TWI789820B - Adjustment hole position water collection line row structure and its construction method - Google Patents

Adjustment hole position water collection line row structure and its construction method Download PDF

Info

Publication number
TWI789820B
TWI789820B TW110125346A TW110125346A TWI789820B TW I789820 B TWI789820 B TW I789820B TW 110125346 A TW110125346 A TW 110125346A TW 110125346 A TW110125346 A TW 110125346A TW I789820 B TWI789820 B TW I789820B
Authority
TW
Taiwan
Prior art keywords
base
water collection
free
collection line
cutting
Prior art date
Application number
TW110125346A
Other languages
Chinese (zh)
Other versions
TW202302964A (en
Inventor
蘇正勝
Original Assignee
蘇宣維
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 蘇宣維 filed Critical 蘇宣維
Priority to TW110125346A priority Critical patent/TWI789820B/en
Application granted granted Critical
Publication of TWI789820B publication Critical patent/TWI789820B/en
Publication of TW202302964A publication Critical patent/TW202302964A/en

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本發明為有關一種調校孔位集水線排結構及其工法,主要結構包括一集水線排底座,集水線排底座上形成有一底座集水區、一底座調校孔位限制區、一底座切片夾合部、及至少一底座結合部,集水線排底座之一側處還設有一固定座,固定座上設有一固定座調校孔位對應區、一固定座切片夾合部、一固定座轉動限位擋止部、及至少一固定座結合部,固定座上還放置有一自由裁切片,自由裁切片上形成有一自由裁切部、一裁切片轉動限位擋止部、及一裁切片出水部。藉上述結構,使用者能利用自由裁切片可讓使用者自行裁切的功能,來達到360度的全方位調整校對效果,藉此提高使用上的方便性與降低製造的成本。 The present invention relates to a water collection line row structure for adjusting hole positions and its construction method. The main structure includes a water collection line row base, a base water collection area, a base adjustment hole position restriction area, A base slice clamping part, and at least one base joint part, one side of the water collection line base is also provided with a fixing seat, and the fixing seat is provided with a corresponding area for adjusting the hole position of the fixing seat, and a slice clamping part of the fixing seat , a fixed seat rotation limit stop part, and at least one fixed seat joint part, a free cutting piece is also placed on the fixed seat, a free cutting part, a cutting piece rotation limit stop part, and a water outlet part of a cutting piece. With the above structure, the user can use the function of the free-cutting sheet to allow the user to cut by himself to achieve a 360-degree all-round adjustment and proofreading effect, thereby improving the convenience of use and reducing the manufacturing cost.

Description

調校孔位集水線排結構及其工法 Adjusting hole position water collection line row structure and its construction method

本發明為提供一種調校孔位集水線排結構及其工法,尤指一種使用上更加方便快速及減少製造成本的調校孔位集水線排結構及其工法。 The present invention provides a water-collecting row structure for adjusting hole positions and a construction method thereof, in particular to a water-collecting line row structure for adjusting hole positions and a construction method thereof which are more convenient and quick to use and reduce manufacturing costs.

按,在建築物製造的過程中,有許多設備都需要事先規劃好,例如自來水管路、及排水管路。且此種管路設備往往都是直接埋設於地板上或是相應的位置處,因此之後再進行裝潢或是改建之類的動作時,時常要配合這類已經埋設好的管路來設置相對應的承接結構。 Press, in the process of building manufacturing, there are many equipments that need to be planned in advance, such as water pipes and drainage pipes. And this kind of pipeline equipment is often directly buried on the floor or at the corresponding position, so when doing decoration or reconstruction later, it is often necessary to set up the corresponding pipeline in conjunction with this kind of pipeline that has already been buried. The undertaking structure.

但因為每種建築物的規劃方式都不完全相同,所以一般的水電廠商在裝設時,都需要依照現場狀況準備各種相對應類型的承接結構,例如需要準備各種尺寸的集排水槽來連接事先埋設好的排水管路。但是由於建築物埋設之規劃方式種類眾多且位置無法達到一致性,若是要針對每種類型與尺寸的排水管路都製造出一種相對應的集排水槽,在製造成本上會大幅的提升。並且若是在施工現場發現有尺寸上的錯誤(例如規劃時的量測錯誤、或埋設時的位置錯誤)或需配合其他建材之規格性,來調整最佳適當位置達到美觀之效果時(例如淋浴隔間位置、或舖面磁磚完整性、等分尺寸、調整間隔),都無法根據現場狀況來進行有效的調整動作,皆利用打除重新修正排水管位置或使用錯位方式進行安裝,此方式往往都會造成浴室地坪漏水、排水不良、或落水頭設備無法安裝之情形。 However, because the planning methods of each building are different, general hydropower manufacturers need to prepare various corresponding types of receiving structures according to the site conditions during installation. Buried drainage pipes. However, due to the variety of planning methods for building burial and the inconsistency of locations, if a corresponding collection and drainage tank is to be manufactured for each type and size of drainage pipeline, the manufacturing cost will be greatly increased. And if there is a dimensional error found on the construction site (such as a measurement error during planning, or a wrong location during embedding) or when it is necessary to adjust the best and proper position to achieve an aesthetic effect (such as a shower) in accordance with the specifications of other building materials The position of the compartment, or the integrity of the tiles on the pavement, the equal size, and the adjustment of the interval) cannot be adjusted effectively according to the site conditions. They all use removal to re-correct the position of the drain pipe or use a dislocation method for installation. This method is often It will cause water leakage on the bathroom floor, poor drainage, or failure to install the water head equipment.

是以,要如何解決上述習用之問題與缺失,即為本發明之申請人與從事此行業之相關廠商所亟欲研究改善之方向所在者。 Therefore, how to solve the above-mentioned conventional problems and deficiencies is the direction that the applicant of the present invention and related manufacturers engaged in this industry want to research and improve urgently.

故,本發明之發明人有鑑於上述缺失,乃蒐集相關資料,經由多方評估及考量,並以從事於此行業累積之多年經驗,經由不斷試作及修改,始設計出此種使用上更加有效率且製造成本較低的調校孔位集水線排結構及其工法的發明專利者。 Therefore, in view of the above-mentioned shortcomings, the inventor of the present invention collected relevant information, evaluated and considered in many ways, and based on years of experience accumulated in this industry, through continuous trial and modification, he designed this kind of more efficient use The invention patent holder of the adjustment hole position water collection line row structure and its construction method with low manufacturing cost.

