TWI612200B - Geogrid bag with joint part and connection method thereof - Google Patents

Geogrid bag with joint part and connection method thereof Download PDF

Info

Publication number
TWI612200B
TWI612200B TW105123838A TW105123838A TWI612200B TW I612200 B TWI612200 B TW I612200B TW 105123838 A TW105123838 A TW 105123838A TW 105123838 A TW105123838 A TW 105123838A TW I612200 B TWI612200 B TW I612200B
Authority
TW
Taiwan
Prior art keywords
bag
auxiliary
suture
sand
filling
Prior art date
Application number
TW105123838A
Other languages
Chinese (zh)
Other versions
TW201804053A (en
Inventor
wei-zhe Cai
Original Assignee
Gold Joint Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold Joint Industry Co Ltd filed Critical Gold Joint Industry Co Ltd
Priority to TW105123838A priority Critical patent/TWI612200B/en
Application granted granted Critical
Publication of TWI612200B publication Critical patent/TWI612200B/en
Publication of TW201804053A publication Critical patent/TW201804053A/en

Links

Abstract

一種具連結部之地工砂腸袋,包含一袋體單元、一輔助單元、一封口縫線及二輔助縫線,該袋體單元包括一圍繞部、一實質上呈平面的端部,及一由該圍繞部及該端部共同圍繞界定的容置空間,該輔助單元包括二分別連接於該端部的連接部,及二分別由該等連接部圍繞界定的緩衝空間,該封口縫線設置於該端部及該等連接部,該等輔助縫線分別設置於該等連接部與該端部間並與該封口縫線相交,藉由該等連接部及該等輔助縫線的設置,在填灌壓力過大時,使該等輔助縫線能先斷裂而使相對應的連接部鼓起,讓使用者因此獲得警示,而避免該地工砂腸袋的損壞。The utility model relates to a geotextile sausage bag with a joint portion, comprising a bag body unit, an auxiliary unit, an oral suture thread and two auxiliary sutures, the bag body unit comprising a surrounding portion and a substantially flat end portion, and The auxiliary unit includes two connecting portions respectively connected to the end portion, and two surrounding buffer spaces defined by the connecting portions respectively, the sealing stitching line is defined by the surrounding portion and the end portion. Provided at the end portion and the connecting portions, the auxiliary sutures are respectively disposed between the connecting portion and the end portion and intersecting the sealing suture, and the connecting portions and the auxiliary sutures are disposed When the filling pressure is too large, the auxiliary sutures can be broken first to make the corresponding connecting portions bulge, so that the user can obtain warnings to avoid damage to the sand bag.

Description

具連結部之地工砂腸袋與其連結方法Geogrid bag with joint part and connection method thereof

本發明是有關於一種地工砂腸袋,特別是指一種具連結部之地工砂腸袋與其連結方法。The invention relates to a geotechnical sand sausage bag, in particular to a geotechnical sand bag with a joint portion and a connecting method thereof.

地工砂腸袋通常運用於河海工程或環境工程,可用以構築海事構造物,如防波堤、突堤、堤防等,或者防止砂石遭受河水或海浪沖刷而流失。Geotechnical sand bags are usually used in river and sea engineering or environmental engineering, and can be used to construct marine structures such as breakwaters, jetties, dikes, etc., or to prevent sandstone from being washed away by river water or waves.

地工砂腸袋一般由地工織布構成,內填砂石、土或其他填充料,並在填灌完成後形成一柔性透水結構,有消散水流沖擊力之作用。The geotechnical sand intestine bag is generally composed of geotextile weaving cloth, filled with sand stone, soil or other filling materials, and forms a flexible water-permeable structure after the filling is completed, which has the function of dissipating the impact force of the water flow.

參閱圖1、2,現有的地工砂腸袋的加工方式是先以地工織布形成一管狀的袋體91,再分別以二封口縫線92縫合於該袋體91的兩端來收口閉合。Referring to Figures 1 and 2, the conventional geotechnical sand bag is processed by first forming a tubular bag body 91 by ground weaving, and then sewing the two ends of the bag body 91 with two sealing stitches 92 to close the mouth. closure.

由於此種縫合方式會使該袋體91在鄰近該等封口縫線92處的高度開始遞減,因此若要將兩個地工砂腸袋進行連結,需使兩者之端部處交疊(見圖3),然而此方式將使交疊處產生缺口和高度的落差,使水流易於由此通過,進而削減整體構造物之侵蝕控制效果。且當該等地工砂腸袋進行堆疊時,下方地工砂腸袋交疊之端部的高程差將使上方地工砂腸袋陷落或突起,故可能導致不連續缺口之產生,而不利於整體構造物的穩定性。Since the stitching manner causes the height of the bag body 91 adjacent to the sealing seam 92 to begin to decrease, if the two geotextile bags are to be joined, the ends of the two are overlapped ( See Figure 3), however, this approach will result in a gap and a height drop at the overlap, making it easier for the water flow to pass therethrough, thereby reducing the erosion control effect of the overall structure. And when the sand bags are stacked, the elevation difference at the end of the lower sand bag will cause the upper sand bag to collapse or protrude, which may result in discontinuous gaps, which is unfavorable. The stability of the overall structure.

此外,因左右相鄰的地工砂腸袋無法緊密相接並固定,故在相鄰處亦可能有前後之錯位,同樣會使水流易於通過,影響整體構造物的侵蝕控制效果。In addition, since the left and right adjacent sand intestine bags cannot be closely connected and fixed, there may be misalignment between the front and the rear, which also makes the water flow easy to pass, which affects the erosion control effect of the overall structure.

