TWI578005B - Test project control method and its system - Google Patents
Test project control method and its system Download PDFInfo
- Publication number
- TWI578005B TWI578005B TW101140338A TW101140338A TWI578005B TW I578005 B TWI578005 B TW I578005B TW 101140338 A TW101140338 A TW 101140338A TW 101140338 A TW101140338 A TW 101140338A TW I578005 B TWI578005 B TW I578005B
- Authority
- TW
- Taiwan
- Prior art keywords
- test
- communication
- detected
- control
- communication unit
- Prior art date
Links
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Selective Calling Equipment (AREA)
- General Factory Administration (AREA)
Description
本發明是有關於一種生產線作業管制系統,且特別是有關於一種用於確認電子裝置出廠前的檢驗程序是否完善的測試項目管控方法及其系統。 The present invention relates to a production line operation control system, and more particularly to a test item management method and system for confirming whether an inspection procedure of an electronic device before shipment is perfect.
隨著科技的進步,手機、無線存取裝置(Wireless Access Point)等通訊產品也隨著使用者的需求增加而蓬勃發展,其價格也受市場趨勢所致而不斷降低。因此,在通訊產品的生產過程中,對於其中各項元件的測試勢必影響整體通訊產品的製造成本,進而反映價格。 With the advancement of technology, communication products such as mobile phones and wireless access points have also prospered with the increasing demand of users, and their prices have been continuously reduced due to market trends. Therefore, in the production process of communication products, the testing of each component will inevitably affect the manufacturing cost of the overall communication product, and thus reflect the price.
習知通訊產品在開發過程中或認證階段均需進行各種不同的測試項目,以驗證該待測通訊產品是否符合所有相關測試規範之需求,然而,現今通訊產品的出廠測試是透過人工的方式,依照一固定式的流程,依序將每個元件進行測試,如此不但耗費過多的人力導致測試成本增加,也會因為人為的因素而影響整體測試的品質。 In the development process or the certification phase, the familiar communication products need to carry out various test items to verify whether the tested communication products meet the requirements of all relevant test specifications. However, the current factory test of communication products is through manual means. According to a fixed process, each component is tested in sequence, which not only consumes too much manpower, but also increases the cost of testing, and also affects the quality of the overall test due to human factors.
本發明提供一種測試項目管控方法及其系統,藉此以有效的攔截不良品出廠,提高出貨產品的品質,並實現生 產的實際時程管控,以節約測試時間。 The invention provides a test project control method and a system thereof, thereby effectively intercepting defective products, improving the quality of the shipped products, and realizing the raw materials. The actual time management of the production is controlled to save test time.
本發明提出一種測試項目管控方法,其主要是透過一儲存模組記錄待檢測裝置經過一檢測程序後,所產生之檢測紀錄資料,再建立待檢測裝置與一管控裝置之一通訊管道,以利用管控裝置依據檢測紀錄資料,檢驗檢測程序是否正常執行。 The invention provides a test item control method, which mainly records a test record data generated by a device to be tested after a test procedure through a storage module, and then establishes a communication pipeline between the device to be detected and a control device to utilize The control device checks whether the test program is normally executed based on the test record data.
本發明更提出一種測試項目管控方法,是透過一儲存模組紀錄待檢測裝置經過一檢測程序後,所產生之一檢測紀錄資料。再透過一管控裝置之一通訊單元連接待檢測裝置之一通訊埠,以建立管控裝置及待檢測裝置之一通訊管道,透過通訊管道使管控裝置取得檢測紀錄資料,並依據檢測紀錄資料,使管控裝置透過一管控程式檢驗待檢測裝置之檢測程序是否正常執行,以根據判斷結果產生相對應的一提示訊息。 The invention further provides a test item control method, which is a record detection data generated by a storage module after a detection program passes through a detection program. Then, a communication unit of one of the control devices is connected to one of the communication devices of the device to be detected to establish a communication pipe of the control device and the device to be detected, and the control device obtains the test record data through the communication pipe, and controls the data according to the test record data. The device checks whether the detection program of the device to be detected is normally executed through a control program to generate a corresponding prompt message according to the judgment result.