本發明之主要目的在於:利用可配合環境自行裁切的自由裁切片,來提升安裝時的效率與降低製造上的成本,並透過裁切片轉動限位擋止部配合固定座轉動限位擋止部防止自由裁切片旋轉,以便於裝設及拆卸各種附加之排水本體設備。 The main purpose of the present invention is to improve the efficiency of installation and reduce the cost of manufacturing by using free-cutting pieces that can be cut by themselves according to the environment. The part prevents the rotation of the free-cut slices, so as to facilitate the installation and disassembly of various additional drainage body equipment.

為達成上述目的,本發明之主要結構包括:一集水線排底座、一形成於該集水線排底座上的底座調校孔位限制區、一形成於集水線排底座上並位於底座調校孔位限制區之一側處的底座切片夾合部、至少一設於集水線排底座上的底座結合部、一設於集水線排底座之一側處的固定座、一形成於固定座上的固定座調校孔位對應區、一形成於固定座上的固定座切片夾合部、至少一設於固定座上的固定座結合部、一設於固定座上的固定座轉動限位擋止部、一供放置於固定座上的自由裁切片、一形成於自由裁切片上的自由裁切部、一形成於自由裁切片上的裁切片出水部、及一設於自由裁切片上的裁切片轉動限位擋止部。 In order to achieve the above purpose, the main structure of the present invention includes: a water collection line base, a base adjustment hole position restriction area formed on the water collection line base, a water collection line base formed on the base and located on the base The clamping part of the base slice at one side of the restricted area of the adjustment hole position, at least one base joint part arranged on the base of the water collection line row, one fixing seat provided at one side of the base of the water collection line row, one forming The corresponding area of the fixing seat adjustment hole position on the fixing seat, a section clamping part of the fixing seat formed on the fixing seat, at least one connecting part of the fixing seat arranged on the fixing seat, and a fixing seat arranged on the fixing seat Rotation limit stop part, a free cutting section for placing on the fixed seat, a free cutting section formed on the free cutting section, a cutting section water outlet formed on the free cutting section, and a free cutting section formed on the free cutting section Cutting piece rotation limit stop on the cutting piece.

藉由上述之結構,使用者可先將自由裁切片之裁切片出水部置於建築物的排水管路中,並將集水線排底座放置於自由裁切片之上,然後再用自由裁切片與底座調校孔位限制區的相互配合,對照現場環境相關位置來進行調校孔位的動作,並可利用底座調校孔位限制區在自由裁切部的表面上繪製標記出調校位置與需要裁切掉的區域,藉此來達到全方向360度的調整校對效果。 With the above structure, the user can first place the water outlet of the free-cutting piece in the drainage pipe of the building, and place the base of the water collection line on the free-cutting piece, and then use the free-cutting piece Cooperate with the restricted area of the adjustment hole position of the base, adjust the hole position according to the relevant position of the site environment, and use the restricted area of the adjustment hole position of the base to draw and mark the adjustment position on the surface of the free cutting part And the area that needs to be cut off, so as to achieve the adjustment and proofreading effect of 360 degrees in all directions.

之後再將自由裁切部上需要裁切的區域裁切掉後,就能將自由裁切片放置於固定座上,並利用固定座結合部及底座結合部將固定座固定於集水線排底座的一側處,此時就能利用底座切片夾合部及固定座切片夾合部固定住自由裁切片,並將集水線排底座固定於調整校對後的對應區域上,此時裁切片出水部就會對準於排水管路處,即能透過此種方式,快速的進行安裝調整校對的動作,來提高使用上的方便性。 After cutting off the area that needs to be cut on the free cutting part, the free cutting piece can be placed on the fixing seat, and the fixing seat can be fixed to the water collection line base by using the fixing seat joint part and the base joint part At this time, the free-cutting section can be fixed by using the clamping part of the base slice and the clamping part of the fixed seat, and the base of the water-collecting line can be fixed on the corresponding area after adjustment and calibration. In this way, the installation, adjustment and calibration can be performed quickly to improve the convenience of use.

並由於使用者能根據狀況自行調整校對自由裁切片的位置,來進 行調整校對的動作,就能大幅提高使用上的便利性。而自由裁切片放置於固定座上時,因此只需同時製造同一種尺寸的自由裁切片就能應付各種類型的狀況來進行調整裁切,所以也能大幅減少製造時的成本,還能利用固定座轉動限位擋止部及裁切片轉動限位擋止部的相互擋止效果,來防止自由裁切片旋轉,並可配合設備結合部,來快速簡便的裝設更換各種不同功能之相對應排水設備,以達到組裝設備模組化之實用性及進步性。 And because the user can adjust the position of the proofreading free-cutting slice according to the situation, to carry out The convenience of use can be greatly improved by performing adjustment and proofreading actions. When the free-cutting piece is placed on the fixed seat, it only needs to manufacture the same size free-cutting piece at the same time to adjust and cut according to various types of conditions, so it can also greatly reduce the cost of manufacturing, and it can also use the fixed The mutual blocking effect of the seat rotation limit stop part and the cutting piece rotation limit stop part prevents the free cutting piece from rotating, and can cooperate with the equipment joint part to quickly and easily install and replace the corresponding drainage of various functions equipment to achieve the practicability and advancement of modularized assembly equipment.

藉由上述技術,可針對習用集排水槽製造成本較高與安裝上較為麻煩的問題點加以突破。 With the above-mentioned technology, a breakthrough can be made to solve the problems of high manufacturing cost and troublesome installation of conventional collection and drainage tanks.

