TW202304780A - Bulk screw packing process and its equipment - Google Patents

Bulk screw packing process and its equipment Download PDF

Info

Publication number
TW202304780A
TW202304780A TW110127582A TW110127582A TW202304780A TW 202304780 A TW202304780 A TW 202304780A TW 110127582 A TW110127582 A TW 110127582A TW 110127582 A TW110127582 A TW 110127582A TW 202304780 A TW202304780 A TW 202304780A
Authority
TW
Taiwan
Prior art keywords
film
heat
screw
film material
screws
Prior art date
Application number
TW110127582A
Other languages
Chinese (zh)
Inventor
郭漢斌
Original Assignee
鉑川有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 鉑川有限公司 filed Critical 鉑川有限公司
Priority to TW110127582A priority Critical patent/TW202304780A/en
Publication of TW202304780A publication Critical patent/TW202304780A/en

Links

Images

Landscapes

  • Screw Conveyors (AREA)

Abstract

The present invention is about a bulk screw packing process and its equipment, which counts the number of screws to be packed into piles by a fixed number calculation step, then prepares a heat shrinkable film material of suitable size and length, places the screw piles into the heat shrinkable film material by a sleeve step, and heats the heat shrinkable film material to tighten the packed screws into bundles by a shrinkable film tightening step, so as to complete the bulk screw packing process. Accordingly, the bulk screws are packed in bundles through the process steps to achieve the convenient effect of packing the screws in small bundles.

Description

散裝螺絲束裝製程及其設備Bulk screw bundle packing process and its equipment

本發明係有關於一種散裝螺絲束裝製程及其設備,尤其是指一種可將散裝螺絲計數封裝成綑的束裝製程及其設備為其創作發明者。The present invention relates to a bulk screw packing process and its equipment, in particular to a bulk screw packing process and its equipment which can count and package bulk screws into bundles.

按,在螺絲製造產業中,當螺絲加工完成後必須進行包裝,包裝過程是於包裝線上利用輸送帶輸送螺絲,且包裝線上配置有多位作業員,由作業員將大量的螺絲清點數量置入一箱子內,進行秤重,再將箱子貼上膠帶封好以及貼上標籤,最後搬運離開。但由於目前勞工市場上勞工短缺的現象非常嚴重,而且在搬貨過程中容易造成人員腰部受傷之職業傷害,因此要聘雇到包裝與搬貨的員工已越來越困難。況且以人工包裝與搬運,較為費工費時,上述缺失有待改良。Press, in the screw manufacturing industry, after the screw processing is completed, it must be packaged. The packaging process is to use the conveyor belt to convey the screws on the packaging line, and there are many operators on the packaging line, and the operators will put a large number of screws into the Inside a box, weigh the box, then tape the box, seal it and label it, and finally move it away. However, due to the serious shortage of labor in the current labor market, and occupational injuries such as waist injuries are likely to be caused during the process of moving goods, it is becoming more and more difficult to hire employees for packaging and moving goods. Moreover, manual packaging and handling is labor-intensive and time-consuming, and the above-mentioned deficiencies need to be improved.

另外,一般螺絲包裝大都如上述採大箱秤重包裝,而此種包裝並不適用時一般小規模或DIY的施作用途,即便是大量使用螺絲的工作場所,在施工人員由箱內拿取螺絲進行施作的過程都是不方便,且因數量眾多拿取過程容易刺傷自己的手指,或一次拿取過量而由指間掉落,導致他人受傷;也因此衍生有一種束帶式包裝,係於一長條的釘帶上間距設有數孔,於每一孔內嵌入一螺絲做為定位包裝,然而,此種包裝除了浪費束帶成本之外,也製造大量塑料垃圾,同時,須要更大的材質包裝盒來包裝釘帶組,施工者也不易使用,需一根根拿出來進行螺鎖,相當費時。In addition, the general screw packaging is usually packed in a large box as mentioned above, and this kind of packaging is not suitable for small-scale or DIY construction purposes. Even in workplaces where a large number of screws are used, the construction personnel will take them out of the box. The process of applying screws is inconvenient, and it is easy to stab your own fingers during the process of picking up a large number of screws, or take too much at one time and fall from your fingers, causing injuries to others; therefore, a kind of belt-type packaging is derived. There are several holes at intervals on a long nail belt, and a screw is embedded in each hole as a positioning package. However, this kind of packaging not only wastes the cost of the belt, but also produces a lot of plastic waste. At the same time, it needs to be replaced. The large material packaging box is used to pack the nail belt group, which is not easy for the builder to use. It needs to be taken out one by one for screw locking, which is quite time-consuming.

緣是,發明人有鑑於此,秉持多年該相關行業之豐富設計開發及實際製作經驗,再予以研究改良,提供一種散裝螺絲束裝製程及其設備,以期達到更佳實用價值性之目的者。The reason is that, in view of this, the inventor has been adhering to years of rich experience in design, development and actual production in this related industry, and then researched and improved it to provide a bulk screw bundle manufacturing process and its equipment in order to achieve better practical value.

本發明之主要目的在於提供一種散裝螺絲束裝製程及其設備,尤其是指一種可將散裝螺絲計數封裝成綑的束裝製程及其設備,使在其整體施行使用上更增實用功效特性者。The main purpose of the present invention is to provide a bulk screw packaging process and its equipment, especially a packaging process and equipment that can package the bulk screws into bundles, so that the overall implementation and use of the package have more practical and functional characteristics.

