TW201915279A - Method for constructing sound-isolating floor mat including applying a water-resistant coating in seams between adjacent sound-isolating mats and also applying a layer of water-resistant coating on surfaces of the sound-isolating mats - Google Patents

Method for constructing sound-isolating floor mat including applying a water-resistant coating in seams between adjacent sound-isolating mats and also applying a layer of water-resistant coating on surfaces of the sound-isolating mats Download PDF

Info

Publication number
TW201915279A
TW201915279A TW106131700A TW106131700A TW201915279A TW 201915279 A TW201915279 A TW 201915279A TW 106131700 A TW106131700 A TW 106131700A TW 106131700 A TW106131700 A TW 106131700A TW 201915279 A TW201915279 A TW 201915279A
Authority
TW
Taiwan
Prior art keywords
mats
sound
mat
soundproofing
isolating
Prior art date
Application number
TW106131700A
Other languages
Chinese (zh)
Other versions
TWI656264B (en
Inventor
李志龍
Original Assignee
愛諾克建材有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 愛諾克建材有限公司 filed Critical 愛諾克建材有限公司
Priority to TW106131700A priority Critical patent/TWI656264B/en
Application granted granted Critical
Publication of TWI656264B publication Critical patent/TWI656264B/en
Publication of TW201915279A publication Critical patent/TW201915279A/en

Links

Abstract

A method for constructing a sound-isolating floor mat comprises the following steps: (A) preceding operation: planning multiple first laying zones on a floor plane of a construction area and preparing multiple first sound-isolating mats; (B) sound-isolating mat laying operation: correspondingly adhering the firsts sound-isolating mats respectively to the first laying zones; (C) sound-isolating mat seam processing operation: applying a first seam water-resistant coating between every two adjacent first sound-isolating mats on the floor plane; (D) sound-isolating mat surface water resistance processing operation: applying a layer of a first water-resistant coating on surfaces of the first sound-isolating mats and casting silica sand. The present invention applies the first seam water resistant coating between every two adjacent sound-isolating mats to be cured and formed into a sturdy water-resistant film that provides better hardness to prevent mortar liquid from flowing downward, and also adopts the arrangement that a first water-resistant coating is applied on the first sound-isolating mats and silica sand is cast thereon so as to allow mortar to be completely adhered and fixed to the first sound-isolating mats as a unitary structure, in addition to providing a water-resistant protection film on the surfaces of the first sound-isolating mats.

Description

隔音地墊工程的施工方法Construction method of soundproof floor mat engineering

本發明是有關於一種施工方法,特別是指一種隔音地墊工程的施工方法。The invention relates to a construction method, in particular to a construction method of a sound insulation floor project.

參閱圖1,用於建築物樓層間的現有隔音地墊工程的施工方法包含下列步驟:Referring to Figure 1, the construction method for the existing soundproofing mat construction between building floors includes the following steps:

步驟一、前期作業:將各樓層欲施工區域9的地板平面91規劃出多個隔音墊鋪設區911、將圍繞該地板平面91周緣的牆面92規劃出多個彼此相接且緊鄰該地板平面91的直立鋪設區921、備料多片隔音墊93,及備料多片泡棉94。步驟二、 鋪設作業:將該等隔音墊93分別有所對應地黏設於該等隔音墊鋪設區911,將該等泡棉94分別有所對應地黏設於該等直立鋪設區921。步驟三、防潮膜覆蓋作業:將一大片防潮膜95覆蓋於該等泡棉94立面及該等隔音墊93頂面,其中該防潮膜95為聚乙烯(Polyethylene,簡稱PE)膜。Step 1: Pre-operation: Plan a plurality of soundproofing mat laying areas 911 on the floor plan 91 of the floor area 9 of each floor, and plan a plurality of wall surfaces 92 surrounding the floor plane 91 to be adjacent to each other and adjacent to the floor plane. The upright laying area 921 of 91, the preparation of a plurality of soundproofing mats 93, and the preparation of a plurality of sheets of foam 94. Step 2: Laying work: The sound insulating mats 93 are respectively adhered to the soundproofing mat laying areas 911, and the foaming sheets 94 are respectively adhered to the vertical laying areas 921. Step 3: Moisture-proof film covering operation: a large moisture-proof film 95 is covered on the top surface of the foam 94 and the top surface of the sound-insulating mat 93. The moisture-proof film 95 is a polyethylene (PE) film.

當完成上述現有隔音工程步驟後,便會於該防潮膜95頂面灌入一層砂漿流體96或是鋼筋混凝土 (Reinforced Concrete, 簡稱RC) 流體,待砂漿流體96固化後,接著便能繼續進行後續室內裝潢工程如貼磁磚作業。After the above existing sound insulation engineering steps are completed, a mortar fluid 96 or a reinforced concrete (RC) fluid is poured into the top surface of the moisture barrier film 95. After the mortar fluid 96 is solidified, the subsequent operation can be continued. Interior decoration works such as tile work.

使用上述現有隔音地墊工程的施工方法具有以下缺點:The construction method using the above existing soundproofing mat construction has the following disadvantages:

一、防潮膜95易包覆空氣而無法貼平於該等隔音墊93表面,從而影響後續進行貼磁磚作業的施工品質。1. The moisture-proof film 95 is easy to cover the air and cannot be flattened on the surface of the sound-insulating mat 93, thereby affecting the construction quality of the subsequent tile-attaching operation.