1、1a:集水線排底座 1. 1a: Water collection line row base

11:底座集水區 11: Base catchment area

12:底座調校孔位限制區 12: Restricted area of base adjustment holes

13:底座切片夾合部 13: Base slice clamping part

14、14a:底座結合部 14, 14a: base junction

2、2a:固定座 2, 2a: fixed seat

21:固定座調校孔位對應區 21: The corresponding area of the fixing seat adjustment hole position

22:固定座切片夾合部 22: Fixing seat slice clamping part

23、23a:固定座結合部 23, 23a: The junction of the fixed seat

24:固定座切片容置區 24: Holder section holding area

25、25a、25d:固定座轉動限位擋止部 25, 25a, 25d: the rotation limit stop part of the fixed seat

3、3a、3b、3c:自由裁切片 3, 3a, 3b, 3c: Free cut slices

31:自由裁切部 31:Free cutting department

32、32a、32d:裁切片轉動限位擋止部 32, 32a, 32d: cutting piece rotation limit stopper

33、33a、33c:裁切片出水部 33, 33a, 33c: water outlet part of cut piece

34b:設備結合部 34b: Equipment joint

35b、35c:設備容置區 35b, 35c: equipment accommodation area

36b:設備承載部 36b: Equipment carrying part

4:排水管路 4: Drainage pipeline

5a:排水蓋 5a: Drain cover

51a:排水蓋支撐部 51a: Drain cover support

6、6a:結合元件 6, 6a: Binding elements

7b:排水本體設備 7b: Drainage body equipment

8c:排水過濾設備 8c: Drain filter equipment

第一圖 係為本發明較佳實施例之立體圖。 The first figure is a perspective view of a preferred embodiment of the present invention.

第二圖 係為本發明較佳實施例之分解圖。 The second figure is an exploded view of a preferred embodiment of the present invention.

第三圖 係為本發明較佳實施例之步驟流程圖。 The third figure is a flow chart of the steps of the preferred embodiment of the present invention.

第四圖 係為本發明較佳實施例之自由裁切片示意圖。 The fourth figure is a schematic diagram of a free-cut slice according to a preferred embodiment of the present invention.

第五圖 係為本發明較佳實施例之對齊示意圖。 The fifth figure is a schematic diagram of the alignment of the preferred embodiment of the present invention.

第六圖 係為本發明較佳實施例之固定示意圖。 The sixth figure is a fixed schematic diagram of a preferred embodiment of the present invention.

第七圖 係為本發明較佳實施例之安裝示意圖。 The seventh figure is a schematic diagram of the installation of the preferred embodiment of the present invention.

第八圖 係為本發明再一較佳實施例之分解圖。 Figure 8 is an exploded view of another preferred embodiment of the present invention.

第九圖 係為本發明再一較佳實施例之俯視圖。 Figure 9 is a top view of another preferred embodiment of the present invention.

第十圖 係為本發明又一較佳實施例之自由裁切片示意圖。 Figure 10 is a schematic diagram of a free-cut slice of another preferred embodiment of the present invention.

第十一圖 係為本發明又一較佳實施例之剖面示意圖。 Figure 11 is a schematic cross-sectional view of another preferred embodiment of the present invention.

第十二圖 係為本發明另一較佳實施例之剖面示意圖。 Figure 12 is a schematic cross-sectional view of another preferred embodiment of the present invention.

第十三圖 係為本發明更一較佳實施例之分解圖。 Figure 13 is an exploded view of a further preferred embodiment of the present invention.

為達成上述目的及功效,本發明所採用之技術手段及構造,茲繪圖就本發明較佳實施例詳加說明其特徵與功能如下,俾利完全了解。 In order to achieve the above-mentioned purpose and effect, the technical means and structure adopted by the present invention are hereby illustrated in detail with respect to the preferred embodiments of the present invention. Its features and functions are as follows, so that it can be fully understood.

請參閱第一圖至第七圖所示,係為本發明較佳實施例之立體圖至安裝示意圖,由圖中可清楚看出本發明係包括: Please refer to shown in the first figure to the seventh figure, which is a perspective view to a schematic diagram of installation of a preferred embodiment of the present invention. It can be clearly seen that the present invention comprises:

一集水線排底座1,本實施例之集水線排底座1以金屬製的殼體作為舉例,但其並不設限; A water-collecting line base 1, the water-collecting line base 1 of the present embodiment takes a metal shell as an example, but it is not limited;

一形成於集水線排底座1上的底座集水區11; A base water collection area 11 formed on the base 1 of the water collection line;

一形成於集水線排底座1上並位於底座集水區11中的底座調校孔位限制區12,本實施例之底座調校孔位限制區12以形成於底座集水區11中的方形孔洞作為舉例,但其並不設限; A base adjustment hole restriction area 12 formed on the base 1 of the water collection line and located in the base water collection area 11. The base adjustment hole restriction area 12 of this embodiment is formed in the base water collection area 11 A square hole is given as an example, but it is not limiting;

一形成於集水線排底座1上並位於底座調校孔位限制區12之一側處的底座切片夾合部13; A base slice clamping portion 13 formed on the base 1 of the water-collecting line and located on one side of the base adjustment hole restriction area 12;

至少一設於集水線排底座1上的底座結合部14; At least one base joint 14 provided on the base 1 of the water collection line;

一設於集水線排底座1之一側處的固定座2; A fixing seat 2 provided on one side of the base 1 of the water collection line;

一形成於固定座2上的固定座調校孔位對應區21; A fixing seat adjustment hole corresponding area 21 formed on the fixing seat 2;

一形成於固定座2上的固定座切片夾合部22,該固定座切片夾合部22位於該固定座調校孔位對應區21之一側處; A fixed seat slice clamping part 22 formed on the fixed seat 2, the fixed seat slice clamping part 22 is located at one side of the corresponding area 21 of the fixed seat adjustment hole position;

至少一設於該固定座2上的固定座結合部23,且該固定座結合部23係供配合底座結合部14將固定座2固定於集水線排底座1之一側處; At least one fixed seat joint 23 provided on the fixed seat 2, and the fixed seat joint 23 is used to cooperate with the base joint 14 to fix the fixed seat 2 on one side of the water collection line base 1;

一設於固定座2上的固定座切片容置區24,且固定座調校孔位對應區21位於固定座切片容置區24之內; A fixed seat section accommodation area 24 provided on the fixed seat 2, and the fixed seat adjustment hole corresponding area 21 is located in the fixed seat section accommodation area 24;

