TWI765241B - Project management system - Google Patents

Project management system Download PDF

Info

Publication number
TWI765241B
TWI765241B TW109110921A TW109110921A TWI765241B TW I765241 B TWI765241 B TW I765241B TW 109110921 A TW109110921 A TW 109110921A TW 109110921 A TW109110921 A TW 109110921A TW I765241 B TWI765241 B TW I765241B
Authority
TW
Taiwan
Prior art keywords
task
column
displayed
notice board
project
Prior art date
Application number
TW109110921A
Other languages
Chinese (zh)
Other versions
TW202139084A (en
Inventor
廖光陽
Original Assignee
廖光陽
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 廖光陽 filed Critical 廖光陽
Priority to TW109110921A priority Critical patent/TWI765241B/en
Publication of TW202139084A publication Critical patent/TW202139084A/en
Application granted granted Critical
Publication of TWI765241B publication Critical patent/TWI765241B/en

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Present invention is related to a project management system comprising a main window. At least one billboard is displayed on the main window. The billboard shows information of at least one project. The information of the project on the billboard includes but not limited to a link, a type of work, a responsible person, a project serial number and a project name of the project. When clicking the link of a specific project, a webpage of such project with its details will be displayed to the user. This webpage may include a project details/information review and a workflow corresponded to the type of work. The workflow could be a tasks list comprising at least one task. These tasks are displayed in the workflow in order. Each task is assigned to a responsible person with his or her name on the task. The name of such person will also show on the information of the project on the billboard. The task that is currently running will be marked when reviewing the webpage. When the responsible person of that task has completed the work, he or she can submit the work and the following task will be marked to be ready for the next responsible person. The present invention could allow each responsible person easily managing their tasks on the main window.

Description

專案管理系統 Project Management System

本發明涉及一種電腦管理系統的介面,尤其涉及一種專案管理系統。 The invention relates to an interface of a computer management system, in particular to a project management system.

為了管理專案的進行以及任務的分配,有人以共筆的電腦報表對專案的各項任務進行分配與管理,透過電腦報表對於專案進行的各項流程以及各項流程的時間、執行的負責人進行管控。 In order to manage the progress of the project and the assignment of tasks, someone assigns and manages the various tasks of the project with computer reports that are written together. Control.

上述透過電腦報表的方式雖能進行一定程度的專案管理,但由於專案的各項流程還需要各負責人自行確認進度以及時間,因此有可能在專案進行的過程中產生疏漏以及時間延遲的問題,需要以更能提醒負責人承辦的較佳系統來管控專案進行的各個流程的任務。 Although the above-mentioned method of computer reporting can carry out a certain degree of project management, because the various processes of the project still require the person in charge to confirm the progress and time, there may be omissions and time delays in the process of the project. A better system that better alerts the responsible person to undertake the tasks of each process of the project needs to be managed.

由於現有以電腦報表登載不同專案負責人工作的表格在使用上容易產生任務的混淆且任務移交流程不易管理。為此,本發明設計一種專案管理系統,透過將專案中相同負責人的執行中任務列都歸屬於同一負責人主視窗的方式,達到較佳的專案管理效果。 Because the existing forms for reporting the work of different project leaders in computer reports are prone to task confusion and the task handover process is not easy to manage. Therefore, the present invention designs a project management system, which achieves a better project management effect by assigning all the executing task columns of the same person in charge in the project to the main window of the same person in charge.

