TWI447596B - Loss calculation system and method - Google Patents

Loss calculation system and method Download PDF

Info

Publication number
TWI447596B
TWI447596B TW099147410A TW99147410A TWI447596B TW I447596 B TWI447596 B TW I447596B TW 099147410 A TW099147410 A TW 099147410A TW 99147410 A TW99147410 A TW 99147410A TW I447596 B TWI447596 B TW I447596B
Authority
TW
Taiwan
Prior art keywords
module
calculation
loss
storage
information
Prior art date
Application number
TW099147410A
Other languages
Chinese (zh)
Other versions
TW201227348A (en
Inventor
you-yang Huang
Original Assignee
Zhen Ding Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhen Ding Technology Co Ltd filed Critical Zhen Ding Technology Co Ltd
Priority to TW099147410A priority Critical patent/TWI447596B/en
Publication of TW201227348A publication Critical patent/TW201227348A/en
Application granted granted Critical
Publication of TWI447596B publication Critical patent/TWI447596B/en

Links

Description

損耗計算系統及損耗計算方法Loss calculation system and loss calculation method

本發明涉及損耗計量,尤其涉及一種可較方便獲得損耗資訊之損耗計算系統及損耗計算方法。The invention relates to loss metering, in particular to a loss calculation system and a loss calculation method which can conveniently obtain loss information.

隨著科學技術之進步,印刷電路板在電子產品得到之廣泛之應用。關於電路板之應用請參見文獻Takahashi, A. Ooki, N. Nagai, A. Akahoshi, H. Mukoh, A. Wajima, M. Res. Lab, High density multilayer printed circuit board for HITAC M-880,IEEE Trans. on Components, Packaging, and Manufacturing Technology, 1992, 15(4): 418-425。With the advancement of science and technology, printed circuit boards have been widely used in electronic products. For application of the circuit board, please refer to the literature Takahashi, A. Ooki, N. Nagai, A. Akahoshi, H. Mukoh, A. Wajima, M. Res. Lab, High density multilayer printed circuit board for HITAC M-880, IEEE Trans On Components, Packaging, and Manufacturing Technology, 1992, 15(4): 418-425.

電路板一般由覆銅基板、銅箔、膠片及其它物料通過種種流程製作而成,每個物料在每個流程一般都有所損耗。舉例而言,覆銅基板需要裁切成複數電路板單元,在裁切之過程中就會產生邊角廢料,這些即為損耗量。在核算電路板之製作成本之時候,就需要計算電路板中各個物料在各個流程之損耗量。並且,當生產之電路板需要出口時,還需要將損耗量報關。然而,在實際計算損耗量時,由於每個物料都需要經過複數流程,每個流程之損耗量之計算方法都不一樣。因此,電路板之損耗量之計算係非常繁瑣複雜而且極易出錯。Circuit boards are typically fabricated from copper-clad substrates, copper foil, film, and other materials through a variety of processes, each of which is typically lost in each process. For example, a copper clad substrate needs to be cut into a plurality of circuit board units, and corner scraps are generated during the cutting process, which is the amount of loss. When calculating the manufacturing cost of the board, it is necessary to calculate the amount of loss of each material in the board in each process. Moreover, when the production circuit board needs to be exported, it is also necessary to declare the amount of loss. However, when the actual amount of loss is calculated, since each material needs to go through a complex process, the calculation method of the loss amount of each process is different. Therefore, the calculation of the amount of loss on the board is very cumbersome and error-prone.

有鑑於此,提供一種可較快且較準確獲得損耗資訊之損耗計算系統及損耗計算方法實屬必要。In view of this, it is necessary to provide a loss calculation system and a loss calculation method that can obtain loss information faster and more accurately.

以下將以實施例說明一種電路板及其製作方法。A circuit board and a method of fabricating the same will be described below by way of embodiments.

