TWI628347B - Pre-buried leakage prevention method for window frame - Google Patents

Pre-buried leakage prevention method for window frame Download PDF

Info

Publication number
TWI628347B
TWI628347B TW106136634A TW106136634A TWI628347B TW I628347 B TWI628347 B TW I628347B TW 106136634 A TW106136634 A TW 106136634A TW 106136634 A TW106136634 A TW 106136634A TW I628347 B TWI628347 B TW I628347B
Authority
TW
Taiwan
Prior art keywords
window frame
infusion
venting
buried
leakage prevention
Prior art date
Application number
TW106136634A
Other languages
Chinese (zh)
Other versions
TW201917269A (en
Inventor
張展祥
Original Assignee
張展祥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 張展祥 filed Critical 張展祥
Priority to TW106136634A priority Critical patent/TWI628347B/en
Application granted granted Critical
Publication of TWI628347B publication Critical patent/TWI628347B/en
Publication of TW201917269A publication Critical patent/TW201917269A/en

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

一種窗框的預埋式防漏方法,包含一預埋步驟、一開孔步驟、一通氣步驟、一密封步驟,及一灌注步驟。在該預埋步驟中,將至少一注漿管預埋於該凹槽內。在該開孔步驟中,於該窗框上開設出多個透氣孔。在該通氣步驟中,由該至少一注漿管輸入氣體並確認是否會由該等透氣孔輸出,確認後設置多個連通該等透氣孔的透氣管。在該密封步驟中,對該窗框及該牆體間的連接處進行封膠。在該灌注步驟中,對該至少一注漿管輸入灌注劑,直至其入該等透氣管中。透過在該窗框安裝時便預先將注漿管埋設於該凹槽內,往後僅需由該至少一注漿管進行灌注即可。A pre-buried leakproof method for a window frame includes a pre-buried step, an opening step, a venting step, a sealing step, and a pouring step. In the pre-buried step, at least one grouting tube is pre-buried in the recess. In the opening step, a plurality of vent holes are formed in the window frame. In the venting step, the gas is input from the at least one grouting pipe to confirm whether or not the gas is discharged from the vent holes, and a plurality of vent pipes that communicate with the vent holes are provided after confirmation. In the sealing step, the joint between the window frame and the wall is sealed. In the infusion step, the infusion agent is input to the at least one grouting tube until it enters the venting tubes. When the sash is installed, the grouting pipe is embedded in the groove in advance, and only the at least one grouting pipe is required to inject thereafter.

Description

窗框的預埋式防漏方法Pre-buried leakage prevention method for window frame

本發明是有關於一種防漏方法,特別是指一種窗框的預埋式防漏方法。The invention relates to a leakage prevention method, in particular to a pre-buried leakage prevention method for a window frame.

一般的窗框是以鋁擠件構成,且其在外周圍繞出一凹槽,當將窗框結合於牆體上時,凹槽會朝向牆體而使窗框與牆體間產生空隙,當遇到大雨或天氣過於潮濕時,水分便容易由這些空隙進入而導致漏水並破壞結構。為了避免水分由窗框附近滲入凹槽,往往需要另外進行防漏工程。一般的防漏工程通常會在鄰近窗框的外圍牆體上鑽孔,並灌入灌注劑以將凹槽填滿,進而達到防水之功效。但由於鑽設出孔洞需要與被牆體及窗框遮蔽的凹槽連通,故此一鑽孔工程相當考驗施工人員的技術,不純熟的施工人員很可能要花上大把時間,甚至鑽設出許多無法使用的孔洞而破壞牆體結構強度,不僅費時費力,事後還需重新填補,造成施工效率低落。The general window frame is made of aluminum extrusion, and it surrounds a groove on the outer circumference. When the window frame is coupled to the wall, the groove will face the wall to create a gap between the window frame and the wall. In the event of heavy rain or when the weather is too humid, moisture can easily enter through these voids, causing water leakage and damaging the structure. In order to prevent moisture from penetrating into the groove near the window frame, it is often necessary to perform additional leak prevention works. In general, leak-proof works usually drill holes in the outer wall of the adjacent window frame, and fill the filling agent to fill the groove to achieve the waterproof effect. However, since the drilling holes need to be connected with the grooves covered by the wall and the window frame, the drilling project is quite a test of the construction personnel's technology, and the impure construction workers may take a lot of time or even drill out. Many unusable holes break the strength of the wall structure, which is not only time-consuming and laborious, but also needs to be refilled afterwards, resulting in low construction efficiency.