為達到上述目的,本發明提供一種專案管理系統,包括一電腦裝置,該電腦裝置包括一顯示器以及一輸入介面,於該顯示器顯示一屬於負責人 的負責人主視窗,於該負責人主視窗顯示一個以上的任務告示牌,於各任務告示牌顯示一工作項目告示欄、一案號告示欄以及一專案名稱告示欄,於各工作項目告示欄、各案號告示欄以及各專案名稱告示欄分別顯示一工作項目、一案號以及一專案名稱,於各任務告示牌形成一專案連結,以該輸入介面點擊任一任務告示牌的專案連結後,於該顯示器顯示一對應該任務告示牌的案號的專案頁面,其中:於該專案頁面顯示一看版以及一工作流程,於該看板顯示該專案頁面對應的該任務告示牌的該案號以及該專案名稱,於該看板以下顯示該工作流程,該工作流程包括一個以上依序排列的任務列,其中一任務列為執行中的任務列,於該執行中的任務列顯示一執行標示,於各任務列顯示一編號、一工作項目欄以及一負責人欄,並於執行中的任務列顯示一任務完成鈕,於各工作項目欄顯示與對應的工作項目告示欄相同的該工作項目,於各負責人欄顯示一負責人名稱,執行中的任務列依照該負責人名稱,於相同負責人的該負責人主視窗顯示為所述的任務告示牌,以該輸入介面點擊執行中的任務列的該任務完成鈕時,該任務列的該任務完成鈕消失並將任務移交給該工作流程的下一個編號的任務列,使其成為執行中的狀態。 In order to achieve the above object, the present invention provides a project management system, including a computer device, the computer device includes a display and an input interface, on the display a project belonging to the person in charge is displayed. In the main window of the person in charge, more than one task notice board is displayed in the main window of the person in charge, and a work item notice board, a case number notice board and a project name notice board are displayed on each task notice board, and each work item notice board is displayed. , each case number notice column and each project name notice column respectively display a work item, a case number and a project name, and a project link is formed on each task notice board. Click the project link of any task notice board through the input interface. , display a pair of project pages corresponding to the case number of the task notice board on the display, wherein: a first-look version and a work flow are displayed on the project page, and the case number of the task notice board corresponding to the project page is displayed on the board and the project name, the workflow is displayed below the kanban, the workflow includes one or more task columns arranged in sequence, one of the task columns is a running task column, and an execution indicator is displayed in the running task column, A number, a work item column and a person-in-charge column are displayed in each task column, a task completion button is displayed in the executing task column, and the same work item as the corresponding work item notice column is displayed in each work item column, A name of the person in charge is displayed in the column of each person in charge, and the task being executed is displayed in the main window of the person in charge according to the name of the person in charge. The main window of the person in charge of the same person is displayed as the task notice board, and the task in execution is clicked on the input interface. When the task completion button of the task column is clicked, the task completion button of the task column disappears and the task is handed over to the next numbered task column of the workflow, making it a state of execution.

進一步,本發明於所述各任務告示牌進一步顯示一任務倒數告示欄,於各任務倒數告示欄顯示一以天數為單位的倒數數字,於所述各任務列顯示一剩餘天數欄,於執行中的任務列的該剩餘天數欄顯示與對應的任務倒數告示欄相同的該倒數數字,當執行中的任務列的該倒數數字顯示為零以下時,於該執行中的任務列的該剩餘天數欄顯示一警示標記。 Further, in the present invention, a task countdown notice board is further displayed on each task notice board, a countdown number in days is displayed on each task countdown notice board, and a remaining days column is displayed on each task line. The remaining days column of the task column displays the same countdown number as the corresponding task countdown notice column. When the countdown number of the running task column is displayed below zero, the remaining days column of the running task column displays the same countdown number. A warning sign is displayed.

進一步,本發明於所述各任務告示牌進一步顯示一任務期限告示欄,於各任務期限告示欄顯示一以天數為單位的任務期限,同一任務告示牌的 該倒數數字等於該任務期限的天數扣除設立後經過天數的結果;於所述各任務列顯示一期限欄,於各期限欄顯示與對應的任務期限告示欄相同的該任務期限。 Further, the present invention further displays a task deadline notice board on each task notice board, and displays a task deadline in days on each task limit notice board. The countdown number is equal to the result of deducting the number of days after the establishment of the task deadline from the number of days; a deadline column is displayed in each task column, and each deadline column displays the same task deadline as the corresponding task deadline notice column.

進一步,本發明於所述各任務告示牌進一步顯示一形式種類告示欄,於各形式種類告示欄顯示一任務種類,於該看板顯示與該專案頁面對應的該任務告示牌相同的該任務種類。 Further, the present invention further displays a form type notice board on each task notice board, displays a task type on each form type notice board, and displays the task type same as the task notice board corresponding to the project page on the board.

進一步,本發明於所述各任務告示牌進一步顯示一客戶告示欄以及一聯絡人告示欄,於各客戶告示欄與各聯絡人告示欄分別顯示一客戶名稱以及一聯絡人名稱,於該看板顯示與該專案頁面對應的該任務告示牌相同的該客戶名稱以及該聯絡人名稱。 Further, the present invention further displays a customer notice board and a contact person notice board on each task notice board, and respectively displays a customer name and a contact person name on each customer notice board and each contact person notice board, and displays on the board. The client name and the contact person name are the same as the task notice board corresponding to the project page.

更進一步,本發明於所述各任務告示牌顯示一績效告示欄,並於各績效告示欄顯示一績效,於所述各任務列顯示一績效欄,於各績效欄顯示與對應的任務期限告示欄相同的該績效;於該顯示器顯示一績效計算選項,以該輸入介面點擊該績效計算選項並選擇一時間週期,即累計該負責人於該時間週期內點擊過該任務完成鈕的各任務列的該績效,將累計的結果於該顯示器顯示為一累計績效。 Further, in the present invention, a performance notice board is displayed on each task notice board, and a performance notice board is displayed on each performance notice board, a performance column is displayed on each task column, and a corresponding task deadline notice is displayed on each performance column. display a performance calculation option on the display, click on the performance calculation option on the input interface and select a time period, that is, the task columns for which the person in charge has clicked the task completion button during the time period are accumulated. the performance, the cumulative result will be displayed on the display as a cumulative performance.