本發明散裝螺絲束裝製程之主要目的與功效,係由以下具體技術手段所達成:The main purpose and effect of the bulk screw bundle packaging process of the present invention are achieved by the following specific technical means:

其主要將散裝螺絲經由定數計算步驟,將每次欲包裝之螺絲數量計數成堆,再備製有適當大小長度的熱縮膜料步驟,將該螺絲堆經由套膜步驟,把螺絲堆置入熱縮膜料內,並經由縮膜束緊步驟將熱縮膜料加熱束緊包裝螺絲成綑,以完成散裝螺絲束裝加工;藉此,透過上製程步驟數將散裝螺絲一捆一捆打包束裝,達到可供應螺絲小包束裝的便利功效。It mainly counts the number of screws to be packaged into piles through the fixed number calculation step, and then prepares the heat-shrinkable film material step with an appropriate size and length, and then passes the screw pile through the filming step to stack the screws into the heat-shrinkable film material, and the heat-shrinkable film material is heated and tightened through the shrinking film tightening step to bundle the packaging screws to complete the bulk screw packaging process; thus, the bulk screws are packaged one by one through the above-mentioned process steps Packed in bundles to achieve the convenience of supplying screws in small bundles.

本發明散裝螺絲束裝製程及其設備的較佳實施例,其中所述定數計算步驟,能經由一計數單元對應定數計算欲包裝螺絲,讓螺絲經計數成一定值數量的螺絲堆。In a preferred embodiment of the bulk screw bundle packing process and equipment of the present invention, the fixed number calculation step can calculate the screws to be packaged corresponding to the fixed number through a counting unit, so that the screws can be counted into a certain number of screw piles.

本發明散裝螺絲束裝製程及其設備的較佳實施例,其中所述備製膜料步驟係採用熱縮膜料,依據欲包裝螺絲長度裁切適當長度的環形熱縮膜料。In a preferred embodiment of the bulk screw bundle packaging process and equipment of the present invention, the step of preparing the film material is to use heat-shrinkable film material, and cut an appropriate length of ring-shaped heat-shrinkable film material according to the length of the screw to be packaged.

本發明散裝螺絲束裝製程及其設備的較佳實施例,其中所述套膜步驟係將一定值數量的螺絲堆置入於環形熱縮膜料中完成套膜動作。In the preferred embodiment of the bulk screw bundle packing process and equipment of the present invention, the covering step is to put a certain amount of screws into the annular heat-shrinkable film material to complete the covering action.

本發明散裝螺絲束裝製程及其設備的較佳實施例,其中所述縮膜束緊步驟係將套設有熱縮膜料之一定值數量的螺絲堆外部進行加熱,使其熱縮膜料因溫度而收縮束緊螺絲。In the preferred embodiment of the bulk screw bundle packing process and its equipment of the present invention, the shrinking film tightening step is to heat the outside of the pile of screws covered with a certain amount of heat shrinkable film material, so that the heat shrinkable film material is Temperature shrinks the tightening screw.

本發明散裝螺絲束裝設備之主要目的與功效,係由以下具體技術手段所達成:The main purpose and effect of the bulk screw bundle packing equipment of the present invention are achieved by the following specific technical means:

其主要於機台上設有一經動力驅動旋轉的轉盤,於所述轉盤上環設有數個置膜筒,且在所述機台對應所述置膜筒依序設置供膜機構、送料機構、熱封縮膜機構及落料機構,其中於所述供膜機構中設有套膜柱對應套設輸送熱縮膜料,並將膜料裁切適當長度落入所述置膜筒內,再經所述送料機構中的計數單元點算欲包裝數量的螺絲,並落入於具有熱縮膜料的置膜筒內,再經所述熱封縮膜機構對應膜料吹送熱風,而能將數螺絲束裝成綑,最後,透過所述落料機構夾持束裝完成的螺絲綑出料;藉此,達成散裝螺絲一貫作業的束裝程序。It is mainly provided with a turntable driven by power to rotate on the machine table, and several film placement cylinders are arranged on the upper ring of the turntable, and a film supply mechanism, a feeding mechanism, a heating mechanism, and a heating mechanism are sequentially arranged on the machine platform corresponding to the film placement cylinders. The shrink film mechanism and the blanking mechanism, wherein a film column is set in the film supply mechanism to transport the heat-shrinkable film material, and the film material is cut to an appropriate length and dropped into the film tube, and then The counting unit in the feeding mechanism counts the number of screws to be packaged, and falls into the film tube with heat-shrinkable film material, and then blows hot air to the corresponding film material through the heat-sealing shrinkable film mechanism, so that the number of screws can be The screw bundles are packed into bundles, and finally, the bundled screw bundles are clamped and discharged by the blanking mechanism; thereby, the bundled screw bundle procedure of the consistent operation of bulk screws is achieved.

為令本發明所運用之技術內容、發明目的及其達成之功效有更完整且清楚的揭露,茲於下詳細說明之,並請一併參閱所揭之圖式及圖號:In order to have a more complete and clear disclosure of the technical content used in the present invention, the purpose of the invention and the effects achieved, it will be described in detail below, and please also refer to the disclosed drawings and drawing numbers:

首先,請參閱第一~二圖所示,為本發明散裝螺絲束裝製程流程示意圖,其步驟如下:First of all, please refer to the first to second figures, which are schematic diagrams of the process flow of the bulk screw bundle assembly process of the present invention, and the steps are as follows:

a)定數計算步驟-將欲包裝螺絲經由一計數單元對應定數計算,讓欲包裝螺絲經計數後構成一定值數量的螺絲堆;a) Calculation step of fixed number - calculate the corresponding fixed number of screws to be packaged through a counting unit, so that the screws to be packaged can be counted to form a screw pile of a certain value;

b)備製膜料步驟-係採用熱縮膜料,並依據欲包裝螺絲長度裁切熱縮膜料;b) The step of preparing the film material - use the heat-shrinkable film material, and cut the heat-shrinkable film material according to the length of the screw to be packaged;

c)套膜步驟-係將該定值數量的螺絲堆置入於熱縮膜料中完成套膜動作;c) Sheathing step - is to put the fixed number of screws into the heat-shrinkable film material to complete the sheathing action;

d)縮膜束緊步驟-係於套設有熱縮膜料之定值數量的螺絲堆外部進行加熱,使其熱縮膜料因溫度而收縮束緊定值數量的螺絲堆,以完成束裝螺絲。d) Shrink film tightening step - heat the outside of the fixed number of screw piles covered with heat shrinkable film material, so that the heat shrinkable film material shrinks and tightens the fixed value screw pile due to temperature to complete the bundle screw.