為解決此地工砂腸袋連結上之問題,專利號碼US8777523揭示了一種地工砂腸袋,包括一呈管狀的袋體、二與該袋體的管狀斷面一致並分別結合於該袋體的兩端的平板,及複數綁帶,連結時是使兩個地工砂腸袋的平板相互對接後,並以該等綁帶進行捆綁的方式連接該等地工砂腸袋。In order to solve the problem of the connection of the sand bag in this place, the patent number US8777523 discloses a geotechnical sand bag, which comprises a tubular bag body, two in accordance with the tubular section of the bag body and respectively coupled to the bag body. The flat plates at both ends and the plurality of straps are connected to each other so that the flat plates of the two geotechnical sand sausage bags are butted together, and the sandbags are connected by the straps.

然而,由於單一地工砂腸袋的該等平板、該袋體及該等綁帶分別為獨立元件,因此相互結合處容易形成整體結構之弱點,以最常使用的縫合方式為例,在該等平板與該袋體的縫合過程中縫針的穿刺必然對織物造成損傷,使縫合處的抗拉強度降低,因此在填灌過程中,織物縫合處將受到縫線拉扯,受力相對非縫合處更為集中,故更容易於該處發生破壞。因此,該專利將該等平板與該袋體分別以環狀車縫之收口閉合方式,相較於圖1、2的直線封口方式,縫合區域增加,故該地工砂腸袋破壞機率也隨之增加。However, since the flat plates, the bag bodies and the straps of the single sand bag are separate elements, the joints are likely to form a weakness of the overall structure, taking the most commonly used stitching method as an example. During the suturing process of the flat plate and the bag body, the puncture of the needle needle inevitably causes damage to the fabric, so that the tensile strength of the stitching portion is lowered. Therefore, during the filling process, the stitching portion of the fabric will be pulled by the suture, and the force is relatively non-stitched. It is more concentrated, so it is easier to break down there. Therefore, in the patent, the flat plate and the bag body are respectively closed by the closed seam of the bag, and the stitching area is increased compared with the straight sealing method of FIGS. 1 and 2, so the probability of the damage of the ground sand bag is also Increase.

另外,該地工砂腸袋在填灌過程中,該等平板與該袋體結合的底部位置除了需承受填灌壓力外,同時還需承受填灌物的重力,因此當該處存在結構弱點時,破壞機率將大幅增加,故此方法雖然解決了前述的不連續缺口的問題,但卻降低了整體的結構強度。In addition, during the filling process, the bottom position of the flat sanding bag and the bag body is not only subjected to the filling pressure, but also needs to bear the gravity of the filling material, so there is a structural weakness at the place. At this time, the probability of destruction will increase greatly, so this method solves the aforementioned problem of discontinuous gap, but reduces the overall structural strength.

另外,該地工砂腸袋在填灌過程中,常因填灌壓力過大而導致該地工砂腸袋於填灌時破裂,該地工砂腸袋一旦於填灌時發生破裂,除了將導致整件物品失效外,同時因破裂前該地工砂腸袋的袋內為一高壓環境,且袋體尺寸通常甚大,因此破裂後湧出之大量填灌物具有強大之衝擊力,將對周遭施工人員和機具之安全產生重大的威脅。In addition, during the filling process, the ground sand intestine bag is often broken due to excessive filling pressure, and the sand bag is broken during filling, and the sand bag of the ground is broken when it is filled, except Leading to the failure of the whole item, and because the bag inside the sand bag is a high-pressure environment before the rupture, and the size of the bag is usually very large, the large amount of filling material that rushes after the rupture has a strong impact and will be around The safety of construction personnel and machinery poses a major threat.

因此,本發明的目的,即在提供一種具連結部之地工砂腸袋與其連結方法。Accordingly, it is an object of the present invention to provide a method for joining a sand bag with a joint portion and a method of joining the same.

於是,本發明具連結部之地工砂腸袋,包含一袋體單元、一輔助單元、一封口縫線,及二輔助縫線。Therefore, the present invention has a joint portion of a sand bag, comprising a bag unit, an auxiliary unit, an oral suture, and two auxiliary sutures.

該袋體單元包括一圍繞一軸線的圍繞部、一沿該軸線設置於該圍繞部的一端且實質上呈平面的端部,及一由該圍繞部及該端部共同圍繞界定的容置空間,該輔助單元一體連接該端部,且包括二分別連接於該端部的兩相反側的連接部,及二分別由該等連接部圍繞界定的緩衝空間,該封口縫線設置於該端部及該等連接部以分別封閉該容置空間及該等緩衝空間,該等輔助縫線分別設置於該等連接部與該端部間並與該封口縫線相交以隔離該等緩衝空間及該容置空間。The bag unit includes a surrounding portion around an axis, a substantially planar end disposed at one end of the surrounding portion along the axis, and a receiving space defined by the surrounding portion and the end portion The auxiliary unit is integrally connected to the end portion, and includes two connecting portions respectively connected to opposite sides of the end portion, and two buffer spaces respectively defined by the connecting portions, and the sealing suture is disposed at the end portion And the connecting portions respectively enclosing the accommodating space and the buffer spaces, wherein the auxiliary sutures are respectively disposed between the connecting portions and the end portions and intersecting the sealing sutures to isolate the buffer spaces and the Accommodate space.

