TWI817714B - Server, adapter card and control method thereof - Google Patents

Server, adapter card and control method thereof Download PDF

Info

Publication number
TWI817714B
TWI817714B TW111134453A TW111134453A TWI817714B TW I817714 B TWI817714 B TW I817714B TW 111134453 A TW111134453 A TW 111134453A TW 111134453 A TW111134453 A TW 111134453A TW I817714 B TWI817714 B TW I817714B
Authority
TW
Taiwan
Prior art keywords
power supply
module
power
server
interface
Prior art date
Application number
TW111134453A
Other languages
Chinese (zh)
Other versions
TW202411855A (en
Inventor
宋文文
Original Assignee
英業達股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 英業達股份有限公司 filed Critical 英業達股份有限公司
Priority to TW111134453A priority Critical patent/TWI817714B/en
Application granted granted Critical
Publication of TWI817714B publication Critical patent/TWI817714B/en
Publication of TW202411855A publication Critical patent/TW202411855A/en

Links

Images

Landscapes

  • Percussion Or Vibration Massage (AREA)
  • Preliminary Treatment Of Fibers (AREA)
  • Supplying Of Containers To The Packaging Station (AREA)
  • Power Sources (AREA)

Abstract

An adapter card, a control method thereof, and a server. The adapter card includes a power interface, at least one first power supply module, a second power supply module and at least one network card power supply interface; the input end of the first power supply module is connected to the first power supply module of the server motherboard through the power supply interface Electrical connection, the output end of the first power supply module is electrically connected with the power supply interface of the network card, the enabling end of the first power supply module is connected with the controller of the server motherboard; the input end of the second power supply module is connected to the power supply interface through the power supply interface. The first power supply module is electrically connected, the output end of the second power supply module is electrically connected to the power supply interface of the network card, and the enabling end of the second power supply module is connected to the controller; the second power supply module is used for receiving the control When the enable signal of the server is activated, the second power supply voltage is output to the network card power supply interface, so as to supply power to the network card of the server before the server is turned on. The technical solution of the embodiment of the present invention realizes that before the server is powered on, power is supplied to the network card or the display card of the server.

Description

轉接卡及其控制方法、伺服器Adapter card and its control method, server

本發明涉及轉接卡技術領域,尤其涉及一種轉接卡及其控制方法、伺服器。The present invention relates to the technical field of adapter cards, and in particular to an adapter card, a control method thereof, and a server.

PCIE(peripheral component interconnect express)是一種高速串行計算機擴展總線標準,Riser轉接卡是一種PCIE的轉接卡或擴展卡,用於支持更多的PCIE設備。PCIE (peripheral component interconnect express) is a high-speed serial computer expansion bus standard. The riser adapter card is a PCIE adapter card or expansion card used to support more PCIE devices.

Riser轉接卡可以支持75W的功耗,但當Riser卡連接一些無法單獨供電的器件,如網路卡或顯示卡(graphics processing unit,GPU)時,會因為功耗問題不能支持到而不能搭配用,也不能實現在伺服器開機前的S5狀態下正常運行。The riser adapter card can support 75W power consumption, but when the riser card is connected to some devices that cannot be powered independently, such as network cards or graphics cards (graphics processing unit, GPU), it will not be supported due to power consumption issues and cannot be used. Even if it is not used, it cannot run normally in the S5 state before the server is powered on.

本發明提供了一種轉接卡及其控制方法、伺服器,以解決轉接卡與無法單獨供電的器件連接時,器件無法在伺服器開機前的S5狀態下正常運行的問題。The invention provides an adapter card, a control method thereof, and a server to solve the problem that when the adapter card is connected to a device that cannot be powered independently, the device cannot operate normally in the S5 state before the server is started.

根據本發明的一方面,提供了一種轉接卡,轉接卡包括:電源接口、至少一個第一供電模組、第二供電模組和至少一個網路卡供電接口;According to one aspect of the present invention, an adapter card is provided. The adapter card includes: a power interface, at least one first power supply module, a second power supply module and at least one network card power supply interface;

所述第一供電模組的輸入端通過所述電源接口與伺服器主板的第一電源模組電連接,所述第一供電模組的輸出端與所述網路卡供電接口電連接,所述第一供電模組的致能端與所述伺服器主板的控制器連接;所述第一供電模組用於在接收到所述控制器的致能訊號時,將所述第一電源模組的第一電源電壓轉換為第一供電電壓,並將所述第一供電電壓輸出至所述網路卡供電接口,以在伺服器開機前,為所述伺服器的網路卡供電;The input end of the first power supply module is electrically connected to the first power module of the server motherboard through the power interface, and the output end of the first power supply module is electrically connected to the network card power supply interface, so The enabling end of the first power supply module is connected to the controller of the server mainboard; the first power supply module is used to turn on the first power supply module when receiving the enabling signal of the controller. Convert the first power supply voltage of the group into a first power supply voltage, and output the first power supply voltage to the network card power supply interface to power the network card of the server before the server is started;

所述第二供電模組的輸入端通過所述電源接口與所述第一電源模組電連接,所述第二供電模組的輸出端與所述網路卡供電接口電連接,所述第二供電模組的致能端與所述控制器連接;所述第二供電模組用於在接收到所述控制器的致能訊號時,將所述第一電源電壓轉換為第二供電電壓,並將所述第二供電電壓輸出至所述網路卡供電接口,以在所述伺服器開機前,為所述伺服器的網路卡供電。The input end of the second power supply module is electrically connected to the first power supply module through the power interface, and the output end of the second power supply module is electrically connected to the network card power supply interface. The enable terminals of two power supply modules are connected to the controller; the second power supply module is used to convert the first power supply voltage into a second power supply voltage when receiving an enable signal from the controller. and output the second power supply voltage to the network card power supply interface to provide power to the network card of the server before the server is started.

可選地,轉接卡還包括輸入輸出擴展模組;Optionally, the adapter card also includes an input and output expansion module;

所述輸入輸出擴展模組的輸入端與所述控制器連接,所述輸入輸出擴展模組的輸出端與所述第一供電模組的致能端電連接,所述輸入輸出擴展模組的輸出端還與所述第二供電模組的致能端電連接;所述輸入輸出擴展模組用於將所述控制器的控制訊號轉換為所述致能訊號,並將所述致能訊號輸出至所述第一供電模組和所述第二供電模組。The input end of the input and output expansion module is connected to the controller, the output end of the input and output expansion module is electrically connected to the enabling end of the first power supply module, and the input and output expansion module has an The output end is also electrically connected to the enable end of the second power supply module; the input and output expansion module is used to convert the control signal of the controller into the enable signal, and convert the enable signal Output to the first power supply module and the second power supply module.

可選地,轉接卡還包括控制器接口;Optionally, the riser card also includes a controller interface;

所述輸入輸出擴展模組的輸入端通過所述控制器接口與所述控制器連接;The input end of the input and output expansion module is connected to the controller through the controller interface;

所述輸入輸出擴展模組的電源端通過所述控制器接口與所述伺服器主板的第二電源模組電連接,所述控制器接口用於將所述第二電源模組的第二電源電壓輸出至所述輸入輸出擴展模組的電源端,以在所述伺服器開機前,為所述輸入輸出擴展模組供電。The power end of the input and output expansion module is electrically connected to the second power module of the server motherboard through the controller interface, and the controller interface is used to connect the second power supply of the second power module to The voltage is output to the power terminal of the input-output expansion module to provide power to the input-output expansion module before the server is started.

可選地,轉接卡還包括溫度檢測模組;Optionally, the adapter card also includes a temperature detection module;

所述溫度檢測模組通過所述控制器接口與所述控制器連接,所述溫度檢測模組用於檢測所述轉接卡的溫度訊息,並將所述溫度訊息發送至所述控制器;The temperature detection module is connected to the controller through the controller interface, and the temperature detection module is used to detect the temperature information of the adapter card and send the temperature information to the controller;

所述溫度檢測模組的電源端通過所述控制器接口與所述第二電源模組電連接,所述控制器接口用於將所述第二電源電壓輸出至所述溫度檢測模組的電源端,以在所述伺服器開機前,為所述溫度檢測模組供電。The power end of the temperature detection module is electrically connected to the second power module through the controller interface, and the controller interface is used to output the second power voltage to the power supply of the temperature detection module. terminal to provide power to the temperature detection module before the server is powered on.