當螺絲製作完成之後,其散裝的螺絲會置放在承料箱內並經由震動盤來分裝於箱盒內[此為大量包裝形態],當以小量束裝製程時,則透過本發明的束裝流程來達成,說明如下:After the screws are manufactured, the bulk screws will be placed in the material receiving box and packed in the box via the vibrating plate [this is a large amount of packaging form]. Bundle process to achieve, as follows:

主要將散裝的螺絲,依據欲束裝數量來計數,如一束10根、一束15根…等數量來計數成定值數量的螺絲堆,而計數的方式能透過一計數單元來對應定數計算,如在一銜接震動盤輸送的盛載斗內設置計數器來定數計算螺絲,以完成(a)定數計算步驟。The bulk screws are mainly counted according to the number of bundles to be packed, such as a bunch of 10, a bunch of 15, etc. to count the number of screw piles with a fixed value, and the counting method can be calculated through a counting unit corresponding to the fixed number. For example, a counter is set in a loading bucket connected with the vibrating plate to count the screws, so as to complete (a) the counting step.

接著,(b)備製膜料步驟為預先準備可將定值數量的螺絲堆束裝的膜料,主要採用熱縮膜料,並依據欲包裝螺絲長度裁切出適當長度的熱縮膜料;進一步可透過導送熱縮膜料的方式,於拉伸一適當長度之後,將該長度的熱縮膜料經裁切設備進行截斷;然而,(a1)備製膜料步驟也能在(b1)定數計算步驟之前就預先準備熱縮膜料[如第三圖所示]。Next, (b) the step of preparing the film material is to prepare in advance the film material that can pack a fixed number of screws, mainly using heat-shrinkable film material, and cutting out an appropriate length of heat-shrinkable film material according to the length of the screw to be packaged; Further, the heat-shrinkable film material can be cut by cutting equipment after being stretched to an appropriate length by guiding the heat-shrinkable film material; ) Just prepare the heat-shrinkable film material [as shown in the third figure] in advance before the fixed number calculation step.

當膜料備製完成,能經由(c)套膜步驟,將該定值數量的螺絲堆置入於熱縮膜料中完成套膜動作;接著,就將套設有熱縮膜料之定值數量的螺絲堆外部進行加熱,其加熱方式可採熱風吹風機、烤箱、熱管…等方式,使其熱縮膜料因溫度而收縮束緊定值數量的螺絲堆,以完成(d)縮膜束緊步驟的束裝動作。When the preparation of the film material is completed, the set value of screws can be placed in the heat-shrinkable film material to complete the film-coating action through (c) the film-coating step; A certain number of screw piles are heated externally, and the heating methods can be hot air blower, oven, heat pipe, etc., so that the heat shrinkable film material shrinks and tightens a fixed number of screw piles due to temperature, so as to complete (d) Shrink film Bundle action for the tightening step.

上述的諸等步驟,能透過半自動方式達成,也能經由全自動化機械設備來達成,當以自動化設備實際執行上述製程步驟時,係能透過下列結構實際來達成束裝螺絲的製程,請參閱第四~六圖所示,其設備主要包含有:The above-mentioned steps can be achieved through semi-automatic methods, or through fully-automated mechanical equipment. When the above-mentioned process steps are actually carried out by automated equipment, the process of binding screws can be actually achieved through the following structure. Please refer to the fourth ~As shown in Figure 6, the equipment mainly includes:

一機台(1);One machine (1);

一轉盤(2),係設置在所述機台(1)上,所述轉盤(2)可經動力驅動旋轉,且於所述轉盤(2)上環設有數個置膜筒(21);A turntable (2), which is arranged on the machine (1), the turntable (2) can be driven to rotate by power, and several film tubes (21) are arranged on the upper ring of the turntable (2);

一供膜機構(3),係架設在所述機台(1)一側且對應所述轉盤(2)上其一置膜筒(21),用以輸送熱縮膜料(A)至所述置膜筒(21)內,其所述供膜機構(3)包含有一平台(31),於所述平台(31)上設有一透孔(311),於所述透孔(311)內穿入一套設熱縮膜料(A)的套膜柱(32),並讓所述套膜柱(32)位於所述置膜筒(21)上方,且所述套膜柱(32)與所述透孔(311)之間具有供熱縮膜料(A)穿設的間隙,再於所述套膜柱(32)壁面設有數組導輪(321),所述導輪(321)對應固定在所述平台(31)上的定位滑輪(33),以能將所述套膜柱(32)定位在所述透孔(311)內輸送熱縮膜料(A),再於所述套膜柱(32)位於所述平台(31)下方位置處設有一環溝(322),且所述平台(31)下方對應所述環溝(322)處設有數個切膜刀(34),再於所述平台(31)下方對應所述套膜柱(32)壁面設有導送熱縮膜料(A)至所述置膜筒(21)內的導滑輪(35);A film feeding mechanism (3) is set up on one side of the machine (1) and corresponds to a film tube (21) on the turntable (2), for transporting the heat-shrinkable film material (A) to the In the said film tube (21), said film feeding mechanism (3) includes a platform (31), on said platform (31) is provided with a through hole (311), in said through hole (311) Penetrate a set of mantle column (32) that is provided with heat-shrinkable film material (A), and allow described mantle column (32) to be positioned at described film setting cylinder (21) top, and described mantle column (32) There is a gap between the through hole (311) for the heat-shrinkable film material (A) to pass through, and then a set of guide wheels (321) are arranged on the wall of the mantle column (32), and the guide wheels (321 ) corresponds to the positioning pulley (33) fixed on the platform (31), so that the mantle column (32) can be positioned in the through hole (311) to transport the heat-shrinkable film material (A), and then Described mantle column (32) is positioned at described platform (31) lower position to be provided with a ring ditch (322), and described platform (31) place is provided with several film cutting knives ( 34), then a guide pulley (35) is provided on the wall of the mantle column (32) below the platform (31) to guide the heat-shrinkable film material (A) to the film placement cylinder (21);