在本發明之一實施例中,上述之建立待檢測裝置與一管控裝置之一通訊管道之步驟中,更包括:透過一管控裝置之一無線通訊單元連接待檢測裝置之一無線通訊埠,以建立管控裝置及待檢測裝置之一無線通訊管道。 In an embodiment of the present invention, the step of establishing a communication pipeline between the device to be detected and a control device further comprises: connecting, by using one of the control devices, a wireless communication unit to the wireless communication device of the device to be detected, Establish a wireless communication pipe for the control device and one of the devices to be tested.
在本發明之一實施例中,上述之建立待檢測裝置與一管控裝置之一通訊管道之步驟中,更包括:透過一纜線(cable or wireline)連接一管控裝置之一通訊單元及待檢測裝置之一通訊埠,以建立管控裝置及待檢測裝置之一通訊管道。 In an embodiment of the present invention, the step of establishing a communication pipeline between the device to be detected and a control device further comprises: connecting a communication unit of a control device through a cable or wireline and detecting One of the devices communicates with each other to establish a communication pipe for the control device and one of the devices to be tested.
本發明提出一種測試項目管控系統,包括:一待檢測裝置及一管控裝置。待檢測裝置包括一通訊埠及一儲存模組,儲存模組係儲存待檢測裝置經一檢測程序後,所產生之一檢測紀錄資料。管控裝置設置一管控程式,並透過一通訊單元與通訊埠之通訊,建立管控裝置與待檢測裝置的一通訊管道,使管控裝置透過通訊管道取得檢測紀錄資料,以透過管控程式依據檢測紀錄資料,檢驗待檢測裝置之檢測程序執行是否正常執行,並根據判斷結果產生相對應的一提示訊息。 The invention provides a test project management and control system, comprising: a to-be-detected device and a control device. The device to be tested includes a communication port and a storage module. The storage module stores one of the detection record data generated by the device to be detected after a detection process. The control device is provided with a control program and communicates with the communication device through a communication unit to establish a communication pipe between the control device and the device to be tested, so that the control device obtains the test record data through the communication pipe to detect the record data through the control program. It is checked whether the execution of the detection program of the device to be detected is normally executed, and a corresponding prompt message is generated according to the judgment result.
在本發明之一實施例中,上述之通訊埠及通訊單元係分別為一藍芽裝置、一紅外線裝置及一通用序列匯流排連接埠,其中之一者。 In one embodiment of the present invention, the communication port and the communication unit are respectively a Bluetooth device, an infrared device, and a universal serial bus bar, one of which.
在本發明之一實施例中,上述之儲存模組系為一快閃記憶體(NAND Value)。 In an embodiment of the invention, the storage module is a NAND Value.
為讓本發明之上述特徵和優點能更明顯易懂,下文特舉實施例,並配合所附圖式,作詳細說明如下。 The above described features and advantages of the present invention will be more apparent from the following description.
圖1是本發明之測試項目管控系統之元件方塊示意圖。在圖1中,測試項目管控系統包括一待檢測裝置100及一管控裝置200。其中,待檢測裝置100為一般手機、智慧型手機、個人數位助理(PDA)、平板電腦及筆記型電腦(notebook)等電子裝置,管控裝置200為個人電腦(PC)、 平板電腦及筆記型電腦等電子裝置,但不以此為限。 1 is a block diagram showing the components of the test item control system of the present invention. In FIG. 1, the test project management system includes a device to be detected 100 and a control device 200. The device to be detected 100 is an electronic device such as a general mobile phone, a smart phone, a personal digital assistant (PDA), a tablet computer, and a notebook computer. The control device 200 is a personal computer (PC). Electronic devices such as tablets and notebook computers, but not limited to them.
待檢測裝置100包括一通訊埠110及一儲存模組120,儲存模組120係儲存待檢測裝置100經一檢測程序後,所產生之一檢測紀錄資料121。管控裝置200設置一管控程式201,並透過一通訊單元210與通訊埠110之通訊,建立管控裝置200與待檢測裝置100的一通訊管道,使管控裝置200透過通訊管道取得檢測紀錄資料121,以透過管控程式201依據檢測紀錄資料121,檢驗待檢測裝置100之檢測程序執行是否正常執行,並根據判斷結果產生相對應的一提示訊息。 The device to be tested 100 includes a communication port 110 and a storage module 120. The storage module 120 stores a detection record data 121 generated by the device 100 to be detected after a detection process. The control device 200 is provided with a control program 201, and communicates with the communication port 110 through a communication unit 210 to establish a communication pipe between the control device 200 and the device 100 to be detected, so that the control device 200 obtains the detection record data 121 through the communication pipe. The control program 201 checks whether the execution of the detection program of the device to be detected 100 is normally executed according to the detection record data 121, and generates a corresponding prompt message according to the determination result.
