TWI225098B - Pre-treatment method for hot steel-slag stabilization operation - Google Patents

Pre-treatment method for hot steel-slag stabilization operation Download PDF

Info

Publication number
TWI225098B
TWI225098B TW92120574A TW92120574A TWI225098B TW I225098 B TWI225098 B TW I225098B TW 92120574 A TW92120574 A TW 92120574A TW 92120574 A TW92120574 A TW 92120574A TW I225098 B TWI225098 B TW I225098B
Authority
TW
Taiwan
Prior art keywords
slag
hot steel
steel slag
hot
treatment
Prior art date
Application number
TW92120574A
Other languages
Chinese (zh)
Other versions
TW200504225A (en
Inventor
Ping-Chiuan Lin
Hung-Jiu Shie
Original Assignee
China Hi Ment Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Hi Ment Corp filed Critical China Hi Ment Corp
Priority to TW92120574A priority Critical patent/TWI225098B/en
Application granted granted Critical
Publication of TWI225098B publication Critical patent/TWI225098B/en
Publication of TW200504225A publication Critical patent/TW200504225A/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Landscapes

  • Furnace Details (AREA)

Abstract

A pre-treatment method for a hot steel-slag stabilization operation mainly comprises collecting the hot steel-slag produced by a converter process in a large slag tank; loading the hot steel-slag in the large slag tank into a plurality of slag disks; separately performing an air cooling operation on the hot steel-slag in each slag disk to a surface temperature below 350 DEG C; and separately removing the air-cooled hot steel-slag from the slag disks to form block slags, and allowing the removed block slags to naturally cool off to a core temperature of 500 to 700 DEG C during the transport process for supplying thermal energy needed in the subsequent simmering steam conditioning and stabilization operation, thereby reducing the processing cost. Furthermore, the hot steel-slags do not touch the ground during the treatment process and do not need to be stacked on a slag cart. Thus, there is no occurrence of problems associated with contamination and damaged slag cart, etc. Meanwhile, no water spray cooling is used during the pre-treatment method of hot steel-slag, and no occurrence of an industrial safety problem such as gas explosion.

Description

玖、發明說明: 【發明所屬之技術領域】 本發明是有關於-種前置處理方法,特別是指一種哉 鋼渣安定化作業之前置處理方法。 … 【先前技術】 10 近年來,由於產業界發現熱鋼渣(如高爐石、轉爐石等 )之成h田中具有類似天然砂石、耐磨損、耐高溫與耐腐餘 等乜異的物化特性’若能經由適當處理,則深具資源回收 再利用之潛力;以轉爐石相,由於轉爐石之主要成分為 氧化糾⑽、二氧化石夕(Si〇2)、游離態氧化約(ρ—⑽以及 鐵等,雖於冷卻後形成固態大塊體,但卻具有自然膨脹與 自然分解等不穩定特性,因&,若未經適#處理而貿铁再 利用(例如,作為地基),則潛藏著於曰後因膨脹爆破,進 而引發類如地基鬆動等嚴重危機。 15 因此,目前一般資源回收業者為解決此一問題,故申 請人曾研發且目前提出專利申請之熱闊蒸氣養生安定化處说明 Description of the invention: [Technical field to which the invention belongs] The present invention relates to a pretreatment method, and particularly to a pretreatment method for the stabilization of concrete slag. … [Prior technology] 10 In recent years, due to the discovery of hot steel slag (such as blast furnace stone, converter stone, etc.) in the industry, fields have similar physical and chemical properties like natural sandstone, abrasion resistance, high temperature resistance, and corrosion resistance. 'If it can be properly treated, it has deep potential for resource recovery and reuse. In the converter stone phase, the main components of converter stone are oxidation correction, dioxide dioxide (SiO2), and free oxidation (ρ—⑽). And iron, although it forms a solid large block after cooling, but it has unstable characteristics such as natural expansion and natural decomposition. Because &, if the trade iron is reused without proper treatment (for example, as foundation), then There is a potential for serious crises such as loose foundations due to expansion and explosion later. 15 Therefore, in order to solve this problem, the general resource recovery industry has now developed and stabilized the hot steam health care that the applicant has developed and currently filed for a patent application. Place