一設於固定座2上之固定座轉動限位擋止部25,且該固定座轉動限位擋止部25位於該固定座切片容置區24之側壁面上,並形成一方形的態樣; A fixed seat rotation limit stop part 25 located on the fixed seat 2, and the fixed seat rotation limit stop part 25 is located on the side wall surface of the fixed seat slice accommodation area 24, and forms a square shape ;

至少一設於固定座2及集水線排底座1之間的結合元件6,結合元件6以能夠凝固成型的水泥、或黏著劑(例如矽利康、AB膠、熱熔膠)作為舉例,而本實施例以水泥作為舉例,但其並不設限; At least one coupling element 6 arranged between the fixing base 2 and the water collection line base 1, the coupling element 6 is exemplified by solidified cement or adhesive (such as silicone, AB glue, hot melt glue), and The present embodiment takes cement as an example, but it is not limited;

一放置於固定座2上的自由裁切片3; A free-cut piece 3 placed on the holder 2;

一形成於自由裁切片3上的自由裁切部31; A free-cut portion 31 formed on the free-cut piece 3;

一形成於自由裁切片3上的裁切片轉動限位擋止部32;及 A cutting piece rotation limit stop portion 32 formed on the free cutting piece 3; and

一形成於自由裁切片3上的裁切片出水部33。 A cutting piece water outlet 33 formed on the free cutting piece 3 .

藉由上述之說明,已可了解本技術之結構,而依據這個結構之對應配合,更可達到安裝時更加方便與減少製造成本的優勢,而詳細之解說將於下述說明。 Through the above description, the structure of this technology can already be understood, and according to the corresponding cooperation of this structure, the advantages of more convenient installation and reduced manufacturing cost can be achieved, and the detailed explanation will be explained below.

而本發明調校孔位集水線排結構之安裝工法,其步驟包含: And the installation method of the present invention to adjust the hole position water collection line row structure, its steps include:

(a)放置步驟:將一自由裁切片3之裁切片出水部33放置於排水管路4上及將一集水線排底座1放置於自由裁切片3上; (a) Placement step: place the water outlet part 33 of a cut piece 3 on the drainage pipeline 4 and place a water collection line row base 1 on the cut piece 3;

(b)對位步驟:透過調整該自由裁切片3配合一底座集水區11中的底座調校孔位限制區12進行調校孔位動作,並於該自由裁切片3之自由裁切部31上標示出裁切對應位置; (b) Alignment step: by adjusting the free-cutting section 3 to cooperate with the base adjustment hole position restriction area 12 in the base water collection area 11, the hole position adjustment action is performed, and at the free-cutting part of the free-cutting section 3 31 indicates the corresponding position of cutting;

(c)裁切步驟:取出自由裁切片3並於自由裁切部31上沿裁切對應位置進行裁切動作; (c) Cutting step: take out the free cutting piece 3 and perform cutting along the corresponding cutting position on the free cutting part 31;

(d)組裝步驟:將經調校孔位與裁切後之自由裁切片3放置於一固定座2上,以使裁切片出水部33穿出於一固定座調校孔位對應區21,以經由一固定座轉動限位擋止部25及一裁切片轉動限位擋止部32之擋止效果限制該自由裁切片3之轉動效果; (d) Assembly step: place the adjusted hole position and the cut free-cut piece 3 on a fixed seat 2, so that the water outlet part 33 of the cut piece passes through the corresponding area 21 of the adjusted hole position of the fixed seat, The rotation effect of the free-cut piece 3 is limited by the blocking effect of a fixed seat rotation limit stop part 25 and a cutting piece rotation limit stop part 32;

(e)結合步驟:透過至少一固定座結合部23及至少一底座結合部14將該固定座2結合於該集水線排底座1上,並利用一底座切片夾合部13及一固定座切片夾合部22夾合固定該自由裁切片3完成集水線排底座1之結構組裝;及 (e) Combining step: combine the fixed seat 2 on the water-collecting line base 1 through at least one fixed seat joint part 23 and at least one base joint part 14, and use a base slice clamping part 13 and a fixed seat The slice clamping part 22 clamps and fixes the free-cutting slice 3 to complete the structural assembly of the water collection line row base 1; and

(f)安裝步驟:將完成結構組裝之該集水線排底座1的該裁切片出水部33對準於該排水管路4後,以將該集水線排底座1安裝於該排水管路4上。 (f) Installation step: Align the water outlet part 33 of the cut piece of the water-collecting line base 1 after the structural assembly is completed with the drainage pipeline 4, so as to install the water-collecting line base 1 on the drainage pipeline 4 on.

由上述步驟可明確得知,使用者可先將自由裁切片3之裁切片出水部33對準於建築物的排水管路4上,再把集水線排底座1放置於自由裁切片3上,藉此配合自由裁切片3與底座調校孔位限制區12針對現場環境進行調校孔位的動作,如此就能讓裁切片出水部33在底座調校孔位限制區12內以上下左右360度的方位調整校對位置,當調整校正完畢後,即可知道於自由裁切部31上需要裁切的位置,並能利用繪製標記的方式將需要的裁切對應位置標記於自由裁切片3上。本實施例之裁切對應位置,以大於底座調校孔位限制區12外側,並小於固定座結合部23的位置作為舉例。 From the above steps, it can be clearly known that the user can first align the water outlet 33 of the free-cutting section 3 with the drainage pipe 4 of the building, and then place the water-collecting line base 1 on the free-cutting section 3 , so as to cooperate with the free cutting piece 3 and the base adjustment hole restriction area 12 to adjust the hole position according to the on-site environment, so that the cutting piece water outlet 33 can be up, down, left, and right in the base adjustment hole restriction area 12 360-degree azimuth adjustment and proofreading position. After the adjustment and correction is completed, the position to be cut on the free cutting part 31 can be known, and the corresponding position of the required cutting can be marked on the free cutting section 3 by drawing a mark superior. The corresponding position of cutting in this embodiment is taken as an example of a position that is larger than the outer side of the adjustment hole restriction area 12 of the base and smaller than the joint portion 23 of the fixing base.