一種損耗計算系統,包括存儲模組、資訊獲取模組、查找模組、判定模組、計算模組以及輸出模組。所述存儲模組用於存儲複數料號之製作參數列表與物料表,每個料號之製作參數列表均包括複數物料之製作參數,每個料號之物料表均包括所述複數物料之流程資訊。所述資訊獲取模組用於獲取自輸入裝置輸入之料號及與該料號相關之製作參數。所述查找模組用於在存儲模組中查找與資訊獲取模組獲取之料號相關之製作參數列表及物料表。所述判定模組用於判定查找模組獲得的製作參數列表中之製作參數與資訊獲取模組從輸入裝置獲取之製作參數是否滿足計算模組之要求。所述計算模組用於在判定模組判定為是時,根據獲得的物料表與獲得的與所述料號相關之製作參數計算出所述料號之每個物料在每個流程之損耗資訊。所述輸出模組用於輸出計算模組計算出之損耗資訊。A loss calculation system includes a storage module, an information acquisition module, a lookup module, a decision module, a calculation module, and an output module. The storage module is configured to store a production parameter list and a material table of the plurality of item numbers, and the production parameter list of each item number includes production parameters of the plurality of materials, and the material table of each item number includes the process of the plurality of materials. News. The information acquisition module is configured to obtain a material number input from the input device and a production parameter related to the material number. The search module is configured to search the storage module for a production parameter list and a material list related to the item number obtained by the information acquisition module. The determining module is configured to determine whether the production parameters in the production parameter list obtained by the search module and the production parameters acquired by the information acquisition module from the input device meet the requirements of the calculation module. The calculation module is configured to calculate, according to the obtained material table and the obtained production parameters related to the item number, the loss information of each material in each process according to the obtained material list. . The output module is configured to output loss information calculated by the calculation module.

一種損耗計算方法,包括步驟:獲取自輸入裝置輸入之料號及與該料號相關之製作參數;在存儲模組中查找與獲取之料號相關之製作參數列表及物料表,每個料號之製作參數列表均包括複數物料之製作參數,每個料號之物料表均包括複數物料之流程資訊;判定從存儲模組查找出之製作參數列表中之製作參數與資訊獲取模組從輸入裝置獲取之製作參數是否滿足計算要求;在判定為是時,根據獲得的物料表與獲得的與所述料號相關之製作參數計算出所述料號之每個物料在每個流程之損耗資訊,並輸出計算出之損耗資訊;以及在判定為否時,輸出具有不能計算之含義之顯示資訊。A loss calculation method includes the steps of: obtaining a material number input from an input device and a production parameter related to the material number; searching a storage module for a production parameter list and a material table related to the obtained material number, each material number The production parameter list includes production parameters of the plurality of materials, and the material table of each material number includes process information of the plurality of materials; determining the production parameters and the information acquisition module from the input device in the production parameter list found by the storage module Obtaining the production parameters satisfying the calculation requirement; when the determination is yes, calculating the loss information of each material of the material number in each process according to the obtained material table and the obtained production parameters related to the material number, And outputting the calculated loss information; and when the determination is no, outputting display information having a meaning that cannot be calculated.

本技術方案之損耗計算系統及損耗計算方法具有如下優點:利用存儲模組、查找模組、判定模組以及計算模組可以自動得出與輸入之料號相關之損耗資訊,如此,避免了人為之複雜計算與人為因素之干擾,不但可以較快速地得出計算結果,而且使得計算結果較為準確。The loss calculation system and the loss calculation method of the technical solution have the following advantages: the storage module, the search module, the determination module and the calculation module can automatically obtain the loss information related to the input item number, thus avoiding artificial The complex calculation and the interference of human factors can not only obtain the calculation results more quickly, but also make the calculation results more accurate.

下面將結合附圖及實施例,對本技術方案提供之電路板及其製作方法作進一步之詳細說明。The circuit board provided by the technical solution and the manufacturing method thereof will be further described in detail below with reference to the accompanying drawings and embodiments.

請參閱圖1,本技術方案實施例提供之損耗計算系統10可以建構在一個或者複數電腦100中,所述一個或者複數電腦100通過資料線與一輸入裝置102相連接,還與一輸出裝置104相連接。所述輸入裝置102可以為鍵盤、滑鼠、觸摸屏等設備,用於供使用者向電腦100內輸入資訊與命令。所述輸出裝置104可以為顯示幕,用於顯示電腦100之輸出資訊。Referring to FIG. 1 , the loss calculation system 10 provided by the embodiment of the present technical solution may be constructed in one or a plurality of computers 100. The one or more computers 100 are connected to an input device 102 through a data line, and an output device 104. Connected. The input device 102 can be a keyboard, a mouse, a touch screen, etc., for the user to input information and commands into the computer 100. The output device 104 can be a display screen for displaying output information of the computer 100.