可選地,轉接卡還包括存儲模組;Optionally, the riser card also includes a storage module;

所述存儲模組通過所述控制器接口與所述控制器連接,所述存儲模組用於存儲所述轉接卡的配置訊息;The storage module is connected to the controller through the controller interface, and the storage module is used to store configuration information of the adapter card;

所述存儲模組的電源端通過所述控制器接口與所述第二電源模組電連接,所述控制器接口用於將所述第二電源電壓輸出至所述存儲模組的電源端,以在所述伺服器開機前,為所述存儲模組供電。The power terminal of the storage module is electrically connected to the second power module through the controller interface, and the controller interface is used to output the second power voltage to the power terminal of the storage module, To provide power to the storage module before the server is powered on.

可選地,轉接卡還包括第一帶寬調節模組和第二帶寬調節模組;Optionally, the adapter card also includes a first bandwidth adjustment module and a second bandwidth adjustment module;

所述第一供電模組的輸出端通過所述第一帶寬調節模組與所述網路卡供電接口電連接;The output end of the first power supply module is electrically connected to the network card power supply interface through the first bandwidth adjustment module;

所述第二供電模組的輸出端通過所述第二帶寬調節模組與所述網路卡供電接口電連接。The output end of the second power supply module is electrically connected to the network card power supply interface through the second bandwidth adjustment module.

可選地,所述第一供電模組包括電子熔斷器電路。Optionally, the first power supply module includes an electronic fuse circuit.

根據本發明的另一方面,提供了一種轉接卡的控制方法,用於控制本發明任意實施方案所述的轉接卡;所述轉接卡包括:電源接口、至少一個第一供電模組、第二供電模組和至少一個網路卡供電接口;所述第一供電模組的輸入端通過所述電源接口與伺服器主板的第一電源模組電連接,所述第一供電模組的輸出端與所述網路卡供電接口電連接,所述第一供電模組的致能端與所述伺服器主板的控制器連接;所述第二供電模組的輸入端通過所述電源接口與所述第一電源模組電連接,所述第二供電模組的輸出端與所述網路卡供電接口電連接,所述第二供電模組的致能端與所述控制器連接;According to another aspect of the present invention, a method for controlling an adapter card is provided, which is used to control the adapter card according to any embodiment of the present invention; the adapter card includes: a power interface, at least one first power supply module , a second power supply module and at least one network card power supply interface; the input end of the first power supply module is electrically connected to the first power module of the server motherboard through the power interface, and the first power supply module The output end of the first power supply module is electrically connected to the network card power supply interface, the enabling end of the first power supply module is connected to the controller of the server mainboard; the input end of the second power supply module passes through the power supply The interface is electrically connected to the first power supply module, the output end of the second power supply module is electrically connected to the network card power supply interface, and the enabling end of the second power supply module is connected to the controller. ;

所述控制方法由伺服器主板上的控制器執行;The control method is executed by a controller on the server motherboard;

所述控制方法包括:The control methods include:

在伺服器接入交流電源後,輸出致能訊號至所述第一供電模組和所述第二供電模組;以使所述第一供電模組輸出第一供電電壓至所述網路卡供電接口,以使所述第二供電模組輸出第二供電電壓至所述網路卡供電接口,進而在伺服器開機前,為所述伺服器的網路卡供電。After the server is connected to the AC power supply, an enable signal is output to the first power supply module and the second power supply module; so that the first power supply module outputs a first power supply voltage to the network card The power supply interface enables the second power supply module to output the second power supply voltage to the network card power supply interface, thereby supplying power to the network card of the server before the server is started.

可選地,所述控制方法還包括:Optionally, the control method also includes:

輸出關閉訊號至所述第一供電模組和所述第二供電模組,以控制所述網路卡關機。Output a shutdown signal to the first power supply module and the second power supply module to control the network card to shut down.

根據本發明的另一方面,提供了一種伺服器,伺服器包括本發明任意實施方案所述的轉接卡,還包括伺服器主板,所述伺服器主板包括第一電源模組和控制器;According to another aspect of the present invention, a server is provided. The server includes the riser card according to any embodiment of the present invention, and also includes a server mainboard. The server mainboard includes a first power module and a controller;

所述第一電源模組通過所述轉接卡的電源接口與所述轉接卡的第一供電模組的輸入端電連接,所述第一電源模組用於在所述伺服器開機前,為所述第一供電模組提供第一電源電壓;The first power module is electrically connected to the input end of the first power supply module of the adapter card through the power interface of the adapter card. The first power module is used to power on the server before the server is turned on. , providing the first power supply voltage to the first power supply module;

所述第一電源模組通過所述電源接口與所述轉接卡的第二供電模組的輸入端電連接,所述第一電源模組用於在所述伺服器開機前,為所述第二供電模組提供第一電源電壓;The first power module is electrically connected to the input end of the second power supply module of the adapter card through the power interface, and the first power module is used to provide the power supply for the server before starting the server. The second power supply module provides the first power supply voltage;

所述控制器與所述第一供電模組的致能端電連接,所述控制器還與所述第二供電模組的致能端電連接,所述控制器用於在伺服器接入交流電源後,輸出致能訊號至所述第一供電模組和所述第二供電模組。The controller is electrically connected to the enabling end of the first power supply module, the controller is also electrically connected to the enabling end of the second power supply module, and the controller is used to access the AC in the server. After power is supplied, an enable signal is output to the first power supply module and the second power supply module.

本發明實施例的技術方案,通過在轉接卡上設置第一供電模組和第二供電模組,在伺服器開機前,如果伺服器接入交流電,伺服器主板的控制器就會發送致能訊號至第一供電模組和第二供電模組,第一供電模組和第二供電模組在接收到致能訊號後,第一供電模組將伺服器主板上第一電源模組提供的第一電源電壓轉換為第一供電電壓,並將第一供電電壓輸出至網路卡供電接口,為網路卡供電;第二供電模組將第一電源電壓轉換為第二供電電壓,並將第二供電電壓輸出至網路卡供電接口,為網路卡供電;從而在伺服器開機前,為伺服器的網路卡或顯示卡供電;因此,在伺服器開機前,伺服器的網路卡或顯示卡可以正常運行。並且,伺服器主板的控制器可以通過第一供電模組和第二供電模組來控制網路卡關機;因此,可以實現在伺服器開機前的S5狀態下,對網路卡進行開關處理。本發明實施例的技術方案解決了轉接卡與無法單獨供電的器件連接時,器件無法在伺服器開機前的S5狀態下正常運行的問題;實現了在伺服器開機前,為伺服器的網路卡或顯示卡供電,實現在伺服器開機前的S5狀態下,對網路卡進行開關處理。The technical solution of the embodiment of the present invention is to set the first power supply module and the second power supply module on the adapter card. Before the server is started, if the server is connected to AC power, the controller of the server mainboard will send a message. The enable signal is sent to the first power supply module and the second power supply module. After the first power supply module and the second power supply module receive the enable signal, the first power supply module provides the first power supply module on the server motherboard. The first power supply voltage is converted into a first power supply voltage, and the first power supply voltage is output to the network card power supply interface to power the network card; the second power supply module converts the first power supply voltage into a second power supply voltage, and The second power supply voltage is output to the network card power supply interface to power the network card; thus, before the server is started, the network card or graphics card of the server is powered; therefore, before the server is started, the network card of the server is powered. The road card or graphics card can function normally. Moreover, the controller of the server mainboard can control the network card to shut down through the first power supply module and the second power supply module; therefore, the network card can be switched on and off in the S5 state before the server is started. The technical solution of the embodiment of the present invention solves the problem that when the adapter card is connected to a device that cannot be powered independently, the device cannot operate normally in the S5 state before the server is started; it realizes the network connection for the server before the server is started. The circuit card or graphics card supplies power to enable switching of the network card in the S5 state before the server is powered on.