二、由於該等隔音墊93彼此只是利用接縫膠帶相黏(甚至是沒有黏合在一起),所以在進行灌入砂漿流體96(或是RC流體)於該防潮膜95上的作業時,除了砂漿流體96會受重力向下擠壓防潮膜95並流入該等隔音墊93接縫之外,砂漿流體96也會橫向移動衝壓泡棉94。此時,若泡棉94與該地板平面91兩者間產生隙縫,砂漿流體96便會自然而然地流入,另外受擠壓的該防潮膜95若發生破損,砂漿流體96也會橫向移動於該等隔音墊93內(特別是結構體本身破損的隔音墊93),屆時當砂漿流體96固化成砂漿層後,即會大幅降低原先預期的隔音效果。2. Since the soundproofing mats 93 are only adhered to each other by the seaming tape (or even not bonded together), in addition to the operation of pouring the mortar fluid 96 (or RC fluid) onto the moisture barrier film 95, The mortar fluid 96 will be forced downwardly by gravity to squeeze the moisture barrier film 95 and flow out of the seam of the sound insulating mats 93, and the mortar fluid 96 will also move the stamped foam 94 laterally. At this time, if a gap is formed between the foam 94 and the floor plane 91, the mortar fluid 96 will naturally flow in, and if the pressed moisture-proof film 95 is damaged, the mortar fluid 96 will also move laterally to the same. In the soundproofing pad 93 (especially the sound insulating pad 93 which is damaged by the structure itself), when the mortar fluid 96 is solidified into a mortar layer, the originally expected sound insulation effect is greatly reduced.

三、防潮膜95無法與砂漿流體96或RC流體充分黏固成一體,而易成為一個滑動介面層,特別是當地震發生時,位於防潮膜95上的砂漿層(或RC層)便會發生相對於該等隔音墊93移動,進而反覆擠壓泡棉94,長期而言,砂漿流體96因擠壓位移而易產生表面龜裂進而影響後續表面裝飾材品質。3. The moisture-proof film 95 cannot be fully adhered to the mortar fluid 96 or the RC fluid, and easily becomes a sliding interface layer, especially when an earthquake occurs, the mortar layer (or RC layer) on the moisture-proof film 95 occurs. Relative to the movement of the sound insulating mats 93, the foam 94 is repeatedly pressed. In the long term, the mortar fluid 96 is liable to cause surface cracking due to the extrusion displacement and thus affect the quality of the subsequent surface decorative material.

四、牆內給水管若滲水,水會流入該防潮膜95與該等隔音墊93之間,水氣不易排出,久之便會造成樓下層天花板漏水的情形發生。4. If the water supply pipe in the wall seeps water, the water will flow between the moisture-proof film 95 and the sound-insulating mats 93, and the water and gas will not be easily discharged, and the leaking of the ceiling of the lower floor will occur for a long time.

因此,本發明的目的,即在提供一種至少能克服先前技術中至少一個缺點的隔音地墊工程的施工方法。Accordingly, it is an object of the present invention to provide a construction method for a sound insulating floor mat that overcomes at least one of the disadvantages of the prior art.

於是,本發明隔音地墊工程的施工方法,包含下列步驟:(A) 前期作業:將施工區域的地板平面規劃出多個第一鋪設區,及備料多片第一隔音墊。(B) 隔音墊鋪設作業:將該等第一隔音墊分別有所對應地黏設於該等第一鋪設區。(C) 隔音墊接縫處理作業:將位於該地板平面上的每兩片第一隔音墊之間塗佈一條第一接縫防水塗料。(D) 隔音墊表面防水處理作業:塗佈一層第一防水塗料於該等第一隔音墊表面。Therefore, the construction method of the soundproofing floor mat of the present invention comprises the following steps: (A) Pre-operation: planning a plurality of first laying areas of the floor plan of the construction area, and preparing a plurality of first soundproofing mats. (B) Soundproofing mat laying operation: the first soundproofing mats are respectively adhered to the first laying zones. (C) Sound insulation joint processing: Apply a first joint waterproof coating between every two first sound insulation mats on the floor level. (D) Soundproofing pad surface water repellent treatment: Apply a layer of first waterproof coating to the surface of the first soundproofing mat.

本發明的功效在於:每兩片第一隔音墊之間塗佈一條第一接縫防水塗料,且固化成強韌防水膜能提供較佳硬度而防止砂漿流體往下流入該等第一隔音墊的接縫間;另外利用塗佈第一防水塗料的工法來取代防潮膜於該等第一隔音墊上的設計,除了能改善現有防潮膜包覆空氣而無法密貼合於該等隔音墊進而影響後續進行貼磁磚作業的施工品質外,較佳地,於該等第一隔音墊上鋪設矽砂也能使砂漿層或RC層充分與該等第一隔音墊黏固成一體,藉此避免相對位移的運動而確保長期使用下仍有較佳的阻水性,及增加不同材質間摩擦以提升接著效果。The effect of the invention is that a first seam waterproof coating is applied between every two first soundproofing mats, and curing into a tough waterproof membrane can provide better hardness and prevent the mortar fluid from flowing downward into the first soundproof mats. In addition, the design of the first waterproof coating can be used to replace the moisture-proof film on the first sound-insulating mats, and the existing moisture-proof film can be coated with air to be intimately attached to the sound-insulating mats. In addition to the subsequent construction quality of the tile-attaching operation, preferably, laying the sand on the first sound-insulating mats enables the mortar layer or the RC layer to be sufficiently adhered to the first sound-insulating mats, thereby avoiding relative The movement of the displacement ensures that there is still better water resistance under long-term use, and the friction between different materials is increased to enhance the subsequent effect.

