TWI765241B - Project management system - Google Patents
Project management system Download PDFInfo
- Publication number
- TWI765241B TWI765241B TW109110921A TW109110921A TWI765241B TW I765241 B TWI765241 B TW I765241B TW 109110921 A TW109110921 A TW 109110921A TW 109110921 A TW109110921 A TW 109110921A TW I765241 B TWI765241 B TW I765241B
- Authority
- TW
- Taiwan
- Prior art keywords
- task
- column
- displayed
- notice board
- project
- Prior art date
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本發明涉及一種電腦管理系統的介面,尤其涉及一種專案管理系統。 The invention relates to an interface of a computer management system, in particular to a project management system.
為了管理專案的進行以及任務的分配,有人以共筆的電腦報表對專案的各項任務進行分配與管理,透過電腦報表對於專案進行的各項流程以及各項流程的時間、執行的負責人進行管控。 In order to manage the progress of the project and the assignment of tasks, someone assigns and manages the various tasks of the project with computer reports that are written together. Control.
上述透過電腦報表的方式雖能進行一定程度的專案管理,但由於專案的各項流程還需要各負責人自行確認進度以及時間,因此有可能在專案進行的過程中產生疏漏以及時間延遲的問題,需要以更能提醒負責人承辦的較佳系統來管控專案進行的各個流程的任務。 Although the above-mentioned method of computer reporting can carry out a certain degree of project management, because the various processes of the project still require the person in charge to confirm the progress and time, there may be omissions and time delays in the process of the project. A better system that better alerts the responsible person to undertake the tasks of each process of the project needs to be managed.
由於現有以電腦報表登載不同專案負責人工作的表格在使用上容易產生任務的混淆且任務移交流程不易管理。為此,本發明設計一種專案管理系統,透過將專案中相同負責人的執行中任務列都歸屬於同一負責人主視窗的方式,達到較佳的專案管理效果。 Because the existing forms for reporting the work of different project leaders in computer reports are prone to task confusion and the task handover process is not easy to manage. Therefore, the present invention designs a project management system, which achieves a better project management effect by assigning all the executing task columns of the same person in charge in the project to the main window of the same person in charge.
為達到上述目的,本發明提供一種專案管理系統,包括一電腦裝置,該電腦裝置包括一顯示器以及一輸入介面,於該顯示器顯示一屬於負責人 的負責人主視窗,於該負責人主視窗顯示一個以上的任務告示牌,於各任務告示牌顯示一工作項目告示欄、一案號告示欄以及一專案名稱告示欄,於各工作項目告示欄、各案號告示欄以及各專案名稱告示欄分別顯示一工作項目、一案號以及一專案名稱,於各任務告示牌形成一專案連結,以該輸入介面點擊任一任務告示牌的專案連結後,於該顯示器顯示一對應該任務告示牌的案號的專案頁面,其中:於該專案頁面顯示一看版以及一工作流程,於該看板顯示該專案頁面對應的該任務告示牌的該案號以及該專案名稱,於該看板以下顯示該工作流程,該工作流程包括一個以上依序排列的任務列,其中一任務列為執行中的任務列,於該執行中的任務列顯示一執行標示,於各任務列顯示一編號、一工作項目欄以及一負責人欄,並於執行中的任務列顯示一任務完成鈕,於各工作項目欄顯示與對應的工作項目告示欄相同的該工作項目,於各負責人欄顯示一負責人名稱,執行中的任務列依照該負責人名稱,於相同負責人的該負責人主視窗顯示為所述的任務告示牌,以該輸入介面點擊執行中的任務列的該任務完成鈕時,該任務列的該任務完成鈕消失並將任務移交給該工作流程的下一個編號的任務列,使其成為執行中的狀態。 In order to achieve the above object, the present invention provides a project management system, including a computer device, the computer device includes a display and an input interface, on the display a project belonging to the person in charge is displayed. In the main window of the person in charge, more than one task notice board is displayed in the main window of the person in charge, and a work item notice board, a case number notice board and a project name notice board are displayed on each task notice board, and each work item notice board is displayed. , each case number notice column and each project name notice column respectively display a work item, a case number and a project name, and a project link is formed on each task notice board. Click the project link of any task notice board through the input interface. , display a pair of project pages corresponding to the case number of the task notice board on the display, wherein: a first-look version and a work flow are displayed on the project page, and the case number of the task notice board corresponding to the project page is displayed on the board and the project name, the workflow is displayed below the kanban, the workflow includes one or more task columns arranged in sequence, one of the task columns is a running task column, and an execution indicator is displayed in the running task column, A number, a work item column and a person-in-charge column are displayed in each task column, a task completion button is displayed in the executing task column, and the same work item as the corresponding work item notice column is displayed in each work item column, A name of the person in charge is displayed in the column of each person in charge, and the task being executed is displayed in the main window of the person in charge according to the name of the person in charge. The main window of the person in charge of the same person is displayed as the task notice board, and the task in execution is clicked on the input interface. When the task completion button of the task column is clicked, the task completion button of the task column disappears and the task is handed over to the next numbered task column of the workflow, making it a state of execution.