所述損耗計算系統10用於計算工件在生產過程之各步驟中需要之損耗。所述工件可以為電路板或者其他元件。損耗計算系統10包括存儲模組11、資訊獲取模組12、查找模組13、判定模組14、計算模組15及輸出模組16。The loss calculation system 10 is used to calculate the losses that the workpiece requires in each step of the production process. The workpiece can be a circuit board or other component. The loss calculation system 10 includes a storage module 11, an information acquisition module 12, a search module 13, a determination module 14, a calculation module 15, and an output module 16.

所述存儲模組11用於存儲複數料號之製作參數列表與所述複數料號之物料表。每個料號之製作參數列表均包括與該料號相關之複數物料之製作參數,每個料號之物料表均包括與該料號相關之複數物料及該複數物料之流程資訊。所述存儲模組11包括第一存儲子模組111與第二存儲子模組112,所述第一存儲子模組111存儲有複數料號之製作參數列表。所述第二存儲子模組112存儲有複數料號之物料表。所述複數料號係指複數不同工藝要求之工件之料號。以電路板為工件進行舉例,所述第一存儲子模組111內可存儲有複數料號之電路板之製作參數列表,第二存儲子模組112內可存儲有複數料號之電路板之物料表。電路板之製作參數列表中之製作參數包括覆銅基板之尺寸、覆銅基板之裁切片數、蝕刻銅面之面積等等。電路板之物料表包括覆銅基板、銅箔、膠層、防焊油墨等物料及每個物料之製作流程。比如說,覆銅基板之製作流程一般包括裁板、圖像轉移、蝕刻、鑽孔、成型等步驟。防焊油墨之製作流程一般包括顯影、成型等步驟。The storage module 11 is configured to store a production parameter list of the plurality of item numbers and a material table of the plurality of item numbers. The production parameter list of each item number includes the production parameters of the plurality of materials related to the item number, and the material list of each item number includes the plurality of materials related to the item number and the process information of the plurality of materials. The storage module 11 includes a first storage sub-module 111 and a second storage sub-module 112. The first storage sub-module 111 stores a production parameter list of a plurality of item numbers. The second storage sub-module 112 stores a material table of a plurality of item numbers. The plural number refers to the part number of the workpiece with multiple different process requirements. For example, the circuit board is used as a workpiece. The first storage sub-module 111 can store a manufacturing parameter list of a circuit board with multiple item numbers, and the second storage sub-module 112 can store a circuit board with multiple material numbers. Material list. The manufacturing parameters in the manufacturing parameter list of the circuit board include the size of the copper-clad substrate, the number of cut pieces of the copper-clad substrate, the area of the etched copper surface, and the like. The material list of the circuit board includes copper-clad substrate, copper foil, glue layer, solder-proof ink and other materials and the production process of each material. For example, the fabrication process of a copper-clad substrate generally includes steps such as panel cutting, image transfer, etching, drilling, and molding. The manufacturing process of the solder resist ink generally includes steps of development, molding, and the like.

所述資訊獲取模組12與輸入裝置102連接,用於獲取自輸入裝置102輸入之料號以及製作參數。所述資訊獲取模組12包括第一獲取子模組121及第二獲取子模組122。所述第一獲取子模組121用於獲取輸入之料號,所述第二獲取子模組122用於獲取輸入之製作參數,例如與該料號相關之某個物料之厚度資訊。The information acquisition module 12 is connected to the input device 102 for acquiring the item number input from the input device 102 and the production parameters. The information acquisition module 12 includes a first acquisition sub-module 121 and a second acquisition sub-module 122. The first obtaining sub-module 121 is configured to obtain an input item number, and the second obtaining sub-module 122 is configured to obtain an input manufacturing parameter, such as thickness information of a certain material related to the item number.

所述查找模組13可以訪問存儲模組11,通過比對資訊獲取模組12獲取之料號與存儲模組11中之存儲資料而獲得與資訊獲取模組12獲取之料號相關之製作參數列表及物料表。具體而言,查找模組13包括第一查找子模組131與第二查找子模組132,所述第一查找子模組131用於訪問第一存儲子模組111,並在第一存儲子模組111中查找與資訊獲取模組12獲取之料號相關之複數物料之製作參數列表。所述第二查找子模組132用於訪問第二存儲子模組112,以在第二存儲子模組112中查找與資訊獲取模組12獲取之料號相關之物料表,從而獲得與資訊獲取模組12獲取之料號相關之複數物料及每個物料之生產流程。The search module 13 can access the storage module 11 and obtain the production parameters related to the item number obtained by the information acquisition module 12 by comparing the item number obtained by the information acquisition module 12 with the storage data in the storage module 11. List and material list. Specifically, the search module 13 includes a first search sub-module 131 and a second search sub-module 132. The first search sub-module 131 is used to access the first storage sub-module 111 and is in the first storage. The sub-module 111 searches for a list of production parameters of the plurality of materials related to the item number obtained by the information acquisition module 12. The second search sub-module 132 is configured to access the second storage sub-module 112 to find a material table related to the item number obtained by the information acquisition module 12 in the second storage sub-module 112, thereby obtaining information and information. Obtain the plurality of materials related to the item number obtained by the module 12 and the production process of each material.