理方法,其主要是將熱鋼逢直接置人__熱悶裝置中,除藉 喷水使鋼㈣化外,再輔以熱悶保溫及蒸氣供應補充,^ 20 使熱鋼渣溫度能維持於設定的⑽。c〜2G(rc間藉以提供熱 鋼產足夠穩定化溫度,使熱㈣中之游離氧化約能迅速水 解成氫氧化mca_2],最後達穩定化與粉碎化之目的, 以便將熱鋼渣予以資源化處理。 再者,蓉於煉鋼製程所產生之熱鋼逢溫度為12〇〇」_ t高溫,因此該高溫之熱鋼渣若要進行安定化作業時,必 4 1225098 須先行針對熱鋼渣進行-前置處理作業,方才能將熱鋼逢 置入熱悶裝置中處理,而前述前置作業方法如@ 1所示, 5 其主要是依序包含有集料步w 1G、潑地步驟、首次喷水 冷卻步驟14、堆渣步驟16及再次喷水冷卻步驟18等;其 中’ 6亥集料步驟10是先將煉鋼後所殘留之高溫孰鋼潰,利 用大渣桶之盛裝,以做為承載輸送之用,同時並且備一較 大的倒逢區,以供熱鋼逢餘放降溫,以利熱鋼渣後續處理 ,故該大渣桶中所盛奘夕古i A丄 遴裝之阿溫熱鋼渣並載送至倒渣區,即 10 進行熱舰潑地㈣12,直接將熱㈣_堆疊於倒㈣ 之場地中。 仍續前述’之後針對該堆疊之熱鋼渣’第-次進行噴 水冷卻(即喷水冷卻步驟⑷,以將高溫熱㈣先行水冷降 溫’待該熱㈣表溫降至跡彻。c時,然後再進行堆清步 15 驟16,亦即利用推渣車將該等熱鋼渣堆疊集中於-處Γ俾 便空餘出場地,以做為今j拥 马久批熱鋼渣倒渣降溫處理使用,最 後再進行二次噴水冷卻㈣18,使堆疊之熱㈣再度喷水 "卻至100 50 c之後,該冷卻之熱鋼潰可送至加工薇直接《 使用,但因該熱鋼逢的穩定性不足,且實際使用上不符合 20 要求,因此進-步針對該熱鋼渣進行安定化處理。 然而,針對前揭對熱鋼潰所進行之前置處理作業中, 發現具有以下缺失值得改進: 、 (1)造成空污問題: 由於該高溫熱鋼渣呈液體且以潑地方式直接傾倒於 倒渣區之地面上,並再利用噴水方式,加以水冷裂化成 5 1225098 塊狀,以便於後續之運輸;惟,前述熱鋼渣在進行喷水 冷卻降温後之堆渣,容易產生塵土飛揚現象,造成空氣 污染缺失,對環保意識高漲的今天而言,極易招致民怨 ,故該前置處理作業亟待改善。 5 (2)有氣爆工安問題: 習知大渣桶每桶有42噸容量,故當如此大量之熱 鋼渣以潑地方式直接傾倒於倒渣區之地面上,正因倒渣 區%地又到熱鋼渣重覆噴水、堆渣作業影響,故場地易 呈潮座,或呈積水狀態,一旦大量高溫熱鋼渣覆蓋到水 ° ’會迅速將水料以氣化成蒸氣,進而產线爆,此時 工作人員再稍不注意’將會被氣爆所傷,就連同推潰設 備亦會造成損毀,故工安事件頻傳。 (3) 後續安定化處理之速度較慢且成本高: 習知針對熱鋼渣所進行之前置處理作業,最後是將 5 熱鋼2水降溫至_〜啊之後,再送人熱㈣置進行 後縯女疋化處理作業’然而,由於熱鋼潰已被水冷卻降 故後續所要進行之安定化處理作業,完全要利用大 ΐ条氣加以補充提昇,以提供熱悶裝置内之熱鋼渣所需 安定化處理的作業溫度,故必須消耗許多蒸氣熱能方能 0 維持在—定的溫度與壓力,實不具經濟效益。 (4) 推渣車損壞嚴重·· 在進行堆潰步驟16時,由於是利用推逢車將該等 塊狀熱_載送堆積集中於—處,而此時之塊狀熱_ 溫度仍高達l〇(MGG°C ’因此高溫容易造成該推逢車產 6 1225098 生損壞。 (5)工作環境不佳: 5 由於習知針對熱鋼渣所進行之前置處理作業會產生 前述空污及轉工安等問題,且操作者必須時常:高溫 環境下作業,因此整體之卫作環境對操作者而 ^ 劣。 田心 【發明内容】 10 於是,本發明之目的是在提供—種降低空污與氣爆工 安因素,以及改善作業環境品質,進一步提供後續安定化 處理具有速度快且成本較低的熱鋼渣安定化之前置處理 法。 15 本發明熱鋼潰前置處理方法,用於熱鋼渣在進行熱問蒸 氣養生安定化處理之前的前置作業,其依序包含有一集料: 驟、-分裝步驟、一空冷步驟、以及一脫模步驟。該集料步 驟是先將轉爐煉鋼製程所產生之熱鋼渣收集於一大渣桶中. 該分裝步驟是將大潰桶内之熱鋼渣分褒進料至複數個渔盤中 ,該空冷步驟則是將每一渣盤内之熱鋼渣進行空冷降溫至表 溫為35(TC以下之動作;該脫模步驟是將已完成空冷步驟: 20 熱鋼渣分別自潰盤中取出而形成塊渣,並令取出之塊渣自秋 冷卻至心溫為500°C〜700°C。 一 本發明藉由上述步驟,使熱鋼渣從送出至安定化處王 過程中,料落地且亦μ㈣渣車進行堆渣,同時熱Z 渣處理過程更不需噴水冷卻,所以改善作業環境品質“,、、且 無氣爆工安及空污問題’同時亦能減少推渣車設傷之損機 7 5 ,再者,最後取出之熱鋼渣心溫可達5〇〇〇c ,、 行後續熱悶蒸氣養生安定化處理作#所需熱能,可由 渣所提供,大量降低蚊化作業所需之熱量,進 Μ 定化作業處理之費用成本。 - 【實施方式】 有關本發明之前述及其他技術内容、特點與功效,在 乂下配口麥考圖式之較佳實施例的詳細說明中,將可、、主 的明白。 10 芩閱圖2,本發明熱鋼渣前置處理方法之一較佳實施例 ,是用於熱鋼渣在進行熱問蒸氣養生安定化處理之前的前 置作業,該熱鋼潰前置處王里方法是依序包含有一集料步驟2 分裝步驟3、一空冷步驟4、以及一脫模步驟5。 15 於該集料步驟2中,本實施例係以轉爐鋼渣為例,工 作者先將轉爐煉鋼製程所產生之熱鋼》分別集收大渣桶中 2且該每一大渣桶約可盛裝42噸熱鋼渣,其中,該熱鋼渣 疋呈液態狀,且其溫度因盛裝於大渣桶時間的先後,故熱 鋼渣溫度在1200〜1400°C之間。 20 於該分1步驟3中,是將大渣桶内之熱鋼渣再行分裝 至複數個渣盤中,且每一渣盤盛裝前必先塗抹脫模劑,以 利於熱鋼渣硬化後之脫模作業,另外,該熱鋼渣分裝於渣 盤上,故可維持每一渣盤上之熱鋼渣具有特定大小尺寸、 重量。 於該空冷步驟4中,將每一渣盤内之熱鋼渣進行空氣 冷卻降溫處理,使該熱鋼渣表溫降至35〇t:以下,且該熱鋼 8 !225〇98 -条㈤t該渔盤内所堆放之熱鋼法表面降溫形成塊狀 〇 於該脫模步驟中5,將已完成空冷步驟之熱鋼渣,將其 5所承載之逢盤一一載運至安定化處理廠,此時該熱鋼清的 心溫為50(TC〜7〇(rc,再分別自逢盤中將呈塊狀且自缺冷 部之熱鋼渣予以取出,直接置入熱悶裝置(圖中未示出)中, 以進行後績之熱悶蒸氣養生安定化處理作業。 口此藉由上述步驟,使得熱鋼渣從送出至安定化處 理過程中,均不落地且亦不需用推渣車進行堆渣因此能春 10 ?文善工作環境品質,同時並無空污問題且亦能減少推渣車 設備=損壞’再者’更因前置處理過程中不需利用喷水方 式進打冷卻’所以亦無氣爆工安問題,且由於最後取出之 塊潰心溫可達500t;〜70(rc,故進行後續熱間蒸氣養生安 定化處理作業所需熱能,均可由熱鋼渣所提供,大量降低 15 安定化作業所需之熱量,進而降低安定化作業處理之費用 成本。 經由前述說明,可歸納出以下之功效,兹詳述如下:Φ (1 )無空污問題: 由於本發明之咼溫熱鋼渣呈液體排出後,即可藉 20 由〉查盤的分別盛裝,以使每-潰盤盛裝-^大小尺寸、 重里之熱鋼邊,待其空氣冷卻一段時間之後,即直接將 冷卻硬化之熱㈣載送置人熱时置(非本發明特徵, 故圖中未示出)中,因此整個過程之熱鋼渣均不落地, 且亦不需用到推渣車進行堆潰作業,更沒有喷水冷卻造 9 1225098 成塵土飛揚之現象,所以作業環境整潔且能有效 污問題。 Ά (2)無氣爆工安問題·· 本發明之高溫熱鋼渣於整個處理過程當中均是以 空乳冷卻之方式來進行冷卻,所以不會有熱鋼造覆蓋 到水,且迅速將水份予以氣化成蒸氣發生氣爆現象, 致使工作人員及操作設備被氣爆所傷或損毁,相對 低工安事件產生。 (3)後續安定化處理之速度快且成本低·· 。由於本發明最後取出之塊清心溫可達$⑼。c〜彻 ’故對於熱鋼渣後續置入熱悶裝置欲進行熱悶蒸氣養 ^安定化處理’因此可利用熱鋼清高溫,再適時辅以 洛氣加熱補充’以使熱鋼逢維持一定的溫度與I力即可 ,故熱鋼渣處理過程所需消耗能量相對降低許多,而費 用成本亦相對降低。 、 (4) 推渣車設備損壞減少·· 由於本發明並不需要關推料來對高溫之熱鋼籲 座進仃推㈣業’因此並無推邊車設備損壞產生。 (5) 工作環境較佳: 本發明由於能有效解決f知前置處理作業所產生之 空污及氣爆工安等問題,因此對工作者而言,整體工作 環境品質較習知為佳。 歸納上述,本發明熱鋼渣安定化之前置處理方法確· 能有效達到無空污及氣爆I安問題,進—步改善工作環= 10 5 口口貝’同時後續安定化處理具有速度快且成本 ,故確實能夠達到本發明之目的。 