在本發明被詳細描述之前,應當注意在以下的說明內容中,類似的元件是以相同的編號來表示。另外,各圖式中所示厚度及長度等尺寸與實際物品不同。Before the present invention is described in detail, it should be noted that in the following description, similar elements are denoted by the same reference numerals. In addition, dimensions such as thickness and length shown in the drawings are different from actual items.

參閱圖2為本發明隔音地墊工程的施工方法之一第一實施例的流程圖。本發明隔音地墊工程的施工方法之該第一實施例,包含下列步驟:2 is a flow chart of a first embodiment of a construction method of a soundproof floor mat according to the present invention. The first embodiment of the construction method of the soundproofing mat engineering of the present invention comprises the following steps:

步驟一、如圖3、4所示, 前期作業100:首先,對施工區域101進行異物清除與凹洞整平,如泥渣敲除、鐵釘清除、牆陰角孔洞填補,或是地板平面102凹洞填補整平。此段所述牆陰角為裝修術語,為此技術領域中具有通常知識者所熟知,故不在此贅述其定義。Step 1, as shown in Figures 3 and 4, the preliminary work 100: First, foreign matter removal and pit leveling are performed on the construction area 101, such as sludge knocking, nail removal, wall corner hole filling, or floor plane. 102 holes fill the leveling. The corners of the wall described in this paragraph are decorative terms, which are well known to those of ordinary skill in the art, and the definitions thereof are not described herein.

接著,將施工區域101的地板平面102規劃出多個第一鋪設區103,及備料多片第一隔音墊1。較佳地,也可進一步將圍繞該地板平面102周圍的牆面104規劃出多個彼此相接且緊鄰該地板平面102的第二鋪設區105,及備料多片第二隔音墊2,其中,每一第二隔音墊2的橫截面呈L字型,並具有一縱向連接部21與一橫向連接部22。具體說明的是,每一第一隔音墊1與每一第二隔音墊2其等材質能為環保橡膠顆粒、橡膠發泡顆粒或聚氨酯(Polyurethane,簡稱PU)發泡顆粒等。Next, a plurality of first laying zones 103 are planned from the floor plan 102 of the construction area 101, and a plurality of first soundproofing mats 1 are prepared. Preferably, a plurality of second laying zones 105 that are adjacent to each other and adjacent to the floor plan 102 are further planned around the wall surface 104 around the floor plane 102, and a plurality of second soundproofing mats 2 are prepared. Each of the second sound insulating mats 2 has an L-shaped cross section and has a longitudinal connecting portion 21 and a lateral connecting portion 22. Specifically, each of the first sound insulating mat 1 and each of the second sound insulating mats 2 can be made of environmentally friendly rubber particles, rubber foamed particles or polyurethane (PU) foamed particles.

步驟二、如圖5所示,隔音墊搭接作業200:將每一第二隔音墊2的該縱向連接部21黏設於各自的該第二鋪設區105,且每一第二隔音墊2的該橫向連接部22相對於該縱向連接部21彎折地黏設於所對應的該第一鋪設區103。Step 2, as shown in FIG. 5, the sound insulation mat lap joint work 200: the longitudinal joint portion 21 of each second soundproof mat 2 is adhered to the respective second laying zone 105, and each second soundproofing mat 2 The lateral connecting portion 22 is bent and adhered to the corresponding first laying region 103 with respect to the longitudinal connecting portion 21 .

步驟三、如圖3、5所示,隔音墊鋪設作業300:將該等第一隔音墊1分別有所對應地黏設於該等第一鋪設區103,其中,鄰近於該地板平面102周緣的每一第一隔音墊1具有一搭接部11及一自該搭接部11朝遠離該牆面104延伸的延伸部12。鄰近於該地板平面102周緣的每一第一隔音墊1的該搭接部11疊設黏接於所對應的該第二隔音墊2的該橫向連接部22。Step 3, as shown in FIGS. 3 and 5, the soundproofing mat laying operation 300: the first soundproofing mats 1 are respectively correspondingly adhered to the first laying areas 103, wherein adjacent to the periphery of the floor plane 102 Each of the first soundproof mats 1 has a lap portion 11 and an extension portion 12 extending from the lap portion 11 away from the wall surface 104. The overlapping portion 11 of each of the first sound insulating mats 1 adjacent to the periphery of the floor plane 102 is superposed and adhered to the corresponding lateral connecting portion 22 of the second sound insulating mat 2.

在本實施例中,每一第一隔音墊1的該搭接部11位於所對應的該第二隔音墊2的該橫向連接部22頂面,且每一第一隔音墊1的該搭接部11具有一緊鄰於所對應的該第二隔音墊2的該縱向連接部21的接觸面111。如此,本發明能藉由加強牆陰角的隔震效果,而確實阻擾聲波橫向傳遞的路徑,而有較佳的橫向隔音效果。In this embodiment, the overlapping portion 11 of each of the first soundproofing mats 1 is located on the top surface of the corresponding lateral connecting portion 22 of the second sound insulating mat 2, and the overlapping of each of the first sound insulating mats 1 The portion 11 has a contact surface 111 adjacent to the corresponding longitudinal connection portion 21 of the second sound insulating mat 2. In this way, the present invention can effectively block the path of lateral transmission of sound waves by strengthening the vibration isolation effect of the corner of the wall, and has better lateral sound insulation effect.