判定模組14與計算模組15相連接,用於判定獲得的資訊,即,資訊獲取模組12獲取之輸入資訊以及查找模組13查找到之資訊,是否滿足計算模組15之要求,並在判定為是時觸發計算模組15,在判定為否時觸發輸出模組16。所述計算模組15用於在判定模組14判定為是時,根據獲得的物料表與獲得的與所述料號相關之製作參數,計算出資訊獲取模組12獲取的料號中每個物料在每個流程之損耗資訊。獲得的與所述料號相關之製作參數包括查找模組13查找獲得的製作參數列表中之製作參數與資訊獲取模組12從輸入裝置102獲取之製作參數。所述計算模組15可依據精確之計算公式計算損耗資訊,亦可根據經驗公式計算損耗資訊。所述用於計算損耗資訊之損耗計算公式一般包括複數個經驗公式。損耗計算公式可以列表存儲在計算模組15中,亦可存儲在存儲模組11中,例如可以存儲在物料表中。損耗計算公式之存儲位置不限,僅需計算模組15運行時,可以訪問並關聯這些損耗計算公式即可。舉例而言,銅箔在成型流程中之損耗量之計算公式為:損耗量=邊角料殘銅面積×(層別銅箔厚度-減銅厚度(mil)/1000)×(使用倍數)×(0.145992÷每片含電路板單元數)。在該公式中,邊角料殘銅面積、減銅厚度、使用倍數及每片含電路板單元數等製作參數值可由查找模組13自存儲模組11中查找而得,層別銅箔厚度之參數值可由使用者自輸入裝置102輸入,並由第二獲取子模組122獲得。The determining module 14 is connected to the computing module 15 for determining whether the obtained information, that is, the input information obtained by the information acquiring module 12 and the information found by the searching module 13 meet the requirements of the computing module 15 and When the determination is YES, the calculation module 15 is triggered, and when the determination is negative, the output module 16 is triggered. The calculation module 15 is configured to calculate, according to the obtained material table and the obtained production parameters related to the item number, the calculation module 15 to calculate each of the item numbers acquired by the information acquisition module 12 Material loss information in each process. The obtained production parameters related to the item number include the production parameters in the production parameter list obtained by the search module 13 and the production parameters acquired by the information acquisition module 12 from the input device 102. The calculation module 15 can calculate loss information according to an accurate calculation formula, and can also calculate loss information according to an empirical formula. The loss calculation formula for calculating loss information generally includes a plurality of empirical formulas. The loss calculation formula may be stored in the calculation module 15 or may be stored in the storage module 11, for example, in a material list. The storage location of the loss calculation formula is not limited, and only when the calculation module 15 is running, these loss calculation formulas can be accessed and associated. For example, the calculation formula of the loss amount of copper foil in the molding process is: loss amount = residual copper area of the corner material × (layer copper foil thickness - copper reduction thickness (mil) / 1000) × (use multiple) × (0.145992 ÷ Each piece contains the number of circuit board units). In the formula, the value of the residual copper area, the thickness of the copper reduction, the multiple of use, and the number of circuit board units per piece can be found by the search module 13 from the storage module 11, and the thickness of the layer copper foil is determined. The value can be input by the user from the input device 102 and obtained by the second acquisition sub-module 122.