本發明之功效在於:藉由該封口縫線、該等輔助縫線及與該袋體單元一體連結的該等連接部的設置,使該端部在該地工砂腸袋填灌完成後呈現平面,以提升兩相鄰之地工砂腸袋端部結合之緊密性與結合強度,且在填灌壓力過大時,該等輔助縫線能先斷裂而使相對應的連接部鼓起,讓使用者因此獲得警示後能提早處理,避免該地工砂腸袋的損壞。The utility model has the advantages that: the sealing suture, the auxiliary sutures and the connecting portions integrally connected with the bag body unit are arranged, the end portion is presented after the filling of the sand bag in the ground Plane, to improve the tightness and bonding strength of the end of the sandbags of two adjacent places, and when the filling pressure is too large, the auxiliary stitches can be broken first to make the corresponding joints bulge, let Therefore, the user can obtain early warning after the warning, so as to avoid damage to the sand bag.

於是,本發明地工砂腸袋的連結方法,應用於連結兩個如前述的具連結部之地工砂腸袋,該方法先將其中一地工砂腸袋的該等連接部分別與另一地工砂腸袋的該等連接部相互連結,最後分別對該等地工砂腸袋填灌一填充物。Therefore, the method for joining the sandbags of the present invention is applied to join two ground sand sausage bags having the joints as described above, and the method firstly connects the joints of one of the sandbags to the other The connecting portions of the sandbags of one place are connected to each other, and finally a filler is filled in the sand bags of the respective sands.

本發明之功效在於:由於兩相鄰之地工砂腸袋可於填灌前進行連結,因此在填灌後兩者能形成緊密結合之狀態。The effect of the invention is that since the two adjacent sand bags can be joined before filling, the two can form a tight joint after filling.

於是,本發明地工砂腸袋的連結方法,應用於連結兩個如前述的具連結部之地工砂腸袋,該方法先對其中一地工砂腸袋填灌一填充物,接著將已填灌該填充物的該地工砂腸袋的該等連接部分別與尚未填灌該填充物的另一地工砂腸袋的該等連接部相互連結,最後對尚未填灌該填充物的另一地工砂腸袋填灌該填充物。Therefore, the method for joining the sandbags of the present invention is applied to join two ground sand sausage bags having the joints as described above, and the method first fills one of the sandbags with a filler, and then The connecting portions of the grit bag that have been filled with the filling are respectively connected to the connecting portions of another grit bag that has not been filled with the filling, and finally the filling has not been filled. Another ground sand bag fills the filling.

本發明之功效在於:由於兩相鄰之地工砂腸袋可於兩者皆填灌完成前進行連結,因此在兩者皆填灌後能形成緊密結合之狀態。The effect of the invention is that since the two adjacent sand bags can be connected before the filling is completed, the two can be tightly combined after filling.

在本發明被詳細描述的前,應當注意在以下的說明內容中,類似的元件是以相同的編號來表示。Before the present invention is described in detail, it should be noted that in the following description, similar elements are denoted by the same reference numerals.

參閱圖4、5,本發明具連結部之地工砂腸袋之一第一實施例,包含一袋體單元2、一輔助單元3、一封口縫線4,及二輔助縫線5。Referring to Figures 4 and 5, a first embodiment of the present invention is a bag body unit 2, an auxiliary unit 3, an oral suture 4, and two auxiliary sutures 5.

該袋體單元2包括一圍繞一軸線L的圍繞部21、一沿該軸線L設置於該圍繞部21的一端且實質上呈平面的端部22,及一由該圍繞部21及該端部22共同圍繞界定的容置空間23。The bag unit 2 includes a surrounding portion 21 surrounding an axis L, a substantially planar end 22 disposed at one end of the surrounding portion 21 along the axis L, and a surrounding portion 21 and the end portion 22 collectively around the defined containment space 23.

該輔助單元3一體連接該端部22,且包括二分別連接於該端部22的兩相反側的連接部31,及二分別由該等連接部31圍繞界定的緩衝空間32。The auxiliary unit 3 is integrally connected to the end portion 22 and includes two connecting portions 31 respectively connected to opposite sides of the end portion 22, and two buffer spaces 32 respectively defined by the connecting portions 31.

該封口縫線4設置於該端部22及該等連接部31以分別封閉該容置空間23及該等緩衝空間32。The sealing suture 4 is disposed at the end portion 22 and the connecting portions 31 to respectively close the accommodating space 23 and the buffer spaces 32.

該等輔助縫線5分別設置於該等連接部31與該端部22間,並與該封口縫線4相交以隔離該等緩衝空間32及該容置空間23。The auxiliary sutures 5 are respectively disposed between the connecting portions 31 and the end portions 22 and intersect the sealing sutures 4 to isolate the buffer spaces 32 and the accommodating spaces 23.

於本實施例中,該袋體單元2及該輔助單元3是一體製成,並由該封口縫線4及該等輔助縫線5於後續進行縫製,該封口縫線4呈直線狀,每一輔助縫線5呈直線狀,每一輔助縫線5的強度是低於該封口縫線4的強度,每一輔助縫線5是與該封口縫線4相互垂直,該端部22是呈類似長方形的形狀。In the embodiment, the bag unit 2 and the auxiliary unit 3 are integrally formed, and the sealing suture 4 and the auxiliary suture 5 are subsequently sewn, and the sealing suture 4 is linear, each An auxiliary suture 5 is linear, the strength of each auxiliary suture 5 is lower than the strength of the sealing suture 4, and each auxiliary suture 5 is perpendicular to the sealing suture 4, and the end portion 22 is Similar to the shape of a rectangle.