進一步,本發明於所述各任務告示牌進一步顯示一任務倒數告示欄,於各任務倒數告示欄顯示一以天數為單位的倒數數字,於所述各任務列顯示一剩餘天數欄,於執行中的任務列的該剩餘天數欄顯示與對應的任務倒數告示欄相同的該倒數數字,當執行中的任務列的該倒數數字顯示為零以下時,於該執行中的任務列的該剩餘天數欄顯示一警示標記。 Further, in the present invention, a task countdown notice board is further displayed on each task notice board, a countdown number in days is displayed on each task countdown notice board, and a remaining days column is displayed on each task line. The remaining days column of the task column displays the same countdown number as the corresponding task countdown notice column. When the countdown number of the running task column is displayed below zero, the remaining days column of the running task column displays the same countdown number. A warning sign is displayed.
進一步,本發明於所述各任務告示牌進一步顯示一任務期限告示欄,於各任務期限告示欄顯示一以天數為單位的任務期限,同一任務告示牌的 該倒數數字等於該任務期限的天數扣除設立後經過天數的結果;於所述各任務列顯示一期限欄,於各期限欄顯示與對應的任務期限告示欄相同的該任務期限。 Further, the present invention further displays a task deadline notice board on each task notice board, and displays a task deadline in days on each task limit notice board. The countdown number is equal to the result of deducting the number of days after the establishment of the task deadline from the number of days; a deadline column is displayed in each task column, and each deadline column displays the same task deadline as the corresponding task deadline notice column.
進一步,本發明於所述各任務告示牌進一步顯示一形式種類告示欄,於各形式種類告示欄顯示一任務種類,於該看板顯示與該專案頁面對應的該任務告示牌相同的該任務種類。 Further, the present invention further displays a form type notice board on each task notice board, displays a task type on each form type notice board, and displays the task type same as the task notice board corresponding to the project page on the board.
進一步,本發明於所述各任務告示牌進一步顯示一客戶告示欄以及一聯絡人告示欄,於各客戶告示欄與各聯絡人告示欄分別顯示一客戶名稱以及一聯絡人名稱,於該看板顯示與該專案頁面對應的該任務告示牌相同的該客戶名稱以及該聯絡人名稱。 Further, the present invention further displays a customer notice board and a contact person notice board on each task notice board, and respectively displays a customer name and a contact person name on each customer notice board and each contact person notice board, and displays on the board. The client name and the contact person name are the same as the task notice board corresponding to the project page.
更進一步,本發明於所述各任務告示牌顯示一績效告示欄,並於各績效告示欄顯示一績效,於所述各任務列顯示一績效欄,於各績效欄顯示與對應的任務期限告示欄相同的該績效;於該顯示器顯示一績效計算選項,以該輸入介面點擊該績效計算選項並選擇一時間週期,即累計該負責人於該時間週期內點擊過該任務完成鈕的各任務列的該績效,將累計的結果於該顯示器顯示為一累計績效。 Further, in the present invention, a performance notice board is displayed on each task notice board, and a performance notice board is displayed on each performance notice board, a performance column is displayed on each task column, and a corresponding task deadline notice is displayed on each performance column. display a performance calculation option on the display, click on the performance calculation option on the input interface and select a time period, that is, the task columns for which the person in charge has clicked the task completion button during the time period are accumulated. the performance, the cumulative result will be displayed on the display as a cumulative performance.