步驟四、如圖6、7、8所示, 隔音墊接縫處理作業400:首先,將位於該地板平面102上的每兩片第一隔音墊1之間塗佈一條第一接縫防水塗料41,藉此防止後續所灌入的砂漿流體30(如圖11)自該等第一隔音墊1接縫處121向下流入,如此便能有效避免該等第一隔音墊1因為砂漿流體30流入其等內部固化,進而降低隔音效果的情形發生。接著,再將位於該牆面104上的每兩片第二隔音墊2之間填補一條立面接縫黏著劑42。在本實施例中,所述第一接縫防水塗料41能為環氧樹脂(Epoxy)、單液型PU、橡化瀝青防水膠、乙烯/醋酸乙烯酯共聚物(Ethylene Vinyl Acetate, 簡稱EVA)系防水劑、複合式防水彈性水泥或壓克力(acrylic)系列防水劑等;所述立面接縫黏著劑42能為環氧樹脂。Step 4, as shown in Figures 6, 7, and 8, the sound insulation pad joint processing operation 400: First, a first seam waterproof coating is applied between each two first sound insulation mats 1 on the floor plane 102. 41, thereby preventing the subsequently poured mortar fluid 30 (Fig. 11) from flowing downward from the seams 121 of the first soundproofing mats 1, so that the first soundproofing mats 1 can be effectively avoided because of the mortar fluid 30. It flows into the interior to solidify, thereby reducing the sound insulation effect. Next, a façade joint adhesive 42 is filled between each of the two second soundproofing mats 2 on the wall surface 104. In this embodiment, the first joint waterproof coating 41 can be epoxy resin (Epoxy), single liquid PU, rubberized asphalt waterproof rubber, and ethylene/vinyl acetate copolymer (Ethylene Vinyl Acetate, EVA for short). It is a waterproofing agent, a composite waterproof elastic cement or an acrylic series waterproofing agent, etc.; the façade joint adhesive 42 can be an epoxy resin.

步驟五、如圖9所示, 隔音墊表面防水處理作業500:塗佈一層第一防水塗料51於該等第一隔音墊1表面,及塗佈一層第二防水膠52於該等第二隔音墊2表面。在本實施例中,所述第一防水塗料51與所述第二防水塗料52能為環氧樹脂、PU防水膠、UV漆(紫外光硬化塗料)、橡化瀝青防水膠、EVA系防水劑、複合式防水彈性水泥、壓克力系列防水劑或潑水劑等。本發明利用塗佈第一防水塗料51的工法來取代現有使用防潮膜於該等第一隔音墊1上的設計,除了也能兼具防水特性外,還能改善現有防潮膜包覆空氣的情形,另外也能改善該等第一隔音墊1接縫黏貼不確實,而導致矽漿流體30(或水泥漿水)流入而影響隔音墊效果的缺憾發生。Step 5, as shown in FIG. 9, the soundproofing pad surface waterproofing operation 500: coating a layer of the first waterproof coating 51 on the surface of the first soundproofing mat 1 and applying a layer of the second waterproof adhesive 52 to the second soundproofing Pad 2 surface. In this embodiment, the first waterproof coating 51 and the second waterproof coating 52 can be epoxy resin, PU waterproof glue, UV paint (UV hardening coating), rubberized asphalt waterproof glue, EVA waterproofing agent. , composite waterproof elastic cement, acrylic series waterproofing agent or water repellent. The invention utilizes the method of coating the first waterproof coating 51 to replace the design of the existing moisture-proof film on the first sound-insulating mat 1 , in addition to the waterproof property, the existing moisture-proof film can be improved. In addition, it is also possible to improve the seam adhesion of the first soundproofing mats 1 and cause a defect in which the slurry fluid 30 (or cement slurry water) flows in to affect the effect of the soundproof mat.

步驟六、如圖10所示,隔音墊表面防護處理作業600:全面鋪撒設矽砂61於該等第一隔音墊1上方,在本實施例中,該施工區域101的每平方公尺上撒設有0.3~0.5公斤的矽砂61(Silica Sand)。此步驟目的是為了增加該等第一隔音墊1與所灌入砂漿流體30(或RC流體)彼此間的摩擦性,藉此提升兩者接著效果,以防止地震產生而造成固化後的砂漿流體30發生位移現象。Step 6. As shown in FIG. 10, the soundproofing pad surface protection processing operation 600: the sanding 61 is fully spread over the first soundproofing mats 1, in this embodiment, the square of the construction area 101 is per square meter. Sprinkle 0.3 to 0.5 kg of Silica Sand. The purpose of this step is to increase the friction between the first soundproofing mat 1 and the mortar fluid 30 (or RC fluid) that is poured into it, thereby enhancing the effect of the two to prevent the occurrence of earthquakes and causing the cured mortar fluid. 30 displacement phenomenon occurred.

參閱圖11,在完成上述本發明隔音地墊工程的施工方法後,便能繼續進行灌入砂漿流體30(或是RC流體),及貼磁磚作業等後段室內裝潢工程。Referring to Fig. 11, after the construction method of the sound insulating floor mat of the present invention is completed, the mortar liquid 30 (or RC fluid) can be continuously poured, and the interior decoration project of the post-tiling operation can be continued.