因此,本發明之目的,即在提供一種預先埋設而不會有鑽孔問題的防漏方法。Accordingly, it is an object of the present invention to provide a leak proof method that is pre-embedded without the problem of drilling.

於是,本發明窗框的預埋式防漏方法,適用於一設置於一牆體上的窗框,該窗框圍繞出一朝向該牆體的凹槽。該預埋式防漏方法包含一預埋步驟、一開孔步驟、一通氣步驟、一密封步驟,及一灌注步驟。Therefore, the pre-buried leakage prevention method of the window frame of the present invention is applicable to a window frame disposed on a wall, and the window frame surrounds a groove facing the wall. The pre-buried leakage prevention method comprises a pre-buried step, an opening step, a venting step, a sealing step, and a pouring step.

在該預埋步驟中,將至少一表面開設有複數開孔的注漿管預埋於該凹槽內。在該開孔步驟中,於該窗框上開設出多個連通該凹槽的透氣孔。在該通氣步驟中,由該至少一注漿管的任一端輸入氣體,確認氣體是否會由該等透氣孔輸出,確認後設置多個連通該等透氣孔的透氣管。在該密封步驟中,對該窗框及該牆體之間的連接處進行封膠。在該灌注步驟中,對該至少一注漿管輸入灌注劑,直至灌注劑流入該等透氣管中。In the pre-embedding step, at least one grouting tube having a plurality of open surfaces and a plurality of openings is embedded in the recess. In the opening step, a plurality of vent holes that communicate with the groove are formed in the window frame. In the venting step, gas is input from either end of the at least one grouting tube to confirm whether the gas is outputted from the vent holes, and a plurality of vent pipes that communicate with the vent holes are provided after confirmation. In the sealing step, the joint between the window frame and the wall is sealed. In the infusion step, the infusion agent is input to the at least one grouting tube until the infusion agent flows into the gas permeable tubes.

本發明之功效在於:透過預先將具有複數開孔的注漿管在該窗框安裝時便埋設於該凹槽內,往後在進行防漏施工的後續步驟時,便不需再於該牆體上開設灌注孔,僅需由該至少一注漿管進行灌注即可,從而可避免因於該牆體上鑽孔不當而產生的各種問題。The utility model has the advantages that the grouting pipe having a plurality of openings is embedded in the groove when the window frame is installed in advance, and the subsequent step of the leakproof construction is not required in the subsequent step. The filling hole is opened in the body, and only the at least one grouting pipe is required for infusion, so that various problems caused by improper drilling on the wall can be avoided.

在本發明被詳細描述之前,應當注意在以下的說明內容中,類似的元件是以相同的編號來表示。Before the present invention is described in detail, it should be noted that in the following description, similar elements are denoted by the same reference numerals.

參閱圖1、圖2,及圖3,本發明窗框11的預埋式防漏方法之一第一實施例,適用於一設置於一牆體12上的窗框11。該窗框11圍繞出一朝向該牆體12的凹槽111,並包含一下框體112、二相間隔地設置於該下框體112的左右兩端的側框體113,及一連接該等側框體113的上框體114。Referring to FIG. 1, FIG. 2, and FIG. 3, a first embodiment of the pre-buried leakage prevention method of the window frame 11 of the present invention is applicable to a window frame 11 disposed on a wall 12. The sash 11 surrounds a groove 111 facing the wall 12, and includes a lower frame 112, two side frames 113 spaced apart from each other at the left and right ends of the lower frame 112, and a side connecting the sides The upper frame 114 of the frame 113.

參閱圖1、圖4,及圖5,該預埋式防漏方法包含一預埋步驟21、一開孔步驟22、一通氣步驟23、一密封步驟24,及一灌注步驟25。在該預埋步驟21中,將三個表面開設有複數開孔30的注漿管3分別對應該下框體112及該等側框體113如圖6所示地埋設於該凹槽111內。需要特別說明的是,該預埋步驟21通常是在該窗框11欲安裝於該牆體12上時進行,以達到預先安裝之功效。每一注漿管3的兩端是穿出該牆體12或該窗框11,並以其他物件(圖未示)遮擋或封設。Referring to FIG. 1, FIG. 4, and FIG. 5, the pre-buried leakage prevention method includes a pre-buried step 21, an opening step 22, a ventilation step 23, a sealing step 24, and a filling step 25. In the pre-embedding step 21, the grouting tubes 3 having the plurality of openings 30 on the three surfaces are respectively embedded in the recesses 111 corresponding to the lower frame 112 and the side frames 113 as shown in FIG. . It should be specially noted that the pre-embedding step 21 is usually performed when the window frame 11 is to be mounted on the wall 12 to achieve pre-installation effect. Both ends of each grouting pipe 3 pass through the wall 12 or the sash 11 and are shielded or sealed by other objects (not shown).

參閱圖1及圖7,在該開孔步驟22中,在該下框體112及該等側框體113的相對最高處開設出複數透氣孔41。參閱圖1、圖8,及圖9,在該通氣步驟23中,對每一注漿管3的任一端輸入氣體,並確認氣體是否會由該等透氣孔41出氣,也就是確認該等注漿管3、該凹槽111及該等透氣孔41是否相連通。在確認可通氣後便於該等透氣孔41上設置相互連通的透氣管42。在該密封步驟24中,在該窗框11及該牆體12之間的連接處塗覆封膠,朝向室外的一側需要較高的抗潮濕度,因此塗覆矽氧樹脂(silicone),而朝向室內的一側因潮濕程度較低,因此塗覆AB膠即可。Referring to FIGS. 1 and 7, in the opening step 22, a plurality of vent holes 41 are formed at the relatively highest positions of the lower frame 112 and the side frames 113. Referring to Figures 1, 8, and 9, in the venting step 23, gas is input to either end of each of the grouting tubes 3, and it is confirmed whether the gas will be vented by the venting holes 41, that is, the same is confirmed. Whether the slurry pipe 3, the groove 111 and the vent holes 41 are in communication. After the ventilating is confirmed, it is convenient to provide the venting pipes 42 which are in communication with each other on the vent holes 41. In the sealing step 24, the sealant is applied at the joint between the window frame 11 and the wall 12, and the side facing the outside needs a high moisture resistance, so that a silicone resin is applied. The side facing the room is low in moisture, so the AB glue can be applied.

在該灌注步驟25中,先灌注對應該下框體112的注漿管3,並由該注漿管3相反兩端之開口同時注入灌注劑,灌注劑會由該注漿管3注入該凹槽111,並在堆積至足夠高度後由該下框體112上的該等透氣管42中流出,當施工人員目視到灌注劑流入前述的透氣管42中時,即可停止灌注動作。接著再交互地灌注其餘兩個對應該等側框體113的注漿管3,同樣地,每一注漿管3在灌注時,也是由該注漿管3的兩端同時輸入灌注劑,灌注劑會由該等注漿管3進入該凹槽111,並繼續由兩側填充該凹槽111,填充完位於兩側的凹槽111部分後,便開始填充位於上方的凹槽111部分,當灌注劑將所有的凹槽111灌滿後,便會由位於該等側框體113最高處的該等透氣管42中溢出,當施工人員目視到灌注劑流入前述的透氣管42中時,便可停止灌注並完成灌注動作。在施工完畢後便可將該等透氣管42移除,並填補該等透氣孔41。該等透氣管42的開口通常是朝向下方,故可在該等透氣管42下方設置容器以容裝流出的灌注劑。In the infusion step 25, the grouting pipe 3 corresponding to the lower frame 112 is first poured, and the infusion agent is simultaneously injected from the opening of the opposite ends of the grouting pipe 3, and the infusion agent is injected into the concave by the grouting pipe 3. The grooves 111 are discharged from the venting tubes 42 on the lower frame 112 after being stacked to a sufficient height. When the constructor visually sees that the boring agent flows into the venting tube 42 as described above, the pouring operation can be stopped. Then, the remaining two grouting tubes 3 corresponding to the side frames 113 are alternately infused, and similarly, each grouting tube 3 is simultaneously filled with perfusion agent at both ends of the grouting tube 3 during perfusion. The agent will enter the groove 111 from the grouting tubes 3, and continue to fill the groove 111 by both sides. After filling the grooves 111 on both sides, the filling portion 111 is filled. After the filling agent fills all the grooves 111, it will overflow from the vent pipes 42 located at the highest point of the side frames 113. When the constructor visually sees the infusion agent flowing into the venting pipe 42 as described above, The perfusion can be stopped and the perfusion action is completed. The venting tubes 42 can be removed after construction is completed and the venting holes 41 can be filled. The openings of the venting tubes 42 are generally oriented downwardly so that a container can be placed beneath the venting tubes 42 to accommodate the effluent perfusion.

需要特別說明的是,該第一實施例中所使用的灌注劑可為PU900雙液型灌注劑,其是將兩種類的灌注劑混合後而成,當PU900雙液型灌注劑混合後,不僅會產生黏性,同時也會產生些許熱能,加上該窗框11為鋁擠件而易於傳遞溫度,因此該凹槽111內的灌注劑之熱能會傳遞到該窗框11相對應位置的表面,故施工人員可用手觸摸該窗框11並感受其溫度,以再次確認灌注劑是否有填補至目標位置。除了會發出熱能外,PU900混合後還會硬化而使敲擊聲變厚實,讓施工人員可透過敲擊該窗框11來確認灌注劑是否填實。此外,PU900還有著剛注入的新膠可與已注入的舊膠可結合成一體的特性,因此不需費心注意新舊膠之間是否能黏合,且PU900硬化後不會收縮,可降低誤差的產生。除了PU900雙液型灌注劑外,還可視需求改用環氧樹脂、親水發泡劑、樹脂砂漿,或無收縮純樹脂等灌注劑。It should be specially noted that the infusion agent used in the first embodiment may be a PU900 two-liquid type infusion agent, which is obtained by mixing two types of infusion agents, and when the PU900 two-liquid type infusion agent is mixed, not only It will produce viscousness and also generate some heat energy. The sash 11 is easy to transfer temperature due to the aluminum extrusion, so the thermal energy of the infusion agent in the groove 111 is transmitted to the surface corresponding to the sash 11 Therefore, the constructor can touch the window frame 11 by hand and feel the temperature to reconfirm whether the potting agent has filled to the target position. In addition to the heat generated, the PU900 will harden after mixing and thicken the knocking sound, allowing the constructor to confirm whether the infusion is filled by tapping the window frame 11. In addition, the PU900 also has the characteristics that the newly injected new glue can be combined with the injected old glue, so there is no need to pay attention to whether the new and old glues can be bonded together, and the PU900 will not shrink after hardening, which can reduce the error. produce. In addition to PU900 two-liquid infusion, it can also be changed to epoxy resin, hydrophilic foaming agent, resin mortar, or non-shrinking pure resin infusion agent.

透過於安裝窗框11時便將該等注漿管3預先埋設於該凹槽111內,讓施工人員往後在進行防漏工程時不需再於該牆體12上鑽孔,而只要進行該第一實施例的該開孔步驟22至該灌注步驟25即可,不但可避免施工人員因不熟練而鑽設過多孔洞及耗費工序,還可避免該牆體12因鑽孔過多而使結構受損之情事。此外,施工人員可對應不同尺寸的凹槽111選定不同尺寸的注漿管3,配置簡單且利於模組化When the sash 11 is installed, the grouting pipes 3 are preliminarily embedded in the recesses 111, so that the constructor does not need to drill holes in the wall 12 when performing the leakage prevention process, but only The opening step 22 to the infusion step 25 of the first embodiment can not only prevent the constructor from drilling through the porous hole and the costly process, but also avoid the structure of the wall 12 due to excessive drilling. Damaged situation. In addition, the construction personnel can select different sizes of the grouting pipe 3 corresponding to the grooves 111 of different sizes, and the configuration is simple and modular.

參閱圖1及圖10,本發明窗框11的預埋式防漏方法之一第二實施例大致上是與該第一實施例相同,不同之處在於:每一注漿管3包括一埋設於該凹槽111(見圖9)內且開設該等開孔30的灌注段31、一連接該灌注段31的其中一端的第一觀測段32,及一連接該灌注段31的另一端的第二觀測段33。該第一觀測段32及該第二觀測段33是以透明材質製成,且分別界定出一連通該等開孔30的第一注入口321,及一連通該等開孔30及該第一注入口321的第二注入口331。Referring to FIG. 1 and FIG. 10, a second embodiment of the pre-buried leakage prevention method of the window frame 11 of the present invention is substantially the same as the first embodiment, except that each grouting pipe 3 includes a buried pipe. a filling section 31 in the groove 111 (see FIG. 9) and opening the opening 30, a first observation section 32 connecting one end of the filling section 31, and a connecting end of the other end of the filling section 31 Second observation section 33. The first observation section 32 and the second observation section 33 are made of a transparent material, and respectively define a first injection port 321 that communicates with the openings 30, and a communication opening of the openings 30 and the first The second injection port 331 of the inlet 321 is injected.

在該灌注步驟25中,是先由該第一觀測段32之第一注入口321輸入灌注劑,直至灌注劑流入相對應的透氣管42中,且以目視方式觀測到灌注劑流入該第二觀測段33中後停止灌注。接著對該第二觀測段33之第二注入口331輸入灌注劑,直至灌注劑再次流入該等透氣管42中,且以目視方式觀測到灌注劑流入該第一觀測段32中後停止灌注。In the infusion step 25, the infusion agent is first input from the first injection port 321 of the first observation section 32 until the infusion agent flows into the corresponding ventilation tube 42 and the infusion agent is visually observed to flow into the second portion. The perfusion was stopped after the observation section 33. The infusion is then input to the second injection port 331 of the second observation section 33 until the perfusion agent flows into the venting tubes 42 again, and the perfusion is visually observed to stop the perfusion after flowing into the first observation section 32.

綜上所述,本發明在安裝該窗框11時便預先埋設該等注漿管3,故施工人員不需再於該牆體12上鑽孔,從而可避免人為因素的影響,故確實能達成本發明之目的。In summary, the present invention pre-embeds the grouting pipes 3 when the sash 11 is installed, so that the constructor does not need to drill holes in the wall 12, thereby avoiding the influence of human factors, so The object of the invention is achieved.

惟以上所述者,僅為本發明之實施例而已,當不能以此限定本發明實施之範圍,凡是依本發明申請專利範圍及專利說明書內容所作之簡單的等效變化與修飾,皆仍屬本發明專利涵蓋之範圍內。However, the above is only the embodiment of the present invention, and the scope of the invention is not limited thereto, and all the equivalent equivalent changes and modifications according to the scope of the patent application and the patent specification of the present invention are still The scope of the invention is covered.

11‧‧‧窗框
111‧‧‧凹槽
112‧‧‧下框體
113‧‧‧側框體
114‧‧‧上框體
12‧‧‧牆體
21‧‧‧預埋步驟
22‧‧‧開孔步驟
23‧‧‧通氣步驟
24‧‧‧密封步驟
25‧‧‧灌注步驟
3‧‧‧注漿管
30‧‧‧開孔
31‧‧‧灌注段
32‧‧‧第一觀測段
321‧‧‧第一注入口
33‧‧‧第二觀測段
331‧‧‧第二注入口
41‧‧‧透氣孔
42‧‧‧透氣管
11‧‧‧Window frame
111‧‧‧ Groove
112‧‧‧ Lower frame
113‧‧‧ side frame
114‧‧‧Upper frame
12‧‧‧ wall
21‧‧‧Pre-embedded steps
22‧‧‧ Opening steps
23‧‧‧ Ventilation steps
24‧‧‧ Sealing step
25‧‧‧Pouring steps
3‧‧‧ grouting pipe
30‧‧‧Opening
31‧‧‧Perfusion section
32‧‧‧First observation section
321‧‧‧ first injection port
33‧‧‧Second observation
331‧‧‧second injection port
41‧‧‧ venting holes
42‧‧‧ Breathable tube

本發明之其他的特徵及功效,將於參照圖式的實施方式中清楚地呈現,其中: 圖1是一流程圖,說明本發明窗框的預埋式防漏方法之一第一實施例; 圖2是一示意圖,說明設置於一牆體上的一窗框之結構; 圖3是一側視剖面圖,進一步說明該窗框與該牆體的結合方式; 圖4是一示意圖,說明該第一實施例中的一預埋步驟; 圖5是一立體圖,說明該第一實施例中的一注漿管; 圖6是一側視剖面圖,進一步說明圖4時的剖面態樣; 圖7是一示意圖,說明該第一實施例中的一開動步驟; 圖8是一示意圖,說明該第一實施例中的一通氣步驟; 圖9是一側視剖面圖,進一步說明圖8時的剖面態樣;及 圖10是一示意圖,說明本發明窗框的預埋式防漏方法之一第二實施例。The other features and advantages of the present invention will be apparent from the following description of the drawings, wherein: FIG. 1 is a flow chart illustrating a first embodiment of a method of pre-buried leakage prevention of a window frame of the present invention; Figure 2 is a schematic view showing the structure of a window frame provided on a wall; Figure 3 is a side sectional view, further illustrating the manner in which the window frame is combined with the wall; Figure 4 is a schematic view showing the FIG. 5 is a perspective view showing a grouting pipe in the first embodiment; FIG. 6 is a side cross-sectional view, further illustrating a cross-sectional view in FIG. 4; 7 is a schematic view showing an actuating step in the first embodiment; FIG. 8 is a schematic view showing a venting step in the first embodiment; FIG. 9 is a side cross-sectional view, further illustrating FIG. The cross-sectional aspect; and FIG. 10 is a schematic view showing a second embodiment of the pre-embedded leakage preventing method of the window frame of the present invention.

Claims (8)

一種窗框的預埋式防漏方法,適用於一設置於一牆體上的窗框,該窗框圍繞出一朝向該牆體的凹槽,該預埋式防漏方法包含: 一預埋步驟,將至少一表面開設有複數開孔的注漿管預埋於該凹槽內; 一開孔步驟,於該窗框上開設出多個連通該凹槽的透氣孔; 一通氣步驟,由該至少一注漿管的任一端輸入氣體,確認氣體是否會由該等透氣孔輸出,確認後設置多個連通該等透氣孔的透氣管; 一密封步驟,對該窗框及該牆體之間的連接處進行封膠;及 一灌注步驟,對該至少一注漿管輸入灌注劑,直至灌注劑流入該等透氣管中。A pre-buried leakage prevention method for a window frame is applicable to a window frame disposed on a wall body, the window frame surrounding a groove facing the wall body, the pre-buried leakage prevention method comprises: a pre-buried a step of pre-burying at least one grouting tube having a plurality of openings in the surface; and a venting step for opening the venting hole; and a venting step Entering gas at either end of the at least one grouting tube to confirm whether the gas is outputted from the venting holes, and arranging a plurality of venting pipes connected to the venting holes after confirming; a sealing step, the sash and the wall The joint is sealed; and a filling step is performed by inputting the infusion to the at least one grouting tube until the infusion agent flows into the venting tubes. 如請求項1所述窗框的預埋式防漏方法,其中,該窗框包含一下框體、二相間隔地設置於該下框體的左右兩端的側框體,及一連接該等側框體的上框體,在該預埋步驟中,是將三個注漿管分別對應該下框體及該等側框體設置,在該開孔步驟中,是在該下框體及該等側框體的相對最高處開設出該等透氣孔。The pre-embedded leakage prevention method of the window frame according to claim 1, wherein the window frame comprises a lower frame body, two side-spaced side frames spaced apart from each other at the left and right ends of the lower frame body, and a connecting side The upper frame of the frame, in the pre-embedding step, the three grouting pipes are respectively disposed corresponding to the lower frame and the side frames, and in the opening step, the lower frame and the lower frame The vent holes are formed at the opposite heights of the equal side frames. 如請求項2所述窗框的預埋式防漏方法,其中,在該灌注步驟中,是先灌注對應該下框體的注漿管,直至灌注劑流入該下框體上的該等透氣管中,接著再交互地灌注對應該等側框體的注漿管,直至灌注劑流入該等側框體上的該等透氣管中。The method of pre-buried leakage prevention of the window frame according to claim 2, wherein in the infusion step, the grouting pipe corresponding to the lower frame body is first poured until the perfusion agent flows into the lower frame body. In the tube, the grouting tubes corresponding to the side frames are then alternately infused until the potting agent flows into the venting tubes on the side frames. 如請求項1所述窗框的預埋式防漏方法,其中,在該灌注步驟中,是由該至少一注漿管的兩端同時輸入灌注劑。The method of pre-buried leakage prevention of the window frame according to claim 1, wherein in the infusion step, the infusion agent is simultaneously input from both ends of the at least one grouting tube. 如請求項1所述窗框的預埋式防漏方法,其中,該至少一注漿管包括一埋設於該凹槽內且開設該等開孔的灌注段、一連接該灌注段的其中一端的第一觀測段,及一連接該灌注段的另一端的第二觀測段,該第一觀測段是以透明材質製成,且界定出一連通該等開孔的第一注入口,該第二觀測段是以透明材質製成,且界定出一連通該等開孔及該第一注入口的第二注入口。The pre-buried leakage prevention method of the window frame of claim 1, wherein the at least one grouting pipe comprises a pouring section embedded in the groove and opening the opening, and one end connecting the pouring section a first observation section, and a second observation section connected to the other end of the perfusion section, the first observation section is made of a transparent material, and defines a first injection port connecting the openings, the first The two observation sections are made of a transparent material and define a second injection port that connects the openings and the first injection port. 如請求項5所述窗框的預埋式防漏方法,其中,在該灌注步驟中,是先由該第一觀測段之第一注入口輸入灌注劑,直至灌注劑流入該等透氣管中,且觀測到灌注劑流入該第二觀測段中後停止灌注,接著對該第二觀測段之第二注入口輸入灌注劑,直至灌注劑再次流入該等透氣管中,且觀測到灌注劑流入該第一觀測段中後停止灌注。The method of pre-buried leakage prevention of the window frame according to claim 5, wherein in the infusion step, the infusion agent is first input from the first injection port of the first observation section until the infusion agent flows into the ventilation tubes And stopping the perfusion after the infusion agent flows into the second observation section, and then inputting the infusion agent to the second injection port of the second observation section until the perfusion agent flows into the ventilation tubes again, and the perfusion agent inflow is observed. The perfusion is stopped after the first observation segment. 如請求項1所述窗框的預埋式防漏方法,其中,在該灌注步驟中,該灌注劑選自PU900雙液型灌注劑、環氧樹脂、親水發泡劑、樹脂砂漿,及無收縮純樹脂。The pre-embedded leakage preventing method of the window frame according to claim 1, wherein in the infusion step, the infusion agent is selected from the group consisting of PU900 two-liquid type infusion agent, epoxy resin, hydrophilic foaming agent, resin mortar, and Shrinking pure resin. 如請求項1所述窗框的預埋式防漏方法,其中,在該密封步驟中,是在該窗框及該牆體的朝向室內的一側及朝向室外的一側皆塗覆封膠。The method of pre-buried leakage prevention of the window frame according to claim 1, wherein in the sealing step, the sash and the side of the wall facing the room and the side facing the outdoor are coated with a sealant. .
TW106136634A 2017-10-25 2017-10-25 Pre-buried leakage prevention method for window frame TWI628347B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW106136634A TWI628347B (en) 2017-10-25 2017-10-25 Pre-buried leakage prevention method for window frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW106136634A TWI628347B (en) 2017-10-25 2017-10-25 Pre-buried leakage prevention method for window frame