較佳的,本發明所述的績效以及所述的累積績效都是時數,所述的警示標記是填充在該剩餘天數欄內的顏色,所述的執行標示是填充在該任務列內的顏色。 Preferably, the performance and the cumulative performance of the present invention are both hours, the warning mark is the color filled in the remaining days column, and the execution mark is filled in the task column. color.

當使用者也就是負責人使用本發明時,能由該負責人主視窗的一個以上的任務告示牌,看出所有屬於他負責且執行中的任務列的工作項目、案號以及專案名稱,並且當想要知道某個案號的專案執行的狀況時,通過點擊各專案連結的方式能進入對應的各專案頁面中,確認各工作流程的任務列的進行狀況。 When the user, that is, the person in charge, uses the present invention, the person in charge can see all the work items, case numbers and project names belonging to the task column that he is responsible for and is executing from one or more task notices in the main window of the person in charge, and When you want to know the project execution status of a certain case number, you can click on the link of each project to enter the corresponding project page, and check the progress status of the task bar of each workflow.

當負責人完成任務後可點擊執行中的任務列的任務完成鈕,將任務移交給下一個編號的任務列,使下一個編號的任務列成為執行中的狀態,讓對應此任務列的任務告示牌顯示於相應負責人的負責人主視窗,達到本發明能利用負責人主視窗提醒負責人處理與其有關的任務列,且依照設定的順序移交任務列給相應負責人依序處理的功效,達到較佳的專案管理效果。 When the person in charge completes the task, he can click the task completion button in the task column under execution to transfer the task to the next numbered task column, so that the next numbered task column is in the executing state, and the task corresponding to this task column will be notified. The card is displayed in the main window of the person in charge of the corresponding person in charge, so that the present invention can use the main window of the person in charge to remind the person in charge to deal with the task list related to it, and hand over the task list to the corresponding person in charge according to the set order. Better project management effect.

10:電腦裝置 10: Computer device

11:顯示器 11: Display

12:輸入介面 12: Input interface

20:任務告示牌 20: Mission Notice Board

201:專案連結 201: Project Links

21:任務倒數告示欄 21: Task countdown notice board

211:倒數數字 211: countdown number

22:工作項目告示欄 22: Work Item Notice Board

221:工作項目 221: Work Items

23:任務期限告示欄 23: Task deadline notice board

231:任務期限 231: Mission Deadline

24:績效告示欄 24: Performance Bulletin Board

241:績效 241: Performance

25:案號告示欄 25: Case number notice board

251:案號 251: case number

26:形式種類告示欄 26: Form type notice board

261:任務種類 261: Task Type

27:客戶告示欄 27: Customer notice board

271:客戶名稱 271:Customer name

28:聯絡人告示欄 28: Contact Notice Board

281:聯絡人名稱 281: Contact name

29:專案名稱告示欄 29: Project name notice board

291:專案名稱 291:Project name

30:專案頁面 30: Project page

31:看版 31: see version

32:工作流程 32: Workflow

40:任務列 40: Task column

401:執行標示 401: Execution flag

402:任務完成鈕 402: task completion button

403:警示標記 403: Warning sign

41:編號 41:Number

42:工作項目欄 42: Work item column

43:負責人欄 43: Responsible column

431:負責人名稱 431: Name of person in charge

44:剩餘天數欄 44: Remaining days column

45:期限欄 45: Deadline column

46:績效欄 46: Performance column

47:進度狀況欄 47: Progress status bar

48:備註欄 48: Remarks column

49:檔案上傳欄 49: File upload bar

50:績效計算選項 50: Performance Calculation Options

51:時間週期 51: Time Period

52:累計績效 52: Cumulative Performance

A:專案管理程式 A: Project management program

B:負責人 B: The person in charge

C:負責人主視窗 C: Responsible main window

圖1是本發明較佳實施例的系統示意圖。 FIG. 1 is a system schematic diagram of a preferred embodiment of the present invention.

圖2是本發明較佳實施例的負責人主視窗的示意圖。 FIG. 2 is a schematic diagram of the main window of the person in charge of the preferred embodiment of the present invention.

圖3是本發明較佳實施例的專案頁面的示意圖。 FIG. 3 is a schematic diagram of a project page according to a preferred embodiment of the present invention.

圖4是本發明較佳實施例的專案頁面操作後的示意圖。 FIG. 4 is a schematic diagram of the project page after operation according to the preferred embodiment of the present invention.

圖5是本發明較佳實施例的績效計算選項的示意圖。 FIG. 5 is a schematic diagram of the performance calculation options of the preferred embodiment of the present invention.

