invention can float on the water, providing a carrier for floating on the water when cultivators are working, and using the floating scaffolding, the strings of oyster seedlings hanging on the floating scaffolding can hang down into the water to grow, and the oyster seedlings can be grown when they are ready. After growing, it can be easily harvested by farmers.

本發明浮棚架中,該多支配合浮管20可皆搭接於該多支主浮管10的上側,而為雙層疊置型態組合構造;或者,該多支配合浮管20皆以上下相對方式搭接於該多支主浮管10的上側及下側,為三層疊置型態組合構造。本發明浮棚架中,主浮管10以及配合浮管20之間的組合構造,係與前述浮管組中的主浮管10及配合浮管20的組合構造相同,其具體構造,於此不再贅述。 In the floating scaffold of the present invention, the multiple combined floating tubes 20 can all overlap the upper sides of the multiple main floating tubes 10 to form a double-layer stacked combined structure; or, the multiple combined floating tubes 20 can all overlap Overlapping the upper and lower sides of the plurality of main floating tubes 10 in an up-and-down manner, forming a three-layer stacked combined structure. In the floating scaffold of the present invention, the combined structure between the main floating tube 10 and the matching floating tube 20 is the same as the combined structure of the main floating tube 10 and the matching floating tube 20 in the floating tube group. The specific structure is as follows. No more details.

由前述說明可知,本發明浮管組及浮棚架除了利用相互縱橫搭接組合的主浮管10與配合浮管20,搭配綁繩綁設固定之組合構造外,其進一步利用主浮管10之搭接部12設有沿著主浮管10長度方向間隔排列的複數第一卡槽121,以及位於相鄰兩第一卡槽121之間的第一卡榫122,配合浮管20之組接部22設有複數第二卡榫221,以及位於相鄰兩第二卡榫221之間的第二卡槽222,主浮管10之搭接部12與配合浮管20之組接部22相互搭接時,利用第一卡榫122嵌設於位置相對應第二卡槽222,第二卡榫221嵌設於位置相對應的第一卡槽121中,使主浮管10與配合浮管20之間藉由相互錯位的卡合構造,使主浮管10與配合浮管20搭接組合後具備良好的結合穩固性,進而增進浮管組與浮棚架的整體結構強度,且有助提升浮管組與浮棚架漂浮於水上的平穩性。 As can be seen from the foregoing description, in addition to the combined structure of the main floating tube 10 and the matching floating tube 20 that are overlapped vertically and horizontally and tied and fixed with tie ropes, the floating tube group and floating scaffolding of the present invention further utilize the main floating tube 10 The overlapping portion 12 is provided with a plurality of first clamping slots 121 spaced apart along the length direction of the main floating tube 10, and first clamping tenons 122 located between two adjacent first clamping slots 121 to cooperate with the assembly of the floating tubes 20. The connecting portion 22 is provided with a plurality of second latching tenons 221 and a second latching groove 222 located between two adjacent second latching tenons 221. The overlapping portion 12 of the main floating tube 10 and the assembly portion 22 of the mating floating tube 20 When overlapping each other, the first latching tenon 122 is embedded in the corresponding second latching groove 222, and the second latching tenon 221 is embedded in the corresponding first latching groove 121, so that the main float tube 10 and the matching float are Through the mutually offset engagement structure between the tubes 20, the main floating tube 10 and the matching floating tube 20 have good combination stability after being overlapped and combined, thereby improving the overall structural strength of the floating tube group and the floating scaffold, and having Helps improve the stability of floating tube groups and floating scaffolding on the water.

10:主浮管 10: Main float tube

11:浮管本體 11: Floating tube body

12:搭接部 12: Overlapping part

121:第一卡槽 121:First card slot

122:第一卡榫 122:The first tenon

13:綁繩卡槽 13:Tie rope slot

20:配合浮管 20: Match the floating tube

21:管體 21:Tube body

22:組接部 22: Assembly and connection department

221:第二卡榫 221:Second tenon

222:第二卡槽 222: Second card slot

30:固定件 30: Fixtures

Claims (10)