經由以上的說明,可再將本發明隔音地墊工程的施工方法的優點歸納如下:Through the above description, the advantages of the construction method of the soundproofing mat engineering of the present invention can be summarized as follows:

一、每兩片第一隔音墊1之間塗佈一條第一接縫防水塗料41的設計,在第一接縫防水塗料41固化後便能提供較佳硬度而防止砂漿流體30往下流入該等第一隔音墊1的接縫間,藉此以避免砂漿流體30破壞該等第一隔音墊1用來達成隔音作用的結構體。1. A design of applying a first seam waterproof coating 41 between each two first soundproof mats 1 provides a better hardness after the first joint waterproof coating 41 is cured to prevent the mortar fluid 30 from flowing downward. Between the seams of the first sound insulating mat 1 , thereby preventing the mortar fluid 30 from damaging the structures of the first sound insulating mats 1 for achieving sound insulation.

二、利用塗佈第一防水塗料51的工法來取代以防潮膜覆蓋於該等第一隔音墊1上的設計,除了能改善現有防潮膜包覆空氣及接縫黏貼不確實砂漿流體(或水泥漿水)易流入來影響隔音墊效果的問題外;較佳地,本發明還會繼續進行隔音墊表面防護處理作業600,即在該等第一隔音墊1表面全面鋪撒矽砂61,能使後續所灌入的砂漿流體30(或RC流體)充分與該等第一隔音墊1黏固成一體,如此,當砂漿流體30固化成砂漿層31後,能避免砂漿層31相對該等第一隔音墊1因地震位移而擠壓該等第二隔音墊2的情形發生,確保本發明在長期使用下,能保有兩不同材質間較佳的摩擦性,以提升接著效果。Second, the method of coating the first waterproof coating 51 is used to replace the design of the moisture-proof film covering the first sound-insulating mats 1, in addition to improving the existing moisture-proof film covering air and the seams are not sure of the mortar fluid (or cement) The slurry water is easy to flow into the problem of affecting the effect of the soundproofing pad; preferably, the present invention will continue to perform the soundproofing pad surface protection processing operation 600, that is, the surface of the first sound insulating pad 1 is completely spread with the shovel 61, The subsequently poured mortar fluid 30 (or RC fluid) is sufficiently adhered to the first sound insulating mat 1 so that when the mortar fluid 30 is solidified into the mortar layer 31, the mortar layer 31 can be prevented from being opposed to the first The case where a soundproofing pad 1 presses the second soundproofing mats 2 due to earthquake displacement ensures that the present invention can maintain better friction between two different materials under long-term use to enhance the subsequent effect.

三、本發明鄰近於牆面104與地板平面102交界處所設置的該等第二隔音墊2是採用L字型搭接於其等所對應的該等第一隔音墊1之設計,能加強牆陰角阻絕震波傳遞的功效而提升本發明隔音效果。The second soundproofing mat 2 disposed adjacent to the wall 104 and the floor plane 102 is designed to be reinforced by the L-shaped first soundproofing mats 1 corresponding thereto. The negative angle hinders the effect of the shock wave transmission and enhances the sound insulation effect of the present invention.

參閱圖12為本發明隔音地墊工程的施工方法之一第二實施例的流程圖,該第二實施例與該第一實施例的主要差異在於:12 is a flow chart of a second embodiment of a construction method of a soundproof floor mat according to the present invention. The main difference between the second embodiment and the first embodiment is as follows:

參閱圖13,本發明隔音地墊工程的施工方法之該第二實施例省略該第一實施例的隔音墊搭接作業,並包含下列步驟:Referring to FIG. 13, the second embodiment of the construction method of the soundproofing mat engineering of the present invention omits the soundproofing mat overlapping operation of the first embodiment, and comprises the following steps:

步驟I、 前期作業100’:主要同於該第一實施例的步驟一,其差異在於每一第二隔音墊2的橫截面不是呈L字型,且只具有一縱向連接部21(即無橫向連接部)。Step I, pre-work 100': mainly the same as step 1 of the first embodiment, the difference is that each second sound-insulating mat 2 has a cross-section that is not L-shaped and has only one longitudinal connecting portion 21 (ie, no Horizontal connection)).

步驟II、隔音墊鋪設作業300’: 主要同於該第一實施例的步驟三,其差異在於該等第二隔音墊2只有該等縱向連接部21分別有所對應地黏設於該等第二鋪設區105。Step II, the soundproofing pad laying operation 300': mainly the same as the third step of the first embodiment, the difference is that only the longitudinal connecting portions 21 of the second sound insulating mats 2 are respectively adhered to the first Two laying areas 105.

步驟III、隔音墊接縫處理作業400’:主要同於該第一實施例的步驟四,其差異是多了一道工序,該工序是在相鄰的該第一隔音墊1與該第二隔音墊2之間塗佈一條第二接縫防水塗料43。Step III, the sound insulation pad joint processing operation 400': mainly the same as the fourth step of the first embodiment, the difference is that there is an additional process, the process is adjacent to the first soundproofing mat 1 and the second soundproofing A second seam waterproof coating 43 is applied between the mats 2.

步驟IV、隔音墊表面防水處理作業500’:同於該第一實施例的步驟五。Step IV, the soundproofing pad surface water repellent treatment operation 500': same as step 5 of the first embodiment.