之後使用者即可取出集水線排底座1及自由裁切片3,並於自由裁切部31上裁切至需要的位置,就能將自由裁切片3放置於固定座切片容置區24內,並利用底座切片夾合部13及固定座切片夾合部22將裁切後的自 由裁切片3固定於固定座2及集水線排底座1之間,再配合底座結合部14及固定座結合部23將固定座2固定於集水線排底座1的一側處,本實施例以透過結合元件6凝固成型的方式將底座結合部14與固定座結合部23相互黏合作為舉例,但其並不設限。 After that, the user can take out the water-collecting line base 1 and the free-cutting section 3 , and cut to the desired position on the free-cutting part 31 , and then place the free-cutting section 3 in the section holding area 24 of the fixing seat. , and use the base slice clamping part 13 and the holder slice clamping part 22 to cut the self The cutting piece 3 is fixed between the fixing seat 2 and the water-collecting line row base 1, and then the fixing seat 2 is fixed on one side of the water-collecting line row base 1 by cooperating with the base joint part 14 and the fixing seat joint part 23. As an example, the bonding of the base joint portion 14 and the fixing base joint portion 23 through solidification and molding of the joint element 6 is taken as an example, but it is not limited thereto.

之後再將集水線排底座1固定於排水管路4的位置上,此時裁切片出水部33則會穿出於固定座調校孔位對應區21並對準結合於排水管路4上。如此即可透過上述之方式,快速的安裝集水線排底座1,並能配合各種位置的排水管路4達到調校的功能。由於自由裁切片3放置於固定座切片容置區24內時,裁切片轉動限位擋止部32會與固定座轉動限位擋止部25相互抵觸,並因為裁切片轉動限位擋止部32會與固定座轉動限位擋止部25相互之間具有能相互對應卡合的折角,故能透過相互抵觸的效果,來防止自由裁切片3產生旋轉的狀況,進而增加與排水管路4的對位準確度。 Afterwards, fix the base 1 of the water collection line on the position of the drainage pipeline 4. At this time, the water outlet part 33 of the cutting piece will pass through the corresponding area 21 of the fixing seat adjustment hole position and be aligned and combined with the drainage pipeline 4. . In this way, the water-collecting line base 1 can be quickly installed through the above-mentioned method, and the function of adjustment can be achieved by matching the drainage pipeline 4 in various positions. When the free cut piece 3 is placed in the section holding area 24 of the fixed seat, the cut piece rotation limit stop part 32 will interfere with the fixed seat rotation limit stop part 25, and because the cut piece rotates the limit stop part 32 and the rotation limit stopper 25 of the fixed seat have knuckles that can be engaged with each other, so that the rotation of the free-cut piece 3 can be prevented through the effect of mutual conflict, thereby increasing the connection with the drainage pipeline 4 alignment accuracy.

且因為自由裁切片3能根據現場狀況來讓使用者自行裁切,所以只需製造統一尺寸的自由裁切片3、集水線排底座1、及固定座2,就能配合各種位置的排水管路4,藉此來降低製造時的成本。 And because the free-cutting section 3 can be cut by the user according to the site conditions, it is only necessary to manufacture the free-cutting section 3 of a uniform size, the water collection line row base 1, and the fixing seat 2 to match the drainage pipes in various positions Way 4, thereby reducing the cost of manufacture.

再請同時配合參閱第八圖及第九圖所示,係為本發明再一較佳實施例之分解圖及俯視圖,由圖中可清楚看出,本實施例與上述實施例為大同小異,僅於本實施例中,會於集水線排底座1a上設有一排水蓋5a,且排水蓋5a上形成有一排水蓋支撐部51a,藉此使排水蓋5a與集水線排底座1a之間形成可供容納液體的空間,同時能經由排水蓋5a的遮擋效果,來防止過多的雜物進入集水線排底座1a之中。 Please also refer to the eighth and ninth figures, which are an exploded view and a top view of another preferred embodiment of the present invention. It can be clearly seen from the figure that this embodiment is similar to the above-mentioned embodiment, only In this embodiment, a drain cover 5a is provided on the base 1a of the water collection line, and a drain cover support portion 51a is formed on the drain cover 5a, thereby forming a gap between the drain cover 5a and the base 1a of the water collection line. There is space for accommodating liquid, and at the same time, through the shielding effect of the drain cover 5a, excessive sundries can be prevented from entering the water-collecting line base 1a.

且本實施例中,經過裁切後的裁切片出水部33a並不會位於自由裁切片3a的中央處,並能配合固定座轉動限位擋止部25a與裁切片轉動限位擋止部32a的擋止效果,使裁切片出水部33a能較為準確的對準於排水管路上,藉此表示本案可根據狀況自行調整校對所要對準的位置,以達到調校的功能。 And in this embodiment, the water outlet part 33a of the cut piece after cutting will not be located at the center of the free cut piece 3a, and can cooperate with the fixed seat rotation limit stop part 25a and the cut piece rotation limit stop part 32a The blocking effect makes the water outlet part 33a of the cutting piece more accurately aligned on the drainage pipeline, thereby indicating that the case can adjust the position to be aligned according to the situation, so as to achieve the function of adjustment.

而本實施例之底座結合部14a為形成於集水線排底座1a上的孔洞,固定座結合部23a則為形成於固定座2a上的孔洞,並會透過複數的結合元件6a將穿過底座結合部14a與固定座結合部23a將其相互結合(本實施例之結合元件6a以螺絲配合螺帽作為舉例,但其並不設限),以增加整 體的固定效果。 The base joint part 14a of this embodiment is a hole formed on the water-collecting line base 1a, and the fixing base joint part 23a is a hole formed on the fixing base 2a, and will pass through the base through a plurality of coupling elements 6a. The joint part 14a and the fixed seat joint part 23a combine it with each other (the joint element 6a of this embodiment is exemplified by a screw with a nut, but it is not limited thereto), to increase the overall The fixed effect of the body.