一送料機構(4),係設置位於所述供膜機構(3)一側且對應所述轉盤(2)上其一置膜筒(21),其所述送料機構(4)包含有一承接螺絲(B)的入料斗(41),於所述入料斗(41)上設有一計數單元(42),所述計數單元(42)用以計算落入所述入料斗(41)的螺絲(B)數量,所述入料斗(41)將螺絲(B)導入具有熱縮膜料(A)的所述置膜筒(21)內;A feeding mechanism (4), which is located on one side of the film feeding mechanism (3) and corresponds to a film cylinder (21) on the turntable (2), and the feeding mechanism (4) includes a receiving screw The hopper (41) of (B) is provided with a counting unit (42) on the hopper (41), and the counting unit (42) is used to count the screws (B) falling into the hopper (41). ) quantity, the hopper (41) introduces the screw (B) into the film-setting cylinder (21) with heat-shrinkable film material (A);

一熱封縮膜機構(5),係設置位於所述送料機構(4)一側且對應所述轉盤(2)上至少一置膜筒(21),其所述熱封縮膜機構(5)設有至少一送風模組(51),每一送風模組(51)包含有一安裝在所述機台(1)上的架體(511)及設置在所述架體(511)內的熱風機(512),所述熱風機(512)出風口對應所述置膜筒(21),用以吹送熱風令熱縮膜料(A)束裝螺絲(B)成綑;A heat-sealing shrink film mechanism (5) is arranged on one side of the feeding mechanism (4) and corresponds to at least one film tube (21) on the turntable (2), and the heat-sealing shrink film mechanism (5 ) is provided with at least one air supply module (51), and each air supply module (51) includes a frame body (511) installed on the machine platform (1) and a A hot air blower (512), the air outlet of the hot air blower (512) corresponds to the film-setting cylinder (21), and is used to blow hot air to bundle the heat-shrinkable film material (A) into bundles with the screws (B);

一落料機構(6),係設置位於所述熱封縮膜機構(5)一側且對應所述轉盤(2)上其一置膜筒(21),為將束裝後的螺絲綑導出所述機台者。A blanking mechanism (6), which is arranged on one side of the heat-sealing shrink film mechanism (5) and corresponds to a film tube (21) on the turntable (2), is used to export the bundled screw bundles. Those who describe the machine.

請參閱第四~十八圖所示,當於組裝使用時,在所述供膜機構(3)之套膜柱(32)上方設有數個導膜輪(36),以能將熱縮膜料(A)導入套設在所述套膜柱(32)上,而熱縮膜料(A)通過所述導輪(321)與所述定位滑輪(33)之間,並穿過所述透孔(311)與所述套膜柱(32)之間的間隙,且延伸至所述套膜柱(32)底端的導滑輪(35);而散裝的螺絲(B)則由所述送料機構(4)端導入,其所述送料機構(4)進一步連接一輸送螺絲(B)的震動盤[圖中未示],所述震動盤設有一導軌(40)連接所述送料機構(4),以能將一根一根的螺絲(B)經由所述導軌(40)導入所述入料斗(41),以讓所述入料斗(41)之計數單元(42)進行計數。Please refer to Figures 4 to 18. When assembling and using, there are several film guide wheels (36) above the film column (32) of the film supply mechanism (3) so that the heat shrinkable film The material (A) is imported and set on the mantle column (32), and the heat-shrinkable film material (A) passes between the guide wheel (321) and the positioning pulley (33), and passes through the The gap between the through hole (311) and the mantle column (32), and extends to the guide pulley (35) at the bottom of the mantle column (32); and the screw (B) in bulk is fed by the Mechanism (4) end imports, and its described feeding mechanism (4) further connects the vibrating plate [not shown in the figure] of a conveying screw (B), and described vibrating plate is provided with a guide rail (40) to connect described feeding mechanism (4 ), so that the screws (B) one by one can be introduced into the hopper (41) via the guide rail (40), so that the counting unit (42) of the hopper (41) can be counted.

當於實際包裝時,請參閱第七~十圖所示,係先經由所述供膜機構(3)將熱縮膜料(A)導入機台(1)進行(a1)備製膜料步驟,啟動所述定位滑輪(33)與所述導滑輪(35)轉動,以讓該熱縮膜料(A)經由所述定位滑輪(33)對應所述導輪(321)的轉動而往下輸送,同時,所述套膜柱(32)底端的導滑輪(35)也一併輸導熱縮膜料(A),當熱縮膜料(A)被輸送一適當長度後[此長度為依據欲束裝螺絲長度而定],再驅動所述平台(31)下方的數個切膜刀(34)作動,往所述套膜柱(32)之環溝(322)切斷熱縮膜料(A),再經由所述導滑輪(35)的滾動而將熱縮膜料(A)推送至所述置膜筒(21)內。進一步在所述供膜機構(3)之平台(31)下方對應所述切膜刀(34)處設有一感應器(37),所述感應器(37)用以感測所述切膜刀(34)掃切熱縮膜料(A)後再持續供膜的動作。When it comes to actual packaging, please refer to the seventh to tenth pictures, the heat-shrinkable film material (A) is introduced into the machine (1) through the film supply mechanism (3) first, and the film material preparation step (a1) is performed , start the rotation of the positioning pulley (33) and the guide pulley (35), so that the heat shrinkable film material (A) goes down through the rotation of the positioning pulley (33) corresponding to the guide wheel (321) At the same time, the guide pulley (35) at the bottom of the mantle column (32) also conducts the heat-shrinkable film material (A) together. After the heat-shrinkable film material (A) is transported to an appropriate length [this length is based on It depends on the length of the screw to be bundled], and then drive several film cutting knives (34) below the platform (31) to move, and cut off the heat-shrinkable film material ( A), and then push the heat-shrinkable film material (A) into the film-setting cylinder (21) through the rolling of the guide pulley (35). Further, a sensor (37) is provided corresponding to the film cutting knife (34) below the platform (31) of the film supply mechanism (3), and the sensor (37) is used to sense the film cutting knife (34) After sweeping and cutting the heat-shrinkable film material (A), the action of film supply is continued.