圖6是本發明較佳實施例的操作績效計算選項的示意圖。 FIG. 6 is a schematic diagram of the operational performance calculation options of the preferred embodiment of the present invention.

為能詳細瞭解本發明的技術特徵及實用功效,並可依照說明書的內容來實施,進一步以如圖式所示的較佳實施例,詳細說明如下。 In order to understand the technical features and practical effects of the present invention in detail, and to implement it according to the contents of the description, the preferred embodiments shown in the drawings are further described in detail as follows.

請參看如圖1至圖3所示的本發明較佳實施例,本發明提供一種專案管理系統,包括一電腦裝置10,該電腦裝置10包括一顯示器11以及一輸入介面12,該電腦裝置10執行一專案管理程式A,可於本地端執行或者透過瀏覽器於網際網路的雲端執行,該專案管理程式A於該顯示器11顯示一屬於負責人B的負責人主視窗C,於該負責人主視窗C顯示一個以上的任務告示牌20,如本較佳實施例是顯示三個任務告示牌20,於各任務告示牌20顯示一任務倒數告示欄21、 一工作項目告示欄22、一任務期限告示欄23、一績效告示欄24、一案號告示欄25、一形式種類告示欄26、一客戶告示欄27、一聯絡人告示欄28以及一專案名稱告示欄29。 Please refer to the preferred embodiments of the present invention as shown in FIG. 1 to FIG. 3 , the present invention provides a project management system including a computer device 10 , the computer device 10 includes a display 11 and an input interface 12 , the computer device 10 Execute a project management program A, which can be executed locally or in the cloud of the Internet through a browser. The project management program A displays on the display 11 a person-in-charge main window C belonging to the person in charge B, on the person in charge The main window C displays more than one task notice board 20. For example, in the preferred embodiment, three task notice boards 20 are displayed, and each task notice board 20 displays a task countdown notice board 21, A work item notice board 22, a task deadline notice board 23, a performance notice board 24, a case number notice board 25, a form category notice board 26, a customer notice board 27, a contact person notice board 28 and a project name Notice Board 29.

於各任務倒數告示欄21顯示一以天數為單位的倒數數字211,於各工作項目告示欄22顯示一工作項目221,於各任務期限告示欄23顯示一以天數為單位的任務期限231,同一任務告示牌20的該倒數數字211等於該任務期限231的天數扣除該任務期限231設立後經過天數的結果;於各績效告示欄24顯示一績效241,該績效241可以是績效的點數或者時數,如本較佳實施例中該績效241是時數,例如天、小時或分鐘等時數,於各案號告示欄25顯示一案號251,於各形式種類告示欄26顯示一任務種類261,於各客戶告示欄27與各聯絡人告示欄28分別顯示一客戶名稱271以及一聯絡人名稱281,並且於各專案名稱告示欄29顯示一專案名稱291。於各任務告示牌20形成一專案連結201,如本較佳實施例中各專案連結201是形成在各專案名稱291,以該輸入介面12點擊任一任務告示牌20的專案連結201後,會在該顯示器11顯示一對應該任務告示牌20的案號251的專案頁面30,其中:於該專案頁面30顯示一看版31以及一工作流程32,於該看版31顯示該專案頁面30對應的任務告示牌20的案號251、任務種類261、客戶名稱271、聯絡人名稱281以及專案名稱291,於該看版31以下顯示該工作流程32,該工作流程32包括一個以上依序排列的任務列40,其中至少一任務列40為執行中的任務列40,於該執行中的任務列40顯示一執行標示401,如本較佳實施例該執行標示401是填充在該任務列40內的顏色例如黃色,於各任務列40顯示一編號41、一工作項目欄42、一負責人欄43、一剩餘天數欄44、一期限欄45、一績效欄46、一進度狀況欄47、一備註欄48以及一檔案上傳欄49,於執行中的任務列 40進一步顯示一任務完成鈕402,如本較佳實施例中該任務完成鈕402顯示在該進度狀況欄47內。 A countdown number 211 in days is displayed on each task countdown notice column 21 , a work item 221 is displayed on each work item notice column 22 , and a task deadline 231 in days is displayed on each task deadline notice column 23 . The countdown number 211 of the task notice board 20 is equal to the number of days of the task period 231 minus the number of days after the task period 231 is established; a performance 241 is displayed on each performance bulletin board 24, and the performance 241 can be the performance points or hours. Number, in this preferred embodiment, the performance 241 is the number of hours, such as days, hours or minutes, etc., a case number 251 is displayed in each case number notice column 25, and a task type is displayed in each form type notice column 26 261 , a customer name 271 and a contact person name 281 are displayed on each customer notice column 27 and each contact notice column 28 , respectively, and a project name 291 is displayed on each project name notice column 29 . A project link 201 is formed on each task notice board 20. For example, in this preferred embodiment, each project link 201 is formed on each project name 291. After clicking the project link 201 of any task notice board 20 through the input interface 12, the A pair of project pages 30 corresponding to the case number 251 of the task notice board 20 are displayed on the display 11 , wherein: the project page 30 displays a page 31 and a work flow 32 , and the project page 30 corresponding to the project page 30 is displayed on the page 31 . The case number 251, the task type 261, the customer name 271, the contact person name 281 and the project name 291 of the task notice board 20, the workflow 32 is displayed below the page 31, and the workflow 32 includes more than one sequential order. Task column 40, wherein at least one task column 40 is a task column 40 in execution, and an execution mark 401 is displayed in the task column 40 in execution. In this preferred embodiment, the execution mark 401 is filled in the task column 40 The color is yellow, for example, in each task column 40, a number 41, a work item column 42, a person in charge column 43, a remaining days column 44, a deadline column 45, a performance column 46, a progress status column 47, a Remarks column 48 and a file upload column 49, in the running task column 40 further displays a task completion button 402, such as the task completion button 402 is displayed in the progress status bar 47 in this preferred embodiment.