於本實施例中,儲存模組預設一測試確認(test check)選項,使待檢測裝置在工廠測試模式(Factory test mode,FTM)下,經由測試確認(test check)選項以記錄每個出廠測試項目的檢測過程,並產生檢測紀錄資料。 In this embodiment, the storage module presets a test check option, so that the device to be tested is in the factory test mode (FTM), and the test check option is used to record each factory. Test the test process of the project and generate test record data.
於本實施例中,通訊埠及通訊單元若為無線通訊,則通訊埠及通訊單元分別同為一藍芽裝置或一紅外線裝置。 In this embodiment, if the communication port and the communication unit are wireless communication, the communication port and the communication unit are respectively a Bluetooth device or an infrared device.
於本實施例中,通訊埠及通訊單元若為有線通訊,則通訊埠及通訊單元分別同為通用序列匯流排連接埠,並透過一纜線以插接於通訊埠及通訊單元之通用序列匯流排連接埠,使通訊埠及該通訊單元建立通訊管道。 In this embodiment, if the communication port and the communication unit are wired communication, the communication port and the communication unit are respectively connected to the universal serial bus, and are connected to the universal sequence of the communication port and the communication unit through a cable. The port is connected to enable the communication port and the communication unit to establish a communication pipe.
於本實施例中,儲存模組為一快閃記憶體。 In this embodiment, the storage module is a flash memory.
圖2是本發明的第一實施例裝置示意圖。於本實施例 中,待檢測裝置100的通訊埠110是為一藍芽裝置或一紅外線裝置,而管控裝置200之通訊單元210係與待檢測裝置100的通訊埠110相對應設置,通訊埠110及通訊單元210同時為藍芽裝置,或者通訊埠110及通訊單元210同時為紅外線裝置,藉此,使待檢測裝置100及管控裝置200,透過藍芽裝置或紅外線裝置建立一通訊管道,使待檢測裝置100及管控裝置200藉由通訊管道進行資料之傳遞。 Figure 2 is a schematic view of the apparatus of the first embodiment of the present invention. In this embodiment The communication port 110 of the device 100 to be detected is a Bluetooth device or an infrared device, and the communication unit 210 of the control device 200 is disposed corresponding to the communication port 110 of the device 100 to be detected. The communication port 110 and the communication unit 210 are provided. At the same time, the Bluetooth device, or the communication device 110 and the communication unit 210 are simultaneously infrared devices, thereby enabling the device to be detected 100 and the control device 200 to establish a communication pipe through the Bluetooth device or the infrared device, so that the device to be detected 100 and The control device 200 transmits data through a communication pipe.
待檢測裝置100的儲存模組120係儲存待檢測裝置100經一檢測程序後,所產生之一檢測紀錄資料121,此檢測紀錄資料121係對應待檢測裝置100所經歷之檢測程序,並依檢測項目,一一記錄每一項目的檢測過程。管控裝置200設置一管控程式201,並透過通訊管道,使管控裝置200透過通訊管道取得檢測紀錄資料121,以透過管控程式201依據檢測紀錄資料121,檢驗待檢測裝置100之檢測程序執行是否正常執行,並根據判斷結果於管控裝置200之顯示單元220顯示所產生之相對應的一提示訊息。 The storage module 120 of the device to be detected 100 stores a detection record data 121 generated by the device 100 to be detected after a detection process, and the detection record data 121 corresponds to the detection process experienced by the device to be detected 100, and is detected by the detection device 100. The project records the testing process of each project one by one. The control device 200 is provided with a control program 201, and the control device 200 obtains the test record data 121 through the communication pipe through the communication pipe to check whether the test program execution of the device to be detected 100 is normally executed according to the test record data 121 through the control program 201. And displaying a corresponding prompt message generated on the display unit 220 of the control device 200 according to the judgment result.