請參閱第十一~十四圖所示,當所述機台(1)轉盤(2)上對應所述供膜機構(3)的置膜筒(21)內盛接到熱縮膜料(A)之後,即驅動轉盤(2)旋轉至下一入料流程,讓該置膜筒(21)進入所述送料機構(4)進行(b1)定數計算步驟,而此時,所述送料機構(4)的入料斗(41),藉由以讓所述計數單元(42)計算每一束裝螺絲(B)的數量[可依所需設定數量],當入料斗(41)內的螺絲(B)數量到達設定值之後,即通過一閘門(43)讓螺絲(B)落入於盛裝有熱縮膜料(A)的置膜筒(21)內;然而,為了使螺絲(B)能精準落入所述置膜筒(21)內,使熱縮膜料(A) 套設在螺絲(B)完成(c)套膜步驟,係進一步於所述入料斗(41)下方設有一可上下滑動的導管(44),所述導管(44)安裝在一線性滑軌(45)上,可上下位移導送螺絲(B)導入所述置膜筒(21)內。Please refer to Figures 11 to 14, when the heat-shrinkable film material ( A) Afterwards, the turntable (2) is driven to rotate to the next feeding process, and the film-setting cylinder (21) is allowed to enter the feeding mechanism (4) to perform the (b1) constant number calculation step, and at this time, the feeding The feeding hopper (41) of the mechanism (4), by allowing the counting unit (42) to calculate the quantity of each bundle of screws (B) [can be set according to the required quantity], when the screws in the feeding hopper (41) (B) After the quantity reaches the set value, let the screw (B) fall into the film tube (21) containing the heat-shrinkable film material (A) through a gate (43); however, in order to make the screw (B) It can accurately fall into the film-setting cylinder (21), so that the heat-shrinkable film material (A) is sleeved on the screw (B) to complete the (c) film-coating step, and a A conduit (44) that can slide up and down, the conduit (44) is installed on a linear slide rail (45), and the guide screw (B) that can move up and down is introduced into the described film-setting cylinder (21).

之後,請參閱第十五~十八圖所示,當螺絲(B)被導入置膜筒(21)內後,所述轉盤(2)持續旋轉,讓該置膜筒(21)導入熱封縮膜機構(5)進行熱風吹送,而熱封縮膜機構(5)包含有多數個送風模組(51),能分設在送料機構(4)的所對應的置膜筒(21)或之後的置膜筒(21),利用轉盤(2)的旋轉與對應數個送風模組(51)之熱風機(512),由不同角度吹送熱風,讓熱縮膜料(A)均勻收縮束裝螺絲(B)成綑,最後,完成(d)縮膜束緊步驟。Afterwards, please refer to Figures 15 to 18, when the screw (B) is introduced into the film tube (21), the turntable (2) continues to rotate, allowing the film tube (21) to be introduced into the heat-sealed tube (21). The shrinking film mechanism (5) carries out hot air blowing, and the heat-sealing shrinking film mechanism (5) includes a plurality of air supply modules (51), which can be separately arranged on the corresponding film tube (21) of the feeding mechanism (4) or Next, the film set tube (21) uses the rotation of the turntable (2) and the hot air blower (512) corresponding to several air supply modules (51) to blow hot air from different angles, so that the heat shrinkable film material (A) can shrink evenly. The screws (B) are bundled, and finally, the (d) shrink film tightening step is completed.

當螺絲(B)束裝完成後,所述轉盤(2)持續轉動將束裝螺絲(B)轉送至所述落料機構(6),利用所述落料機構(6)將束裝後的螺絲綑導出所述機台(1),進一步所述落料機構(6)可採機械手臂、磁吸出料設備等等,係將束裝完成的螺絲一捆一捆導出裝箱,完成(e)輸出步驟。After the screw (B) is bundled, the turntable (2) continues to rotate to transfer the bundled screw (B) to the blanking mechanism (6), and the bundled screw bundle is exported by the blanking mechanism (6) Described machine platform (1), further described blanking mechanism (6) can adopt mechanical arm, magnetic suction discharge equipment etc., is the screw that bundle pack is finished export packing bundle by bundle, finish (e) output step.

為了達到束裝螺絲(B)能準確落料,特於所述落料機構(6)一側設有一推桿組(7),所述推桿組(7)架設在所述機台(1)上,且位於所述落料機構(6)與所述供膜機構(3)之間,並讓所述推桿組(7)對應所述轉盤(2)上的置膜筒(21),所述推桿組(7)用以推落束裝螺絲(B)由所述置膜筒(21)落出,以確保束裝螺絲(B)能準確落料。In order to achieve accurate blanking of the bundle screw (B), a push rod group (7) is specially provided on one side of the blanking mechanism (6), and the push rod group (7) is erected on the machine platform (1) and located between the blanking mechanism (6) and the film supply mechanism (3), and let the push rod group (7) correspond to the film setting cylinder (21) on the turntable (2), The push rod group (7) is used to push down the bundled screw (B) to fall out from the film setting cylinder (21), so as to ensure that the bundled screw (B) can be accurately blanked.

然而前述之實施例或圖式並非限定本發明之產品結構或使用方式,任何所屬技術領域中具有通常知識者之適當變化或修飾,皆應視為不脫離本發明之專利範疇。However, the aforementioned embodiments or drawings do not limit the product structure or usage of the present invention, and any appropriate changes or modifications by those with ordinary knowledge in the technical field shall be considered as not departing from the patent scope of the present invention.