應當理解,本部分所描述的內容並非旨在標識本發明的實施例的關鍵或重要特徵,也不用於限制本發明的範圍。本發明的其它特徵將通過以下的說明書而變得容易理解。It should be understood that what is described in this section is not intended to identify key or important features of the embodiments of the invention, nor is it intended to limit the scope of the invention. Other features of the present invention will become easily understood from the following description.

為了使本技術領域的人員更好地理解本發明方案,下面將結合本發明實施例中的附圖,對本發明實施例中的技術方案進行清楚、完整地描述,顯然,所描述的實施例僅僅是本發明一部分的實施例,而不是全部的實施例。基於本發明中的實施例,本領域普通技術人員在沒有做出創造性勞動前提下所獲得的所有其他實施例,都應當屬於本發明保護的範圍。In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only These are some embodiments of the present invention, rather than all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts should fall within the scope of protection of the present invention.

需要說明的是,本發明的說明書和申請專利範圍及上述附圖中的術語“第一”、“第二”等是用於區別類似的對象,而不必用於描述特定的順序或先後次序。應該理解這樣使用的數據在適當情況下可以互換,以便這裡描述的本發明的實施例能夠以除了在這裡圖示或描述的那些以外的順序實施。此外,術語“包括”和“具有”以及他們的任何變形,意圖在於覆蓋不排他的包含,例如,包含了一系列步驟或單元的過程、方法、系統、產品或設備不必限於清楚地列出的那些步驟或單元,而是可包括沒有清楚地列出的或對於這些過程、方法、產品或設備固有的其它步驟或單元。It should be noted that the terms "first", "second", etc. in the description and patent scope of the present invention and the above-mentioned drawings are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It is to be understood that the data so used are interchangeable under appropriate circumstances so that the embodiments of the invention described herein are capable of being practiced in sequences other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, e.g., a process, method, system, product, or apparatus that encompasses a series of steps or units and need not be limited to those explicitly listed. Those steps or elements may instead include other steps or elements not expressly listed or inherent to the process, method, product or apparatus.

圖1是本發明實施例提供的一種轉接卡的結構示意圖,參考圖1,轉接卡100包括電源接口101、至少一個第一供電模組102、第二供電模組103和至少一個網路卡供電接口104;第一供電模組102的輸入端通過電源接口101與伺服器主板200的第一電源模組201電連接,第一供電模組102的輸出端與網路卡供電接口104電連接,第一供電模組102的致能端與伺服器主板200的控制器202連接;第一供電模組102用於在接收到控制器202的致能訊號時,將第一電源模組201的第一電源電壓轉換為第一供電電壓,並將第一供電電壓輸出至網路卡供電接口104,以在伺服器開機前,為伺服器的網路卡供電;第二供電模組103的輸入端通過電源接口101與第一電源模組201電連接,第二供電模組103的輸出端與網路卡供電接口104電連接,第二供電模組103的致能端與控制器202連接;第二供電模組103用於在接收到控制器202的致能訊號時,將第一電源電壓轉換為第二供電電壓,並將第二供電電壓輸出至網路卡供電接口104,以在伺服器開機前,為伺服器的網路卡供電。Figure 1 is a schematic structural diagram of an adapter card provided by an embodiment of the present invention. Referring to Figure 1, the adapter card 100 includes a power interface 101, at least a first power supply module 102, a second power supply module 103 and at least one network. Card power supply interface 104; the input end of the first power supply module 102 is electrically connected to the first power module 201 of the server motherboard 200 through the power interface 101, and the output end of the first power supply module 102 is electrically connected to the network card power supply interface 104. connection, the enable end of the first power supply module 102 is connected to the controller 202 of the server motherboard 200; the first power supply module 102 is used to connect the first power module 201 when receiving the enable signal from the controller 202. The first power supply voltage is converted into a first power supply voltage, and the first power supply voltage is output to the network card power supply interface 104 to power the network card of the server before the server is started; the second power supply module 103 The input end is electrically connected to the first power module 201 through the power interface 101, the output end of the second power supply module 103 is electrically connected to the network card power supply interface 104, and the enabling end of the second power supply module 103 is connected to the controller 202 ; The second power supply module 103 is used to convert the first power supply voltage into a second power supply voltage when receiving the enable signal of the controller 202, and output the second power supply voltage to the network card power supply interface 104, so as to Before starting the server, power the server's network card.

其中,轉接卡100例如為Riser轉接卡,是一種PCIE的轉接卡或擴展卡,用於增加插槽,便於伺服器主板200連接更多的器件,例如網路卡、顯示卡或聲卡等。第一供電模組102例如包括升壓電路或降壓電路,也可以包括熔斷器電路,也可以包括其他電壓轉換電路,第一供電模組102可以將第一電源模組201提供的第一電源電壓轉換為第一供電電壓,第一供電電壓例如為網路卡所需的主供電電壓,即為網路卡上主控芯片所需的供電電壓。第二供電模組103例如包括升壓電壓或降壓電路,也可以包括其他電壓轉換電路,第二供電模組103可以將第一電源模組201提供的第一電源電壓轉換為第二供電電壓,第二供電電壓例如可以為網路卡上的記憶體或光纖光學端口等進行供電。網路卡供電接口104例如設置有至少兩個子接口,不同的子接口可以輸出不同的供電電壓,就可以將不同的供電電壓(第一供電電壓和第二供電電壓)輸出至網路卡,從而為網路卡上不同的器件進行供電,滿足不同器件的供電需求。Among them, the adapter card 100 is, for example, a Riser adapter card, which is a PCIE adapter card or expansion card used to add slots to facilitate the server motherboard 200 to connect more devices, such as network cards, display cards or sound cards. wait. The first power supply module 102 may include, for example, a boost circuit or a buck circuit, a fuse circuit, or other voltage conversion circuits. The first power supply module 102 may convert the first power supply provided by the first power module 201 The voltage is converted into a first supply voltage. The first supply voltage is, for example, the main supply voltage required by the network card, that is, the supply voltage required by the main control chip on the network card. The second power supply module 103 includes, for example, a voltage boosting circuit or a buck circuit, and may also include other voltage conversion circuits. The second power supply module 103 may convert the first power supply voltage provided by the first power supply module 201 into a second power supply voltage. , the second supply voltage can, for example, supply power to the memory or fiber optic port on the network card. For example, the network card power supply interface 104 is provided with at least two sub-interfaces. Different sub-interfaces can output different power supply voltages, and different power supply voltages (the first power supply voltage and the second power supply voltage) can be output to the network card. This provides power to different devices on the network card to meet the power supply needs of different devices.

具體地,在伺服器關機時,如果伺服器接入交流電源,伺服器就會進入S5狀態,此時的伺服器並未開機;S5狀態時,伺服器主板200上的第一電源模組201可提供第一電源電壓,第一電源電壓例如為12V_STBY電壓;當第一供電模組102接收到控制器202的致能訊號時,第一供電模組102就會將第一電源電壓12V_STBY轉換為第一供電電壓,第一供電電壓例如為12V電壓,也可以為其他數值的電壓,第一供電模組102通過網路卡供電接口104將第一供電電壓輸出至負載,負載例如為網路卡或顯示卡;從而在伺服器開機前,即伺服器處於S5狀態時,為伺服器的網路卡或顯示卡供電。當第二供電模組103接收到控制器202的致能訊號時,第二供電模組103就會將第一電源電壓12V_STBY轉換為第二供電電壓,第二供電電壓例如為3.3V電壓,也可以為其他數值的電壓;第二供電模組103通過網路卡供電接口104將第二供電電壓輸出至負載,負載例如為網路卡或顯示卡;從而在伺服器開機前,即伺服器處於S5狀態時,為伺服器的網路卡或顯示卡供電;因此,在伺服器處於S5狀態時,可以滿足網路卡或顯示卡的功耗需求,伺服器的網路卡或顯示卡可以正常運行。Specifically, when the server is shut down, if the server is connected to AC power, the server will enter the S5 state, and the server is not powered on at this time; in the S5 state, the first power module 201 on the server motherboard 200 A first power supply voltage can be provided, for example, the first power supply voltage is 12V_STBY voltage; when the first power supply module 102 receives the enable signal of the controller 202, the first power supply module 102 converts the first power supply voltage 12V_STBY to The first power supply voltage. The first power supply voltage is, for example, a 12V voltage, or may be a voltage of other values. The first power supply module 102 outputs the first power supply voltage to the load through the network card power supply interface 104. The load is, for example, a network card. or graphics card; thus powering the server's network card or graphics card before the server is powered on, that is, when the server is in the S5 state. When the second power supply module 103 receives the enable signal from the controller 202, the second power supply module 103 converts the first power supply voltage 12V_STBY into a second power supply voltage. The second power supply voltage is, for example, 3.3V voltage. It can be a voltage with other values; the second power supply module 103 outputs the second power supply voltage to the load through the network card power supply interface 104, and the load is, for example, a network card or a graphics card; thus, before the server is turned on, the server is in When the server is in the S5 state, it supplies power to the server's network card or display card; therefore, when the server is in the S5 state, it can meet the power consumption requirements of the network card or display card, and the server's network card or display card can operate normally. run.