步驟V、隔音墊表面防護處理作業600’:同於該第一實施例的步驟六。Step V, soundproofing pad surface protection processing operation 600': same as step six of the first embodiment.

如此,本發明隔音地墊工程的施工方法的該第二實施例,也可達到與上述本發明隔音地墊工程的施工方法的該第一實施例相同的目的與功效。Thus, the second embodiment of the construction method of the sound insulating floor mat of the present invention can achieve the same object and effect as the first embodiment of the above-described construction method of the sound insulating floor mat of the present invention.

綜上所述,本發明隔音地墊工程的施工方法,在於利用每兩片第一隔音墊1之間塗佈一條第一接縫防水塗料41,且固化成強韌防水膜以提供較佳硬度而防止砂漿流體往下流入該等第一隔音墊1的接縫間。再者,利用塗佈第一防水塗料51的工法來取代防潮膜於該等第一隔音墊1上的設計,除了能改善現有防潮膜包覆空氣及接縫黏貼不確實砂漿流體30(或水泥漿水)易流入來影響隔音墊效果的問題外;較佳地,本發明所進行的隔音墊表面防護處理作業600,能使砂漿層或RC層充分與該等第一隔音墊1黏固成一體,藉此避免因地震而相對位移的運動,確保長期使用下保有兩不同材質間較佳的摩擦性,以提升兩者的接著效果,故確實能達成本發明的目的。In summary, the construction method of the soundproofing mat project of the present invention consists in coating a first joint waterproof coating 41 between each two first soundproofing mats 1 and curing into a tough waterproof membrane to provide better hardness. The mortar fluid is prevented from flowing downward into the joint between the first sound insulating mats 1. Furthermore, the design of the first waterproof coating 51 is used to replace the design of the moisture-proof film on the first sound-insulating mats 1, in addition to improving the existing moisture-proof film covering air and the joints to adhere to the undetermined mortar fluid 30 (or cement). Preferably, the soundproofing pad surface protection treatment operation 600 performed by the present invention enables the mortar layer or the RC layer to be sufficiently adhered to the first sound insulating mat 1 In one way, the movement of the relative displacement due to the earthquake is avoided, and the better friction between the two different materials is ensured under long-term use, so as to enhance the subsequent effect of the two, the object of the present invention can be achieved.

惟以上所述者,僅為本發明的實施例而已,當不能以此限定本發明實施的範圍,凡是依本發明申請專利範圍及專利說明書內容所作的簡單的等效變化與修飾,皆仍屬本發明專利涵蓋的範圍內。However, the above is only the embodiment of the present invention, and the scope of the invention is not limited thereto, and all the simple equivalent changes and modifications according to the scope of the patent application and the patent specification of the present invention are still Within the scope of the invention patent.