計算模組15根據資訊獲取模組12獲取之料號與製作參數以及查找模組13查找到之製作參數列表與物料表,關聯與該料號相關之損耗計算公式,即可進行計算步驟,計算得出該料號中每個物料在每個流程之損耗資訊。當然,在計算模組15進行計算之前,判定模組14判定計算損耗需用到之損耗計算公式中之各個製作參數值是否齊備,並在齊備時觸發計算模組15進行計算。在計算模組15計算得出該料號之損耗資訊之後,計算模組15觸發輸出模組16。所述輸出模組16用於向輸出裝置104輸出資訊。在被判定模組14觸發時,即損耗計算公式中之各個製作參數值不齊備時,輸出模組16向輸出裝置104輸出具有“不能計算”、“fault”或類似含義之文本框或顯示視窗。在被計算模組15觸發時,獲取計算模組15之計算結果並將計算結果輸出至輸出裝置104。所述計算結果,即,該料號之損耗資訊可以以文本框或列表之形式被顯示。The calculation module 15 performs the calculation step according to the item number and the production parameter obtained by the information acquisition module 12 and the production parameter list and the material table found by the search module 13 and associates the loss calculation formula related to the item number, thereby performing the calculation step and calculating The loss information of each material in the item number in each process is obtained. Of course, before the calculation module 15 performs the calculation, the determination module 14 determines whether each of the production parameter values in the loss calculation formula used for calculating the loss is complete, and triggers the calculation module 15 to perform calculation when it is ready. After the calculation module 15 calculates the loss information of the item number, the calculation module 15 triggers the output module 16. The output module 16 is configured to output information to the output device 104. When triggered by the determination module 14, that is, when the production parameter values in the loss calculation formula are not complete, the output module 16 outputs a text box or display window having "unable to calculate", "fault" or the like to the output device 104. . When triggered by the computing module 15, the calculation result of the calculation module 15 is obtained and the calculation result is output to the output device 104. The calculation result, that is, the loss information of the item number can be displayed in the form of a text box or a list.

請參閱圖2,本技術方案還提供一種利用損耗計算系統10計算損耗之方法,包括步驟:Referring to FIG. 2, the technical solution further provides a method for calculating loss by using the loss calculation system 10, including the steps:

S1,資訊獲取模組12獲取自輸入裝置102輸入之料號與製作參數。資訊獲取模組12通過第一獲取子模組121與第二獲取子模組122一併獲取這些輸入資訊。S1. The information acquisition module 12 acquires the item number and the production parameter input from the input device 102. The information acquisition module 12 acquires the input information together with the second acquisition sub-module 122 through the first acquisition sub-module 121.

S2,查找模組13在存儲模組11中查找與資訊獲取模組12獲取之料號相關之製作參數列表及物料表。S2, the search module 13 searches the storage module 11 for the production parameter list and the material list related to the item number obtained by the information acquisition module 12.

當然,本領域技術人員可以理解,在S2步驟之前,所述損耗計算方法還包括步驟:建構一個所述存儲模組11;以及在所述存儲模組11中存儲複數料號之製作參數列表與物料表,每個料號之製作參數列表均包括複數物料之製作參數,每個料號之物料表均包括複數物料之流程資訊,如前所述。Certainly, those skilled in the art can understand that before the step S2, the loss calculation method further includes the steps of: constructing one of the storage modules 11; and storing a list of production parameters of the plurality of item numbers in the storage module 11 and The material list, the production parameter list of each item number includes the production parameters of the plurality of materials, and the material table of each item number includes the process information of the plurality of materials, as described above.

S3,判定模組14判定獲得的跟資訊獲取模組12獲取之料號相關之製作參數是否滿足計算要求。獲得的製作參數包括資訊獲取模組12之第二獲取子模組122從輸入裝置102獲取之製作參數以及查找模組13之第一查找子模組131在存儲模組11中查找到之製作參數列表中之製作參數。判定模組14判定為是時,觸發計算模組15,在判定為否時,觸發輸出模組16。S3. The determining module 14 determines whether the obtained production parameter related to the item number acquired by the information acquiring module 12 satisfies the calculation requirement. The obtained production parameters include the production parameters acquired by the second acquisition sub-module 122 of the information acquisition module 12 from the input device 102 and the production parameters found by the first search sub-module 131 of the search module 13 in the storage module 11. Production parameters in the list. When the determination module 14 determines that the determination is YES, the calculation module 15 is triggered, and when the determination is negative, the output module 16 is triggered.

S4,在判定為是時,計算模組15訪問計算公式並關聯計算公式,以根據獲得的物料表與獲得的與所述料號相關之製作參數計算出損耗資訊,即,與所述料號相關之每個物料在每個流程之損耗。輸出模組16向輸出裝置104輸出這些計算結果,即,輸出這些損耗資訊。S4, when the determination is YES, the calculation module 15 accesses the calculation formula and associates the calculation formula to calculate loss information according to the obtained material table and the obtained production parameters related to the item number, that is, the item number Each material involved is depleted in each process. The output module 16 outputs these calculation results to the output device 104, that is, outputs the loss information.