並且,控制器202例如為基板管理控制器(Baseboard Management Controller,BMC),在伺服器未開機的狀態下,對伺服器進行韌體升級、查看機器設備等一些操作。伺服器處於S5狀態時,第一供電模組102和第二供電模組103在接收到控制器202的致能訊號時,才會為網路卡供電,使得網路卡可以運行;第一供電模組102和第二供電模組103在接收到控制器202的關機訊號時,停止輸出第一供電電壓和第二供電電壓,使得網路卡關機,從而通過第一供電模組102和第二供電模組103來控制網路卡關機;控制器202也可以單獨控制網路卡進行關機操作;因此,可以實現在S5狀態下對網路卡進行開關處理。Moreover, the controller 202 is, for example, a Baseboard Management Controller (BMC). When the server is not powered on, it performs some operations such as firmware upgrade on the server and checking of machine equipment. When the server is in the S5 state, the first power supply module 102 and the second power supply module 103 will only provide power to the network card when they receive the enable signal from the controller 202, so that the network card can operate; the first power supply module When receiving the shutdown signal from the controller 202, the module 102 and the second power supply module 103 stop outputting the first power supply voltage and the second power supply voltage, causing the network card to shut down. The power supply module 103 controls the network card to shut down; the controller 202 can also independently control the network card to shut down; therefore, the network card can be switched on and off in the S5 state.

需要說明的是,圖1只對轉接卡設置有兩個第一供電模組102和兩個網路卡供電接口104的情況進行示意,但並不進行限定,網路卡供電接口104的數量具體可以根據實際需要連接的網路卡數量進行確定。It should be noted that Figure 1 only illustrates the case where the adapter card is provided with two first power supply modules 102 and two network card power supply interfaces 104, but does not limit the number of network card power supply interfaces 104. The details can be determined based on the actual number of network cards that need to be connected.

本實施例的技術方案,通過在轉接卡上設置第一供電模組和第二供電模組,在伺服器開機前,如果伺服器接入交流電,伺服器主板的控制器就會發送致能訊號至第一供電模組和第二供電模組,第一供電模組和第二供電模組在接收到致能訊號後,第一供電模組將伺服器主板上第一電源模組提供的第一電源電壓轉換為第一供電電壓,並將第一供電電壓輸出至網路卡供電接口,為網路卡供電;第二供電模組將第一電源電壓轉換為第二供電電壓,並將第二供電電壓輸出至網路卡供電接口,為網路卡供電;從而在伺服器開機前,為伺服器的網路卡或顯示卡供電;因此,在伺服器開機前,伺服器的網路卡或顯示卡可以正常運行。並且,伺服器主板的控制器可以通過第一供電模組和第二供電模組來控制網路卡關機;因此,可以實現在伺服器開機前的S5狀態下,對網路卡進行開關處理。本實施例的技術方案解決了轉接卡與無法單獨供電的器件連接時,器件無法在伺服器開機前的S5狀態下正常運行的問題;實現了在伺服器開機前,為伺服器的網路卡或顯示卡供電,實現在伺服器開機前的S5狀態下,對網路卡進行開關處理。The technical solution of this embodiment is to set the first power supply module and the second power supply module on the adapter card. Before the server is started, if the server is connected to AC power, the controller of the server mainboard will send an enable The signal is sent to the first power supply module and the second power supply module. After the first power supply module and the second power supply module receive the enable signal, the first power supply module uses the power provided by the first power module on the server motherboard. The first power supply voltage is converted into a first power supply voltage, and the first power supply voltage is output to the network card power supply interface to power the network card; the second power supply module converts the first power supply voltage into a second power supply voltage, and The second power supply voltage is output to the network card power supply interface to provide power for the network card; thus, before the server is turned on, the server's network card or graphics card is powered; therefore, before the server is turned on, the server's network The card or graphics card is functioning normally. Moreover, the controller of the server mainboard can control the network card to shut down through the first power supply module and the second power supply module; therefore, the network card can be switched on and off in the S5 state before the server is started. The technical solution of this embodiment solves the problem that when the adapter card is connected to a device that cannot be powered independently, the device cannot operate normally in the S5 state before the server is started; it realizes the network for the server before the server is started. Power supply is provided by the card or graphics card, enabling the network card to be switched on and off in the S5 state before the server is powered on.

圖2是本發明實施例提供的又一種轉接卡的結構示意圖,可選地,參考圖2,轉接卡100還包括輸入輸出擴展模組105;輸入輸出擴展模組105的輸入端與控制器202連接,輸入輸出擴展模組105的輸出端與第一供電模組102的致能端電連接,輸入輸出擴展模組105的輸出端還與第二供電模組103的致能端電連接;輸入輸出擴展模組105用於將控制器202的控制訊號轉換為致能訊號,並將致能訊號輸出至第一供電模組102和第二供電模組103。Figure 2 is a schematic structural diagram of another adapter card provided by an embodiment of the present invention. Optionally, referring to Figure 2, the adapter card 100 also includes an input and output expansion module 105; the input terminal and control of the input and output expansion module 105 The output terminal of the input and output expansion module 105 is electrically connected to the enabling terminal of the first power supply module 102, and the output terminal of the input and output expansion module 105 is also electrically connected to the enabling terminal of the second power supply module 103. ; The input and output expansion module 105 is used to convert the control signal of the controller 202 into an enable signal, and output the enable signal to the first power supply module 102 and the second power supply module 103.

具體地,輸入輸出擴展模組105例如包括輸入輸出(Input/Output,I/O)擴展器,輸入輸出擴展模組105可以與控制器202進行通信,例如為串行通信,輸入輸出擴展模組105接收控制器發送的控制訊號,並將控制器202發送的控制訊號轉換為致能訊號。當控制器202獲知伺服器接入交流電源後,控制器202輸出開啟的控制訊號至輸入輸出擴展模組105,輸入輸出擴展模組105將控制訊號轉換為致能訊號,第一供電模組102和第二供電模組103接收到致能訊號後,第一供電模組102輸出第一供電電壓至網路卡供電接口104,第二供電模組103輸出第二供電電壓至網路卡供電接口104,從而為網路卡或顯示卡進行供電,使得在伺服器在開機前的S5狀態下,網路卡可以正常運行。Specifically, the input/output expansion module 105 includes, for example, an input/output (I/O) expander. The input/output expansion module 105 can communicate with the controller 202 , such as serial communication. The input/output expansion module 105 receives the control signal sent by the controller and converts the control signal sent by the controller 202 into an enable signal. When the controller 202 learns that the server is connected to the AC power supply, the controller 202 outputs a turn-on control signal to the input and output expansion module 105. The input and output expansion module 105 converts the control signal into an enable signal. The first power supply module 102 After the second power supply module 103 receives the enable signal, the first power supply module 102 outputs the first power supply voltage to the network card power supply interface 104, and the second power supply module 103 outputs the second power supply voltage to the network card power supply interface. 104, thereby providing power to the network card or display card, so that the network card can operate normally in the S5 state before the server is started.