4力效 ^准X上所述者,僅為本發明之較佳實施例而已,當不 =以此限定本發明實施之範圍,即大凡依本發明_請專利 範圍及發明說明書内容所作之簡單的等效變化與修飾,皆 應仍屬本發明專利涵蓋之範圍内。 【圖式簡單說明】 圖1為習知熱鋼渣前置處理方法之一流程圖;及 10 圖2為一流程圖,說明本發明熱鋼渣前置處理方法之鲁 一較佳實施例。 【圖式之主要元件代表符號說明】 2 集料步驟 4 空冷步驟 3 分裝步驟 5 脫模步驟The main method is to directly put hot steel into the __ hot stuffing device, in addition to spraying water to make the steel scoured, supplemented by hot stuffing and steam supply, ^ 20 to keep the hot steel slag temperature at Set ⑽. c ~ 2G (to provide hot steel production with sufficient stabilization temperature, so that the free oxidation in the hot water can quickly hydrolyze to hydroxide mca_2], and finally achieve the purpose of stabilization and pulverization, in order to recycle the hot steel slag In addition, the temperature of the hot steel produced by Rong Yu in the steelmaking process is 1 200 ″ _t high temperature. Therefore, if the hot steel slag at this high temperature is to be stabilized, it must be performed on the hot steel slag first. Only before the pre-treatment operation can the hot steel be placed in the hot-seal device. The above-mentioned pre-operation method is shown in @ 1. 5 It mainly includes the collection step w 1G, the ground splashing step, and the first time. Water spray cooling step 14, slag stacking step 16 and water spray cooling step 18, etc .; Among them, the 6th aggregate step 10 is to crush the remaining high-temperature steel after the steelmaking, and use the large slag bucket to hold it. For the purpose of carrying and conveying, and at the same time, a large meeting area is provided for the heating steel to cool down in spare time to facilitate the subsequent processing of the hot steel slag. Therefore, the large slag bucket is filled with Xixigu i A 丄. Awen heats the steel slag and carries it to the slag dumping area, that is, 10 for hot ship splashing ㈣12, directly stack the hot __ in the inverted site. Still continue the aforementioned 'Later for the stacked hot steel slag' for the first time water spray cooling (that is, the water spray cooling step ⑷), in order to cool the high temperature heat ㈣ first with water cooling 'When the temperature of the hot slag surface has fallen to a low level, c, then proceed to stack clearing step 15 step 16, that is, use a slag pusher to concentrate the hot steel slag stack at the-place Γ 空 and leave it to the site to do For the current hot steel slag pouring and cooling treatment approved by Ma Jiujiu, a second water spray cooling (18) is performed at the end, so that the hot water of the stack is sprayed with water again. However, after reaching 100 50 c, the cooled hot steel can be sent to Processing Wei is directly used, but because the hot steel has insufficient stability and does not meet the requirements of 20 in actual use, it has been further stabilized for the hot steel slag. However, the hot steel slag has been carried out for the previous demolition. In the previous processing operation, it was found that the following defects are worth improving: (1) Caused the air pollution problem: Because the high-temperature hot steel slag was liquid and poured directly on the ground of the slagging area in a splashing manner, and reused water spray Way, add water cooling cracking into 5 1225098 block, for subsequent transportation; however, the slag pile of hot steel slag after spray cooling cooling is easy to produce dust and air pollution, which leads to the lack of air pollution. It is very easy to cause public grievance for the rising awareness of environmental protection. Therefore, the pre-treatment operation needs to be improved urgently. 