Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof
(AREA)
Abstract
A working process by crabwise knotting beams for tube sheet pile, which comprises: (a) punching the tube sheet pile into the earth by using a cantilever vibration machine or hammering; (b) punching in adjacent piles to complete a pile row or pile group; (c) welding medium layer infusion ring or reinforcement sheet to lengthen the pile body, followed by punching to complete the pile row or pile group; (d) after the pile group has reached the specified depth, infusing cement slurry into the pipe followed by compression for knotting beams; (e) inserting steel bars into the pipes; and (f) filling up the pipes.
TW83102893A1994-04-011994-04-01Working process by crabwise knotting beams for tube sheet pile