可選地,參考圖2,轉接卡100還包括控制器接口106;輸入輸出擴展模組105的輸入端通過控制器接口106與控制器202連接;輸入輸出擴展模組105的電源端通過控制器接口106與伺服器主板200的第二電源模組203電連接,控制器接口106用於將第二電源模組203的第二電源電壓輸出至輸入輸出擴展模組105的電源端,以在伺服器開機前,為輸入輸出擴展模組105供電。Optionally, referring to Figure 2, the adapter card 100 also includes a controller interface 106; the input end of the input and output expansion module 105 is connected to the controller 202 through the controller interface 106; the power end of the input and output expansion module 105 is connected through the control The controller interface 106 is electrically connected to the second power module 203 of the server motherboard 200. The controller interface 106 is used to output the second power supply voltage of the second power module 203 to the power end of the input and output expansion module 105, so as to Before the server is powered on, power is supplied to the input and output expansion module 105.

具體地,輸入輸出擴展模組105可以通過控制器接口106獲取控制器202輸出的控制訊號,並且可以通過控制器接口106獲取第二電源模組203提供的第二電源電壓,第二電源電壓例如為3.3V_STBY,使得在伺服器開機前,輸入輸出擴展模組105可以正常運行。Specifically, the input and output expansion module 105 can obtain the control signal output by the controller 202 through the controller interface 106, and can obtain the second power supply voltage provided by the second power supply module 203 through the controller interface 106. The second power supply voltage is, for example, is 3.3V_STBY, so that the input and output expansion module 105 can operate normally before the server is turned on.

可選地,參考圖2,轉接卡100還包括溫度檢測模組107;溫度檢測模組107通過控制器接口106與控制器202連接,溫度檢測模組107用於檢測轉接卡的溫度訊息,並將溫度訊息發送至控制器202;溫度檢測模組107的電源端通過控制器接口106與第二電源模組203電連接,控制器接口106用於將第二電源電壓輸出至溫度檢測模組107的電源端,以在伺服器開機前,為溫度檢測模組107供電。Optionally, referring to Figure 2, the adapter card 100 also includes a temperature detection module 107; the temperature detection module 107 is connected to the controller 202 through the controller interface 106, and the temperature detection module 107 is used to detect the temperature information of the adapter card. , and sends the temperature information to the controller 202; the power end of the temperature detection module 107 is electrically connected to the second power module 203 through the controller interface 106, and the controller interface 106 is used to output the second power supply voltage to the temperature detection module. The power terminal of the group 107 is used to provide power to the temperature detection module 107 before the server is started.

具體地,溫度檢測模組107如包括溫度傳感器,可以檢測轉接卡的溫度訊息,並通過控制器接口106將溫度訊息發送至控制器202,使得控制器202可以實時獲知轉接卡的溫度狀態,對轉接卡的溫度進行監控,在轉接卡的溫度過高時,可以及時採取措施,例如控制散熱風扇運行等。並且,溫度檢測模組107可以通過控制器接口106獲取第二電源模組203提供的第二電源電壓,使得在伺服器開機前的S5狀態下,溫度檢測模組107可以正常運行。Specifically, if the temperature detection module 107 includes a temperature sensor, it can detect the temperature information of the adapter card, and send the temperature information to the controller 202 through the controller interface 106, so that the controller 202 can know the temperature status of the adapter card in real time. , monitor the temperature of the adapter card. When the temperature of the adapter card is too high, timely measures can be taken, such as controlling the operation of the cooling fan. In addition, the temperature detection module 107 can obtain the second power supply voltage provided by the second power module 203 through the controller interface 106, so that in the S5 state before the server is started, the temperature detection module 107 can operate normally.

可選地,參考圖2,轉接卡100還包括存儲模組108;存儲模組108通過控制器接口106與控制器202連接,存儲模組108用於存儲轉接卡的配置訊息;存儲模組108的電源端通過控制器接口106與第二電源模組203電連接,控制器接口106用於將第二電源電壓輸出至存儲模組108的電源端,以在伺服器開機前,為存儲模組108供電。Optionally, referring to Figure 2, the adapter card 100 also includes a storage module 108; the storage module 108 is connected to the controller 202 through the controller interface 106, and the storage module 108 is used to store configuration information of the adapter card; the storage module The power end of the group 108 is electrically connected to the second power module 203 through the controller interface 106. The controller interface 106 is used to output the second power voltage to the power end of the storage module 108 to provide storage power before the server is started. Module 108 is powered.

具體地,存儲模組108例如包括記憶體,例如為可程式化唯讀記憶體,存儲模組108通過控制器接口106可以獲取控制器202發送的轉接卡100的配置訊息,例如包括轉接卡100的序列號等訊息。並且,存儲模組108可以通過控制器接口106獲取第二電源模組203提供的第二電源電壓,使得在伺服器開機前的S5狀態下,存儲模組108可以正常運行。Specifically, the storage module 108 includes a memory, such as a programmable read-only memory. The storage module 108 can obtain the configuration information of the adapter card 100 sent by the controller 202 through the controller interface 106 , including, for example, the adapter card 100 . Information such as the serial number of card 100. In addition, the storage module 108 can obtain the second power supply voltage provided by the second power module 203 through the controller interface 106, so that the storage module 108 can operate normally in the S5 state before the server is started.

此外,溫度檢測模組107和存儲模組108具有各自的地址訊息,控制器202根據地址訊息可以與對應的溫度檢測模組107或存儲模組108進行通信。In addition, the temperature detection module 107 and the storage module 108 have respective address information, and the controller 202 can communicate with the corresponding temperature detection module 107 or the storage module 108 according to the address information.

可選地,參考圖2,轉接卡100還包括第一帶寬調節模組109和第二帶寬調節模組110;第一供電模組102的輸出端通過第一帶寬調節模組109與網路卡供電接口104電連接;第二供電模組103的輸出端通過第二帶寬調節模組110與網路卡供電接口104電連接。Optionally, referring to Figure 2, the adapter card 100 also includes a first bandwidth adjustment module 109 and a second bandwidth adjustment module 110; the output end of the first power supply module 102 is connected to the network through the first bandwidth adjustment module 109. The card power supply interface 104 is electrically connected; the output end of the second power supply module 103 is electrically connected to the network card power supply interface 104 through the second bandwidth adjustment module 110 .

具體地,第一帶寬調節模組109例如包括Slimline連接器,第二帶寬調節模組例如包括Slimline連接器,Slimline連接器可以進行帶寬調節,對第一供電模組102和第二供電模組103的輸出帶寬進行調節,使得網路卡供電接口104與網路卡相匹配,從而保證輸出的第一供電電壓和第二供電電壓的帶寬滿足網路卡的需求。Specifically, the first bandwidth adjustment module 109 includes, for example, a Slimline connector, and the second bandwidth adjustment module includes, for example, a Slimline connector. The Slimline connector can perform bandwidth adjustment, and the first power supply module 102 and the second power supply module 103 The output bandwidth is adjusted so that the network card power supply interface 104 matches the network card, thereby ensuring that the bandwidth of the output first power supply voltage and the second power supply voltage meets the needs of the network card.

可選地,參考圖2,第一供電模組102包括電子熔斷器電路。Optionally, referring to Figure 2, the first power supply module 102 includes an electronic fuse circuit.

具體地,第一供電模組102包括電子熔斷器(Efuse)電路,電子熔斷器電路集成過流、過熱及過壓保護等功能,在第一供電模組102輸出的第一供電電壓過大或第一供電電壓對應的電流過大時,採取保護措施,從而達到保護電路和轉接板的效果。Specifically, the first power supply module 102 includes an electronic fuse (Efuse) circuit. The electronic fuse circuit integrates functions such as overcurrent, overheating, and overvoltage protection. When the first power supply voltage output by the first power supply module 102 is too large or the third When the current corresponding to the supply voltage is too large, protective measures are taken to achieve the effect of protecting the circuit and the adapter board.

示例性的,由於第一供電電壓和其對應的電流較大,所以為每一個網路卡供電接口104設置對應的第一供電模組102,即第一供電模組102的數量與網路卡供電接口104的數量一致,有利於保證電路的穩定運行,從而保證網路卡的正常運行。For example, since the first power supply voltage and its corresponding current are relatively large, a corresponding first power supply module 102 is provided for each network card power supply interface 104, that is, the number of first power supply modules 102 is equal to the number of the network card. The number of power supply interfaces 104 is consistent, which is beneficial to ensuring the stable operation of the circuit, thereby ensuring the normal operation of the network card.

需要說明的是,圖2只對轉接卡設置有兩個第一供電模組102和兩個網路卡供電接口104的情況進行示意,但並不進行限定,網路卡供電接口104的數量具體可以根據實際需要連接的網路卡數量進行確定。It should be noted that Figure 2 only illustrates the case where the adapter card is provided with two first power supply modules 102 and two network card power supply interfaces 104, but does not limit the number of network card power supply interfaces 104. The details can be determined based on the actual number of network cards that need to be connected.

圖3是本發明實施例提供的一種轉接卡的控制方法的流程圖,參考圖1和圖3,轉接卡的控制方法用於控制本發明任意實施方案的轉接卡;控制方法由伺服器主板上的控制器執行;控制方法包括:Figure 3 is a flow chart of an adapter card control method provided by an embodiment of the present invention. Referring to Figures 1 and 3, the adapter card control method is used to control an adapter card in any embodiment of the present invention; the control method is provided by a servo Executed by the controller on the mainboard of the device; control methods include:

S301、在伺服器接入交流電源後,輸出致能訊號至第一供電模組和第二供電模組;以使第一供電模組輸出第一供電電壓至網路卡供電接口,以使第二供電模組輸出第二供電電壓至網路卡供電接口,進而在伺服器開機前,為伺服器的網路卡供電。S301. After the server is connected to the AC power supply, output an enable signal to the first power supply module and the second power supply module; so that the first power supply module outputs the first power supply voltage to the network card power supply interface, so that the second power supply module The second power supply module outputs the second power supply voltage to the network card power supply interface, and then supplies power to the network card of the server before the server is started.

具體地,轉接卡的控制方法由伺服器主板200上的控制器202執行,控制器202例如為基板管理控制器。在伺服器接入交流電源後,即伺服器的電源供應器(Power Supply Unit,PSU)接入交流電源後,控制器202就會獲知伺服器接入交流電源,即獲知伺服器進入S5狀態,控制器202就會輸出致能訊號至第一供電模組102,第一供電模組102就會將第一電源電壓12V_STBY轉換為第一供電電壓,第一供電電壓例如為12V電壓,也可以為其他數值的電壓,第一供電模組102通過網路卡供電接口104將第一供電電壓輸出至負載,負載例如為網路卡或顯示卡;從而在伺服器開機前,即伺服器處於S5狀態時,為伺服器的網路卡或顯示卡供電。當第二供電模組103接收到控制器202的致能訊號時,第二供電模組103就會將第一電源電壓12V_STBY轉換為第二供電電壓,第二供電電壓例如為3.3V電壓,也可以為其他數值的電壓;第二供電模組103通過網路卡供電接口104將第二供電電壓輸出至負載,負載例如為網路卡或顯示卡;從而在伺服器開機前,即伺服器處於S5狀態時,為伺服器的網路卡或顯示卡供電;因此,在伺服器處於S5狀態時,伺服器的網路卡或顯示卡可以正常運行。Specifically, the control method of the riser card is executed by the controller 202 on the server motherboard 200, and the controller 202 is, for example, a baseboard management controller. After the server is connected to the AC power supply, that is, after the server's power supply unit (PSU) is connected to the AC power supply, the controller 202 will know that the server is connected to the AC power supply, that is, it will know that the server has entered the S5 state. The controller 202 will output the enable signal to the first power supply module 102, and the first power supply module 102 will convert the first power supply voltage 12V_STBY into a first power supply voltage. The first power supply voltage may be, for example, 12V voltage, or it may be For voltages of other values, the first power supply module 102 outputs the first power supply voltage to the load through the network card power supply interface 104. The load is, for example, a network card or a graphics card; thus, before the server is turned on, the server is in the S5 state. to power the server's network card or graphics card. When the second power supply module 103 receives the enable signal from the controller 202, the second power supply module 103 converts the first power supply voltage 12V_STBY into a second power supply voltage. The second power supply voltage is, for example, 3.3V voltage. It can be a voltage with other values; the second power supply module 103 outputs the second power supply voltage to the load through the network card power supply interface 104, and the load is, for example, a network card or a graphics card; thus, before the server is turned on, the server is in When the server is in the S5 state, it supplies power to the server's network card or graphics card; therefore, when the server is in the S5 state, the server's network card or graphics card can operate normally.

在上述技術方案的基礎上,可選地,轉接卡的控制方法還包括:Based on the above technical solution, optionally, the control method of the adapter card also includes:

輸出關閉訊號至第一供電模組和第二供電模組,以控制網路卡關機。Output a shutdown signal to the first power supply module and the second power supply module to control the network card to shut down.

示例性的,參考圖1,在不需要使用網路卡時,伺服器主板的控制器202向第一供電模組102和第二供電模組103發送關機訊號,第一供電模組102和第二供電模組103在接收到控制器202的關機訊號時,停止輸出第一供電電壓和第二供電電壓,使得網路卡關機;從而通過第一供電模組102和第二供電模組103來控制網路卡關機,控制器202也可以單獨控制網路卡進行關機操作;因此,可以實現在伺服器開機前的S5狀態下,對網路卡進行開關處理。For example, referring to Figure 1, when the network card is not needed, the controller 202 of the server motherboard sends a shutdown signal to the first power supply module 102 and the second power supply module 103. The first power supply module 102 and the second power supply module 103 When receiving the shutdown signal from the controller 202, the second power supply module 103 stops outputting the first power supply voltage and the second power supply voltage, causing the network card to shut down; thus, the first power supply module 102 and the second power supply module 103 To control the shutdown of the network card, the controller 202 can also independently control the network card to shut down; therefore, the network card can be switched on and off in the S5 state before the server is started.

本發明實施例還提供了一種伺服器,伺服器包括本發明任意實施方案的轉接卡100,還包括伺服器主板200,伺服器主板200包括第一電源模組201和控制器202;第一電源模組201通過轉接卡100的電源接口101與轉接卡100的第一供電模組102的輸入端電連接,第一電源模組201用於在伺服器開機前,為第一供電模組102提供第一電源電壓;第一電源模組201通過電源接口101與轉接卡100的第二供電模組103的輸入端電連接,第一電源模組201用於在伺服器開機前,為第二供電模組103提供第一電源電壓;控制器202與第一供電模組102的致能端電連接,控制器202還與第二供電模組103的致能端電連接,控制器202用於在伺服器接入交流電源後,輸出致能訊號至第一供電模組102和第二供電模組103。An embodiment of the present invention also provides a server. The server includes the adapter card 100 of any embodiment of the present invention, and also includes a server mainboard 200. The server mainboard 200 includes a first power module 201 and a controller 202; first The power module 201 is electrically connected to the input end of the first power supply module 102 of the adapter card 100 through the power interface 101 of the adapter card 100. The first power module 201 is used to provide the first power supply module before the server is started. The group 102 provides a first power supply voltage; the first power module 201 is electrically connected to the input end of the second power supply module 103 of the adapter card 100 through the power interface 101. The first power module 201 is used to power on the server before the server is started. Provide the first power supply voltage to the second power supply module 103; the controller 202 is electrically connected to the enabling end of the first power supply module 102, and the controller 202 is also electrically connected to the enabling end of the second power supply module 103. The controller 202 is used for outputting an enable signal to the first power supply module 102 and the second power supply module 103 after the server is connected to the AC power supply.

本實施例提供的伺服器包括上述任意實施方案提供的轉接卡,本實施例提供的伺服器的實現原理和技術效果與上述實施方案類似,在此不再贅述。The server provided by this embodiment includes the adapter card provided by any of the above embodiments. The implementation principles and technical effects of the server provided by this embodiment are similar to those of the above embodiments, and will not be described again here.

應該理解,可以使用上面所示的各種形式的流程,重新排序、增加或刪除步驟。例如,本發明中記載的各步驟可以並行地執行也可以順序地執行也可以不同的次序執行,只要能夠實現本發明的技術方案所期望的結果,本文在此不進行限制。It should be understood that various forms of the process shown above may be used, with steps reordered, added or deleted. For example, each step described in the present invention can be executed in parallel, sequentially, or in different orders. As long as the desired results of the technical solution of the present invention can be achieved, there is no limitation here.