各編號41如本較佳實施例是以數字的方式顯示,代表該工作流程32的各任務列40的承辦次序,部分的任務列40可以具有同樣的編號41,這時要在同樣編號41的任務列40都完成之後才會將任務移交下一個編號41的任務列40;於各工作項目欄42顯示與對應的工作項目告示欄22相同的該工作項目221,於各負責人欄43顯示一負責人名稱431,執行中的任務列40依照該負責人名稱431,於相同負責人B的該負責人主視窗C顯示為所述的任務告示牌20;例如於該工作流程中若有兩執行中的任務列40,至少一執行中的任務列40的負責人名稱431為該負責人B,若另一執行中的任務列40的負責人名稱431為另一負責人,則此執行中的任務列40對應的任務告示牌20會顯示於另一負責人所屬的另一負責人主視窗。 Each number 41 is displayed in the form of numbers in this preferred embodiment, representing the order in which each task row 40 of the workflow 32 is undertaken. Some of the task rows 40 may have the same number 41. In this case, the tasks with the same number 41 should be placed The task will be handed over to the task row 40 with the next number 41 only after all the rows 40 are completed; the work item 221 that is the same as the corresponding work item notice column 22 is displayed in each work item column 42, and a responsible person is displayed in each responsible person column 43. Person name 431, according to the person in charge name 431, the task list 40 in execution is displayed as the task notice board 20 in the main window C of the person in charge of the same person in charge B; for example, if there are two executing tasks in the workflow In the task column 40 of at least one executing task column 40, the person in charge 431 is the person in charge B. If the person in charge 431 in another executing task column 40 is another person in charge, then the task in execution The task notice board 20 corresponding to the row 40 will be displayed in the main window of another person in charge to which another person in charge belongs.

於執行中的任務列40的該剩餘天數欄44顯示與對應的任務倒數告示欄21相同的該任務倒數告示欄21,當執行中的任務列40的該任務倒數告示欄21顯示為零以下時,於該執行中的任務列40的該剩餘天數欄44顯示一警示標記403,如本較佳實施例中該警示標記403是填充在該剩餘天數欄44內的顏色例如紅色;於各期限欄45顯示與對應的任務期限告示欄23相同的該任務期限231,各期限欄45內顯示的任務期限231代表該任務列40開始執行後能夠承辦而不至於過期的天數。 The remaining days column 44 of the task bar 40 in execution displays the task countdown notice bar 21 that is the same as the corresponding task countdown notice bar 21. When the task countdown notice bar 21 of the executing task bar 40 is displayed below zero , a warning mark 403 is displayed in the remaining days column 44 of the task row 40 in execution. In this preferred embodiment, the warning mark 403 is filled with a color such as red in the remaining days column 44; in each deadline column 45 displays the task deadline 231 that is the same as the corresponding task deadline notice column 23 , and the task deadline 231 displayed in each deadline column 45 represents the number of days that the task column 40 can undertake without expiring after the execution of the task column 40 starts.