圖3是本發明的第二實施例裝置示意圖,與圖2之差異在於,待檢測裝置100的通訊埠110是為一通用序列匯流排連接埠,而管控裝置200之通訊單元210同時也是通用序列匯流排連接埠,兩者間透過一纜線300電性連接,使待檢測裝置100的通訊埠110及管控裝置200的通訊單元210透過纜線300的電性連接建立一通訊管道,並以此 纜線300使待檢測裝置100及管控裝置200藉由通訊管道進行資料之傳遞。 3 is a schematic diagram of a second embodiment of the present invention. The difference from FIG. 2 is that the communication port 110 of the device to be detected 100 is a universal serial bus port, and the communication unit 210 of the device 200 is also a universal sequence. The bus bar is connected to each other through a cable 300, so that the communication port 110 of the device 100 to be detected and the communication unit 210 of the control device 200 are electrically connected through the cable 300 to establish a communication pipe. The cable 300 allows the device to be detected 100 and the control device 200 to transmit data through a communication pipe.
請參閱圖4繪示對應圖1之測試項目管控方法的流程示意圖,圖5至圖6繪示本發明實施例之測試項目管控方法的細部流程示意圖。請配置參閱圖1至圖3以利於了解。此方法流程如下:圖4是對應本發明一實施例之步驟流程圖。在圖4中,其主要步驟流程如下: FIG. 4 is a schematic flow chart of a test item control method corresponding to FIG. 1 , and FIG. 5 to FIG. 6 are schematic diagrams showing details of a test item control method according to an embodiment of the present invention. Please refer to Figure 1 to Figure 3 for help. The method flow is as follows: Figure 4 is a flow chart corresponding to the steps of an embodiment of the present invention. In Figure 4, the main steps are as follows:
步驟S110:一儲存模組120被設置於一待檢測裝置100,儲存模組為一快閃記憶體。 Step S110: A storage module 120 is disposed in a device to be detected 100, and the storage module is a flash memory.
步驟S120:使待檢測裝置100經過一檢測程序後,所產生之一檢測紀錄資料121,儲存至儲存模組120。 Step S120: After the device 100 to be tested passes a detection process, one of the detection record data 121 is generated and stored in the storage module 120.
其中,儲存模組120預設一測試確認(test check)選項,使待檢測裝置在工廠測試模式(Factory test mode,FTM)下,經由測試確認(test check)選項以記錄每個出廠測試項目的檢測過程,並產生檢測紀錄資料。 The storage module 120 presets a test check option, so that the device to be tested is in a factory test mode (FTM), and a test check option is used to record each factory test item. The inspection process and the detection of the record data.
步驟S130:再透過一管控裝置200之一通訊單元210連接待檢測裝置100之一通訊埠110,以建立管控裝置及待檢測裝置之一通訊管道,於此步驟中,依據有線、無線通訊的方式不同,此步驟的細部施行方式亦有所不同。 Step S130: The communication unit 210 of one of the control devices 200 is connected to the communication port 110 of the device to be detected 100 to establish a communication pipe of the control device and the device to be detected. In this step, according to the method of wired or wireless communication. The details of the implementation of this step are different.
如圖2,若以無線通訊的方式建立通訊管道,則此步驟的細部施行方式即如圖5所示,透過一管控裝置之一無線通訊單元,以連接待檢測裝置之一無線通訊埠(步驟 S131),無線通訊單元及無線通訊埠較佳為藍芽裝置或紅外線裝置。建立管控裝置及待檢測裝置之一無線通訊管道(步驟S139)。 As shown in FIG. 2, if the communication pipeline is established by wireless communication, the detailed implementation of this step is as shown in FIG. 5, through a wireless communication unit of a control device to connect one of the wireless communication devices to be detected (steps) S131), the wireless communication unit and the wireless communication device are preferably a Bluetooth device or an infrared device. A wireless communication pipe of the control device and the device to be detected is established (step S139).
如圖3,若以有線通訊的方式建立通訊管道,則此步驟的細部施行方式即如圖6所示,透過一纜線300連接一管控裝置之一通訊單元及待檢測裝置之一通訊埠(步驟S132),通訊單元及通訊埠較佳為通用序列匯流排連接埠,兩者間透過一纜線300電性連接,藉此以建立通訊管道(步驟S139)。 As shown in FIG. 3, if the communication pipeline is established by wired communication, the detailed implementation of this step is as shown in FIG. 6, and a communication unit of one of the control devices and one of the devices to be detected are connected through a cable 300. In step S132), the communication unit and the communication port are preferably a universal serial bus connection port, and the two are electrically connected through a cable 300, thereby establishing a communication pipe (step S139).