較佳的,本發明所述的績效以及所述的累積績效都是時數,所述的警示標記是填充在該剩餘天數欄內的顏色,所述的執行標示是填充在該任務列內的顏色。 Preferably, the performance and the cumulative performance of the present invention are both hours, the warning mark is the color filled in the remaining days column, and the execution mark is filled in the task column. color.
當使用者也就是負責人使用本發明時,能由該負責人主視窗的一個以上的任務告示牌,看出所有屬於他負責且執行中的任務列的工作項目、案號以及專案名稱,並且當想要知道某個案號的專案執行的狀況時,通過點擊各專案連結的方式能進入對應的各專案頁面中,確認各工作流程的任務列的進行狀況。 When the user, that is, the person in charge, uses the present invention, the person in charge can see all the work items, case numbers and project names belonging to the task column that he is responsible for and is executing from one or more task notices in the main window of the person in charge, and When you want to know the project execution status of a certain case number, you can click on the link of each project to enter the corresponding project page, and check the progress status of the task bar of each workflow.
當負責人完成任務後可點擊執行中的任務列的任務完成鈕,將任務移交給下一個編號的任務列,使下一個編號的任務列成為執行中的狀態,讓對應此任務列的任務告示牌顯示於相應負責人的負責人主視窗,達到本發明能利用負責人主視窗提醒負責人處理與其有關的任務列,且依照設定的順序移交任務列給相應負責人依序處理的功效,達到較佳的專案管理效果。 When the person in charge completes the task, he can click the task completion button in the task column under execution to transfer the task to the next numbered task column, so that the next numbered task column is in the executing state, and the task corresponding to this task column will be notified. The card is displayed in the main window of the person in charge of the corresponding person in charge, so that the present invention can use the main window of the person in charge to remind the person in charge to deal with the task list related to it, and hand over the task list to the corresponding person in charge according to the set order. Better project management effect.
10:電腦裝置 10: Computer device
11:顯示器 11: Display
12:輸入介面 12: Input interface
20:任務告示牌 20: Mission Notice Board
201:專案連結 201: Project Links
21:任務倒數告示欄 21: Task countdown notice board
211:倒數數字 211: countdown number
22:工作項目告示欄 22: Work Item Notice Board
221:工作項目 221: Work Items
23:任務期限告示欄 23: Task deadline notice board
231:任務期限 231: Mission Deadline
24:績效告示欄 24: Performance Bulletin Board
241:績效 241: Performance
25:案號告示欄 25: Case number notice board
251:案號 251: case number
26:形式種類告示欄 26: Form type notice board
261:任務種類 261: Task Type
27:客戶告示欄 27: Customer notice board
271:客戶名稱 271:Customer name
28:聯絡人告示欄 28: Contact Notice Board
281:聯絡人名稱 281: Contact name
29:專案名稱告示欄 29: Project name notice board
291:專案名稱 291:Project name
30:專案頁面 30: Project page
31:看版 31: see version
32:工作流程 32: Workflow
40:任務列 40: Task column
401:執行標示 401: Execution flag
402:任務完成鈕 402: task completion button
403:警示標記 403: Warning sign
41:編號 41:Number
42:工作項目欄 42: Work item column
43:負責人欄 43: Responsible column
431:負責人名稱 431: Name of person in charge
44:剩餘天數欄 44: Remaining days column
45:期限欄 45: Deadline column
46:績效欄 46: Performance column
47:進度狀況欄 47: Progress status bar
48:備註欄 48: Remarks column
49:檔案上傳欄 49: File upload bar
50:績效計算選項 50: Performance Calculation Options
51:時間週期 51: Time Period
52:累計績效 52: Cumulative Performance
A:專案管理程式 A: Project management program
B:負責人 B: The person in charge
C:負責人主視窗 C: Responsible main window
圖1是本發明較佳實施例的系統示意圖。 FIG. 1 is a system schematic diagram of a preferred embodiment of the present invention.