再請同時配合參閱第十圖及第十一圖所示,係為本發明又一較佳實施例之自由裁切片示意圖及剖面示意圖,由圖中可清楚看出,本實施例與上述實施例為大同小異,本實施例中的自由裁切片3b上會形成有一設備結合部34b、一設備容置區35b、及一設備承載部36b,藉此可將一排水本體設備7b放置於設備容置區35b中,並承載於設備承載部36b上,再鎖合於設備結合部34b處,即可把排水本體設備7b安裝固定於自由裁切片上,並且在安裝排水本體設備7b時,由於自由裁切片3b會經由固定座轉動限位擋止部及裁切片轉動限位擋止部的限位效果而不會旋轉,因此能增加安裝與拆卸各種相對應的設備時的方便性,藉此來防止排水管中臭氣、蟲類、或逆流水進入室內,以及阻隔異物流入排水管路中的狀況。 Please also refer to Figure 10 and Figure 11 at the same time, which is a schematic diagram of a free-cut section and a schematic cross-sectional view of another preferred embodiment of the present invention. In order to be similar, the free-cut piece 3b in this embodiment will be formed with an equipment coupling portion 34b, an equipment accommodation area 35b, and an equipment bearing portion 36b, whereby a drainage main body equipment 7b can be placed in the equipment accommodation area 35b, and carried on the equipment bearing part 36b, and then locked at the equipment joint part 34b, the drainage body equipment 7b can be installed and fixed on the free-cutting piece, and when the drainage main body equipment 7b is installed, due to the free-cutting piece 3b will not rotate through the limiting effect of the fixed seat rotation limit stopper and the cutting piece rotation limit stopper, so it can increase the convenience of installing and dismounting various corresponding equipment, thereby preventing drainage The odor, insects, or reverse flow of water in the pipe enter the room, and the situation of blocking foreign matter from flowing into the drainage pipe.

再請同時配合參閱第十二圖所示,係為本發明另一較佳實施例之剖面示意圖,由圖中可清楚看出,本實施例與上述實施例為大同小異,本實施例中可放置一排水過濾設備8c於裁切片出水部33c上,並使排水過濾設備8c能位於設備容置區35c的位置處,藉此表示自由裁切片3c能配合各種類型的過濾設備,來過濾防止異物進入排水管路中造成阻塞的狀況,以提高使用上的方便性。 Please also refer to the twelfth figure at the same time, which is a schematic cross-sectional view of another preferred embodiment of the present invention. It can be clearly seen from the figure that this embodiment is similar to the above-mentioned embodiment, and can be placed in this embodiment. A drainage filtering device 8c is placed on the water outlet part 33c of the cutting piece, and the drainage filtering device 8c can be located at the position of the equipment accommodation area 35c, thereby indicating that the free-cutting piece 3c can cooperate with various types of filtering equipment to filter and prevent foreign matter from entering Blockage in the drainage pipes to improve the convenience of use.

再請同時配合參閱第十三圖所示,係為本發明更一較佳實施例之分解圖,由圖中可清楚看出,本實施例與上述實施例為大同小異,本實施例中僅將固定座轉動限位擋止部25d設置為四塊L型之凸塊,以表示固定座轉動限位擋止部25d之型態並不設限,並非一定要設置於固定座切片容置區之中,且該固定座轉動限位擋止部25d的凸塊形狀不設限,若能對應抵觸限位裁切片轉動限位擋止部32d之凸塊型態皆可。 Please also refer to the thirteenth figure at the same time, which is an exploded view of a more preferred embodiment of the present invention. It can be clearly seen from the figure that this embodiment is similar to the above-mentioned embodiment. In this embodiment, only The rotation limit stop part 25d of the fixed base is set as four L-shaped protrusions, to show that the shape of the rotation limit stop part 25d of the fixed base is not limited, and it does not have to be arranged in the slice accommodation area of the fixed base In addition, there is no restriction on the shape of the protrusion of the rotation limit stop part 25d of the fixed seat, as long as it can correspond to the shape of the protrusion that interferes with the rotation limit stop part 32d of the limit cutting piece.

惟,以上所述僅為本發明之較佳實施例而已,非因此即侷限本發明之專利範圍,故舉凡運用本發明說明書及圖式內容所為之簡易修飾及等效結構變化,均應同理包含於本發明之專利範圍內,合予陳明。 However, the above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Therefore, all simple modifications and equivalent structural changes made by using the description and drawings of the present invention should be treated in the same way. Included in the scope of the patent of the present invention, it is jointly stated.

綜上所述,本發明之調校孔位集水線排結構及其工法於使用時,為確實能達到其功效及目的,故本發明誠為一實用性優異之發明,為符合發明專利之申請要件,爰依法提出申請,盼 審委早日賜准本發明,以保障發明人之辛苦發明,倘若 鈞局審委有任何稽疑,請不吝來函指示,發明人定當竭力 配合,實感德便。 To sum up, the structure of the adjustment holes and the water collection line of the present invention and its construction method can really achieve its effect and purpose when used. Therefore, the present invention is an invention with excellent practicability, and it is in line with the requirements of the invention patent. The application requirements are to submit an application according to the law. I hope that the review committee will approve the invention as soon as possible to protect the hard work of the inventor. If the review committee has any doubts, please feel free to send a letter and the inventor will try his best. Cooperate, feel good and convenient.

1:集水線排底座 1: Water collection line row base

11:底座集水區 11: Base catchment area

12:底座調校孔位限制區 12: Restricted area of base adjustment holes

13:底座切片夾合部 13: Base slice clamping part

14:底座結合部 14: Base junction

2:固定座 2: Fixed seat

21:固定座調校孔位對應區 21: The corresponding area of the fixing seat adjustment hole position

22:固定座切片夾合部 22: Fixing seat slice clamping part

23:固定座結合部 23: Joint of fixed seat

24:固定座切片容置區 24: Holder section holding area

25:固定座轉動限位擋止部 25: Rotation limit stop part of fixed seat

3:自由裁切片 3: Free cutting slice

32:裁切片轉動限位擋止部 32: cutting piece rotation limit stopper

33:裁切片出水部 33:Cutting slice water outlet

6:結合元件 6: Combining components

Claims (20)