S5,在判定為否時,輸出模組16向輸出裝置104輸出具有不能計算含義之顯示資訊。例如,顯示“不能計算”、“fault”或類似含義之文本框或顯示視窗。S5. When the determination is no, the output module 16 outputs display information having an uncalculated meaning to the output device 104. For example, a text box or display window that displays "cannot be calculated", "fault", or the like is displayed.

本技術方案之損耗計算系統及損耗計算方法具有如下優點:利用存儲模組、查找模組、判定模組以及計算模組可以自動得出與輸入之料號相關之損耗資訊,如此,避免了人為之複雜計算與人為因素之干擾,不但可以較快速地得出計算結果,而且使得計算結果較為準確。The loss calculation system and the loss calculation method of the technical solution have the following advantages: the storage module, the search module, the determination module and the calculation module can automatically obtain the loss information related to the input item number, thus avoiding artificial The complex calculation and the interference of human factors can not only obtain the calculation results more quickly, but also make the calculation results more accurate.

綜上所述,本發明確已符合發明專利之要件,遂依法提出專利申請。惟,以上所述者僅為本發明之較佳實施方式,自不能以此限制本案之申請專利範圍。舉凡熟悉本案技藝之人士援依本發明之精神所作之等效修飾或變化,皆應涵蓋於以下申請專利範圍內。In summary, the present invention has indeed met the requirements of the invention patent, and has filed a patent application according to law. However, the above description is only a preferred embodiment of the present invention, and it is not possible to limit the scope of the patent application of the present invention. Equivalent modifications or variations made by persons skilled in the art in light of the spirit of the invention are intended to be included within the scope of the following claims.

10...損耗計算系統10. . . Loss calculation system

100...電腦100. . . computer

102...輸入裝置102. . . Input device

104...輸出裝置104. . . Output device

11...存儲模組11. . . Storage module

12...資訊獲取模組12. . . Information acquisition module

13...查找模組13. . . Search module

14...判定模組14. . . Decision module

15...計算模組15. . . Computing module

16...輸出模組16. . . Output module

111...第一存儲子模組111. . . First storage submodule

112...第二存儲子模組112. . . Second storage submodule

121...第一獲取子模組121. . . First acquisition submodule

122...第二獲取子模組122. . . Second acquisition submodule

131...第一查找子模組131. . . First lookup submodule

132...第二查找子模組132. . . Second lookup submodule

圖1係本技術方案實施例提供之損耗計算系統之模組示意圖。FIG. 1 is a schematic diagram of a module of a loss calculation system provided by an embodiment of the present technical solution.

圖2係本技術方案實施例提供之損耗計算方法之流程示意圖。FIG. 2 is a schematic flow chart of a loss calculation method provided by an embodiment of the present technical solution.

Claims (10)