步驟S140:透過通訊管道使管控裝置200取得檢測紀錄資料121。 Step S140: The control device 200 obtains the detection record data 121 through the communication pipe.
步驟S150:依據檢測紀錄資料121,使管控裝置200透過一管控程式201檢驗待檢測裝置100之檢測程序是否正常執行,若待檢測裝置100已完成所有檢驗項目,進行步驟S160;若待檢測裝置100未完成所有檢驗項目,則回到步驟S120重新進行檢驗。 Step S150: According to the detection record data 121, the control device 200 checks whether the detection program of the device to be detected 100 is normally executed through a control program 201. If the device to be detected 100 has completed all the inspection items, proceed to step S160; if the device to be detected 100 If all the inspection items have not been completed, the process returns to step S120 to perform the inspection again.
步驟S160:根據判斷結果產生相對應的一提示訊息。 Step S160: Generate a corresponding prompt message according to the judgment result.
綜上所述,本發明所採用的測試項目管控方法及其系統,應具有下列之優點: In summary, the test project management method and system used in the present invention should have the following advantages:
(1)於本發明中,可透過檢測紀錄資料以控制手動測試的項目,例如:按鍵測試、震動器測試、液晶顯示器(Liquid Crystal Display,LCD)在白底/紅底/藍底/綠底/黃 底的底色下的灰影斑點測試及觸控面板(Touch Panel)測試等等,以真正達到管控產品出廠前的檢測程序。 (1) In the present invention, it is possible to control manual test items by detecting recorded data, such as: button test, vibrator test, liquid crystal display (LCD) on white/red/blue/green bottom /yellow Gray shadow spot test and touch panel test under the bottom color of the bottom, in order to truly achieve the test procedure before the factory control products.
(2)管控裝置會在待檢測裝置的快閃記憶體下讀取檢測紀錄資料,以自動判斷有無漏測,工具可以連接統計過程控制(Statistical Process Control,SPC),也可不連統計過程控制(SPC)單獨測試,可以配合各種生產流程應用。 (2) The control device will read the test record data under the flash memory of the device to be tested to automatically determine whether there is a missed test. The tool can be connected to the statistical process control (SPC) or not to the statistical process control ( SPC) is tested separately and can be used in a variety of production process applications.
(3)於本發明中,可有效節省在生產中的硬體測試儀器的成本,減少人工操作上的誤差,並有效攔截不良品流出,以保證出貨產品品質,同時實現生產的實際時程管控,節省了測試時間。 (3) In the present invention, the cost of the hardware test instrument in production can be effectively saved, the error in manual operation can be reduced, and the outflow of defective products can be effectively intercepted, so as to ensure the quality of the shipped product and realize the actual time course of production. Control, saving test time.
雖然本發明以前述實施例揭露如上,然其並非用以限定本發明,任何熟習相像技藝者,在不脫離本發明之精神和範圍內,所作更動與潤飾之等效替換,仍為本發明之專利保護範圍內。 While the present invention has been described above in the foregoing embodiments, it is not intended to limit the invention, and the equivalents of the modifications and retouchings are still in the present invention without departing from the spirit and scope of the invention. Within the scope of patent protection.
100‧‧‧待檢測裝置 100‧‧‧Device to be tested
110‧‧‧通訊埠 110‧‧‧Communication埠
120‧‧‧儲存模組 120‧‧‧ storage module
121‧‧‧檢測紀錄資料 121‧‧‧Detection record data
200‧‧‧管控裝置 200‧‧‧Control device
201‧‧‧管控程式 201‧‧‧Control program
210‧‧‧通訊單元 210‧‧‧Communication unit
220‧‧‧顯示單元 220‧‧‧ display unit
300‧‧‧纜線 300‧‧‧ cable
S110~S160‧‧‧步驟流程 S110~S160‧‧‧Step procedure
圖1 是本發明之測試項目管控系統之元件方塊示意圖。 1 is a block diagram showing the components of the test item control system of the present invention.
圖2 是本發明的第一實施例裝置示意圖。 Figure 2 is a schematic view of the apparatus of the first embodiment of the present invention.
圖3 是本發明的第二實施例裝置示意圖。 Figure 3 is a schematic view of a second embodiment of the present invention.
圖4 是繪示對應圖1之測試項目管控方法的流程示意圖。 FIG. 4 is a schematic flow chart showing the control method of the test item corresponding to FIG. 1.
圖5~圖6 是繪示本發明實施例之測試項目管控方法的細部流程示意圖。 5 to FIG. 6 are schematic flow charts showing the control method of the test item according to the embodiment of the present invention.
S110~S160‧‧‧步驟流程 S110~S160‧‧‧Step procedure
Claims (9)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210324440.3A CN103678052A (en) | 2012-09-04 | 2012-09-04 | Test item management and control method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
TW201411159A TW201411159A (en) | 2014-03-16 |
TWI578005B true TWI578005B (en) | 2017-04-11 |
Family
ID=50315697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW101140338A TWI578005B (en) | 2012-09-04 | 2012-10-31 | Test project control method and its system |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103678052A (en) |
TW (1) | TWI578005B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107295142A (en) * | 2017-07-25 | 2017-10-24 | 北京小米移动软件有限公司 | terminal processing method, device and server |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200905212A (en) * | 2007-07-27 | 2009-02-01 | Inventec Appliances Corp | System and method for inspecting electronic device |
TW201038953A (en) * | 2009-04-21 | 2010-11-01 | Inventec Appliances Corp | Portable system with measuring function and measuring method thereof |
TW201123809A (en) * | 2009-12-30 | 2011-07-01 | Inventec Appliances Corp | Overhaul method and portable communication device using the same |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1522086A (en) * | 2003-02-12 | 2004-08-18 | 华冠通讯股份有限公司 | Automatic test system and method for handset function |
US8019333B2 (en) * | 2005-03-14 | 2011-09-13 | Qualcomm Incorporated | Apparatus and methods for product acceptance testing on a wireless device |
-
2012
- 2012-09-04 CN CN201210324440.3A patent/CN103678052A/en active Pending
- 2012-10-31 TW TW101140338A patent/TWI578005B/en active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200905212A (en) * | 2007-07-27 | 2009-02-01 | Inventec Appliances Corp | System and method for inspecting electronic device |
TW201038953A (en) * | 2009-04-21 | 2010-11-01 | Inventec Appliances Corp | Portable system with measuring function and measuring method thereof |
TW201123809A (en) * | 2009-12-30 | 2011-07-01 | Inventec Appliances Corp | Overhaul method and portable communication device using the same |
Also Published As
Publication number | Publication date |
---|---|
TW201411159A (en) | 2014-03-16 |
CN103678052A (en) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105045692B (en) | Testing device for touch screens and system, testing touch screen control device | |
US9870690B2 (en) | Methods and systems for a universal wireless platform for asset monitoring | |
CN101719356B (en) | Programming method for programming EDID simultaneously on liquid crystal display multiinterface | |
TW201305814A (en) | Test system and test method for testing electronic device | |
CN104579506A (en) | Bluetooth equipment testing method and device | |
WO2018000468A1 (en) | Timing controller and data updating method thereof, and liquid crystal display panel | |
US20130162548A1 (en) | Method and software for testing touch panels | |
TWI592798B (en) | Inspection system adjusting the sequence of testing items in diagnostic program through log file and method thereof | |
CN102789073A (en) | Testing method for MIPI liquid crystal screen | |
KR101943416B1 (en) | Displayport interface module of display test equipment | |
JP6467181B2 (en) | Method and system for dynamic workflow prioritization and tasking | |
WO2020168842A1 (en) | Vehicle damage assessment method and device and electronic device | |
CN105636080A (en) | Bluetooth test method and system | |
US20140149815A1 (en) | System and method for programming chips on circuit board through boundary scan technology | |
TW201508456A (en) | Testing method and testing system for fan modules | |
CN114020649B (en) | Quality inspection result verification method, system, test equipment and storage medium | |
TWI578005B (en) | Test project control method and its system | |
CN109218082B (en) | Network configuration parameter processing method, device and equipment | |
CN114578790A (en) | Unmanned aerial vehicle flight control automatic test method, system, equipment and medium | |
CN104575344A (en) | Screen quality detecting method and system based on brightness colorimeter | |
US11354214B2 (en) | Judgment method for hardware compatibility | |
CN202334661U (en) | Full-automatic testing apparatus for mobile phone mainboard | |
CN206057731U (en) | A kind of lcd panel test and lcd touch burning device | |
WO2018103760A1 (en) | Device and method for detecting corrosion state of terminal | |
TW200307153A (en) | Method of testing liquid crystal display cells and apparatus for the same |