一種調校孔位集水線排結構,其主要包含: A water-collecting line structure for adjusting hole positions, which mainly includes: 一集水線排底座; A water line row base; 一底座集水區,該底座集水區形成於該集水線排底座上; a base catchment area, the base catchment area is formed on the base of the water collection line; 一底座調校孔位限制區,該底座調校孔位限制區形成於該集水線排底座上,並位於該底座集水區之中; A base adjustment hole restriction area, the base adjustment hole restriction area is formed on the water collection line base and is located in the base water collection area; 一底座切片夾合部,該底座切片夾合部形成於該集水線排底座上,並位於該底座調校孔位限制區之一側處; A base slice clamping part, the base slice clamping part is formed on the base of the water collection line, and is located at one side of the restricted area of the base adjustment hole; 至少一底座結合部,該底座結合部設於該集水線排底座上; At least one base joint part, the base joint part is arranged on the base of the water collection line; 一固定座,該固定座設於該集水線排底座之一側處; a fixing seat, the fixing seat is arranged at one side of the base of the water collecting line; 一固定座調校孔位對應區,該固定座調校孔位對應區形成於該固定座上; A fixing base adjustment hole corresponding area, the fixing base adjustment hole corresponding area is formed on the fixing base; 一固定座切片夾合部,該固定座切片夾合部形成於該固定座上; A section clamping part of the fixing base, the section clamping part of the fixing base is formed on the fixing base; 至少一固定座結合部,該固定座結合部設於該固定座上,以供配合該底座結合部將該固定座固定於該集水線排底座之一側處; at least one fixing seat joint part, the fixing seat joint part is arranged on the fixing seat, so as to cooperate with the base joint part to fix the fixing seat on one side of the water collection line base; 一固定座轉動限位擋止部,該固定座轉動限位擋止部設於該固定座上; A rotation limit stop part of the fixed seat, the rotation limit stop part of the fixed seat is arranged on the fixed seat; 一自由裁切片,該自由裁切片係供放置於該固定座上; a free-cut piece for placement on the holder; 一自由裁切部,該自由裁切部形成於該自由裁切片上,以供調整校對該自由裁切片之尺寸; a free-cutting portion, the free-cutting portion is formed on the free-cutting piece for adjusting and correcting the size of the free-cutting piece; 一裁切片轉動限位擋止部,該裁切片轉動限位擋止部設於該自由裁切片上,以供對應抵觸該固定座轉動限位擋止部;及 A cutting piece rotation limit stop part, the cut piece rotation limit stop part is set on the free cutting piece, for correspondingly resisting the fixed seat rotation limit stop part; and 一裁切片出水部,該裁切片出水部形成於該自由裁切片上。 A water outlet part of the cutting piece, the water outlet part of the cutting piece is formed on the free cutting piece. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該集水線排底座上係供設置一排水蓋。 As described in item 1 of the scope of the patent application, the structure of the water collection line for adjusting the position of the holes, wherein the base of the water collection line is provided with a drain cover. 如申請專利範圍第2項所述之調校孔位集水線排結構,其中該排水蓋上形成有一排水蓋支撐部。 According to the adjustment hole position water collection line row structure described in item 2 of the scope of the patent application, a drainage cover support part is formed on the drainage cover. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該固定座上設有一固定座切片容置區。 According to the adjustment hole position water collection line row structure described in item 1 of the scope of the patent application, there is a section accommodating area for the fixed seat on the fixed seat. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該自由裁切片上形成有一設備結合部。 According to the adjustment hole position water collection line structure described in item 1 of the patent scope of the application, an equipment joint part is formed on the free-cut piece. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該自由裁切片上 形成有一設備容置區。 As described in item 1 of the scope of the patent application, the structure of the adjustment hole position and water collection line, in which the free-cut slice is A device accommodating area is formed. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該自由裁切片上形成有一設備承載部。 According to the adjustment hole position water collection line structure described in item 1 of the scope of the patent application, an equipment bearing part is formed on the free-cut piece. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該集水線排底座上設有至少一結合元件。 According to the adjustment hole position water collection line structure described in item 1 of the scope of the patent application, at least one coupling element is provided on the base of the water collection line. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該自由裁切片上設有一排水本體設備。 According to the adjustment hole position water collection line arrangement described in item 1 of the scope of the patent application, a drainage body device is arranged on the free-cut piece. 如申請專利範圍第1項所述之調校孔位集水線排結構,其中該自由裁切片上設有一排水過濾設備。 As described in the first item of the scope of the patent application, the adjustment hole location water collection line arrangement structure, wherein the free-cutting section is provided with a drainage filtering device. 一種調校孔位集水線排結構之安裝工法,其主要包含: An installation method for adjusting the hole position water collection line structure, which mainly includes: (a)將一自由裁切片之裁切片出水部放置於排水管路上及將一集水線排底座放置於自由裁切片上; (a) Place the water outlet part of a free-cut piece on the drainage pipe and place a water collection line base on the free-cut piece; (b)透過調整該自由裁切片配合一底座集水區中的底座調校孔位限制區進行調校孔位動作,並於該自由裁切片之自由裁切部上標示出裁切對應位置; (b) Adjust the hole position by adjusting the free-cutting piece to cooperate with the base adjustment hole restriction area in the water collection area of a base, and mark the corresponding cutting position on the free-cutting part of the free-cutting piece; (c)取出自由裁切片並於自由裁切部上沿裁切對應位置進行裁切動作; (c) Take out the free-cutting piece and perform a cutting action along the corresponding cutting position on the free-cutting part; (d)將經調校孔位與裁切後之自由裁切片放置於一固定座上,以使裁切片出水部穿出於一固定座調校孔位對應區,以經由一固定座轉動限位擋止部及一裁切片轉動限位擋止部之擋止效果限制該自由裁切片之轉動效果; (d) Place the adjusted hole position and the cut free-cut piece on a fixed seat, so that the water outlet part of the cut piece passes through the corresponding area of the adjusted hole position of a fixed seat, so that the rotation limit of the fixed seat is limited. The blocking effect of the position stopper and a cut piece rotation limit stopper limits the rotation effect of the free cut piece; (e)透過至少一固定座結合部及至少一底座結合部將該固定座結合於該集水線排底座上,並利用一底座切片夾合部及一固定座切片夾合部夾合固定該自由裁切片完成集水線排底座之結構組裝;及 (e) Combining the fixing seat on the base of the water collection line through at least one fixing seat joint part and at least one base joint part, and using a base slice clamping part and a fixed seat slice clamping part to clamp and fix the Free cut pieces to complete the structural assembly of the water collection line base; and (f)將完成結構組裝之該集水線排底座的該裁切片出水部對準於該排水管路後,以將該集水線排底座安裝於該排水管路上。 (f) After aligning the outlet portion of the cutting piece of the water-collecting line base after the structural assembly is completed with the drainage pipeline, the water-collecting line base is installed on the drainage pipeline. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中於該步驟(f)後,進行步驟(g)於該集水線排底座上設置一排水蓋。 According to the installation method of adjusting hole position water collection line structure described in item 11 of the scope of the patent application, after the step (f), proceed to step (g) to install a drainage cover on the water collection line base. 如申請專利範圍第12項所述之調校孔位集水線排結構之安裝工法,其中該排水蓋上形成有一排水蓋支撐部。 According to the installation method of adjusting hole position and water collection line structure described in item 12 of the scope of the patent application, a drainage cover support part is formed on the drainage cover. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中於該步驟(d)中,該固定座上設有一供容置該自由裁切片之固定座切片 容置區。 According to the installation method of adjusting the hole position water collection line structure described in item 11 of the scope of the patent application, in the step (d), the fixing seat is provided with a fixing seat section for accommodating the free-cutting section containment area. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中該自由裁切片上形成有一設備容置區。 According to the installation method of adjusting hole position and water collection line structure described in item 11 of the scope of the patent application, an equipment accommodation area is formed on the free-cut piece. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中該自由裁切片上形成有一設備承載部。 According to the installation method of adjusting hole position and water collection line structure described in item 11 of the scope of the patent application, an equipment bearing part is formed on the free-cut piece. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中該集水線排底座上設有至少一結合元件。 According to the installation method of adjusting hole position water collection line structure as described in item 11 of the scope of the patent application, at least one coupling element is provided on the base of the water collection line. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中該自由裁切片上形成有一設備結合部。 According to the installation method of adjusting hole position and water collection line structure described in item 11 of the scope of the patent application, an equipment joint part is formed on the free-cut piece. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中該自由裁切片上設有一排水本體設備。 As the installation method for adjusting hole position and water collection line structure described in item 11 of the scope of the patent application, a drainage body device is arranged on the free-cut piece. 如申請專利範圍第11項所述之調校孔位集水線排結構之安裝工法,其中該自由裁切片上設有一排水過濾設備。 According to the installation method for adjusting the hole position and water collection line structure described in item 11 of the scope of the patent application, a drainage filtering device is arranged on the free-cut piece.
TW110125346A 2021-07-09 2021-07-09 Adjustment hole position water collection line row structure and its construction method TWI789820B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW110125346A TWI789820B (en) 2021-07-09 2021-07-09 Adjustment hole position water collection line row structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW110125346A TWI789820B (en) 2021-07-09 2021-07-09 Adjustment hole position water collection line row structure and its construction method