一種損耗計算系統,包括存儲模組、資訊獲取模組、查找模組、判定模組、計算模組以及輸出模組,所述存儲模組用於存儲複數料號之製作參數列表與物料表,每個料號之製作參數列表均包括複數物料之製作參數,每個料號之物料表均包括所述複數物料之流程資訊,所述資訊獲取模組用於獲取自輸入裝置輸入之料號及與該料號相關之製作參數,所述查找模組用於在存儲模組中查找與資訊獲取模組獲取之料號相關之製作參數列表及物料表,所述判定模組用於判定查找模組獲得的製作參數列表中之製作參數與資訊獲取模組從輸入裝置獲取之製作參數是否滿足計算模組之要求,所述計算模組用於在判定模組判定為是時,根據獲得的物料表與獲得的與所述料號相關之製作參數計算出所述料號之每個物料在每個流程之損耗資訊,所述輸出模組用於輸出計算模組計算出之損耗資訊。A loss calculation system includes a storage module, an information acquisition module, a search module, a determination module, a calculation module, and an output module, wherein the storage module is configured to store a production parameter list and a material list of the plurality of item numbers. The production parameter list of each item number includes production parameters of the plurality of materials, and the material table of each item number includes process information of the plurality of materials, and the information acquisition module is configured to obtain the item number input from the input device and And the production parameter related to the item number, wherein the searching module is configured to search, in the storage module, a production parameter list and a material list related to the item number obtained by the information acquisition module, and the determination module is used to determine the search mode. The production parameters in the production parameter list obtained by the group and the production parameters obtained by the information acquisition module from the input device satisfy the requirements of the calculation module, and the calculation module is used to determine the material according to the obtained material when the determination module determines that it is YES. The table and the obtained production parameters related to the item number calculate loss information of each material of the item number in each process, and the output module is used for outputting a calculation mode. To calculate the loss of information. 如申請專利範圍第1項所述之損耗計算系統,其中,所述判定模組在判定為是時觸發計算模組,在判定為否時觸發輸出模組,所述輸出模組還用於在被判定模組觸發時輸出具有不能計算之含義之資訊。The loss calculation system of claim 1, wherein the determination module triggers the calculation module when the determination is yes, and triggers the output module when the determination is no, the output module is further used for When triggered by the decision module, the output has information that cannot be calculated. 如申請專利範圍第1項所述之損耗計算系統,其中,所述計算模組根據計算公式計算料號之每個物料在每個流程之損耗資訊。The loss calculation system of claim 1, wherein the calculation module calculates the loss information of each material of the item number in each process according to the calculation formula. 如申請專利範圍第3項所述之損耗計算系統,其中,所述計算公式存儲於物料表。The loss calculation system of claim 3, wherein the calculation formula is stored in a material list. 如申請專利範圍第1項所述之損耗計算系統,其中,所述存儲模組包括第一存儲子模組與第二存儲子模組,所述第一存儲子模組存儲所述複數料號之製作參數列表,所述第二存儲子模組存儲所述複數料號之物料表,查找模組包括第一查找子模組與第二查找子模組,所述第一查找子模組用於訪問第一存儲子模組,並在第一存儲子模組中查找與資訊獲取模組獲取的料號相關之製作參數列表,所述第二查找子模組用於訪問第二存儲子模組,並在第二存儲子模組中查找與資訊獲取模組獲取的料號相關之物料表。The loss calculation system of claim 1, wherein the storage module comprises a first storage sub-module and a second storage sub-module, and the first storage sub-module stores the plurality of item numbers. The second storage sub-module stores the material list of the plurality of item numbers, the search module includes a first search sub-module and a second search sub-module, and the first search sub-module And accessing the first storage sub-module, and searching, in the first storage sub-module, a production parameter list related to the item number obtained by the information acquisition module, where the second search sub-module is used to access the second storage sub-module Grouping, and searching for a material table related to the item number obtained by the information acquisition module in the second storage sub-module. 一種損耗計算方法,包括步驟:
獲取自輸入裝置輸入之料號及與該料號相關之製作參數;
在存儲模組中查找與獲取之料號相關之製作參數列表及物料表,每個料號之製作參數列表均包括複數物料之製作參數,每個料號之物料表均包括複數物料之流程資訊;
判定從存儲模組查找出之製作參數列表中之製作參數與資訊獲取模組從輸入裝置獲取之製作參數是否滿足計算要求;
在判定為是時,根據獲得的物料表與獲得的與所述料號相關之製作參數計算出所述料號之每個物料在每個流程之損耗資訊,並輸出計算出之損耗資訊;以及
在判定為否時,輸出具有不能計算的含義之顯示資訊。
A loss calculation method, including the steps:
Obtaining a material number input from the input device and a production parameter related to the material number;
In the storage module, the production parameter list and the material list related to the obtained material number are searched, and the production parameter list of each material number includes the production parameters of the plurality of materials, and the material table of each material number includes the process information of the plurality of materials. ;
Determining whether the production parameters in the production parameter list found by the storage module and the production parameters acquired by the information acquisition module from the input device meet the calculation requirements;
When the determination is yes, calculating the loss information of each material of the item number in each process according to the obtained material table and the obtained production parameter related to the item number, and outputting the calculated loss information; When the determination is no, the display information having a meaning that cannot be calculated is output.
如申請專利範圍第6項所述之損耗計算方法,其中,在存儲模組中查找與獲取之料號相關之製作參數列表及物料表之前,所述損耗計算方法還包括步驟:
建構一所述存儲模組;以及
在所述存儲模組中存儲複數料號之製作參數列表與物料表。
The loss calculation method according to claim 6, wherein the loss calculation method further comprises the following steps: before the storage module searches for the production parameter list and the material table related to the obtained material number:
Constructing a storage module; and storing a production parameter list and a material list of the plurality of item numbers in the storage module.
如申請專利範圍第6項所述之損耗計算方法,其中,利用一計算模組關聯計算公式,以根據獲得的物料表與獲得的與所述料號相關之製作參數計算出所述料號之每個物料在每個流程之損耗資訊。The loss calculation method according to claim 6, wherein the calculation formula is associated with a calculation module, and the item number is calculated according to the obtained material table and the obtained production parameters related to the item number. Loss of information for each material in each process. 如申請專利範圍第8項所述之損耗計算方法,其中,所述計算公式存儲於物料表,所述計算模組訪問物料表以關聯計算公式。The loss calculation method according to claim 8, wherein the calculation formula is stored in a material table, and the calculation module accesses the material table to associate the calculation formula. 如申請專利範圍第8項所述之損耗計算方法,其中,所述計算公式存儲於存儲模組,所述計算模組訪問存儲模組以關聯計算公式。The loss calculation method of claim 8, wherein the calculation formula is stored in a storage module, and the calculation module accesses the storage module to associate a calculation formula.
TW099147410A 2010-12-31 2010-12-31 Loss calculation system and method TWI447596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW099147410A TWI447596B (en) 2010-12-31 2010-12-31 Loss calculation system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW099147410A TWI447596B (en) 2010-12-31 2010-12-31 Loss calculation system and method

