TW259831B - Working process by crabwise knotting beams for tube sheet pile - Google Patents

Working process by crabwise knotting beams for tube sheet pile

Info

Publication number
TW259831B
TW259831B TW83102893A TW83102893A TW259831B TW 259831 B TW259831 B TW 259831B TW 83102893 A TW83102893 A TW 83102893A TW 83102893 A TW83102893 A TW 83102893A TW 259831 B TW259831 B TW 259831B
Authority
TW
Taiwan
Prior art keywords
pile
knotting
beams
tube sheet
crabwise
Prior art date
Application number
TW83102893A
Other languages
Chinese (zh)
Inventor
Gwo-Jong Chen
Original Assignee
Gwo-Jong Chen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gwo-Jong Chen filed Critical Gwo-Jong Chen
Priority to TW83102893A priority Critical patent/TW259831B/en
Application granted granted Critical
Publication of TW259831B publication Critical patent/TW259831B/en

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A working process by crabwise knotting beams for tube sheet pile, which comprises: (a) punching the tube sheet pile into the earth by using a cantilever vibration machine or hammering; (b) punching in adjacent piles to complete a pile row or pile group; (c) welding medium layer infusion ring or reinforcement sheet to lengthen the pile body, followed by punching to complete the pile row or pile group; (d) after the pile group has reached the specified depth, infusing cement slurry into the pipe followed by compression for knotting beams; (e) inserting steel bars into the pipes; and (f) filling up the pipes.
TW83102893A 1994-04-01 1994-04-01 Working process by crabwise knotting beams for tube sheet pile TW259831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW83102893A TW259831B (en) 1994-04-01 1994-04-01 Working process by crabwise knotting beams for tube sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW83102893A TW259831B (en) 1994-04-01 1994-04-01 Working process by crabwise knotting beams for tube sheet pile

Publications (1)

Publication Number Publication Date
TW259831B true TW259831B (en) 1995-10-11

Family

ID=51401835

Family Applications (1)

Application Number Title Priority Date Filing Date
TW83102893A TW259831B (en) 1994-04-01 1994-04-01 Working process by crabwise knotting beams for tube sheet pile

Country Status (1)

Country Link
TW (1) TW259831B (en)

Similar Documents

Publication Publication Date Title
US3822557A (en) Jet sheet and circular pile with water hammer assist
CN108643214A (en) It is a kind of to backfill miscellaneous native composite foundation structure and its construction method
TW259831B (en) Working process by crabwise knotting beams for tube sheet pile
EP1012405B1 (en) Steel pile adapted to be driven into the ground and method for driving a steel pile
Little Downdrag on piles: review and recent experimentation
CN115182358A (en) Microbial double-row pile foundation pit supporting structure
CN1047716A (en) Utilize the method and the facility of industrial residue comprehensive treatment soft foundation
CN101024957A (en) Process for composite processing prestressed concrete pipe pile
CN209760216U (en) reinforcement system based on soft soil foundation drainage consolidation
JPS57151722A (en) Filling work for space formed after drawing out sheet pile
SE0103037D0 (en) Concrete pile for piling
CN218437077U (en) Microbial double-row pile foundation pit supporting structure
JP2622312B2 (en) Construction method of double cofferdam
JPS5659926A (en) Construction method for retaining wall and underground outer wall
JPS59118926A (en) Improving work of ground under water pressure and iron-bar setter to be used therein
JPH07197442A (en) Soil improvement method
JPH02209518A (en) Method for insertion of ground foundation modifying material
CN214994199U (en) A construction equipment for earth and stone side is backfilled
CN210684706U (en) Be used for PHC tubular pile to dig instrument of fetching earth soon
CN218757652U (en) Foundation pit side building structure deviation rectifying mechanism
JPS56131711A (en) Water shielding plate for constructing cut-off wall
JPS57161228A (en) Construction work of foundation
JPS57143015A (en) Driving method and pressing device for steel pipe pile
GB1424112A (en) Method and apparatus for producing sub-aqueous and other cast-in- place concrete structures in situ
CN102425180B (en) Construction process of gun machine for steel pipes or shaped steel