一種浮管組,其包括一主浮管以及至少一配合浮管,所述配合浮管與所述主浮管相互縱橫交錯地搭接,並以固定件予以固定,其中:該主浮管具有一浮管本體,所述浮管本體的周壁形成至少一搭接部,所述搭接部具有一搭接面,所述搭接面設有沿著該主浮管長度方向間隔排列的複數第一卡槽,以及每二相鄰的所述第一卡槽之間具有一第一卡榫;所述配合浮管具有一管體,所述管體的周壁形成至少一組接部,所述組接部包括一抵接面,所述抵接面設有複數第二卡榫,以及每二相鄰的所述第二卡榫之間具有一第二卡槽,所述配合浮管及所述抵接面能抵接於所述搭接部的搭接面,且所述第一卡榫能嵌設於位置相對應所述第二卡槽,所述第二卡榫能嵌設於位置相對應的所述第一卡槽中。 A floating tube group, which includes a main floating tube and at least one matching floating tube. The matching floating tube and the main floating tube are crisscrossed with each other and fixed with fixing parts, wherein: the main floating tube has A floating tube body, the peripheral wall of the floating tube body forms at least one overlapping portion, the overlapping portion has an overlapping surface, and the overlapping surface is provided with a plurality of third holes arranged at intervals along the length direction of the main floating tube. A latching groove, and a first latching tenon between each two adjacent first latching grooves; the matching floating tube has a tube body, and the peripheral wall of the tube body forms at least one set of joints, and the The assembly part includes an abutting surface, the abutting surface is provided with a plurality of second latching tenons, and a second latching groove is provided between each two adjacent second latching tenons. The matching floating tube and the The contact surface can contact the overlapping surface of the overlapping portion, and the first latch can be embedded in the position corresponding to the second latch slot, and the second latch can be embedded in the position. in the corresponding first card slot. 如請求項1所述之浮管組,其中,所述搭接部設於該主浮管的上側,所述配合浮管搭接於該主浮管的上側。 The floating tube group according to claim 1, wherein the overlapping portion is provided on the upper side of the main floating tube, and the matching floating tube overlaps on the upper side of the main floating tube. 如請求項1所述之浮管組,其中,所述搭接部設於該主浮管的上側及下側且上下相對應,每二所述配合浮管上下相對地搭接於該主浮管的上側及下側。 The floating tube group according to claim 1, wherein the overlapping portion is provided on the upper and lower sides of the main floating tube and corresponds to each other up and down, and each two matching floating tubes overlap the main floating tube up and down relative to each other. the upper and lower sides of the tube. 如請求項1至3中任一項所述之浮管組,其中,所述配合浮管的抵接面呈內凹面。 The floating tube group according to any one of claims 1 to 3, wherein the abutting surface of the matching floating tube is a concave surface. 如請求項1至3中任一項所述之浮管組,其中,所述固定件為可撓性的綁繩,所述主浮管於鄰近所述搭接部的外周壁設有至少一綁繩卡槽,所述綁繩卡槽提供所述綁繩卡入定位。 The floating tube assembly according to any one of claims 1 to 3, wherein the fixing member is a flexible tying rope, and the main floating tube is provided with at least one on the outer peripheral wall adjacent to the overlapping portion. The tying rope clamping slot provides the tying rope with a locking position. 一種浮棚架,其包括:多支主浮管以及多支配合浮管,所述配合浮管與所述主浮管相互縱橫交錯地搭接,並於每一搭接位置皆以一固定件予以固定,其中: 所述主浮管皆具有一浮管本體,並於所述浮管本體的周壁形成多個搭接部,每一所述搭接部具有一搭接面,所述搭接面設有沿著所述主浮管長度方向間隔排列的複數第一卡槽,以及每二相鄰的所述第一卡槽之間具有一第一卡榫;所述配合浮管皆具有一管體,並於所述管體的周壁形成多個組接部,每一所述組接部包括一抵接面,所述抵接面設有複數第二卡榫,以及每二相鄰的所述第二卡榫之間具有一第二卡槽,所述配合浮管能所述抵接面抵接於所述主浮管位置對應的所述搭接面,並藉由所述第一卡榫嵌設於位置相對應所述第二卡槽,所述第二卡榫嵌設於位置相對應的所述第一卡槽中,使所述配合浮管搭接定位於所述主浮管上。 A floating scaffold, which includes: a plurality of main floating tubes and a plurality of combined floating tubes. The matching floating tubes and the main floating tubes are crisscrossed and overlapped with each other, and a fixing member is used at each overlapping position. be fixed, where: Each of the main floating tubes has a floating tube body, and a plurality of overlapping portions are formed on the peripheral wall of the floating tube body. Each of the overlapping portions has an overlapping surface, and the overlapping surface is provided along the There are a plurality of first clamping slots spaced apart in the length direction of the main floating tube, and a first clamping tenon is arranged between each two adjacent first clamping slots; the matching floating tubes each have a tube body, and are arranged on the main floating tube. The peripheral wall of the tube body forms a plurality of connecting parts, each of the connecting parts includes a contact surface, the contact surface is provided with a plurality of second latches, and every two adjacent second latches are provided. There is a second latching groove between the tenons, and the contact surface of the matching floating tube can contact the overlapping surface corresponding to the position of the main floating tube, and is embedded in the main floating tube through the first latching tenon. The position corresponds to the second clamping groove, and the second latch is embedded in the corresponding first clamping slot, so that the matching floating tube is overlapped and positioned on the main floating tube. 如請求項6所述之浮棚架,其中,所述搭接部設於所述主浮管的上側,所述配合浮管皆搭接於所述主浮管的上側。 The floating scaffold according to claim 6, wherein the overlapping portion is provided on the upper side of the main floating tube, and the matching floating tubes are all overlapped on the upper side of the main floating tube. 如請求項6所述之浮管組,其中,所述搭接部設於該主浮管的上側及下側且上下相對應,該多個配合浮管係以上下相對方式搭接於所述主浮管的上側及下側。 The floating tube group according to claim 6, wherein the overlapping portion is provided on the upper and lower sides of the main floating tube and corresponds to each other up and down, and the plurality of matching floating tubes overlap the said floating tubes in an up and down manner. The upper and lower sides of the main float tube. 如請求項6至8中任一項所述之浮管組,其中,所述固定件為可撓性的綁繩,所述主浮管於鄰近所述搭接部的外周壁設有至少一綁繩卡槽,所述綁繩卡槽提供所述綁繩卡入定位。 The floating tube assembly according to any one of claims 6 to 8, wherein the fixing member is a flexible tying rope, and the main floating tube is provided with at least one on the outer peripheral wall adjacent to the overlapping portion. The tying rope clamping slot provides the tying rope with a locking position. 如請求項6至8中任一項所述之浮管組,其中,所述配合浮管的抵接面呈內凹面。 The floating tube group according to any one of claims 6 to 8, wherein the abutting surface of the matching floating tube is a concave surface.
TW112101400A 2023-01-12 2023-01-12 Floating tube group and floating scaffolding TWI818854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW112101400A TWI818854B (en) 2023-01-12 2023-01-12 Floating tube group and floating scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW112101400A TWI818854B (en) 2023-01-12 2023-01-12 Floating tube group and floating scaffolding