使用時,是於該容置空間23內填灌一填充物(圖未示),當該地工砂腸袋受到填灌時,該端部22在該地工砂腸袋填灌完成後會呈現平面,且該填充物會同時擠壓該封口縫線4及該等輔助縫線5,當擠壓壓力超過其中一輔助縫線5的強度而使該輔助縫線5斷裂時,該填充物會有一小部分自該容置空間23進入對應的該緩衝空間32,而使對應的該連接部31鼓起,此時使用者在肉眼觀察到該連接部31鼓起的現象後,就能獲得填灌壓力過大的警示,進而能夠在該等封口縫線4斷裂前進行調降填灌壓力或停止填灌的措施,以避免該地工砂腸袋的損壞。When in use, the filling space 23 is filled with a filling (not shown). When the ground sand bag is filled, the end 22 will be filled after the filling of the sand bag. Presenting a plane, and the filler simultaneously presses the sealing suture 4 and the auxiliary suture 5, and when the pressing pressure exceeds the strength of one of the auxiliary sutures 5 to break the auxiliary suture 5, the filling A small portion will enter the corresponding buffer space 32 from the accommodating space 23, and the corresponding connecting portion 31 will be bulged. At this time, the user can visually observe the phenomenon that the connecting portion 31 bulges. Filling the warning of excessive pressure can further reduce the filling pressure or stop the filling before the sealing seam 4 breaks to avoid damage to the sand bag.

此外,由於該端部22實質上呈平面,因此在兩個該地工砂腸袋結合時,容易對齊且結合效果更佳。另外,設置於該端部22的該封口縫線4在兩個該地工砂腸袋時結合後,由於相抵的兩個該端部22會處於力平衡狀態,故兩者的該封口縫線22將不會受力,整體而言可減少該地工砂腸袋潛在之結構弱點。In addition, since the end portion 22 is substantially flat, it is easy to align and the bonding effect is better when the two sand bags are combined. In addition, after the sealing suture 4 disposed at the end portion 22 is combined in the two sand bags, the two end portions 22 of the opposite portion are in a force balance state, so the sealing stitch of the two ends 22 will not be stressed, as a whole, it can reduce the potential structural weakness of the sand bag.

要說明的是,可將兩個相鄰的該地工砂腸袋端部以相同尺寸進行製作,則兩者的該端部22於連結時可完全重疊,同時可運用該等連接部31進行對齊與固定,更進一步提升兩者之結合效果。It should be noted that the ends of the two adjacent sandbags can be made of the same size, and the ends 22 of the two can be completely overlapped at the same time, and the connecting portions 31 can be used. Align and fix to further enhance the combination of the two.

參閱圖4、6、7,當要連結兩個具連結部之地工砂腸袋時,可以以兩種地工砂腸袋的連結方法的其中一種來進行連結,其中第一種連結方法包含下列步驟71~72。Referring to Figures 4, 6, and 7, when two geotextile bags with joints are to be joined, one of the two methods of joining the sand bags can be joined. The first method includes The following steps 71~72.

於步驟71時,將其中一地工砂腸袋的該等連接部31分別與另一地工砂腸袋的該等連接部31相互連結。At step 71, the connecting portions 31 of one of the sandbags are respectively coupled to the connecting portions 31 of the other sandbags.

於本實施例中,該等連接部31的連結方式可為縫合、黏合、增加開孔並使用綁帶綑綁等方式進行連結,由於每一連接部31是在各別的輔助縫線5破裂後才會開始發揮警示的作用,因此即便受到縫合,也不會影響原先的結構強度。In this embodiment, the connecting portions 31 can be joined by stitching, bonding, adding holes, and binding by using a strap, since each connecting portion 31 is broken after the respective auxiliary stitch 5 is broken. It will only begin to play the role of warning, so even if it is stitched, it will not affect the original structural strength.

於步驟72時,分別對該等地工砂腸袋填灌該填充物。At step 72, the fillings are filled with the respective sand bags.

如此一來,由於該等地工砂腸袋分別在未填灌該填充物時,容易對齊結合,因此在結合後才填灌該填充物,能夠避免先填灌該填充物之後因體積龐大而難以完全對齊的問題。In this way, since the sandbags of the same sand are easily aligned and unbonded when the filler is not filled, the filler is filled after the combination, and the bulk of the filler can be avoided after being filled first. A problem that is difficult to fully align.

而當多個地工砂腸袋要進行堆疊時,由於每一個地工砂腸袋的該端部22是呈類似長方形的形狀,因此使每一個地工砂腸袋會呈現類似長方體的形狀而易於堆疊,因此不會產生不連續缺口。When a plurality of geotechnical gut bags are to be stacked, since each end portion 22 of each geotechnical gut bag has a rectangular shape, each of the geotechnical gut bags will have a shape resembling a cuboid. Easy to stack, so there are no discontinuities.

參閱圖4、6、8,其中第二種連結方法包含下列步驟81~83。Referring to Figures 4, 6, and 8, the second joining method includes the following steps 81-83.

於步驟81時,對其中一地工砂腸袋填灌該填充物。At step 81, one of the ground sand bags is filled with the filling.