由上述之實施說明可知,本發明與現有技術相較之下,本發明具有以下優點:As can be seen from the above description, compared with the prior art, the present invention has the following advantages:

1.本發明散裝螺絲束裝製程及其設備,透過束裝成綑的螺絲包裝,讓工地的施工人員於工程進行時,可預先取得所需數量的束裝螺絲置放在工作腰包上,無須揹負整箱沉重的螺絲,減少施工過程的負載,提高安全性,並同時減少被螺絲尖端刺傷的機率者。1. The bulk screw packing process and its equipment of the present invention allow the construction personnel on the construction site to obtain the required number of bundled screws in advance and put them on the work pockets without carrying the whole box when the project is in progress. Heavy screws reduce the load during construction, improve safety, and at the same time reduce the chance of being stabbed by the screw tip.

2.本發明散裝螺絲束裝製程及其設備,透過束裝成綑的螺絲包裝,改善釘帶定位螺絲時,大量釘帶塑料的使用,相對地,減少製造八成廢棄塑料,達到環保減塑的優點與功效。2. The bulk screw packaging process and its equipment of the present invention improve the use of a large amount of plastics for nails and positioning screws through the packaging of screws in bundles, and relatively reduce the production of 80% of waste plastics, achieving the advantages of environmental protection and plastic reduction. effect.

綜上所述,本發明實施例確能達到所預期之使用功效,又其所揭露之具體構造,不僅未曾見諸於同類產品中,亦未曾公開於申請前,誠已完全符合專利法之規定與要求,爰依法提出發明專利之申請,懇請惠予審查,並賜准專利,則實感德便。To sum up, the embodiment of the present invention can indeed achieve the expected use effect, and the specific structure disclosed by it has not only never been seen in similar products, nor has it been disclosed before the application, and it has fully complied with the provisions of the Patent Law In accordance with the requirements, it is very convenient to file an application for a patent for invention in accordance with the law, and sincerely ask for the review and approval of the patent.

本發明this invention

1:機台1: machine

2:轉盤2: turntable

21:置膜筒21: film tube

3:供膜機構3: film supply mechanism

31:平台31: Platform

311:透孔311: through hole

32:套膜柱32: mantle column

321:導輪321: guide wheel

322:環溝322: ring ditch

33:定位滑輪33: positioning pulley

34:切膜刀34: film cutting knife

35:導滑輪35: guide pulley

36:導膜輪36: film guiding wheel

37:感應器37: sensor

4:送料機構4: Feeding mechanism

40:導軌40: guide rail

41:入料斗41: into the hopper

42:計數單元42: counting unit

43:閘門43: gate

44:導管44: Conduit

45:線性滑軌45: Linear slide rail

5:熱封縮膜機構5: Heat-sealing shrink film mechanism

51:送風模組51: Air supply module

511:架體511: frame body

512:熱風機512: hot air blower

6:落料機構6: Blanking mechanism

7:推桿組7: Push rod group

A:熱縮膜料A: heat shrinkable film material

B:螺絲B: screw

第一圖: 本發明實施例一流程方塊示意圖。The first figure: a schematic block diagram of the first embodiment of the present invention.

第二圖:本發明實施例一製程示意圖。The second figure: a schematic diagram of the manufacturing process of Embodiment 1 of the present invention.

第三圖:本發明實施例二流程方塊示意圖。The third figure: a schematic block diagram of the second embodiment of the present invention.

第四圖:本發明設備立體外觀示意圖。Figure 4: Schematic diagram of the three-dimensional appearance of the device of the present invention.

第五圖:本發明設備另一角度觀察之立體外觀示意圖Figure 5: Schematic diagram of the three-dimensional appearance of the equipment of the present invention viewed from another angle

第六圖:本發明設備俯視示意圖。Figure 6: a schematic top view of the device of the present invention.

第七圖:本發明供膜機構之立體外觀示意圖。Figure 7: A schematic diagram of the three-dimensional appearance of the film feeding mechanism of the present invention.

第八圖:本發明供膜機構之側視示意圖。Figure 8: A schematic side view of the film feeding mechanism of the present invention.

第九圖:本發明供膜機構導膜動作示意圖。Figure 9: Schematic diagram of film guiding action of the film supply mechanism of the present invention.

第十圖:本發明供膜機構裁切膜料動作示意圖。Figure 10: Schematic diagram of the action of cutting the film material by the film feeding mechanism of the present invention.

第十一圖:本發明送料機構剖視示意圖。Figure 11: a schematic cross-sectional view of the feeding mechanism of the present invention.

第十二圖:本發明送料機構計數螺絲動作示意圖。Figure 12: a schematic diagram of the action of the counting screw of the feeding mechanism of the present invention.

第十三圖:本發明計數後螺絲送入置膜筒動作示意圖。Figure 13: a schematic diagram of the action of the screw being sent into the membrane cylinder after counting in the present invention.

第十四圖:本發明導管收縮後進行熱風吹送示意圖。Figure 14: a schematic diagram of hot air blowing after the catheter of the present invention is shrunk.

第十五圖:本發明落料機構吸引落料示意圖一。Figure 15: Schematic diagram 1 of suction and blanking of the blanking mechanism of the present invention.

第十六圖:本發明落料機構吸引落料示意圖二。Figure 16: Schematic diagram 2 of suction and blanking of the blanking mechanism of the present invention.

第十七圖:本發明落料機構吸引落料示意圖三。Figure 17: Schematic diagram 3 of suction and blanking of the blanking mechanism of the present invention.

第十八圖:本發明落料機構吸引落料示意圖四。Figure 18: Schematic diagram 4 of suction and blanking of the blanking mechanism of the present invention.