5 (2) There is a gas explosion safety problem: It is known that the large slag bucket has a capacity of 42 tons per barrel, so when such a large amount of hot steel slag is directly poured into the slag dumping area in a pouring manner. On the ground, due to the effect of repeated water spraying and slag stacking on the hot steel slag, the site is likely to be a tide seat or a state of standing water. Once a large amount of high temperature hot steel slag is covered with water °, it will quickly The water material is vaporized into steam, and then the production line explodes. At this time, the staff does not pay attention to it. 'It will be injured by the gas explosion. It will also cause damage due to the collapse of the equipment. Therefore, industrial safety incidents are frequent. (3) The subsequent stabilization process is slow and costly: It is known to perform the pre-treatment operation for hot steel slag, and finally, after cooling 5 hot steel and 2 water to _ ~ ah, then send it to the hot decanting process. However, since the hot steel rupture has been cooled down by water, the subsequent stabilization treatment operation to be carried out must be supplemented and improved with the use of large slab gas to provide the hot steel slag in the hot stuffing device. Stabilizing the operating temperature, it must consume a lot of steam thermal energy to maintain at a fixed temperature and pressure, which is not economically beneficial. (4) The slag pusher is severely damaged ... When the stacking step 16 was performed, the block heat_carrying stack was concentrated in the-place by the push car, and the block heat_ temperature was still as high as l〇 (MGG ° C 'Therefore, high temperature is likely to cause damage to the produced car 6 1225098. (5) Poor working environment: 5 Due to the conventional pre-treatment treatment for hot steel slag, the aforementioned air pollution and transfer will occur. Work safety and other issues, and the operator must always: work under high temperature environment, so the overall health environment is inferior to the operator. Tian Xin [Summary of the Invention] 10 Therefore, the object of the present invention is to provide a method to reduce air pollution. And gas explosion safety factors, as well as improving the quality of the operating environment, further provides a fast and low cost hot steel slag stabilization pre-treatment method for subsequent stabilization. 15 The hot steel smash pre-treatment method of the present invention is used for The pre-operation of the hot steel slag before the thermal steam curing and stabilization treatment includes an aggregate in sequence: a step, a -packing step, an air cooling step, and a demolding step. The aggregate step is to first convert the converter Steelmaking process The generated hot steel slag is collected in a large slag bucket. The dispensing step is to feed the hot steel slag in the large bucket into a plurality of fishing plates, and the air cooling step is to hot steel slag in each slag tray Perform air cooling to the surface temperature of 35 (TC below; this demolding step is to complete the completed air cooling step: 20 hot steel slag is removed from the rupture plate to form slag, and the removed slag is cooled to the heart from autumn The temperature is 500 ° C ~ 700 ° C. According to the present invention, the hot steel slag is sent from the ground to the stabilizing prince through the above steps, the material falls to the ground and the slag truck is used for slag stacking, and the hot Z slag