於步驟82時,將已填灌該填充物的該地工砂腸袋的該等連接部31分別與尚未填灌該填充物的另一地工砂腸袋的該等連接部31相互連結。At step 82, the connecting portions 31 of the geotextile bag that have been filled with the filling are respectively coupled to the connecting portions 31 of another grit bag that has not been filled with the filling.

於步驟83時,對尚未填灌該填充物的另一地工砂腸袋填灌該填充物。At step 83, the fill is filled with another ground sausage bag that has not been filled with the fill.

如此一來,在先填灌完成其中一地工砂腸袋後,能夠將尚未進行填灌的另一地工砂腸袋展開後再進行填灌,而能避免在填灌過程中受到該填充物的重力而無法展開。In this way, after filling one of the sandbags in the first place, the other sandbags that have not been filled can be unfolded and then filled, and the filling can be avoided during the filling process. The gravity of the object cannot be unfolded.

值得一提的是,雖然在本實施例中,該袋體單元2於相反於該端部22的另一側是利用縫線來封口,但在其他的實施態樣中,也可以是製作成與該端部22相同的結構,而能達到同樣的效果。It should be noted that, in this embodiment, the bag unit 2 is sealed with a suture on the other side opposite to the end portion 22, but in other embodiments, it may be made. The same structure as the end portion 22 can achieve the same effect.

參閱圖9,本發明的一第二較佳實施例是類似於該第一較佳實施例,其差異之處在於:Referring to Figure 9, a second preferred embodiment of the present invention is similar to the first preferred embodiment in that:

每一連接部31具有二與該封口縫線4相交的分隔縫線311,該等分隔縫線311將對應的該緩衝空間32分隔成三隔間區321。Each connecting portion 31 has two dividing stitches 311 intersecting the sealing stitch 4, and the dividing stitches 311 divide the corresponding buffer space 32 into three compartments 321 .

對應於該連接部31的該輔助縫線5的強度是低於該連接部31的每一分隔縫線311的強度。The strength of the auxiliary suture 5 corresponding to the connecting portion 31 is lower than the strength of each of the dividing stitches 311 of the connecting portion 31.

每一連接部31中沿該封口縫線4相對遠離各別的該輔助縫線5的該分隔縫線311的強度,是大於該連接部31中沿該封口縫線5相對鄰近該輔助縫線5的該分隔縫線311的強度。The strength of the separation stitch 311 in each connecting portion 31 along the sealing seam 4 that is relatively far from the respective auxiliary suture 5 is greater than the auxiliary suture in the connecting portion 31 along the sealing suture 5. The strength of the separation stitch 311 of 5.

使用時,當擠壓壓力超過其中一輔助縫線5的強度而使該輔助縫線5斷裂時,該填充物會有一小部分自該容置空間23進入相鄰的隔間區321內,當擠壓壓力持續上升時,則會使相鄰的分隔縫線311斷裂,由於相對該輔助縫線5位於外側的分隔縫線311的強度是逐漸遞增,因此相當於在該等封口縫線4斷裂前會有多重的警示,以避免該地工砂腸袋的損壞。In use, when the pressing pressure exceeds the strength of one of the auxiliary sutures 5 to break the auxiliary suture 5, a small portion of the filler enters the adjacent compartment area 321 from the accommodating space 23 when When the squeezing pressure continues to rise, the adjacent dividing suture 311 is broken, and the strength of the separating suture 311 located outside the auxiliary suture 5 is gradually increased, so that it is equivalent to breaking at the sealing suture 4 There will be multiple warnings before to avoid damage to the sand bag.

如此,該第二較佳實施例也可達到與上述第一較佳實施例相同的目的與功效。Thus, the second preferred embodiment can achieve the same objects and effects as the first preferred embodiment described above.

參閱圖10,本發明的一第三較佳實施例是類似於該第一較佳實施例,其差異之處在於:Referring to Figure 10, a third preferred embodiment of the present invention is similar to the first preferred embodiment in that:

該封口縫線4呈直線狀,每一輔助縫線5呈直線狀,每一輔助縫線5是與該封口縫線4不相垂直,該端部22是呈類似梯形的形狀,而使該地工砂腸袋便於堆疊使用。且呈梯型的該端部22的斜面可將衝擊水流向上引導,以減少水流掏刷該處之基礎,有助於維持該區結構的穩定。The sealing suture 4 is linear, each auxiliary suture 5 is linear, and each auxiliary suture 5 is not perpendicular to the sealing suture 4, and the end portion 22 has a trapezoidal shape, so that the The geotechnical sand sausage bag is easy to stack. The ramped surface of the end portion 22 can guide the impinging water flow upward to reduce the foundation of the water flow and to help maintain the stability of the structure.

如此,該第三較佳實施例也可達到與上述第一較佳實施例相同的目的與功效。Thus, the third preferred embodiment can achieve the same purpose and effect as the first preferred embodiment described above.

參閱圖11,本發明的一第四較佳實施例是類似於該第一較佳實施例,其差異之處在於:Referring to Figure 11, a fourth preferred embodiment of the present invention is similar to the first preferred embodiment in that:

該封口縫線4呈直線狀,每一輔助縫線5呈弧線狀,該端部22是呈類似橢圓形的形狀。The sealing suture 4 is linear, and each auxiliary suture 5 has an arc shape, and the end portion 22 has an elliptical shape.

由於橢圓形的形狀能夠使受填灌時所受到的應力分布較為均勻,進而提高該地工砂腸袋的強度。Since the shape of the ellipse can make the stress distribution received during filling, the strength of the sand bag is improved.