(a):定數計算步驟 (a): fixed number calculation steps

(b):備製膜料步驟 (b): preparation film material step

(c):套膜步驟 (c): mantle step

(d):縮膜束緊步驟 (d): Shrink film tightening step

Claims (10)

一種散裝螺絲束裝製程,其步驟包含有: a)定數計算步驟-將欲包裝螺絲經由一計數單元對應定數計算,讓欲包裝螺絲經計數後構成一定值數量的螺絲堆; b)備製膜料步驟-係採用熱縮膜料,並依據欲包裝螺絲長度裁切熱縮膜料; c)套膜步驟-係將該定值數量的螺絲堆置入於熱縮膜料中完成套膜動作; d)縮膜束緊步驟-係於套設有熱縮膜料之定值數量的螺絲堆外部進行加熱,使其熱縮膜料因溫度而收縮束緊定值數量的螺絲堆,以完成束裝螺絲。 A bulk screw bundle packing process, the steps of which include: a) Calculation step of fixed number - calculate the corresponding fixed number of screws to be packaged through a counting unit, so that the screws to be packaged can be counted to form a screw pile of a certain value; b) The step of preparing the film material - use the heat-shrinkable film material, and cut the heat-shrinkable film material according to the length of the screw to be packaged; c) Sheathing step - is to put the fixed number of screws into the heat-shrinkable film material to complete the sheathing action; d) Shrink film tightening step - heat the outside of the fixed number of screw piles covered with heat shrinkable film material, so that the heat shrinkable film material shrinks and tightens the fixed value screw pile due to temperature to complete the bundle screw. 一種散裝螺絲束裝製程,其步驟包含有: a1)備製膜料步驟-係採用熱縮膜料,並依據欲包裝螺絲長度裁切熱縮膜料; b1)定數計算步驟-將欲包裝螺絲經由一計數單元對應定數計算,讓欲包裝螺絲經計數後構成一定值數量的螺絲堆; c)套膜步驟-係將該定值數量的螺絲堆置入於熱縮膜料中完成套膜動作; d)縮膜束緊步驟-係於套設有熱縮膜料之定值數量的螺絲堆外部進行加熱,使其熱縮膜料因溫度而收縮束緊定值數量的螺絲堆,以完成束裝螺絲。 A bulk screw bundle packing process, the steps of which include: a1) The step of preparing the film material - heat shrinkable film material is used, and the heat shrinkable film material is cut according to the length of the screw to be packaged; b1) Calculation step of fixed number - calculate the corresponding fixed number of the screws to be packaged through a counting unit, so that the screws to be packaged can be counted to form a screw pile of a certain value; c) Sheathing step - is to put the fixed number of screws into the heat-shrinkable film material to complete the sheathing action; d) Shrink film tightening step - heat the outside of the fixed number of screw piles covered with heat shrinkable film material, so that the heat shrinkable film material shrinks and tightens the fixed value screw pile due to temperature to complete the bundle screw. 如請求項1或2所述散裝螺絲束裝製程,其中於該(d)縮膜束緊步驟之後,係設有一(e)輸出步驟,為將束緊完成的束裝螺絲包裝輸出者。As described in claim 1 or 2, after the (d) step of tightening the shrink film, there is an output step (e) for packaging and outputting the tightened screw bundles. 一種散裝螺絲束裝設備,其包含有: 一機台; 一轉盤,係設置在所述機台上,所述轉盤可經動力驅動旋轉,且於所述轉盤上環設有數個置膜筒; 一供膜機構,係架設在所述機台一側且對應所述轉盤上其一置膜筒,用以輸送熱縮膜料至所述置膜筒內,其所述供膜機構包含有一平台,於所述平台上設有一透孔,於所述透孔內穿入一套設熱縮膜料的套膜柱,並讓所述套膜柱位於所述置膜筒上方,且所述套膜柱與所述透孔之間具有供熱縮膜料穿設的間隙,再於所述套膜柱壁面設有數組導輪,所述導輪對應固定在所述平台上的定位滑輪,以能將所述套膜柱定位在所述透孔內輸送熱縮膜料,再於所述套膜柱位於所述平台下方位置處設有一環溝,且所述平台下方對應所述環溝處設有數個切膜刀,再於所述平台下方對應所述套膜柱壁面設有導送熱縮膜料至所述置膜筒內的導滑輪; 一送料機構,係設置位於所述供膜機構一側且對應所述轉盤上其一置膜筒,其所述送料機構包含有一承接螺絲的入料斗,於所述入料斗上設有一計數單元,所述計數單元用以計算落入所述入料斗的螺絲數量,所述入料斗將螺絲導入具有熱縮膜料的所述置膜筒內; 一熱封縮膜機構,係設置位於所述送料機構一側且對應所述轉盤上至少一置膜筒,其所述熱封縮膜機構設有至少一送風模組,每一送風模組包含有一安裝在所述機台上的架體及設置在所述架體內的熱風機,所述熱風機出風口對應所述置膜筒,用以吹送熱風令熱縮膜料束裝螺絲成綑; 一落料機構,係設置位於所述熱封縮膜機構一側且對應所述轉盤上其一置膜筒,為將束裝後的螺絲綑導出所述機台者。 A kind of bulk screw bundle packing equipment, it comprises: one machine; A turntable, which is set on the machine platform, the turntable can be driven to rotate by power, and several film tubes are arranged on the upper ring of the turntable; A film supply mechanism is erected on one side of the machine and corresponds to a film cylinder on the turntable for transporting heat-shrinkable film material into the film cylinder, and the film supply mechanism includes a platform , a through hole is provided on the platform, and a set of film column provided with heat-shrinkable film material is penetrated into the through hole, and the film column is positioned above the film tube, and the cover There is a gap between the film column and the through hole for the heat-shrinkable film material to pass through, and then there are several sets of guide wheels on the wall of the film column, and the guide wheels correspond to the positioning pulleys fixed on the platform, so as to The mantle column can be positioned in the through hole to transport the heat-shrinkable film material, and then a ring groove is provided at the position of the mantle column below the platform, and the place below the platform corresponds to the ring groove Several film cutting knives are provided, and a guide pulley is provided on the lower side of the platform corresponding to the wall of the film column to guide the heat-shrinkable film material into the film placement cylinder; A feeding mechanism, which is located on one side of the film feeding mechanism and corresponds to a film cylinder on the turntable, the feeding mechanism includes a feeding hopper for receiving screws, and a counting unit is arranged on the feeding hopper, The counting unit is used to count the number of screws falling into the hopper, and the hopper guides the screws into the film-setting cylinder with heat-shrinkable film material; A heat-sealing and shrinking film mechanism is provided on one side of the feeding mechanism and corresponds to at least one film tube on the turntable, and the heat-sealing and shrinking film mechanism is provided with at least one air supply module, and each air supply module includes There is a frame body installed on the machine platform and a hot air blower arranged in the frame body, the air outlet of the hot air blower corresponds to the film placement cylinder, and is used for blowing hot air to make the heat shrinkable film material bundle screwed into bundles; A blanking mechanism, which is located on one side of the heat-sealing shrink film mechanism and corresponds to a film tube on the turntable, is used to export the bundled screw bundles out of the machine. 如請求項4所述散裝螺絲束裝設備,其中所述供膜機構之平台下方對應所述切膜刀處設有一感應器,所述感應器用以感測所述切膜刀掃切熱縮膜料後再持續供膜。Bulk screw-packing equipment as described in claim item 4, wherein a sensor is provided at a place corresponding to the film cutter under the platform of the film supply mechanism, and the sensor is used to sense that the film cutter sweeps and cuts the heat-shrinkable film material Then continue to supply the film. 如請求項4所述散裝螺絲束裝設備,其中於所述供膜機構之套膜柱上方設有數個導送熱縮膜料的導膜輪。The screw-packing equipment in bulk according to claim 4, wherein several film guide wheels for guiding heat-shrinkable film material are arranged above the film column of the film supply mechanism. 如請求項4或5所述散裝螺絲束裝設備,其中於所述送料機構之入料斗下方設有一閘門,所述閘門用以控制螺絲由所述入料斗落入所述置膜筒者。The bulk screw packing equipment as described in Claim 4 or 5, wherein a gate is provided under the hopper of the feeding mechanism, and the gate is used to control the screws from falling into the film tube from the hopper. 如請求項7所述散裝螺絲束裝設備,其中於所述送料機構之入料斗下方設有一可上下滑動的導管,所述導管安裝在一線性滑軌上,可上下位移導送螺絲。The bulk screw packing equipment as described in claim 7, wherein a conduit that can slide up and down is provided below the hopper of the feeding mechanism, and the conduit is installed on a linear slide rail that can move up and down to guide the screw. 如請求項4或5所述散裝螺絲束裝設備,其中所述落料機構可採機械手臂、磁吸出料設備其一。As described in claim 4 or 5, the bulk screw packing equipment, wherein the feeding mechanism can be one of a mechanical arm and a magnetic suction discharging device. 如請求項4或5所述散裝螺絲束裝設備,其中進一步於所述落料機構一側設有一推桿組,所述推桿組架設在所述機台上,且位於所述落料機構與所述供膜機構之間,並讓所述推桿組對應所述轉盤上的置膜筒,所述推桿組用以推落束裝螺絲由所述置膜筒落料者。As described in claim 4 or 5, a push rod group is further provided on one side of the blanking mechanism, and the push rod group is erected on the machine table, and is located between the blanking mechanism and Between the film feeding mechanism, let the push rod group correspond to the film setting cylinder on the turntable, and the push rod group is used to push off the bundle screw that is dropped by the film setting cylinder.
TW110127582A 2021-07-27 2021-07-27 Bulk screw packing process and its equipment TW202304780A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW110127582A TW202304780A (en) 2021-07-27 2021-07-27 Bulk screw packing process and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW110127582A TW202304780A (en) 2021-07-27 2021-07-27 Bulk screw packing process and its equipment