1‧‧‧第一隔音墊1‧‧‧First soundproofing mat

11‧‧‧搭接部11‧‧‧ lap joint

111‧‧‧接觸面111‧‧‧Contact surface

12‧‧‧延伸部12‧‧‧Extension

121‧‧‧接縫處121‧‧‧ seams

2‧‧‧第二隔音墊2‧‧‧Second soundproofing mat

21‧‧‧縱向連接部21‧‧‧Longitudinal connection

22‧‧‧橫向連接部22‧‧‧Transverse connection

30‧‧‧砂漿流體30‧‧‧ mortar fluid

31‧‧‧砂漿層31‧‧‧ mortar layer

41‧‧‧第一接縫防水塗料41‧‧‧First seam waterproof coating

42‧‧‧立面接縫黏著劑42‧‧‧Face joint adhesive

43‧‧‧第二接縫防水塗料43‧‧‧Second joint waterproof coating

51‧‧‧第一防水塗料51‧‧‧First waterproof coating

52‧‧‧第二防水塗料52‧‧‧Second waterproof coating

61‧‧‧矽砂61‧‧‧矽 sand

101‧‧‧施工區域101‧‧‧Construction area

102‧‧‧地板平面102‧‧‧Floor plane

103‧‧‧第一鋪設區103‧‧‧First paved area

104‧‧‧牆面104‧‧‧ wall

105‧‧‧第二鋪設區105‧‧‧Second laying area

100‧‧‧前期作業100‧‧‧Pre-job work

100’‧‧‧前期作業100’‧‧‧Pre-job work

200‧‧‧隔音墊搭接作業200‧‧‧Annual insulation mating work

300‧‧‧隔音墊鋪設作業300‧‧ ‧ soundproofing mat laying operation

300’‧‧‧隔音墊鋪設作業300’‧‧‧ soundproofing mat laying

400‧‧‧隔音墊接縫處理作業400‧‧‧Insulation mat seam processing

400’‧‧‧隔音墊接縫處理作業400'‧‧‧Sound insulation joint processing

500‧‧‧隔音墊表面防水處理作業500‧‧‧ Soundproof pad surface waterproofing operation

500’‧‧‧隔音墊表面防水處理作業500'‧‧‧ Soundproof pad surface waterproofing operation

600‧‧‧隔音墊表面防護處理作業600‧‧‧ Soundproof pad surface protection treatment

600’‧‧‧隔音墊表面防護處理作業600'‧‧‧ Soundproof pad surface protection treatment

本發明的其他的特徵及功效,將於參照圖式的實施方式中清楚地呈現,其中: 圖1是現有隔音工程施工方法施工於建築物樓層間後的一示意圖; 圖2是本發明隔音地墊工程的施工方法的一第一實施例的一流程圖; 圖3是一室內平面配置圖,說明該第一實施例的一施工區域; 圖4是本發明隔音地墊工程的施工方法的該第一實施例之一前期作業示意圖; 圖5是一示意圖,說明該第一實施例之一隔音墊搭接作業與一隔音墊鋪設作業; 圖6是本發明隔音地墊工程的施工方法的該第一實施例之一隔音墊接縫處理作業示意圖; 圖7是沿圖6中VII-VII直線所取得的視圖; 圖8是一局部放大示意圖,說明塗佈一第一接縫防水塗料於每兩片第一隔音墊的接縫處; 圖9是本發明隔音地墊工程的施工方法的該第一實施例之一隔音墊表面防水處理作業示意圖; 圖10是本發明隔音地墊工程的施工方法的該第一實施例之一隔音墊表面防護處理作業示意圖; 圖11是一示意圖,說明施工完該第一實施例後,能再灌入砂漿流體於該施工區域; 圖12是本發明隔音地墊工程的施工方法的一第二實施例的一流程圖;及 圖13是一示意圖,說明施工完該第二實施例後能再灌入砂漿流體,且該砂漿流體會逐漸固化成砂漿層。Other features and effects of the present invention will be apparent from the following description of the drawings, wherein: FIG. 1 is a schematic view showing the construction of the existing soundproofing construction method between the floors of the building; A flow chart of a first embodiment of a construction method of a pad; FIG. 3 is an indoor plan configuration diagram illustrating a construction area of the first embodiment; FIG. 4 is a construction method of the sound insulation floor project of the present invention. FIG. 5 is a schematic view showing a soundproofing mat lap joint operation and a soundproofing mat laying operation of the first embodiment; FIG. 6 is a view showing the construction method of the soundproofing mat engineering of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS FIG. 7 is a view taken along line VII-VII of FIG. 6; FIG. 8 is a partially enlarged schematic view showing the application of a first seam waterproof coating to each Figure 9 is a schematic view showing the waterproofing operation of the surface of the soundproofing pad of the first embodiment of the construction method of the soundproofing floor mat of the present invention; Fig. 10 is a sound insulating floor mat of the present invention; FIG. 11 is a schematic view showing that after the first embodiment is constructed, the mortar fluid can be refilled into the construction area; FIG. 12 is a schematic view of the first embodiment of the construction method of the method; FIG. A flow chart of a second embodiment of the construction method of the soundproofing mat engineering of the present invention; and FIG. 13 is a schematic view showing that the mortar fluid can be refilled after the second embodiment is constructed, and the mortar fluid is gradually solidified. Into a mortar layer.

Claims (10)