Publications (2)

Publication Number Publication Date
TW201227348A TW201227348A (en) 2012-07-01
TWI447596B true TWI447596B (en) 2014-08-01

Family

ID=46933202

Family Applications (1)

Application Number Title Priority Date Filing Date
TW099147410A TWI447596B (en) 2010-12-31 2010-12-31 Loss calculation system and method

Country Status (1)

Country Link
TW (1) TWI447596B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW503346B (en) * 2000-03-24 2002-09-21 Fujitsu Ltd Method of production control and method of manufacturing TFT substrate
US20020174038A1 (en) * 2001-05-18 2002-11-21 Mitac International Corp. Warehouse system with optimal management flow
TW591462B (en) * 2002-08-26 2004-06-11 Taiwan Semiconductor Mfg Material management system and method for semiconductor tool
TW200951839A (en) * 2008-06-06 2009-12-16 Hon Hai Prec Ind Co Ltd System and method for material requirement planning

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW503346B (en) * 2000-03-24 2002-09-21 Fujitsu Ltd Method of production control and method of manufacturing TFT substrate
US20020174038A1 (en) * 2001-05-18 2002-11-21 Mitac International Corp. Warehouse system with optimal management flow
TW591462B (en) * 2002-08-26 2004-06-11 Taiwan Semiconductor Mfg Material management system and method for semiconductor tool
TW200951839A (en) * 2008-06-06 2009-12-16 Hon Hai Prec Ind Co Ltd System and method for material requirement planning

Also Published As

Publication number Publication date
TW201227348A (en) 2012-07-01

Similar Documents

Publication Publication Date Title
JP6754889B2 (en) Printed circuit board metal mask manufacturing system
KR100739407B1 (en) Structural analysis method employing finite element method
JP5062249B2 (en) Analysis apparatus, analysis method, and analysis program
US8806421B1 (en) System and method for designing via of printed circuit board
JP5407632B2 (en) Printed circuit board test support apparatus, printed circuit board test support method, and printed circuit board test support program
US20130158925A1 (en) Computing device and method for checking differential pair
JP5212296B2 (en) Wiring design support device, wiring design support method, and wiring design support program
CN116227417A (en) Circuit board and wiring method thereof
TWI447596B (en) Loss calculation system and method
US9996646B2 (en) System and method of determining high speed resonance due to coupling from broadside layers
JP5040363B2 (en) Analysis apparatus, analysis method, and analysis program
US9372950B2 (en) Circuit layout method and circuit layout apparatus
CN111581683A (en) Display panel information extraction method and device and electronic equipment
US8769472B1 (en) Computing device and method for checking signal transmission line
US8249847B2 (en) Simulation system and method for manufacturing printed circuit board
CN102542392A (en) Loss calculation system and method
WO2020164307A1 (en) Surface mount data conversion method and system based on component three-dimensional database, medium and device
JP6610210B2 (en) Wiring pattern forming system
TWI425897B (en) System and method for layout design
Higgins Industrial scale processing of materials in the manufacture of microelectronic devices
TW200919240A (en) Simulation system and method for manufacturing printed circuit board
CN219981119U (en) Circuit board and electronic device
KR20120053586A (en) Apparatus for generating bill of material for electronic part auto-inserting system and method thereof
DODU et al. A TABU SEARCH FOR TIME MINIMIZATION IN PRINTED CIRCUIT BOARD ASSEMBLY
JP2011198028A (en) Circuit design aiding apparatus and program