treatment process is even less. Water spray cooling is required, so the quality of the working environment is improved. ", And there is no air explosion, industrial safety and air pollution problems. At the same time, it can reduce the damage of the slag pusher and the damage of the machine 7 5. Moreover, the core temperature of the hot steel slag finally removed can reach 5 〇〇〇c, the follow-up hot steam curing and stabilization treatment as the heat energy required by # can be provided by the slag, which can greatly reduce the heat required for mosquitoization operations, and the cost and cost of treatment operations.-[Implementation mode ] In the foregoing and other technologies related to the present invention , Characteristics and effects, in the detailed description of the preferred embodiment of the McCoy pattern with the mouth, will understand the main. 10 Read Figure 2, one of the hot steel slag pretreatment method of the present invention is better This embodiment is used for the pre-operation of hot steel slag before the thermal steam curing and stabilization treatment. The hot-steel crushing method of the front part of the method includes sequentially an aggregate step 2, a packing step 3, and an air cooling step. 4. And a demolding step 5. 15 In the aggregate step 2, this embodiment is based on the converter steel slag. The worker first collects the hot steel produced by the converter steelmaking process. And each big slag bucket can hold about 42 tons of hot steel slag. Among them, the hot steel slag is in a liquid state and its temperature is between 1200 and 1400 ° C due to the time of containing the hot slag bucket . 20 In step 3 of this sub-step, the hot steel slag in the large slag bucket is repacked into a plurality of slag trays, and a mold release agent must be applied before each slag tray is filled to facilitate hot steel slag hardening. In the demoulding operation, in addition, the hot steel slag is separately packed on the slag tray, so the hot steel slag on each slag tray can be maintained to have a specific size, size and weight. In the air-cooling step 4, the hot steel slag in each slag pan is air-cooled and cooled to reduce the surface temperature of the hot steel slag to 35 ° t: the following, and the hot steel 8? The surface of the hot steel method stacked in the tray is cooled to form a block. In the demolding step 5, the hot steel slag that has completed the air cooling step is transported to the Andinghua treatment plant one by one. The hot steel clear heart temperature is 50 (TC ~ 70 (rc), and then the hot steel slag that is block-shaped and from the lack of cold part is taken out from each plate, and placed directly in the hot stuffing device (not shown in the figure) ), In order to perform the stabilizing treatment of hot steam health maintenance after the performance. Through the above steps, the hot steel slag does not fall to the ground during the process of sending out to the stabilization process, and does not need to use a slag pusher to carry out slag stacking. Therefore, the quality of the working environment can be improved in 10 years, while there is no air pollution problem and the slag pusher equipment can be reduced = damage to 'more' is also because the pre-treatment process does not need to be cooled by water spraying. There is no air explosion safety problem, and the heart temperature can reach 500t due to the last block removed; ~ 70 (rc Therefore, the heat energy required for the subsequent thermal treatment steam stabilization treatment can be provided by