Publications (1)

Publication Number Publication Date
TWI818854B true TWI818854B (en) 2023-10-11

Family

ID=89857667

Family Applications (1)

Application Number Title Priority Date Filing Date
TW112101400A TWI818854B (en) 2023-01-12 2023-01-12 Floating tube group and floating scaffolding

Country Status (1)

Country Link
TW (1) TWI818854B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM606694U (en) * 2020-07-15 2021-01-21 陳宗男 Floating pipe interval control structure
TWI783876B (en) * 2022-02-22 2022-11-11 陳宗男 floating scaffolding

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM606694U (en) * 2020-07-15 2021-01-21 陳宗男 Floating pipe interval control structure
TWI783876B (en) * 2022-02-22 2022-11-11 陳宗男 floating scaffolding

Similar Documents

Publication Publication Date Title
US8011637B2 (en) Concrete form system for low-clearance applications
KR200438982Y1 (en) fixing trust structure of type stone for building
TWI818854B (en) Floating tube group and floating scaffolding
TWM606694U (en) Floating pipe interval control structure
KR20160025167A (en) Fastening structure of prefabricated deck panel in city park and nature-type's ecological river
TWI831571B (en) Floating tube group and floating scaffolding
KR102148899B1 (en) Retaining wall structure
TWI798138B (en) Floating tube structure of floating scaffolding
TWI783876B (en) floating scaffolding
TWI838080B (en) Floating tube set and floating scaffolding
TWI630338B (en) Large-diameter submerged pipe joint device and combined method thereof
JP2002213077A (en) Construction method of set form for concrete wall and steel-made form used therefor
CN207863154U (en) A kind of assembly concrete bean column node
KR200339060Y1 (en) Frame connector for a fish cage
CN210104979U (en) Flexible connecting assembly for space building
TWM621756U (en) Floating tube support rack
KR200399003Y1 (en) A Set of Linker for the Aquafarm
KR200418548Y1 (en) Brace for trees
TWI679933B (en) Combined tube kit and raft
KR200348321Y1 (en) Different type flange cylinder unit and With these units the cylinder storage tank which it produces.
JP3300980B2 (en) Concrete block joint means
CN220414608U (en) Truss-inhaul cable combined glass curtain wall
KR200486176Y1 (en) Net fixing bottom frame for aquaculture cage
FI119826B (en) Arrangement for interconnecting support networks
JP6823687B2 (en) Octagonal hollow tube for greenhouse