於各績效欄46顯示與對應的績效告示欄24相同的該績效241,該績效241代表該任務列40被承辦後該負責人B能被計算為績效的點數或時間;當該負責人B完成執行中的任務列40時,以該輸入介面12點擊執行中的任務列40的該任務完成鈕402,請參看圖3、圖4所示,這時該任務完成鈕402消失並以顯示「已提交完成」的方式取而代之,且該任務列40的執行標記401亦取消,接著系 統將任務移交給該工作流程32的下一個編號41的任務列40,使其成為執行中的狀態,這時下一個編號41的任務列的進度狀況欄47會出現該任務完成鈕402且於任務列40顯示該執行標記。於各備註欄48內能逐筆新增文字的備註,於該檔案上傳欄49內設有按鈕提供使用者選擇檔案上傳至系統儲存。 In each performance column 46, the same performance 241 as the corresponding performance notice column 24 is displayed, and the performance 241 represents the points or time that the person in charge B can be calculated as performance after the task column 40 is undertaken; When completing the task bar 40 in execution, click the task completion button 402 of the task bar 40 in execution with the input interface 12, please refer to FIG. 3 and FIG. The method of "Submit Complete" is replaced, and the execution flag 401 of the task row 40 is also canceled, and then the The system will hand over the task to the task row 40 of the next number 41 of the work flow 32 to make it in the state of being executed. At this time, the task completion button 402 will appear in the progress status bar 47 of the task row of the next number 41 and the task will be completed. Column 40 displays the execution flag. Remarks with text can be added in each remark column 48 one by one, and a button is provided in the file uploading column 49 for the user to select a file to upload to the system for storage.

請參看圖1、圖3以及圖5、圖6所示,於該顯示器11顯示一績效計算選項50,以該輸入介面12點擊該績效計算選項50並選擇一時間週期51,即累計該負責人B於該時間週期51內顯示為「已提交完成」的,也就是點擊過該任務完成鈕402的各任務列40的該績效241,將累計的結果於該顯示器11顯示器顯示為一累計績效52,在本較佳實施例中該累計績效52是時數,例如在時間週期51為每個月初至月底的累計績效52可呈現該負責人B於當月完成的所有任務列40的累計績效52,將該累計績效52與當月上班總時數比較可作為檢討當月工作效率的參考。 Please refer to FIG. 1 , FIG. 3 , and FIG. 5 and FIG. 6 , a performance calculation option 50 is displayed on the display 11 , click the performance calculation option 50 with the input interface 12 and select a time period 51 , that is, the person in charge is accumulated B is displayed as "Submitted and completed" in the time period 51, that is, the performance 241 of each task column 40 of which the task completion button 402 has been clicked, and the cumulative result is displayed on the display 11 as a cumulative performance 52. , in this preferred embodiment, the cumulative performance 52 is the number of hours, for example, the cumulative performance 52 in the time period 51 from the beginning of each month to the end of the month can present the cumulative performance 52 of all task columns 40 completed by the person in charge B in the current month, Comparing the accumulated performance 52 with the total working hours of the month can be used as a reference for reviewing the working efficiency of the month.

以上所述僅為本發明的較佳實施例而已,並非用以限定本發明主張的權利範圍,凡其它未脫離本發明所揭示的精神所完成的等效改變或修飾,均應包括在本發明的申請專利範圍內。 The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the scope of rights claimed by the present invention. All other equivalent changes or modifications that do not depart from the spirit disclosed in the present invention shall be included in the present invention. within the scope of the patent application.

10:電腦裝置 10: Computer device

11:顯示器 11: Display

12:輸入介面 12: Input interface

A:專案管理程式 A: Project management program

B:負責人 B: The person in charge

Claims (7)

一種專案管理系統,其一輸入介面上顯示一屬於負責人的負責人主視窗,於該負責人主視窗顯示一個以上的任務告示牌,於各任務告示牌顯示一工作項目告示欄、一案號告示欄以及一專案名稱告示欄,於各工作項目告示欄、各案號告示欄以及各專案名稱告示欄分別顯示一工作項目、一案號以及一專案名稱,於各任務告示牌形成一專案連結,以該輸入介面點擊任一任務告示牌的專案連結後,於該輸入介面顯示一對應該任務告示牌的案號的專案頁面,其中:於該專案頁面顯示一看版以及一工作流程,於該看板顯示該專案頁面對應的該任務告示牌的該案號以及該專案名稱,於該看板以下顯示該工作流程,該工作流程包括複數個依序排列的任務列,其中一任務列為執行中的任務列,於該執行中的任務列顯示一執行標示,於各任務列顯示代表該工作流程各任務列承辦次序的一編號、一工作項目欄以及一負責人欄,該工作流程在同樣編號的各任務列都完成時將任務移交下一個編號的任務列,其中:執行中的任務列顯示一任務完成鈕,於各工作項目欄顯示與對應的工作項目告示欄相同的該工作項目,於各負責人欄顯示一負責人名稱,執行中的任務列依照該負責人名稱,於相同負責人的該負責人主視窗顯示為所述的任務告示牌,以該輸入介面點擊執行中的任務列的該任務完成鈕時,該任務列的該任務完成鈕消失且該任務列的該執行標記亦取消,並接著將任務移交給該工作流程的下一個編號的任務列,使得下一個編號的任務列成為執行中的狀態。 A project management system, an input interface displays a person-in-charge main window belonging to the person in charge, more than one task notice board is displayed on the person-in-charge main window, and each task notice board displays a work item notice board, a case number Notice board and a project name notice board, respectively display a work item, a case number and a project name on each work item notice board, each case number notice board and each project name notice board, and form a project link on each task notice board , after clicking the project link of any task notice board in the input interface, a pair of project pages corresponding to the case number of the task notice board will be displayed in the input interface, wherein: a first look version and a work flow are displayed on the project page, The kanban displays the case number and the project name of the task notice board corresponding to the project page, and the workflow is displayed below the kanban. The workflow includes a plurality of task columns arranged in sequence, one of which is in execution. In the task bar, an execution indicator is displayed in the task bar in execution, and each task bar displays a number, a work item column, and a person-in-charge column representing the execution order of each task bar in the workflow. When each of the task columns of the task line is completed, the task will be handed over to the task column with the next number. Among them: the task column in execution displays a task completion button, and each work item column displays the same work item as the corresponding work item notice column. Each person in charge column displays a name of the person in charge, and the task bar in execution is displayed as the task notice board in the main window of the person in charge of the same person in charge according to the name of the person in charge. Click on the task bar in execution through the input interface. When the task completion button is displayed, the task completion button of the task column disappears and the execution mark of the task column is also cancelled, and then the task is handed over to the next numbered task column of the workflow, so that the next numbered task The column becomes the executing state. 如請求項1之專案管理系統,其中於所述各任務告示牌進一步顯示一任務倒數告示欄,於各任務倒數告示欄顯示一以天數為單位的倒數數字;於所述各任務列顯示一剩餘天數欄,於執行中的任務列的該剩餘天數欄顯 示與對應的任務倒數告示欄相同的該倒數數字,當執行中的任務列的該倒數數字顯示為零以下時,於該執行中的任務列的該剩餘天數欄顯示一警示標記。 The project management system of claim 1, wherein a task countdown notice board is further displayed on each task notice board, a countdown number in days is displayed on each task countdown notice board; a remaining number is displayed on each task line Days column, which is displayed in the remaining days column of the task in execution column The same countdown number as the corresponding task countdown notice bar is displayed. When the countdown number of the executing task bar shows below zero, a warning mark is displayed in the remaining days column of the executing task bar. 如請求項2之專案管理系統,其中於所述各任務告示牌進一步顯示一任務期限告示欄,於各任務期限告示欄顯示一以天數為單位的任務期限,同一任務告示牌的該倒數數字等於該任務期限的天數扣除設立後經過天數的結果;於所述各任務列顯示一期限欄,於各期限欄顯示與對應的任務期限告示欄相同的該任務期限。 The project management system of claim 2, wherein a task deadline notice board is further displayed on each task notice board, a task deadline in days is displayed on each task limit notice board, and the reciprocal number of the same task notice board is equal to The number of days in the task period is the result of deducting the number of days after the establishment; a period column is displayed in each task column, and the task period that is the same as the corresponding task period notice column is displayed in each period column. 如請求項3之專案管理系統,其中於所述各任務告示牌進一步顯示一形式種類告示欄,於各形式種類告示欄顯示一任務種類,於該看板顯示與該專案頁面對應的該任務告示牌相同的該任務種類。 The project management system of claim 3, wherein each task notice board is further displayed with a form category notice board, a task type is displayed on each form type notice board, and the task notice board corresponding to the project page is displayed on the board. The same kind of task. 如請求項4之專案管理系統,其中於所述各任務告示牌進一步顯示一客戶告示欄以及一聯絡人告示欄,於各客戶告示欄與各聯絡人告示欄分別顯示一客戶名稱以及一聯絡人名稱,於該看板顯示與該專案頁面對應的該任務告示牌相同的該客戶名稱以及該聯絡人名稱。 The project management system of claim 4, wherein each task notice board is further displayed with a customer notice board and a contact person notice board, and a customer name and a contact person are respectively displayed on each customer notice board and each contact person notice board Name, the customer name and the contact person name that are the same as the task notice board corresponding to the project page are displayed on the kanban. 如請求項1至5中任一項之專案管理系統,其中於所述各任務告示牌顯示一績效告示欄,並於各績效告示欄顯示一績效,於所述各任務列顯示一績效欄,於各績效欄顯示與對應的任務期限告示欄相同的該績效;於該顯示器顯示一績效計算選項,以該輸入介面點擊該績效計算選項並選擇一時間週期,即累計該負責人於該時間週期內點擊過該任務完成鈕的各任務列的該績效,將累計的結果於該顯示器顯示為一累計績效。 The project management system according to any one of claims 1 to 5, wherein a performance notice column is displayed on each of the task notice boards, a performance is displayed on each performance notice column, and a performance column is displayed on each of the task columns, Display the same performance as the corresponding task deadline notice column in each performance column; display a performance calculation option on the display, click on the performance calculation option through the input interface and select a time period, that is, accumulatively the responsible person in the time period The performance of each task column in which the task completion button has been clicked will display the cumulative result as a cumulative performance on the display. 如請求項6之專案管理系統,其中所述的績效以及所述的累積績效都是時數,所述的警示標記是填充在該剩餘天數欄內的顏色,所述的執行標示是填充在該任務列內的顏色。 According to the project management system of claim 6, wherein the performance and the cumulative performance are hours, the warning mark is the color filled in the remaining days column, and the execution mark is filled in the The color within the task column.
TW109110921A 2020-03-31 2020-03-31 Project management system TWI765241B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW109110921A TWI765241B (en) 2020-03-31 2020-03-31 Project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW109110921A TWI765241B (en) 2020-03-31 2020-03-31 Project management system