the hot steel slag, which can greatly reduce the heat required for the stabilization operation by 15 and further reduce the cost of stabilization operation processing. Through the foregoing description, it can be concluded The following effects are detailed as follows: Φ (1) No air pollution problem: As the 咼 warm steel slag of the present invention is discharged as a liquid, it can be contained separately by 20 >> check disks, so that each-break disk can hold -^ The size and size of the hot steel edge, after the air is cooled for a period of time, the cooling and hardening heat is directly placed in the hot time (not a feature of the present invention, so it is not shown in the figure), so The hot steel slag does not fall to the ground during the whole process, nor does it need a slag pusher to carry out the stacking operation, and there is no water spray cooling to produce 9 1225098 dust, so the operating environment is neat and can effectively pollute. Ά (2 ) No gas explosion problem ... The high temperature hot steel slag of the present invention is cooled by air cooling during the entire processing process, so no hot steel is covered with water, and the water is quickly The gas explosion caused by gasification into vapor causes the workers and operating equipment to be injured or damaged by gas explosion, resulting in relatively low safety incidents. (3) The subsequent stabilization process is fast and low cost ... The temperature of the cleaned heart can be as high as $ ⑼. C ~ Che 'For the hot steel slag is subsequently placed in the hot stuffing device for hot steam curing ^ stabilization treatment' so hot steel can be used to clear the high temperature, and supplemented with Luo gas heating supplement at appropriate time ' In order to make the hot steel maintain a certain temperature and I force, the energy consumption of the hot steel slag processing process is relatively reduced, and the cost and cost is also relatively reduced. (4) The damage of the slag pusher equipment is reduced. It is not necessary to push the material to push the high-temperature hot steel into the seat, so there is no damage to the sidecar equipment. (5) The working environment is better: The present invention can effectively solve the pre-processing operation. The resulting air pollution and gas explosion safety issues, so for workers, the overall quality of the working environment is better than conventional. To sum up, the pre-treatment method for stabilizing the hot steel slag according to the present invention can effectively achieve the problems of no air pollution and gas explosion, and further improve the working ring = 10 5 muzzle. At the same time, the subsequent stabilization process has fast speed. And the cost, it can indeed achieve the purpose of the present invention. 4Effective ^ quasi X is only a preferred embodiment of the present invention, if not = to limit the scope of the implementation of the present invention, that is, what is simple according to the scope of the invention _ please patent scope and the description of the invention The equivalent changes and modifications should still fall within the scope of the patent of the present invention. [Brief description of the drawings] FIG. 1 is a flowchart of a conventional hot steel slag pretreatment method; and FIG. 2 is a flowchart illustrating a preferred embodiment of the hot steel slag pretreatment method of the present invention. [Description of the main symbols of the drawings] 2 Aggregation step 4 Air cooling step 3 Dispensing step 5 Demolding step