上述具體實施方式,並不構成對本發明保護範圍的限制。本領域技術人員應該明白的是,根據設計要求和其他因素,可以進行各種修改、組合、子組合和替代。任何在本發明的精神和原則之內所作的修改、等同替換和改進等,均應包含在本發明保護範圍之內。The above-mentioned specific embodiments do not constitute a limitation on the scope of the present invention. It will be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions are possible depending on design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

100:轉接卡 101:電源接口 102:第一供電模組 103:第二供電模組 104:網路卡供電接口 105:輸入輸出擴展模組 106:控制器接口 107:溫度檢測模組 108:存儲模組 109:第一帶寬調節模組 110:第二帶寬調節模組 200:伺服器主板 201:第一電源模組 202:控制器 203:第二電源模組 S301:步驟 100: Adapter card 101:Power interface 102: First power supply module 103: Second power supply module 104: Network card power supply interface 105: Input and output expansion module 106:Controller interface 107: Temperature detection module 108:Storage module 109: The first bandwidth adjustment module 110: Second bandwidth adjustment module 200:Server motherboard 201:First power module 202:Controller 203: Second power module S301: Step

為了更清楚地說明本發明實施例中的技術方案,下面將對實施例描述中所需要使用的附圖作簡單地介紹,顯而易見地,下面描述中的附圖僅僅是本發明的一些實施例,對於本領域具通常知識者來講,在不付出進步性貢獻的前提下,還可以根據這些附圖獲得其他的附圖。 圖1是本發明實施例提供的一種轉接卡的結構示意圖; 圖2是本發明實施例提供的又一種轉接卡的結構示意圖; 圖3是本發明實施例提供的一種轉接卡的控制方法的流程圖。 In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those with ordinary knowledge in the art, other drawings can be obtained based on these drawings without making any progressive contribution. Figure 1 is a schematic structural diagram of an adapter card provided by an embodiment of the present invention; Figure 2 is a schematic structural diagram of yet another adapter card provided by an embodiment of the present invention; Figure 3 is a flow chart of a control method for an adapter card provided by an embodiment of the present invention.

100:轉接卡 100: Adapter card

101:電源接口 101:Power interface

102:第一供電模組 102: First power supply module

103:第二供電模組 103: Second power supply module

104:網路卡供電接口 104: Network card power supply interface

200:伺服器主板 200:Server motherboard

201:第一電源模組 201:First power module

202:控制器 202:Controller

Claims (9)

一種轉接卡,其中,包括:電源接口、至少一個第一供電模組、第二供電模組、至少一個網路卡供電接口和輸入輸出擴展模組;所述第一供電模組的輸入端通過所述電源接口與伺服器主板的第一電源模組電連接,所述第一供電模組的輸出端與所述網路卡供電接口電連接,所述第一供電模組的致能端與所述伺服器主板的控制器連接;所述第一供電模組用於在接收到所述控制器的致能訊號時,將所述第一電源模組的第一電源電壓轉換為第一供電電壓,並將所述第一供電電壓輸出至所述網路卡供電接口,以在伺服器開機前,為所述伺服器的網路卡供電;所述第二供電模組的輸入端通過所述電源接口與所述第一電源模組電連接,所述第二供電模組的輸出端與所述網路卡供電接口電連接,所述第二供電模組的致能端與所述控制器連接;所述第二供電模組用於在接收到所述控制器的致能訊號時,將所述第一電源電壓轉換為第二供電電壓,並將所述第二供電電壓輸出至所述網路卡供電接口,以在所述伺服器開機前,為所述伺服器的網路卡供電;以及所述輸入輸出擴展模組的輸入端與所述控制器連接,所述輸入輸出擴展模組的輸出端與所述第一供電模組的致能端電連接,所述輸入輸出擴展模組的輸出端還與所述第二供電模組的致能端電連接;所述輸入輸出擴展模組用於將所述控制器的控制訊號轉換為所述致能訊號,並將所述致能訊號輸出至所述第一供電模組和所述第二供電模組。 An adapter card, which includes: a power interface, at least one first power supply module, a second power supply module, at least one network card power supply interface and an input and output expansion module; the input end of the first power supply module The power interface is electrically connected to the first power module of the server motherboard. The output end of the first power module is electrically connected to the network card power interface. The enabling end of the first power module Connected to the controller of the server mainboard; the first power supply module is used to convert the first power supply voltage of the first power module into a first power supply when receiving an enable signal from the controller. power supply voltage, and output the first power supply voltage to the network card power supply interface to power the network card of the server before the server is turned on; the input end of the second power supply module passes The power interface is electrically connected to the first power module, the output end of the second power supply module is electrically connected to the network card power supply interface, and the enabling end of the second power supply module is electrically connected to the Controller connection; the second power supply module is used to convert the first power supply voltage into a second power supply voltage when receiving an enable signal from the controller, and output the second power supply voltage to The network card power supply interface is used to power the network card of the server before the server is started; and the input end of the input and output expansion module is connected to the controller, and the input and output The output end of the expansion module is electrically connected to the enable end of the first power supply module, and the output end of the input and output expansion module is also electrically connected to the enable end of the second power supply module; the input The output expansion module is used to convert the control signal of the controller into the enable signal, and output the enable signal to the first power supply module and the second power supply module. 如請求項1所述的轉接卡,其中,還包括控制器接口; 所述輸入輸出擴展模組的輸入端通過所述控制器接口與所述控制器連接;所述輸入輸出擴展模組的電源端通過所述控制器接口與所述伺服器主板的第二電源模組電連接,所述控制器接口用於將所述第二電源模組的第二電源電壓輸出至所述輸入輸出擴展模組的電源端,以在所述伺服器開機前,為所述輸入輸出擴展模組供電。 The adapter card as described in request item 1, which also includes a controller interface; The input end of the input and output expansion module is connected to the controller through the controller interface; the power end of the input and output expansion module is connected to the second power module of the server motherboard through the controller interface. Set electrical connection, the controller interface is used to output the second power supply voltage of the second power module to the power end of the input and output expansion module, so as to provide the input voltage for the input before the server is started. Output expansion module power supply. 如請求項2所述的轉接卡,其中,還包括溫度檢測模組;所述溫度檢測模組通過所述控制器接口與所述控制器連接,所述溫度檢測模組用於檢測所述轉接卡的溫度訊息,並將所述溫度訊息發送至所述控制器;以及所述溫度檢測模組的電源端通過所述控制器接口與所述第二電源模組電連接,所述控制器接口用於將所述第二電源電壓輸出至所述溫度檢測模組的電源端,以在所述伺服器開機前,為所述溫度檢測模組供電。 The adapter card according to claim 2, further comprising a temperature detection module; the temperature detection module is connected to the controller through the controller interface, and the temperature detection module is used to detect the Adapt the temperature information of the adapter card and send the temperature information to the controller; and the power end of the temperature detection module is electrically connected to the second power module through the controller interface, and the control The server interface is used to output the second power supply voltage to the power end of the temperature detection module to provide power to the temperature detection module before the server is started. 如請求項2所述的轉接卡,其中,還包括存儲模組;所述存儲模組通過所述控制器接口與所述控制器連接,所述存儲模組用於存儲所述轉接卡的配置訊息;以及所述存儲模組的電源端通過所述控制器接口與所述第二電源模組電連接,所述控制器接口用於將所述第二電源電壓輸出至所述存儲模組的電源端,以在所述伺服器開機前,為所述存儲模組供電。 The adapter card according to claim 2, further comprising a storage module; the storage module is connected to the controller through the controller interface, and the storage module is used to store the adapter card configuration information; and the power end of the storage module is electrically connected to the second power module through the controller interface, and the controller interface is used to output the second power voltage to the storage module. The power terminal of the group is used to provide power to the storage module before the server is started. 如請求項1所述的轉接卡,其中,還包括第一帶寬調節模組和第二帶寬調節模組; 所述第一供電模組的輸出端通過所述第一帶寬調節模組與所述網路卡供電接口電連接;以及所述第二供電模組的輸出端通過所述第二帶寬調節模組與所述網路卡供電接口電連接。 The adapter card according to claim 1, further comprising a first bandwidth adjustment module and a second bandwidth adjustment module; The output end of the first power supply module is electrically connected to the network card power supply interface through the first bandwidth adjustment module; and the output end of the second power supply module is through the second bandwidth adjustment module. It is electrically connected to the power supply interface of the network card. 如請求項1所述的轉接卡,其中,所述第一供電模組包括電子熔斷器電路。 The adapter card according to claim 1, wherein the first power supply module includes an electronic fuse circuit. 一種轉接卡的控制方法,其中,用於控制如請求項1至6之任一項所述的轉接卡;所述轉接卡包括:電源接口、至少一個第一供電模組、第二供電模組和至少一個網路卡供電接口;所述第一供電模組的輸入端通過所述電源接口與伺服器主板的第一電源模組電連接,所述第一供電模組的輸出端與所述網路卡供電接口電連接,所述第一供電模組的致能端與所述伺服器主板的控制器連接;所述第二供電模組的輸入端通過所述電源接口與所述第一電源模組電連接,所述第二供電模組的輸出端與所述網路卡供電接口電連接,所述第二供電模組的致能端與所述控制器連接;所述控制方法由伺服器主板上的控制器執行;所述控制方法包括:在伺服器接入交流電源後,輸出致能訊號至所述第一供電模組和所述第二供電模組;以使所述第一供電模組輸出第一供電電壓至所述網路卡供電接口,以使所述第二供電模組輸出第二供電電壓至所述網路卡供電接口,進而在伺服器開機前,為所述伺服器的網路卡供電。 A control method for an adapter card, which is used to control the adapter card as described in any one of claims 1 to 6; the adapter card includes: a power interface, at least one first power supply module, a second A power supply module and at least one network card power supply interface; the input end of the first power supply module is electrically connected to the first power supply module of the server motherboard through the power interface, and the output end of the first power supply module It is electrically connected to the network card power supply interface, and the enabling end of the first power supply module is connected to the controller of the server motherboard; the input end of the second power supply module is connected to the power supply interface through the power interface. The first power supply module is electrically connected, the output end of the second power supply module is electrically connected to the network card power supply interface, and the enabling end of the second power supply module is connected to the controller; The control method is executed by the controller on the server mainboard; the control method includes: after the server is connected to the AC power supply, outputting an enable signal to the first power supply module and the second power supply module; so that The first power supply module outputs a first power supply voltage to the network card power supply interface, so that the second power supply module outputs a second power supply voltage to the network card power supply interface, and then before the server is turned on , powering the server's network card. 如請求項8所述的轉接卡的控制方法,其中,所述控制方法還包括: 輸出關閉訊號至所述第一供電模組和所述第二供電模組,以控制所述網路卡關機。 The control method of the adapter card as described in claim 8, wherein the control method further includes: Output a shutdown signal to the first power supply module and the second power supply module to control the network card to shut down. 一種伺服器,其中,包括如請求項1至6之任一項所述的轉接卡,還包括伺服器主板,所述伺服器主板包括第一電源模組和控制器;所述第一電源模組通過所述轉接卡的電源接口與所述轉接卡的第一供電模組的輸入端電連接,所述第一電源模組用於在所述伺服器開機前,為所述第一供電模組提供第一電源電壓;所述第一電源模組通過所述電源接口與所述轉接卡的第二供電模組的輸入端電連接,所述第一電源模組用於在所述伺服器開機前,為所述第二供電模組提供第一電源電壓;以及所述控制器與所述第一供電模組的致能端電連接,所述控制器還與所述第二供電模組的致能端電連接,所述控制器用於在所述伺服器接入交流電源後,輸出致能訊號至所述第一供電模組和所述第二供電模組。 A server, which includes the adapter card according to any one of claims 1 to 6, and a server mainboard, which includes a first power module and a controller; the first power supply The module is electrically connected to the input end of the first power supply module of the adapter card through the power interface of the adapter card. The first power module is used to provide power to the third power supply module before the server is started. A power supply module provides a first power supply voltage; the first power supply module is electrically connected to the input end of the second power supply module of the adapter card through the power interface, and the first power supply module is used for Before the server is started, the first power supply voltage is provided to the second power supply module; and the controller is electrically connected to the enabling end of the first power supply module, and the controller is also connected to the third power supply module. The enabling terminals of the two power supply modules are electrically connected, and the controller is configured to output an enabling signal to the first power supply module and the second power supply module after the server is connected to the AC power supply.
TW111134453A 2022-09-13 2022-09-13 Server, adapter card and control method thereof TWI817714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW111134453A TWI817714B (en) 2022-09-13 2022-09-13 Server, adapter card and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW111134453A TWI817714B (en) 2022-09-13 2022-09-13 Server, adapter card and control method thereof