如此,該第四較佳實施例也可達到與上述第一較佳實施例相同的目的與功效。Thus, the fourth preferred embodiment can achieve the same objects and effects as the first preferred embodiment described above.

參閱圖12,本發明的一第五較佳實施例是類似於該第二較佳實施例,其差異之處在於:Referring to Figure 12, a fifth preferred embodiment of the present invention is similar to the second preferred embodiment in that:

該封口縫線4呈直線狀,每一輔助縫線5呈朝遠離另一輔助縫線5方向彎折的兩段式直線,每一連接部31具有二與該輔助縫線5及該封口縫線4相交的分隔縫線311,該等分隔縫線311將對應的該緩衝空間32分隔成三隔間區321,該端部22是呈類似六邊形的形狀。The sealing suture 4 is linear, each auxiliary suture 5 is a two-segment straight line bent away from the other auxiliary suture 5, each connecting portion 31 has two and the auxiliary suture 5 and the sealing seam The line 4 intersects the split stitches 311 which divide the corresponding buffer space 32 into three compartments 321 which are in the shape of a hexagon.

由於六邊形的形狀能夠使受填灌時所受到的應力分布較為均勻,進而提高該地工砂腸袋的強度。Since the shape of the hexagon can make the stress distribution received when filling, the strength of the sand bag is improved.

於本實施例中,每一輔助縫線5及對應的兩個分隔縫線311是在一體製成的該袋體單元2及該輔助單元3上直接縫製兩條交叉的縫線而成。In the present embodiment, each of the auxiliary sutures 5 and the corresponding two separate sutures 311 are formed by directly sewing two intersecting sutures on the bag body unit 2 and the auxiliary unit 3 which are integrally formed.

如此,該第五較佳實施例也可達到與上述第二較佳實施例相同的目的與功效。Thus, the fifth preferred embodiment can achieve the same objects and effects as the second preferred embodiment described above.

綜上所述,藉由該等連接部31及該等輔助縫線5的設置,在填灌壓力過大時,使該等輔助縫線5能先斷裂而使相對應的連接部31鼓起,讓使用者因此獲得警示後能提早處理,避免該地工砂腸袋的損壞,此外,由於該端部22實質上呈平面,因此設置於該端部22的該封口縫線4所受到擠壓壓力會相對較小,故較不易損壞,故確實能達成本發明之目的。In summary, by the arrangement of the connecting portions 31 and the auxiliary sutures 5, when the filling pressure is too large, the auxiliary sutures 5 can be broken first and the corresponding connecting portions 31 can be bulged. Therefore, the user can obtain early warning after the warning is obtained, and the damage of the sand bag is avoided. Further, since the end portion 22 is substantially flat, the sealing stitch 4 disposed at the end portion 22 is squeezed. The pressure will be relatively small and therefore less susceptible to damage, so the object of the invention can be achieved.

惟以上所述者,僅為本發明的實施例而已,當不能以此限定本發明實施的範圍,凡是依本發明申請專利範圍及專利說明書內容所作的簡單的等效變化與修飾,皆仍屬本發明專利涵蓋的範圍內。However, the above is only the embodiment of the present invention, and the scope of the invention is not limited thereto, and all the simple equivalent changes and modifications according to the scope of the patent application and the patent specification of the present invention are still Within the scope of the invention patent.

2‧‧‧袋體單元
21‧‧‧圍繞部
22‧‧‧端部
23‧‧‧容置空間
3‧‧‧輔助單元
31‧‧‧連接部
311‧‧‧分隔縫線
32‧‧‧緩衝空間
321‧‧‧隔間區
4‧‧‧封口縫線
5‧‧‧輔助縫線
71~72‧‧‧地工砂腸袋的連結方法的步驟
81~83‧‧‧地工砂腸袋的連結方法的步驟
L‧‧‧軸線
2‧‧‧ bag unit
21‧‧‧ Surrounding
22‧‧‧ End
23‧‧‧ accommodating space
3‧‧‧Auxiliary unit
31‧‧‧Connecting Department
311‧‧‧Separate suture
32‧‧‧ buffer space
321‧‧‧ Compartment
4‧‧‧Seal suture
5‧‧‧Auxiliary suture
71~72‧‧‧Steps for connecting the sandbags
81~83‧‧‧Steps for connecting the sandbags
L‧‧‧ axis

本發明的其他的特徵及功效,將於參照圖式的實施方式中清楚地呈現,其中: 圖1是一現有地工砂腸袋的一前視圖; 圖2是該現有的地工砂腸袋的一不完整的立體圖; 圖3是兩個現有的地工砂腸袋的連結示意圖; 圖4是本發明具連結部之地工砂腸袋的一第一實施例的一立體圖; 圖5是該第一實施例的一側視圖; 圖6是該第一實施例的兩個具連結部之地工砂腸袋的一連結示意圖; 圖7是該第一實施例的第一種地工砂腸袋的連結方法的流程圖; 圖8是該第一實施例的第二種地工砂腸袋的連結方法的流程圖; 圖9是本發明具連結部之地工砂腸袋的一第二實施例的一側視圖; 圖10是本發明具連結部之地工砂腸袋的一第三實施例的一側視圖; 圖11是本發明具連結部之地工砂腸袋的一第四實施例的一側視圖;及 圖12是本發明具連結部之地工砂腸袋的一第五實施例的一側視圖。Other features and effects of the present invention will be apparent from the following description of the drawings, wherein: Figure 1 is a front view of a prior art sand bag; Figure 2 is a prior art sand bag. FIG. 3 is a perspective view showing a connection between two existing geotextile bags; FIG. 4 is a perspective view of a first embodiment of a sand bag with a joint according to the present invention; A side view of the first embodiment; FIG. 6 is a schematic view of a joint of the two sandbags having the joint portion of the first embodiment; FIG. 7 is the first type of sand for the first embodiment. FIG. 8 is a flow chart showing a method for joining a second type of sand bag in the first embodiment; FIG. 9 is a view showing a method of joining a sand bag in the ground of the present invention; FIG. 10 is a side view of a third embodiment of a sand bag with a joint portion according to the present invention; FIG. 11 is a first embodiment of a sand bag with a joint portion of the present invention. a side view of a fourth embodiment; and FIG. 12 is a fifth embodiment of a sand baggage of the present invention having a joint portion View.