1111

Claims (1)

^ Λ申請專利範圍·· 用於熱鋼渣在 業,其處理方 •一種熱鋼渣安定化作業之前置處理方法, 進行熱悶蒸氣養生安定化處理前之前置作 法依序包含有·· -集料步驟,先將煉鋼製程所產生之熱鋼渣收集於 一大渣桶中; 〃、 一分裝步驟 盤中存放; 將大渣桶内之熱鋼渣分裝至複數個渣 一空冷步驟,將每一渣盤内之熱鋼渣進行空氣冷卻籲 降溫處理,使該熱鋼渣表溫降至35()t:以下,且該熱鋼 產降溫同時,該渣盤内所堆放之熱鋼渣表面降溫形成塊 狀;及 一脫模步驟,將已完成空冷步驟之熱鋼渣,將其所 承載之渣盤 載運至安定化處理廠,且載運期間該渣 盤内所堆放之熱鋼渣,自然冷卻至心溫為5〇〇。〇〜7〇〇。〇 ’再分別自渣盤中將呈塊狀且自然冷卻之熱鋼渣予以取 出’以進行後續之熱悶蒸氣養生安定化處理作業。 _ 2.依據申請專利範圍第}項所述熱鋼渣安定化作業之前置處 理方法,其中,該熱鋼渣分裝於渣盤時,該渣盤内緣面佈 有一脫模劑,以利塊狀之熱鋼渣易於脫模。 12^ Λ scope of patent application ·· For the hot steel slag in the industry, its treatment method • A hot steel slag stabilization operation before the treatment method, before the hot steam steam stabilization treatment before the installation method includes in order ... In the collecting step, first collect the hot steel slag generated in the steelmaking process in a large slag bucket; 〃. Store in a sub-packing step tray; Pack the hot steel slag in the big slag bucket into a plurality of slag and air cooling steps. The hot steel slag in each slag pan is air-cooled to reduce the temperature to reduce the surface temperature of the hot steel slag to 35 (t) or less, and the temperature of the hot steel slag is reduced. At the same time, the surface of the hot steel slag stacked in the slag tray is cooled. Form a block; and a demolding step, the hot steel slag that has completed the air-cooling step is carried to the Andinghua treatment plant, and the hot steel slag stacked in the slag tray during the transportation is naturally cooled to the heart The temperature was 500. 〇 ~ 7〇〇. 〇 'Remove the hot steel slag that is massive and naturally cooled from the slag tray separately' for subsequent hot steam stabilization treatment. _ 2. According to the pre-treatment method for stabilizing the hot steel slag according to item} in the scope of the patent application, when the hot steel slag is divided into slag trays, a mold release agent is arranged on the inner edge of the slag tray to facilitate the block. The hot steel slag is easy to demold. 12
TW92120574A 2003-07-28 2003-07-28 Pre-treatment method for hot steel-slag stabilization operation TWI225098B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW92120574A TWI225098B (en) 2003-07-28 2003-07-28 Pre-treatment method for hot steel-slag stabilization operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW92120574A TWI225098B (en) 2003-07-28 2003-07-28 Pre-treatment method for hot steel-slag stabilization operation