Publications (2)

Publication Number Publication Date
TWI817714B true TWI817714B (en) 2023-10-01
TW202411855A TW202411855A (en) 2024-03-16

Family

ID=89857885

Family Applications (1)

Application Number Title Priority Date Filing Date
TW111134453A TWI817714B (en) 2022-09-13 2022-09-13 Server, adapter card and control method thereof

Country Status (1)

Country Link
TW (1) TWI817714B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI313815B (en) * 2005-01-25 2009-08-21 Mitac Int Corp Expansion card with hyper transport interface
US20160132454A1 (en) * 2014-11-11 2016-05-12 Allied Telesis Holdings Kabushiki Kaisha Adapter card for thin computing devices
CN107346292A (en) * 2016-05-06 2017-11-14 广达电脑股份有限公司 Server system and its computer implemented method
CN110609801A (en) * 2019-08-09 2019-12-24 苏州浪潮智能科技有限公司 Adapter plate and server system
CN113568847A (en) * 2021-09-22 2021-10-29 苏州浪潮智能科技有限公司 Network card and processor interconnection device and server

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI313815B (en) * 2005-01-25 2009-08-21 Mitac Int Corp Expansion card with hyper transport interface
US20160132454A1 (en) * 2014-11-11 2016-05-12 Allied Telesis Holdings Kabushiki Kaisha Adapter card for thin computing devices
CN107346292A (en) * 2016-05-06 2017-11-14 广达电脑股份有限公司 Server system and its computer implemented method
CN110609801A (en) * 2019-08-09 2019-12-24 苏州浪潮智能科技有限公司 Adapter plate and server system
CN113568847A (en) * 2021-09-22 2021-10-29 苏州浪潮智能科技有限公司 Network card and processor interconnection device and server

Also Published As

Publication number Publication date
TW202411855A (en) 2024-03-16

Similar Documents

Publication Publication Date Title
CN102129274B (en) Server, server subassembly and fan speed control method
US8782449B2 (en) Power supply system with a plurality of power supply units capable of powering a plurality of load units depending on the type and operation state of each load unit
TW463097B (en) Hot plug control of MP based computer system
US7340620B2 (en) Rapid load reduction for power-over-LAN system using lower and higher priority states for ports
US20120137159A1 (en) Monitoring system and method of power sequence signal
KR100373995B1 (en) Hot-pluggable voltage regulator module
US10481649B2 (en) Computer system, expansion component, auxiliary supply component and use thereof
CN104571273A (en) Fan controller and server system provided with same
CN115224555A (en) Power supply adapter board, electronic equipment and power supply method
CN110401260A (en) A kind of server backup power source and server power supply
TW201011520A (en) Power saving device and method
TW201729097A (en) Rack
TWI817714B (en) Server, adapter card and control method thereof
CN117331423A (en) Power supply method and device of PCIE equipment, storage medium and electronic device
CN218824636U (en) Power supply detection device for server hard disk backboard
CN113687706B (en) Device and method for automatically adjusting whether NCSI is opened or not
TWI753606B (en) Master-slave interchangeable power supply device and its host, master-slave interchangeable power supply method and computer-readable recording medium
US20130144457A1 (en) Server system for updating heat dissipation solution
CN104679123A (en) Mainboard and data burning method thereof
CN103683976A (en) Universal power supply system
CN115421568A (en) Adapter card, control method thereof and server
CN104914970A (en) Powering-on and powering-off device and method for PCIE slots and main board
CN112115091A (en) Server and PCIE system thereof
CN114676009B (en) CPU test system and server
CN215729734U (en) Core board and server