Publications (2)

Publication Number Publication Date
TWI628347B true TWI628347B (en) 2018-07-01
TW201917269A TW201917269A (en) 2019-05-01

Family

ID=63640522

Family Applications (1)

Application Number Title Priority Date Filing Date
TW106136634A TWI628347B (en) 2017-10-25 2017-10-25 Pre-buried leakage prevention method for window frame

Country Status (1)

Country Link
TW (1) TWI628347B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW314570B (en) * 1996-02-07 1997-09-01 Mailouler Entpr Co Ltd The waterproof method used in surrounding wall of window
TW201014961A (en) * 2008-10-08 2010-04-16 zong-yi Xie Water-stopping pressure control method by applying pressure for water leakage in frames of a building
US20110018566A1 (en) * 2005-06-24 2011-01-27 Crafts Douglas E Temporary planar electrical contact device and method using vertically-compressible nanotube contact structures
TW201226687A (en) * 2010-12-16 2012-07-01 Jui-Wen Wang Leak-proof window framework and construction method thereof
CN104343325A (en) * 2014-09-02 2015-02-11 东莞市万科建筑技术研究有限公司 Blocking method for gap between building sash and opening of doors and windows

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW314570B (en) * 1996-02-07 1997-09-01 Mailouler Entpr Co Ltd The waterproof method used in surrounding wall of window
US20110018566A1 (en) * 2005-06-24 2011-01-27 Crafts Douglas E Temporary planar electrical contact device and method using vertically-compressible nanotube contact structures
TW201014961A (en) * 2008-10-08 2010-04-16 zong-yi Xie Water-stopping pressure control method by applying pressure for water leakage in frames of a building
TW201226687A (en) * 2010-12-16 2012-07-01 Jui-Wen Wang Leak-proof window framework and construction method thereof
CN104343325A (en) * 2014-09-02 2015-02-11 东莞市万科建筑技术研究有限公司 Blocking method for gap between building sash and opening of doors and windows

Also Published As

Publication number Publication date
TW201917269A (en) 2019-05-01

Similar Documents

Publication Publication Date Title
CN105442862B (en) A kind of distress in concrete infiltration water collision reinforcement and repair method
CN206034677U (en) Side fascia installation node
CN207739264U (en) A kind of Grouting Pipe
CN207714388U (en) A kind of diaphragm wall circular construction joint waterproof construction
CN107313464A (en) A kind of movement joint is combined leak stopping sealing system and its construction method
CN108252614B (en) Mounting structure and mounting method of prefabricated bay window
US7014219B2 (en) Pipe joint and method of producing a pipe joint
CN206128318U (en) Stagnant water structure is repaired to movement joint
CN108301466A (en) Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
TWI628347B (en) Pre-buried leakage prevention method for window frame
CN104712145B (en) In a kind of it is buried can slip casting waterstop grouting method
CN206320419U (en) From the multi-functional sealing sleeve pipe of sealing bottom type
CN104964121B (en) A kind of sleeve water leakage plugging method
CN204025956U (en) A kind of sound insulating seal ceramic jacket is taken over
CN104846785B (en) Large-section sealing device mounting method
CN105863085A (en) External wall panel waterproof joint
CN107576574B (en) Testing method for equal-size limit water pressure resistance of deformation joint embedded water stop
CN205976057U (en) Side fascia installation node
TWI632282B (en) Window frame trapping method
CN105178322B (en) A kind of grouting construction method
CN205530136U (en) Modular water conservancy ditch rapid prototyping device
CN206189676U (en) Side fascia installation node
CN105064677B (en) Mortar leakage prevention rubber form and its construction method
CN110485853A (en) The built-in type anti-leaking method of window frame
CN110067472B (en) Leakage repairing method for window frame