Publications (2)

Publication Number Publication Date
TWI789820B true TWI789820B (en) 2023-01-11
TW202302964A TW202302964A (en) 2023-01-16

Family

ID=86657869

Family Applications (1)

Application Number Title Priority Date Filing Date
TW110125346A TWI789820B (en) 2021-07-09 2021-07-09 Adjustment hole position water collection line row structure and its construction method

Country Status (1)

Country Link
TW (1) TWI789820B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW315859U (en) * 1997-04-21 1997-09-11 Hao-Qin Bai Modified structure of adjustable drainage joint
US20160265203A1 (en) * 2015-03-13 2016-09-15 Kohler Co. Shower receptacle adapters
CN206554178U (en) * 2017-01-10 2017-10-13 周镇帮 A kind of blowdown row leakage device
CN207749588U (en) * 2017-12-04 2018-08-21 湖南高雷同层排水科技有限公司 A kind of floor built-in type soil stack connector

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW315859U (en) * 1997-04-21 1997-09-11 Hao-Qin Bai Modified structure of adjustable drainage joint
US20160265203A1 (en) * 2015-03-13 2016-09-15 Kohler Co. Shower receptacle adapters
CN206554178U (en) * 2017-01-10 2017-10-13 周镇帮 A kind of blowdown row leakage device
CN207749588U (en) * 2017-12-04 2018-08-21 湖南高雷同层排水科技有限公司 A kind of floor built-in type soil stack connector

Also Published As

Publication number Publication date
TW202302964A (en) 2023-01-16

Similar Documents

Publication Publication Date Title
US20110162137A1 (en) Trench shower drain
US20080098517A1 (en) Method and Associated Apparatus for Assembling and Testing a Plumbing System
US20120005824A1 (en) Method and Associated Apparatus for Assembling and Testing a Plumbing System
US20100133159A1 (en) Floor drain assembly
DE102018103459A1 (en) Installation device and method for installing a drainage of a sanitary installation
TWI789820B (en) Adjustment hole position water collection line row structure and its construction method
JP6654823B2 (en) Sewage basin and temporary toilet system
US9091076B2 (en) Toilet flange template apparatus
US10760250B2 (en) Method of retrofitting a bathtub drainage pipe
US20200063413A1 (en) Shower Drain with Non-Threaded Throat
KR20160028809A (en) prefabricated Bathroom Floor Board
CZ200890A3 (en) Bridge drainer with variable connection
TWM627552U (en) Water collection line device for adjusting floor drain hole
JP3936549B2 (en) Rotating connection joint
DE102005038315A1 (en) Outlet drain assembly for shower trays or baths, includes tubular section between top flange and lower section which sealed and held by catches when fully inserted
AT507426A4 (en) MOUNTING BLOCK FOR CONNECTING DEVICES
JP4171272B2 (en) Drainage header
JP2002327474A (en) Collective batch drainage system for indoor use
JP4541300B2 (en) Synthetic resin drainage
JP2003129541A (en) Drainage piping system
JP4378639B2 (en) Inner secondary pipe for drainage and drainage
JP2006274652A (en) Catch basin and method of adjusting buried position of catch basin
DE3826920C2 (en)
US20220290781A1 (en) Method of providing a pipe passageway through a concrete slab
JP2002138545A (en) Drainage connecting pipe