2‧‧‧袋體單元 2‧‧‧ bag unit

21‧‧‧圍繞部 21‧‧‧ Surrounding

22‧‧‧端部 22‧‧‧ End

23‧‧‧容置空間 23‧‧‧ accommodating space

3‧‧‧輔助單元 3‧‧‧Auxiliary unit

31‧‧‧連接部 31‧‧‧Connecting Department

32‧‧‧緩衝空間 32‧‧‧ buffer space

4‧‧‧封口縫線 4‧‧‧Seal suture

5‧‧‧輔助縫線 5‧‧‧Auxiliary suture

L‧‧‧軸線 L‧‧‧ axis

Claims (12)

一種具連結部之地工砂腸袋,包含: 一袋體單元,包括一圍繞一軸線的圍繞部、一沿該軸線設置於該圍繞部的一端且實質上呈平面的端部,及一由該圍繞部及該端部共同圍繞界定的容置空間; 一輔助單元,一體連接該端部,且包括二分別連接該端部的兩相反側的連接部,及二分別由該等連接部圍繞界定的緩衝空間; 一封口縫線,設置於該端部及該等連接部以分別封閉該容置空間及該等緩衝空間;及 二輔助縫線,分別設置於該等連接部與該端部間並與該封口縫線相交以隔離該等緩衝空間及該容置空間。A geotextile bag with a joint, comprising: a bag unit, comprising a surrounding portion around an axis, a substantially planar end disposed at one end of the surrounding portion along the axis, and a The surrounding portion and the end portion collectively surround the defined receiving space; an auxiliary unit integrally connected to the end portion, and including two connecting portions respectively connecting opposite ends of the end portion, and two respectively surrounded by the connecting portions a defined buffer space; an oral suture line disposed at the end portion and the connecting portions to respectively close the accommodating space and the buffer space; and two auxiliary sutures respectively disposed at the connecting portion and the end portion And intersecting the sealing suture to isolate the buffer space and the accommodating space. 如請求項1所述的具連結部之地工砂腸袋,其中,每一輔助縫線的強度是低於該封口縫線的強度。The earthen gut bag with a joint according to claim 1, wherein the strength of each auxiliary suture is lower than the strength of the seal suture. 如請求項1所述的具連結部之地工砂腸袋,其中,每一連接部具有複數與該封口縫線相交的分隔縫線,該等分隔縫線將對應的該緩衝空間分隔成複數隔間區。The earthen gut bag having a joint portion according to claim 1, wherein each of the joint portions has a plurality of split stitches intersecting the seal stitches, and the split stitches divide the corresponding buffer space into plural numbers. Compartment area. 如請求項3所述的具連結部之地工砂腸袋,其中,對應於其中一連接部的該輔助縫線的強度是低於該連接部的每一分隔縫線的強度。The geotextile bag with a joint according to claim 3, wherein the auxiliary suture corresponding to one of the joints has a strength lower than the strength of each of the split stitches of the joint. 如請求項4所述的具連結部之地工砂腸袋,其中,每一連接部中沿該封口縫線相對遠離各別的該輔助縫線的該分隔縫線的強度,是大於該連接部中沿該封口縫線相對鄰近該輔助縫線的該分隔縫線的強度。The earth sand sausage bag with a joint portion according to claim 4, wherein the strength of the separation stitch line in each joint portion along the seal seam line that is relatively far from the respective auxiliary stitch line is greater than the joint The strength of the dividing suture in the portion along the sealing suture adjacent the auxiliary suture. 如請求項1所述的具連結部之地工砂腸袋,其中,該封口縫線呈直線狀,每一輔助縫線呈直線狀,每一輔助縫線是與該封口縫線相互垂直。The ground sand sausage bag with a joint portion according to claim 1, wherein the seal stitch is linear, each auxiliary stitch is linear, and each auxiliary stitch is perpendicular to the seal stitch. 如請求項1所述的具連結部之地工砂腸袋,其中,該封口縫線呈直線狀,每一輔助縫線呈直線狀,每一輔助縫線是與該封口縫線不相垂直。The ground sand sausage bag with a joint portion according to claim 1, wherein the seal stitch is linear, each auxiliary stitch is linear, and each auxiliary stitch is not perpendicular to the seal stitch. . 如請求項1所述的具連結部之地工砂腸袋,其中,每一封口縫線呈直線狀,每一輔助縫線呈弧線狀。The ground sand sausage bag with a joint portion according to claim 1, wherein each of the mouth stitches has a straight line shape, and each of the auxiliary stitches has an arc shape. 如請求項3所述的具連結部之地工砂腸袋,其中,該封口縫線呈直線狀,每一輔助縫線呈朝遠離另一輔助縫線方向彎折的兩段式直線,每一分隔縫線與該輔助縫線及該封口縫線相交。The earthen gut bag having a joint portion according to claim 3, wherein the seal suture is linear, and each auxiliary suture is a two-stage straight line bent away from the other auxiliary suture. A separate suture intersects the auxiliary suture and the suture suture. 如請求項9所述的具連結部之地工砂腸袋,每一連接部具有二分隔縫線,每一輔助縫線及對應的兩個分隔縫線是在一體製成的該袋體單元及該輔助單元上直接縫製兩條交叉的縫線而成。The ground sand sausage bag with a joint portion according to claim 9, each connecting portion has two dividing stitches, and each auxiliary stitching line and the corresponding two separating stitching wires are integrally formed in the bag body unit. And the auxiliary unit directly sews two intersecting stitches. 一種地工砂腸袋的連結方法,應用於連結兩個如請求項1的具連結部之地工砂腸袋,該方法包含下列步驟: (A)將其中一地工砂腸袋的該等連接部分別與另一地工砂腸袋的該等連接部相互連結;及 (B)分別對該等地工砂腸袋填灌一填充物。A method for joining a geotechnical sand sausage bag, which is applied to a two-ground sand sausage bag having a joint portion as claimed in claim 1, the method comprising the following steps: (A) treating one of the sand bags The connecting portions are respectively connected to the connecting portions of the other sand bags; and (B) filling the filling bags with the filling materials. 一種地工砂腸袋的連結方法,應用於連結兩個如請求項1的具連結部之地工砂腸袋,該方法包含下列步驟: (A)對其中一地工砂腸袋填灌一填充物; (B)將已填灌該填充物的該地工砂腸袋的該等連接部分別與尚未填灌該填充物的另一地工砂腸袋的該等連接部相互連結;及 (C)對尚未填灌該填充物的另一地工砂腸袋填灌該填充物。A method for joining a geotechnical sand intestine bag, which is applied to a two-ground sand sausage bag having a joint portion as claimed in claim 1, the method comprising the following steps: (A) filling one of the sand bags in the ground a filler; (B) interconnecting the joints of the geotextile bag that has been filled with the filler with the joints of another grit bag that has not been filled with the filler; and (C) filling the filling with another ground sand intestine bag that has not been filled with the filling.
TW105123838A 2016-07-28 2016-07-28 Geogrid bag with joint part and connection method thereof TWI612200B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW105123838A TWI612200B (en) 2016-07-28 2016-07-28 Geogrid bag with joint part and connection method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW105123838A TWI612200B (en) 2016-07-28 2016-07-28 Geogrid bag with joint part and connection method thereof