Publications (1)

Publication Number Publication Date
TW202304780A true TW202304780A (en) 2023-02-01

Family

ID=86661292

Family Applications (1)

Application Number Title Priority Date Filing Date
TW110127582A TW202304780A (en) 2021-07-27 2021-07-27 Bulk screw packing process and its equipment

Country Status (1)

Country Link
TW (1) TW202304780A (en)

Similar Documents

Publication Publication Date Title
CN104192380B (en) Automatic packaging streamline and technology of the package
US3747743A (en) Insulation package
CN103434688A (en) Automatic counting packaging machine for plastic pipe
CN107984025B (en) Automatic aluminum sawing assembly line and sawing method thereof
CN206395009U (en) Count blanking device
CN108820398A (en) A kind of cutter the Automation Bottle Packaging Line
KR100989870B1 (en) Installation for producing and packing tubes
TW202304780A (en) Bulk screw packing process and its equipment
TWM620102U (en) Bundling equipment for screws in bulk
CN202414253U (en) Reel and square plate packaging production line
CN208715680U (en) A kind of cutter the Automation Bottle Packaging Line
CN206734800U (en) A kind of compound fertilizer is unpacked device automatically
CN205345417U (en) Automatic package system of plastic tubing
CN103979136B (en) A kind of ceramics group packing method and utilize the set case apparatus of the method
CN206013114U (en) A kind of mushroom packing machine pay-off
CN106742305B (en) A kind of packing machine
CN205707572U (en) A kind of fractional pack prepared slices of Chinese crude drugs automatic packing apparatus
CN207292680U (en) A kind of plasticine packs process units
CN204998888U (en) Special packing production line of plastics line type material for building materials
CN211145022U (en) Pressure maintaining bed
CN205525200U (en) Bag production line and dress box production line are sent and turn to device, packagine machine , are folded in tie of disjunctor bag
CN220243682U (en) Strapping type packer
CN105173272A (en) Packaging production line special for building plastic wire profiles
CN211139808U (en) Horizontal feeding packaging machine for one or more rows of prefabricated bags
CN205186568U (en) Novel big bag packagine machine