圖2是本發明較佳實施例的負責人主視窗的示意圖。 FIG. 2 is a schematic diagram of the main window of the person in charge of the preferred embodiment of the present invention.
圖3是本發明較佳實施例的專案頁面的示意圖。 FIG. 3 is a schematic diagram of a project page according to a preferred embodiment of the present invention.
圖4是本發明較佳實施例的專案頁面操作後的示意圖。 FIG. 4 is a schematic diagram of the project page after operation according to the preferred embodiment of the present invention.
圖5是本發明較佳實施例的績效計算選項的示意圖。 FIG. 5 is a schematic diagram of the performance calculation options of the preferred embodiment of the present invention.
圖6是本發明較佳實施例的操作績效計算選項的示意圖。 FIG. 6 is a schematic diagram of the operational performance calculation options of the preferred embodiment of the present invention.
為能詳細瞭解本發明的技術特徵及實用功效,並可依照說明書的內容來實施,進一步以如圖式所示的較佳實施例,詳細說明如下。 In order to understand the technical features and practical effects of the present invention in detail, and to implement it according to the contents of the description, the preferred embodiments shown in the drawings are further described in detail as follows.
請參看如圖1至圖3所示的本發明較佳實施例,本發明提供一種專案管理系統,包括一電腦裝置10,該電腦裝置10包括一顯示器11以及一輸入介面12,該電腦裝置10執行一專案管理程式A,可於本地端執行或者透過瀏覽器於網際網路的雲端執行,該專案管理程式A於該顯示器11顯示一屬於負責人B的負責人主視窗C,於該負責人主視窗C顯示一個以上的任務告示牌20,如本較佳實施例是顯示三個任務告示牌20,於各任務告示牌20顯示一任務倒數告示欄21、
一工作項目告示欄22、一任務期限告示欄23、一績效告示欄24、一案號告示欄25、一形式種類告示欄26、一客戶告示欄27、一聯絡人告示欄28以及一專案名稱告示欄29。
Please refer to the preferred embodiments of the present invention as shown in FIG. 1 to FIG. 3 , the present invention provides a project management system including a
於各任務倒數告示欄21顯示一以天數為單位的倒數數字211,於各工作項目告示欄22顯示一工作項目221,於各任務期限告示欄23顯示一以天數為單位的任務期限231,同一任務告示牌20的該倒數數字211等於該任務期限231的天數扣除該任務期限231設立後經過天數的結果;於各績效告示欄24顯示一績效241,該績效241可以是績效的點數或者時數,如本較佳實施例中該績效241是時數,例如天、小時或分鐘等時數,於各案號告示欄25顯示一案號251,於各形式種類告示欄26顯示一任務種類261,於各客戶告示欄27與各聯絡人告示欄28分別顯示一客戶名稱271以及一聯絡人名稱281,並且於各專案名稱告示欄29顯示一專案名稱291。於各任務告示牌20形成一專案連結201,如本較佳實施例中各專案連結201是形成在各專案名稱291,以該輸入介面12點擊任一任務告示牌20的專案連結201後,會在該顯示器11顯示一對應該任務告示牌20的案號251的專案頁面30,其中:於該專案頁面30顯示一看版31以及一工作流程32,於該看版31顯示該專案頁面30對應的任務告示牌20的案號251、任務種類261、客戶名稱271、聯絡人名稱281以及專案名稱291,於該看版31以下顯示該工作流程32,該工作流程32包括一個以上依序排列的任務列40,其中至少一任務列40為執行中的任務列40,於該執行中的任務列40顯示一執行標示401,如本較佳實施例該執行標示401是填充在該任務列40內的顏色例如黃色,於各任務列40顯示一編號41、一工作項目欄42、一負責人欄43、一剩餘天數欄44、一期限欄45、一績效欄46、一進度狀況欄47、一備註欄48以及一檔案上傳欄49,於執行中的任務列
40進一步顯示一任務完成鈕402,如本較佳實施例中該任務完成鈕402顯示在該進度狀況欄47內。
A
各編號41如本較佳實施例是以數字的方式顯示,代表該工作流程32的各任務列40的承辦次序,部分的任務列40可以具有同樣的編號41,這時要在同樣編號41的任務列40都完成之後才會將任務移交下一個編號41的任務列40;於各工作項目欄42顯示與對應的工作項目告示欄22相同的該工作項目221,於各負責人欄43顯示一負責人名稱431,執行中的任務列40依照該負責人名稱431,於相同負責人B的該負責人主視窗C顯示為所述的任務告示牌20;例如於該工作流程中若有兩執行中的任務列40,至少一執行中的任務列40的負責人名稱431為該負責人B,若另一執行中的任務列40的負責人名稱431為另一負責人,則此執行中的任務列40對應的任務告示牌20會顯示於另一負責人所屬的另一負責人主視窗。
Each
於執行中的任務列40的該剩餘天數欄44顯示與對應的任務倒數告示欄21相同的該任務倒數告示欄21,當執行中的任務列40的該任務倒數告示欄21顯示為零以下時,於該執行中的任務列40的該剩餘天數欄44顯示一警示標記403,如本較佳實施例中該警示標記403是填充在該剩餘天數欄44內的顏色例如紅色;於各期限欄45顯示與對應的任務期限告示欄23相同的該任務期限231,各期限欄45內顯示的任務期限231代表該任務列40開始執行後能夠承辦而不至於過期的天數。
The remaining
於各績效欄46顯示與對應的績效告示欄24相同的該績效241,該績效241代表該任務列40被承辦後該負責人B能被計算為績效的點數或時間;當該負責人B完成執行中的任務列40時,以該輸入介面12點擊執行中的任務列40的該任務完成鈕402,請參看圖3、圖4所示,這時該任務完成鈕402消失並以顯示「已提交完成」的方式取而代之,且該任務列40的執行標記401亦取消,接著系
統將任務移交給該工作流程32的下一個編號41的任務列40,使其成為執行中的狀態,這時下一個編號41的任務列的進度狀況欄47會出現該任務完成鈕402且於任務列40顯示該執行標記。於各備註欄48內能逐筆新增文字的備註,於該檔案上傳欄49內設有按鈕提供使用者選擇檔案上傳至系統儲存。
In each
請參看圖1、圖3以及圖5、圖6所示,於該顯示器11顯示一績效計算選項50,以該輸入介面12點擊該績效計算選項50並選擇一時間週期51,即累計該負責人B於該時間週期51內顯示為「已提交完成」的,也就是點擊過該任務完成鈕402的各任務列40的該績效241,將累計的結果於該顯示器11顯示器顯示為一累計績效52,在本較佳實施例中該累計績效52是時數,例如在時間週期51為每個月初至月底的累計績效52可呈現該負責人B於當月完成的所有任務列40的累計績效52,將該累計績效52與當月上班總時數比較可作為檢討當月工作效率的參考。
Please refer to FIG. 1 , FIG. 3 , and FIG. 5 and FIG. 6 , a
以上所述僅為本發明的較佳實施例而已,並非用以限定本發明主張的權利範圍,凡其它未脫離本發明所揭示的精神所完成的等效改變或修飾,均應包括在本發明的申請專利範圍內。 The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the scope of rights claimed by the present invention. All other equivalent changes or modifications that do not depart from the spirit disclosed in the present invention shall be included in the present invention. within the scope of the patent application.
10:電腦裝置 10: Computer device
11:顯示器 11: Display
12:輸入介面 12: Input interface
A:專案管理程式 A: Project management program
B:負責人 B: The person in charge
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW109110921A TWI765241B (en) | 2020-03-31 | 2020-03-31 | Project management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW109110921A TWI765241B (en) | 2020-03-31 | 2020-03-31 | Project management system |
Publications (2)
Publication Number | Publication Date |
---|---|
TW202139084A TW202139084A (en) | 2021-10-16 |
TWI765241B true TWI765241B (en) | 2022-05-21 |
Family
ID=79601194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW109110921A TWI765241B (en) | 2020-03-31 | 2020-03-31 | Project management system |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI765241B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI403964B (en) * | 2012-10-08 | 2013-08-01 | Suz Tsung Wei | Project management system |
TWM510498U (en) * | 2015-04-27 | 2015-10-11 | Honlun Comm Co Ltd | Project progress control and management device |
CN105117845A (en) * | 2015-08-25 | 2015-12-02 | 长沙市麓智信息科技有限公司 | Patent agency internal management system |
CN107610003A (en) * | 2017-09-26 | 2018-01-19 | 武汉创研果知识产权服务有限公司 | A kind of intellectual property process management system |
WO2019049162A1 (en) * | 2017-09-11 | 2019-03-14 | Ingenious E-Brain Solutions Pvt Ltd | Method and system for ip project management |
TWM578423U (en) * | 2018-11-09 | 2019-05-21 | 社團法人臺灣防災產業協會 | Smart project management apparatus |
-
2020
- 2020-03-31 TW TW109110921A patent/TWI765241B/en active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI403964B (en) * | 2012-10-08 | 2013-08-01 | Suz Tsung Wei | Project management system |
TWM510498U (en) * | 2015-04-27 | 2015-10-11 | Honlun Comm Co Ltd | Project progress control and management device |
CN105117845A (en) * | 2015-08-25 | 2015-12-02 | 长沙市麓智信息科技有限公司 | Patent agency internal management system |
WO2019049162A1 (en) * | 2017-09-11 | 2019-03-14 | Ingenious E-Brain Solutions Pvt Ltd | Method and system for ip project management |
CN107610003A (en) * | 2017-09-26 | 2018-01-19 | 武汉创研果知识产权服务有限公司 | A kind of intellectual property process management system |
TWM578423U (en) * | 2018-11-09 | 2019-05-21 | 社團法人臺灣防災產業協會 | Smart project management apparatus |
Also Published As
Publication number | Publication date |
---|---|
TW202139084A (en) | 2021-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6119097A (en) | System and method for quantification of human performance factors | |
Kashiwagi | Case study: Best value procurement/performance information procurement system development | |
US20070150327A1 (en) | Project management method and system | |
Abu Aisheh et al. | Health and safety improvement in construction projects: a lean construction approach | |
Lopes et al. | Pharmaceutical quality control laboratory digital twin–A novel governance model for resource planning and scheduling | |
US20140279628A1 (en) | Systems and methods of managing employee teams | |
Amos et al. | Developing key performance indicators for hospital facilities management services: a developing country perspective | |
US20040012638A1 (en) | System and method of electronic commitment tracking | |
US20140279634A1 (en) | Web-based employer-employee networking system | |
US20100017738A1 (en) | Project tracking software with compact visual elements that indicate task completion and overdue status | |
Alameri et al. | Assessing the risk level of the challenges faced in construction projects | |
JP5464006B2 (en) | Information processing apparatus and program | |
de Sivatte et al. | The effects of site experience on job performance: a missing element in work experience | |
Ritti et al. | Professional pluralism in an industrial organization | |
TWI765241B (en) | Project management system | |
Dunavin et al. | Principles of continuous quality improvement applied to intravenous therapy | |
US20140278658A1 (en) | Systems and methods for cloning employee teams | |
Wieczerniak et al. | Root cause analysis methods as a tool of effective change | |
Fadzil et al. | Need of risk management practice amongst bumiputera contractors in Malaysia construction industries | |
Adeyekun | An Assessment of Poor Communication between the Contractor and Subcontractor | |
US20170255605A1 (en) | Annotations and Issue Tracking for Graphical Data | |
Miles | Improvement in the incident reporting and investigation procedures using process excellence (DMAI2C) methodology | |
JP6912148B2 (en) | Personnel management system | |
Inuwa et al. | Application of Project Planning Techniques in Construction Procurement: The case of nigerian indigenous contractors | |
Lines et al. | Organizational implementation of best value project delivery: impact of value-based procurement, preplanning, and risk management |