Publications (2)

Publication Number Publication Date
TWI612200B true TWI612200B (en) 2018-01-21
TW201804053A TW201804053A (en) 2018-02-01

Family

ID=61728710

Family Applications (1)

Application Number Title Priority Date Filing Date
TW105123838A TWI612200B (en) 2016-07-28 2016-07-28 Geogrid bag with joint part and connection method thereof

Country Status (1)

Country Link
TW (1) TWI612200B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM308911U (en) * 2006-09-25 2007-04-01 Nice Entpr Co Ltd Upright bag
TWM413706U (en) * 2010-12-10 2011-10-11 yao-lin Cao Sand gut bag
CN203064369U (en) * 2012-11-13 2013-07-17 福建凯达集团有限公司 Novel packaging bag

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM308911U (en) * 2006-09-25 2007-04-01 Nice Entpr Co Ltd Upright bag
TWM413706U (en) * 2010-12-10 2011-10-11 yao-lin Cao Sand gut bag
CN203064369U (en) * 2012-11-13 2013-07-17 福建凯达集团有限公司 Novel packaging bag

Also Published As

Publication number Publication date
TW201804053A (en) 2018-02-01

Similar Documents

Publication Publication Date Title
US8777523B2 (en) Geotextile tube with flat ends
US9011005B2 (en) Geotextile container
KR100710415B1 (en) Gotextile tube
US20090106904A1 (en) Convex pillow configuration
TWI612200B (en) Geogrid bag with joint part and connection method thereof
JP5144148B2 (en) Civil engineering bag
US9845583B1 (en) Geotextile tube
KR100950443B1 (en) Geotextile tube structure
KR101326775B1 (en) Tube for civil engineering
KR20180023208A (en) Geotextile tube
CN107761667B (en) Has the ground work sand bowel bag of linking part
JP4115922B2 (en) Civil engineering structure forming bag and civil engineering structure using this civil engineering structure forming bag
CN205776064U (en) A kind of flood control sand bag
CN211037521U (en) Flexible building block
JP2016078939A (en) Bag body
CN206090455U (en) Geotechnique's pipe bag
KR101754778B1 (en) Construction method for geotextile tube assembly
JP5035781B2 (en) Civil engineering packaging and underwater construction
KR101070355B1 (en) The connection structure of geotextile tube
JPH0868030A (en) Sand bag having connection device and construction of various structure by use thereof
JP4975548B2 (en) Connection structure of cylindrical members
CN204418103U (en) The bed protection structure of trraning pole
TWM424357U (en) Geotextile tube with high resistance of erosion and scouring
JP2002309538A (en) Sandbag
JP2002138436A (en) Sandbag