Publications (2)

Publication Number Publication Date
TWI225098B true TWI225098B (en) 2004-12-11
TW200504225A TW200504225A (en) 2005-02-01

Family

ID=34568444

Family Applications (1)

Application Number Title Priority Date Filing Date
TW92120574A TWI225098B (en) 2003-07-28 2003-07-28 Pre-treatment method for hot steel-slag stabilization operation

Country Status (1)

Country Link
TW (1) TWI225098B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276121A (en) * 2013-04-24 2013-09-04 新疆八一钢铁股份有限公司 Safety process capable of reducing explosion in hot disintegrating explosion of steel slag

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276121A (en) * 2013-04-24 2013-09-04 新疆八一钢铁股份有限公司 Safety process capable of reducing explosion in hot disintegrating explosion of steel slag
CN103276121B (en) * 2013-04-24 2014-07-02 新疆八一钢铁股份有限公司 Safety process capable of reducing explosion in hot disintegrating explosion of steel slag

Also Published As

Publication number Publication date
TW200504225A (en) 2005-02-01

Similar Documents

Publication Publication Date Title
CN105258515A (en) Apparatus and method for recovering steelmaking slag afterheat of electric arc furnace
CN102191343B (en) Aircooled crushing device and method of molten steel slag
CN101239384B (en) Separation method of casting residue and molten steel
Selvaraj et al. Waste heat recovery from metal casting and scrap preheating using recovered heat
CN202984575U (en) Novel reclaimed sand mechanical device
CN102191342A (en) Comprehensive treatment system and method of steel slag roller crushing-waste heat press self-dissolving and waste heat recovery
CN201670844U (en) Treatment device for crushing melting steel slag in rolling manner under air-cooling condition
TWI225098B (en) Pre-treatment method for hot steel-slag stabilization operation
CN103866384A (en) Polycrystalline silicon ingot furnace with overflow protection function
WO2019174287A1 (en) Slag residual heat utilization device and molten slag granulation method
CN104988256B (en) Furnace slag waste heat recovery system
WO2021223543A1 (en) Efficient treatment method and apparatus for multiphase steel slag
CN202297622U (en) High-temperature steel slag buffering and cooling device available for intermittent feeding
CN102794317B (en) Device and method for descaling surface of casting blank
CN102115800A (en) Pollution-free production process for ferrovanadium alloy
JP4972974B2 (en) Hot metal desulfurization method
CN102039420A (en) Method for preparing superfine zinc powder from hot galvanizing zinc slag wastes through vacuum evaporation and rapid condensation
CN203602634U (en) Waste heat recovery device of blast furnace slag
CN206055642U (en) Air-cooled ash cooling device
CN201102937Y (en) Equipment for heat treatment of melted steel scoria
CN103693218A (en) Wear-resistant steel ball packaging auxiliary device
CN204944168U (en) Casting smelting intermediate frequency furnace
CN104556051B (en) Method for removing boron element in polysilicon slag former with metallurgy method and prepared regenerated slag former
CN104911285B (en) The processing method of slag more than a kind of casting
CN114854911B (en) Device and method for utilizing heat energy of high-temperature steel slag

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees