TWI567267B - Flood protection and revetment - Google Patents
Flood protection and revetment Download PDFInfo
- Publication number
- TWI567267B TWI567267B TW103105216A TW103105216A TWI567267B TW I567267 B TWI567267 B TW I567267B TW 103105216 A TW103105216 A TW 103105216A TW 103105216 A TW103105216 A TW 103105216A TW I567267 B TWI567267 B TW I567267B
- Authority
- TW
- Taiwan
- Prior art keywords
- flood protection
- drainage
- protection bank
- concrete panel
- bank according
- Prior art date
Links
Landscapes
- Revetment (AREA)
Description
本發明係一種防洪護岸,尤指設於河岸並防止河水溢流的防洪護岸。The invention relates to a flood protection and revetment, in particular to a flood protection revetment which is located on the river bank and prevents overflow of river water.
設置於河川兩側之河岸上的護岸,在洪水衝擊與浸流下,經常溢頂崩毀而潰堤,導致洪水橫溢並肆虐家園,歸納原因如以下幾點:The revetments on the banks of the rivers on both sides of the river often collapsed and collapsed under floods and floods, causing floods and ravaged homes. The reasons are as follows:
1.護岸的混凝土面版與面版下方的夯實土心間無粗顆粒級配之排水濾層,且混凝土消波塊直接壓在河床上變成越級配,故水滲入混凝土面版,又混凝土面版在日曬下熱漲冷縮會產生伸縮裂縫,以及混凝土發揮強度時產生水化熱伸縮裂縫,所以河水滲入混凝土面版並軟化夯實土心,造成護岸土堤潰堤。1. The concrete surface plate of the revetment and the drainage filter layer with no coarse particle gradation between the tamping soil core under the surface plate, and the concrete wave-crushing block is directly pressed on the river bed to become a gradual distribution, so the water penetrates into the concrete plate and the concrete In the sun, the hot and cold shrinkage will produce telescopic cracks, and when the concrete exerts strength, it will produce hydration heat expansion cracks. Therefore, the river water penetrates into the concrete surface and softens the soil core, causing the bank to break the bank.
2.護岸之混凝土面版有裂縫而造成夯實土心直接接觸河水,使得夯實土心的土壤溶入河水並被帶出,夯實土心局部溶化形成小孔,又經河川反覆沖刷,使得夯實土心的小孔轉變成大孔而導致潰堤。2. There is a crack in the concrete surface of the revetment, which causes the soil of the soil to directly contact the river water, so that the soil of the soil is dissolved into the river water and taken out. The soil is partially melted to form small holes, and the river is repeatedly washed and washed to make the soil The small hole of the heart is transformed into a large hole and causes a break.
3.夯實土心於吸水後的含水量大於土壤的塑性限度,使得夯實土心軟化為塑性體,在自重與水流衝擊下軟化而發生邊坡滑動與潰堤。3. The soil water content after absorbing the soil is greater than the plastic limit of the soil, so that the soil core softens into a plastomer, softens under the impact of self-weight and water flow, and the slope slides and breaks.
4.護岸下方基礎地盤土壤太軟而承載力不足,又護岸受到洪水衝壓淘洗下,造成護岸下陷變形而降低防洪功效。4. The soil under the revetment is too soft and the bearing capacity is insufficient, and the revetment is subjected to flooding and scouring, which causes the revetment of the revetment to reduce the flood control effect.
本發明之主要目的在於提供一種防洪護岸,希藉此改善現有護岸之防洪功效不佳的問題。The main object of the present invention is to provide a flood protection and revetment, thereby improving the problem of poor flood control performance of the existing revetment.
為達成前揭目的,本發明之防洪護岸係設於河岸的地盤,該防洪護岸包含: 一基礎,其包含有複數伸入地盤且間隔排列的浮木基腳; 一本體,其係設於該基礎上,該本體包含有一分層滾壓的夯實黏土土心,並於該夯實黏土土心的外側覆設厚度大於50公分的排水級配濾層,再於排水級配濾層外側覆設厚度大於30公分的混凝土面版,以及混凝土面版上設有間隔排列的收縮控制縫、間隔排列的抗剪力防水伸縮縫,且該混凝土面版包含有一迎水面及一背水面,並於該背水面上設有多數間隔排列且深入排水級配濾層的排水管,其中,夯實黏土土心吸水後含水量小於土壤塑性限度;以及 一消能層,其係設該基礎上且延伸至該本體之混凝土面版的迎水面,以及該消能層的頂部形成一砂包加高平台。In order to achieve the foregoing disclosure, the flood protection bank of the present invention is located on a river bank, and the flood protection bank comprises: a foundation comprising a plurality of floating wood bases extending into the ground and spaced apart; a body being attached thereto In addition, the body comprises a layered rolled tamping clay core, and a drainage gradation filter layer having a thickness of more than 50 cm is disposed on the outer side of the tamping clay core, and the thickness is disposed on the outer side of the drainage gradation filter layer. a concrete face plate larger than 30 cm, and a concrete surface plate having spaced-apart shrinkage control joints, spaced-apart shear-resistant waterproof expansion joints, and the concrete face plate includes a water-facing surface and a back water surface, and the back surface The water surface is provided with a plurality of drain pipes arranged at intervals and deep into the drainage level filter layer, wherein the water content of the compacted clay soil is less than the plastic limit of the soil; and an energy dissipation layer is provided on the foundation and extends to the body The water surface of the concrete panel and the top of the energy dissipation layer form a sandbag heightening platform.
據上所述,浮木基腳的擠壓可增加地盤土壤密度,且浮木基腳的浮力可增加地盤承載力,以及夯實黏土土心吸水後含水量小於土壤塑性限度,可防止夯實黏土土心吸水變軟下陷而潰堤,以及可改善遇水溶解的問題,另外,排水管可讓排水級配濾層排水、透氣,使夯實黏土土心不會進水軟化,以及收縮控制縫與抗剪力防水伸縮縫可避免混凝土面版開裂,進而讓水不會滲入以提高整體結構強度並提升防洪功效,以及該消能層可消去河水沖刷力。According to the above, the extrusion of the foot of the driftwood can increase the soil density of the ground, and the buoyancy of the foot of the driftwood can increase the bearing capacity of the ground, and the water content of the compacted clay soil is less than the plastic limit of the soil, which can prevent the compacted clay soil. The water absorbs water and becomes soft and sinks, and it can improve the problem of water dissolution. In addition, the drain pipe can drain and ventilate the drainage grade filter layer, so that the compacted clay core will not soften into the water, and the shrinkage control joint and resistance The shear-proof waterproof expansion joint can prevent the concrete surface from cracking, so that the water will not penetrate to improve the overall structural strength and improve the flood control effect, and the energy dissipation layer can eliminate the river flushing force.
請參閱圖1、圖2,本發明防洪護岸係設於河岸的地盤,且包含一基礎10、一本體20及一消能層30。Referring to FIG. 1 and FIG. 2, the flood protection bank of the present invention is installed on a river bank and comprises a foundation 10, a body 20 and an energy dissipation layer 30.
該基礎10包含有複數伸入地盤且間隔排列的浮木基腳11,以及該基礎10於浮木基腳11的上部設有排水層12,其中,浮木基腳11可採用松木、相思木、杉木或竹子,所述排水層12可以為粗顆粒級配,也可以採用建築廢棄物。The foundation 10 includes a plurality of driftwood footings 11 extending into the ground and spaced apart, and the foundation 10 is provided with a drainage layer 12 on the upper portion of the driftwood footing 11, wherein the driftwood footing 11 can be made of pine wood and acacia wood. , the fir or the bamboo, the drainage layer 12 may be a coarse particle gradation or construction waste.
該本體20係設於該基礎10上,該本體20包含有一分層滾壓的夯實黏土土心21,並於該夯實黏土土心21的外側覆設厚度大於50公分的排水級配濾層22,再於排水級配濾層22外側覆設厚度大於30公分的混凝土面版23,以及混凝土面版23上設有間隔排列的收縮控制縫24、間隔排列的抗剪力防水伸縮縫,且該混凝土面版23包含有一迎水面25及一背水面26,並於該背水面26上設有多數間隔排列且深入排水級配濾層22的排水管27,其中,夯實黏土土心21吸水後含水量小於土壤塑性限度。The body 20 is disposed on the foundation 10, and the body 20 includes a layered rolled tamping clay core 21, and a drainage gradation filter layer 22 having a thickness greater than 50 cm is disposed on the outer side of the tamping clay core 21. Further, a concrete surface plate 23 having a thickness of more than 30 cm is disposed on the outer side of the drainage gradation filter layer 22, and a shrinkage control joint 24 having a spacing arrangement on the concrete surface plate 23 and a shear-proof waterproof expansion joint at intervals are arranged. The concrete panel 23 includes a water absorbing surface 25 and a back water surface 26, and the water drainage surface 26 is provided with a drainage pipe 27 which is arranged at a plurality of intervals and penetrates the drainage gradation filter layer 22, wherein the tamping clay earth core 21 is absorbing water and containing The amount of water is less than the plastic limit of the soil.
該消能層30係設該基礎10上且延伸至該本體20之混凝土面版23的迎水面25,以及該消能層30的頂部形成一可提供砂包堆放的砂包加高平台31,其中,該消能層30包含有複數堆疊的石箱籠32。The energy dissipation layer 30 is disposed on the foundation 10 and extends to the water surface 25 of the concrete panel 23 of the body 20, and the top of the energy dissipation layer 30 forms a sandbag heightening platform 31 capable of providing sandbag stacking. The energy dissipation layer 30 includes a plurality of stacked stone cages 32.
上述中,該混凝土面版23可以為鋼絲網或鋼筋混凝土面版23,另外,所述排水管27於伸入該排水級配濾層22的一側設有可過濾砂石的過濾盒28,以防止排水管27阻塞,以及所述排水管27傾斜設置,且排水管27進一步以傾斜15°配置,此外,相鄰之收縮控制縫24的間距為4至5公尺,又所述收縮控制縫24的深度為1公分、寬度為1公厘,另外,相鄰之抗剪力防水伸縮縫的間距為50公尺。In the above, the concrete panel 23 may be a steel mesh or a reinforced concrete panel 23, and the drain pipe 27 is provided with a filter box 28 for filtering sand and gravel on a side of the drainage level filter layer 22. To prevent the drain pipe 27 from being blocked, and the drain pipe 27 is disposed obliquely, and the drain pipe 27 is further disposed at an inclination of 15°, and further, the distance between the adjacent shrinkage control slits 24 is 4 to 5 meters, and the shrinkage control is further performed. The seam 24 has a depth of 1 cm and a width of 1 mm. In addition, the adjacent shear-resistant waterproof expansion joints have a pitch of 50 meters.
其中,該防洪護岸設置於河岸的地盤,且防洪護岸的迎水面25鄰近河流,河流的衝擊會先拍打至該消能層30再接觸到該本體20之混凝土面版23的迎水面25,其中,消能層30可消去河水沖刷力,另外,於洪水爆發前,使用者可以將砂包堆放於該消能層30的砂包加高平台31上,提高防洪高度並防溢。Wherein, the flood protection bank is disposed on the bank of the river bank, and the water surface 25 of the flood protection bank is adjacent to the river, and the impact of the river is first tapped to the energy dissipation layer 30 and then contacts the water surface 25 of the concrete panel 23 of the body 20, wherein The energy dissipation layer 30 can eliminate the river flushing force. In addition, before the flood occurs, the user can stack the sandbags on the sandbag heightening platform 31 of the energy dissipation layer 30 to improve the flood control height and prevent overflow.
上述中,該基礎10的浮木基腳11伸入地盤的土壤中,可有軟弱黏土層伸入到較硬土層,以及浮木基腳11的擠壓可提高地盤之土壤密度,以及浮力基腳提供的浮力可提高地盤承載力,以及該排水層12用以排水消除軟地盤差異沉陷,消除回填土壤地盤產生之超額孔隙水壓。In the above, the drifting foot 11 of the foundation 10 extends into the soil of the ground plate, and the soft clay layer can be extended into the hard soil layer, and the extrusion of the floating wood base 11 can increase the soil density of the ground and the buoyancy. The buoyancy provided by the footing can increase the bearing capacity of the ground, and the drainage layer 12 is used for draining to eliminate the differential subsidence of the soft ground and eliminate the excess pore water pressure generated by the backfilling soil site.
另外,夯實黏土土心21吸水後含水量小於土壤塑性限度,可防止夯實黏土土心21吸水變軟下陷而潰堤,以及可改善遇水溶解的問題,以及排水管27可讓排水級配濾層22排水、透氣,讓夯實黏土土心21不會進水軟化,以及收縮控制縫24可防止防洪護岸之混凝土面版23的鋪面收縮開裂,又抗剪力防水伸縮縫可防止混凝土面版23熱脹冷縮而開裂,使該本體20結構完整且讓水不會滲入,提供良好的結構強度以收優良的防洪功效。In addition, the water content of the tamping clay soil core 21 is less than the plastic limit of the soil, which can prevent the tamping clay soil core 21 from absorbing water and softening and swelling, and can improve the problem of water dissolution, and the drain pipe 27 can be used for drainage level filtration. Layer 22 is drained and ventilated, so that the tamping clay core 21 will not soften into the water, and the shrinkage control joint 24 can prevent the pavement shrinkage cracking of the concrete panel 23 of the flood protection bank, and the shear resistance waterproof expansion joint can prevent the concrete panel 23 The thermal expansion and contraction and cracking enable the body 20 to be structurally intact and allow water to not penetrate, providing good structural strength for excellent flood control.
10‧‧‧基礎
11‧‧‧浮力基腳
12‧‧‧排水層
20‧‧‧本體
21‧‧‧夯實黏土土心
22‧‧‧排水級配濾層
23‧‧‧混凝土面版
24‧‧‧收縮控制縫
25‧‧‧迎水面
26‧‧‧背水面
27‧‧‧排水管
28‧‧‧過濾盒
30‧‧‧消能層
31‧‧‧砂包加高平台
32‧‧‧石箱籠10‧‧‧ Foundation
11‧‧‧ buoyancy footing
12‧‧‧Drainage layer
20‧‧‧ body
21‧‧‧Compact clay earth
22‧‧‧Drained graded filter
23‧‧‧Concrete panel
24‧‧‧ Shrinkage Control Joint
25‧‧‧ Welcome to the water
26‧‧‧Back surface
27‧‧‧Drainage pipe
28‧‧‧Filter box
30‧‧‧ energy dissipation layer
31‧‧‧ sandbag heightening platform
32‧‧‧stone cage
圖1:為本發明防洪護岸之立體示意圖。圖2:為本發明防洪護岸之端面示意圖Figure 1 is a perspective view of the flood protection bank of the present invention. Figure 2 is a schematic view of the end face of the flood protection bank of the present invention
10‧‧‧基礎 10‧‧‧ Foundation
11‧‧‧浮力基腳 11‧‧‧ buoyancy footing
12‧‧‧排水層 12‧‧‧Drainage layer
20‧‧‧本體 20‧‧‧ body
21‧‧‧夯實黏土土心 21‧‧‧Compact clay earth
22‧‧‧排水級配濾層 22‧‧‧Drained graded filter
23‧‧‧混凝土面版 23‧‧‧Concrete panel
24‧‧‧收縮控制縫 24‧‧‧ Shrinkage Control Joint
25‧‧‧迎水面 25‧‧‧ Welcome to the water
26‧‧‧背水面 26‧‧‧Back surface
27‧‧‧排水管 27‧‧‧Drainage pipe
28‧‧‧過濾盒 28‧‧‧Filter box
30‧‧‧消能層 30‧‧‧ energy dissipation layer
31‧‧‧砂包加高平台 31‧‧‧ sandbag heightening platform
32‧‧‧石箱籠 32‧‧‧stone cage
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW103105216A TWI567267B (en) | 2014-02-18 | 2014-02-18 | Flood protection and revetment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW103105216A TWI567267B (en) | 2014-02-18 | 2014-02-18 | Flood protection and revetment |
Publications (2)
Publication Number | Publication Date |
---|---|
TW201533297A TW201533297A (en) | 2015-09-01 |
TWI567267B true TWI567267B (en) | 2017-01-21 |
Family
ID=54694682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW103105216A TWI567267B (en) | 2014-02-18 | 2014-02-18 | Flood protection and revetment |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI567267B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI756152B (en) * | 2021-05-06 | 2022-02-21 | 國立高雄科技大學 | Flood control bank with spillway type permeable weir embankment |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869080A (en) * | 2015-12-14 | 2017-06-20 | 关隆股份有限公司 | Dyke greening method and dyke |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101012648A (en) * | 2006-12-27 | 2007-08-08 | 马兴华 | Method for compacting cohesive soil road embankment and ground foundation of highroad, road and railroad by using vacuum precompression |
TWI307734B (en) * | 2005-09-13 | 2009-03-21 | da-xiong Peng | |
CN201495468U (en) * | 2009-08-18 | 2010-06-02 | 冯守中 | Structure of highway subgrade on wet soft foundation |
CN202559376U (en) * | 2012-04-28 | 2012-11-28 | 浙江润业建设有限公司 | Near-river municipal administration road structure below viaduct bridge |
-
2014
- 2014-02-18 TW TW103105216A patent/TWI567267B/en active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI307734B (en) * | 2005-09-13 | 2009-03-21 | da-xiong Peng | |
CN101012648A (en) * | 2006-12-27 | 2007-08-08 | 马兴华 | Method for compacting cohesive soil road embankment and ground foundation of highroad, road and railroad by using vacuum precompression |
CN201495468U (en) * | 2009-08-18 | 2010-06-02 | 冯守中 | Structure of highway subgrade on wet soft foundation |
CN202559376U (en) * | 2012-04-28 | 2012-11-28 | 浙江润业建设有限公司 | Near-river municipal administration road structure below viaduct bridge |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI756152B (en) * | 2021-05-06 | 2022-02-21 | 國立高雄科技大學 | Flood control bank with spillway type permeable weir embankment |
Also Published As
Publication number | Publication date |
---|---|
TW201533297A (en) | 2015-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510528B (en) | For the blind drainage structure of underground structure anti-floating | |
JP5157710B2 (en) | Embankment reinforcement structure | |
CN103046565A (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN212052626U (en) | Concrete panel rock-fill dam with multiple anti-seepage structure | |
CN210917200U (en) | Permanent structure of renovating of dammed lake | |
TWI567267B (en) | Flood protection and revetment | |
CN111270698A (en) | Protective structure for exposed diseases of bridge pile foundation in sand-mining river channel in mountainous area and construction method of protective structure | |
JP2015007354A (en) | Reinforcement structure for banking | |
JP5396368B2 (en) | Pavement structure | |
CN108914959B (en) | Foundation structure suitable for mountain house building and construction method thereof | |
CN107687155B (en) | Anti-seepage and anti-lifting structure of basin and arrangement method | |
KR20150021098A (en) | Waterside structures reinforced method | |
CN112854131A (en) | Ecological revetment for water source protection area and construction method thereof | |
JP7480643B2 (en) | River levee overflow control structure | |
CN210712967U (en) | Impervious anti structure that floats of basement | |
CN212477587U (en) | Dyke seepage-proofing structure | |
CN209873823U (en) | Impervious protective structure of embankment side slope soaks | |
JP5880060B2 (en) | Structure and method for suppressing level difference between building and surrounding ground caused by ground subsidence | |
CN217174912U (en) | Piping lane basement waterproof construction | |
TWI756152B (en) | Flood control bank with spillway type permeable weir embankment | |
CN217758566U (en) | Be applied to metal construction check dam that erosion gully administered | |
CN214783639U (en) | Ecological bank protection component in water source protection area | |
CN221167881U (en) | Foundation pit hydrophobic structure suitable for under rich water stratum condition | |
CN217026896U (en) | River sluice flood control dyke structure | |
CN219825964U (en) | Waterproof ground hidden leakage drainage structure |