Publications (2)

Publication Number Publication Date
TW202139084A TW202139084A (en) 2021-10-16
TWI765241B true TWI765241B (en) 2022-05-21

Family

ID=79601194

Family Applications (1)

Application Number Title Priority Date Filing Date
TW109110921A TWI765241B (en) 2020-03-31 2020-03-31 Project management system

Country Status (1)

Country Link
TW (1) TWI765241B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI403964B (en) * 2012-10-08 2013-08-01 Suz Tsung Wei Project management system
TWM510498U (en) * 2015-04-27 2015-10-11 Honlun Comm Co Ltd Project progress control and management device
CN105117845A (en) * 2015-08-25 2015-12-02 长沙市麓智信息科技有限公司 Patent agency internal management system
CN107610003A (en) * 2017-09-26 2018-01-19 武汉创研果知识产权服务有限公司 A kind of intellectual property process management system
WO2019049162A1 (en) * 2017-09-11 2019-03-14 Ingenious E-Brain Solutions Pvt Ltd Method and system for ip project management
TWM578423U (en) * 2018-11-09 2019-05-21 社團法人臺灣防災產業協會 Smart project management apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI403964B (en) * 2012-10-08 2013-08-01 Suz Tsung Wei Project management system
TWM510498U (en) * 2015-04-27 2015-10-11 Honlun Comm Co Ltd Project progress control and management device
CN105117845A (en) * 2015-08-25 2015-12-02 长沙市麓智信息科技有限公司 Patent agency internal management system
WO2019049162A1 (en) * 2017-09-11 2019-03-14 Ingenious E-Brain Solutions Pvt Ltd Method and system for ip project management
CN107610003A (en) * 2017-09-26 2018-01-19 武汉创研果知识产权服务有限公司 A kind of intellectual property process management system
TWM578423U (en) * 2018-11-09 2019-05-21 社團法人臺灣防災產業協會 Smart project management apparatus

Also Published As

Publication number Publication date
TW202139084A (en) 2021-10-16

Similar Documents

Publication Publication Date Title
US6119097A (en) System and method for quantification of human performance factors
Kashiwagi Case study: Best value procurement/performance information procurement system development
US20070150327A1 (en) Project management method and system
Abu Aisheh et al. Health and safety improvement in construction projects: a lean construction approach
Lopes et al. Pharmaceutical quality control laboratory digital twin–A novel governance model for resource planning and scheduling
US20140279628A1 (en) Systems and methods of managing employee teams
Amos et al. Developing key performance indicators for hospital facilities management services: a developing country perspective
US20040012638A1 (en) System and method of electronic commitment tracking
US20140279634A1 (en) Web-based employer-employee networking system
US20100017738A1 (en) Project tracking software with compact visual elements that indicate task completion and overdue status
Alameri et al. Assessing the risk level of the challenges faced in construction projects
JP5464006B2 (en) Information processing apparatus and program
de Sivatte et al. The effects of site experience on job performance: a missing element in work experience
Ritti et al. Professional pluralism in an industrial organization
TWI765241B (en) Project management system
Dunavin et al. Principles of continuous quality improvement applied to intravenous therapy
US20140278658A1 (en) Systems and methods for cloning employee teams
Wieczerniak et al. Root cause analysis methods as a tool of effective change
Fadzil et al. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries
Adeyekun An Assessment of Poor Communication between the Contractor and Subcontractor
US20170255605A1 (en) Annotations and Issue Tracking for Graphical Data
Miles Improvement in the incident reporting and investigation procedures using process excellence (DMAI2C) methodology
JP6912148B2 (en) Personnel management system
Inuwa et al. Application of Project Planning Techniques in Construction Procurement: The case of nigerian indigenous contractors
Lines et al. Organizational implementation of best value project delivery: impact of value-based procurement, preplanning, and risk management