一種隔音地墊工程的施工方法,包含下列步驟: (A) 前期作業:將施工區域的地板平面規劃出多個第一鋪設區,及備料多片第一隔音墊; (B) 隔音墊鋪設作業:將該等第一隔音墊分別有所對應地黏設於該等第一鋪設區; (C) 隔音墊接縫處理作業:將位於該地板平面上的每兩片第一隔音墊之間塗佈一條第一接縫防水塗料;及 (D) 隔音墊表面防水處理作業:塗佈一層第一防水塗料於該等第一隔音墊表面。The construction method of the soundproofing floor mat engineering comprises the following steps: (A) Pre-operation: planning a plurality of first laying areas of the floor plan of the construction area, and preparing a plurality of first soundproofing mats; (B) laying the soundproofing mats : respectively, the first soundproofing mats are respectively adhered to the first laying areas; (C) the soundproofing mat joint processing operation: coating each of the two first soundproofing mats on the plane of the floor Cloth a first seam waterproof coating; and (D) soundproofing mat surface waterproofing operation: applying a layer of first waterproof coating on the surface of the first soundproofing mat. 如請求項1所述的隔音地墊工程的施工方法,其中,在該步驟(A)中,將圍繞該地板平面周圍的牆面規劃出多個彼此相接且緊鄰該地板平面的第二鋪設區,及備料多片第二隔音墊,在該步驟(B)中將該等第二隔音墊分別有所對應地黏設於該等第二鋪設區,在該步驟(C)中將位於該牆面上的每兩片第二隔音墊之間填補一條立面接縫黏著劑。The construction method of the soundproofing mat construction according to claim 1, wherein in the step (A), a plurality of second layings adjacent to each other and adjacent to the floor plane are planned around the wall surface of the floor plane And in the step (B), the second sound-insulating mats are respectively correspondingly adhered to the second laying areas, and the second sound-insulating mats are respectively disposed in the second laying zone. A façade joint adhesive is filled between every two second soundproofing mats on the wall. 如請求項2所述的隔音地墊工程的施工方法,其中,在該步驟(C)中,相鄰的該第一隔音墊與該第二隔音墊之間塗佈一條第二接縫防水塗料。The construction method of the soundproofing mat construction according to claim 2, wherein in the step (C), a second joint waterproof coating is applied between the adjacent first soundproofing mat and the second sound insulating mat. . 如請求項3所述的隔音地墊工程的施工方法,其中,在該步驟(D)中,塗佈一層第二防水膠於該等第二隔音墊表面。The construction method of the soundproofing mat construction according to claim 3, wherein in the step (D), a layer of a second waterproof rubber is applied to the surfaces of the second sound insulating mats. 如請求項1所述的隔音地墊工程的施工方法,其中,在該步驟(A)中,將圍繞該地板平面周圍的牆面規劃出多個彼此相接且緊鄰該地板平面的第二鋪設區,及備料多片第二隔音墊,每一第二隔音墊具有一縱向連接部與一橫向連接部,該隔音地墊工程的施工方法還包含一位於該步驟(A)與該步驟(B)之間的隔音墊搭接作業,在該隔音墊搭接作業中將每一第二隔音墊的該縱向連接部黏設於各自的該第二鋪設區,且每一第二隔音墊的該橫向連接部相對於該縱向連接部彎折地黏設於所對應的該第一鋪設區,在該步驟(B)中鄰近於該地板平面周緣的每一第一隔音墊具有一搭接部及一自該搭接部朝遠離該牆面延伸的延伸部,每一第一隔音墊的該搭接部疊設黏接於所對應的該第二隔音墊的該橫向連接部,在該步驟(C)中將位於該牆面上的每兩片第二隔音墊之間填補一條立面接縫黏著劑。The construction method of the soundproofing mat construction according to claim 1, wherein in the step (A), a plurality of second layings adjacent to each other and adjacent to the floor plane are planned around the wall surface of the floor plane And a plurality of second soundproofing mats each having a longitudinal connecting portion and a lateral connecting portion, the construction method of the sound insulating floor project further comprising a step (A) and the step (B) a sound insulation mat lap joint between the longitudinal joints of each of the second soundproof mats in the second laying zone, and the second soundproofing mat of the second soundproofing mat The transverse connecting portion is bent and adhered to the corresponding first laying portion with respect to the longitudinal connecting portion, and each of the first sound insulating mats adjacent to the peripheral edge of the floor plane has a lap portion in the step (B) and An embossing portion of each of the first soundproofing mats is superposed and adhered to the corresponding lateral connecting portion of the second sound insulating mat, in the step ( C) fill a façade between every two second soundproofing mats on the wall Adhesive. 如請求項5所述的隔音地墊工程的施工方法,其中,每一第一隔音墊的該搭接部位於所對應的該第二隔音墊的該橫向連接部頂面。The construction method of the sound insulating floor mat according to claim 5, wherein the overlapping portion of each of the first sound insulating mats is located at a top surface of the lateral connecting portion of the corresponding second sound insulating mat. 如請求項6所述的隔音地墊工程的施工方法,其中,每一第一隔音墊的該搭接部具有一緊鄰於所對應的該第二隔音墊的該縱向連接部的接觸面。The construction method of the sound insulating floor mat according to claim 6, wherein the overlapping portion of each of the first sound insulating mats has a contact surface adjacent to the corresponding longitudinal connecting portion of the second sound insulating mat. 如請求項5所述的隔音地墊工程的施工方法,其中,在該步驟(D)中,塗佈一層第二防水膠於該等第二隔音墊表面。The construction method of the soundproofing mat construction according to claim 5, wherein in the step (D), a layer of a second waterproof rubber is applied to the surfaces of the second sound insulating mats. 如請求項1至8中任一項所述的隔音地墊工程的施工方法,還包含一位於該步驟(D)之後的隔音墊表面防護處理作業,在該隔音墊表面防護處理作業中,全面撒設矽砂於該等第一隔音墊上方。The construction method of the soundproofing mat construction according to any one of claims 1 to 8, further comprising a surface protection treatment operation of the soundproofing mat after the step (D), in the protective treatment of the surface of the soundproof mat, comprehensive Spread the sand over the first soundproofing mats. 如請求項9所述的隔音地墊工程的施工方法,其中,該施工區域的每平方公尺上設有0.3~0.5公斤的矽砂。The construction method of the sound insulation floor mat according to claim 9, wherein the construction area is provided with 0.3 to 0.5 kg of strontium sand per square meter.
TW106131700A 2017-09-15 2017-09-15 Construction method of soundproof floor mat engineering TWI656264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW106131700A TWI656264B (en) 2017-09-15 2017-09-15 Construction method of soundproof floor mat engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW106131700A TWI656264B (en) 2017-09-15 2017-09-15 Construction method of soundproof floor mat engineering

Publications (2)

Publication Number Publication Date
TWI656264B TWI656264B (en) 2019-04-11
TW201915279A true TW201915279A (en) 2019-04-16

Family

ID=66991570

Family Applications (1)

Application Number Title Priority Date Filing Date
TW106131700A TWI656264B (en) 2017-09-15 2017-09-15 Construction method of soundproof floor mat engineering

Country Status (1)

Country Link
TW (1) TWI656264B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266689B (en) * 2013-05-24 2015-10-28 东莞市彩丽建筑维护技术有限公司 A kind of construction method of the light weight concrete construction board wall that bonds, elastic binder and wallboard
TWM479325U (en) * 2013-11-29 2014-06-01 Sheng-Liang Chen Soundproof mat material
CN104120814B (en) * 2014-06-16 2017-04-19 广东省建筑科学研究院集团股份有限公司 Sound insulation floor with micro-foaming plate as sound insulation cushion layer and construction method of sound insulation floor
CN105256930A (en) * 2015-10-30 2016-01-20 深圳市亚泰国际建设股份有限公司 Suspended quakeproof sound-proof isolating layer structure and quakeproof sound-proof floor slab construction method

Also Published As

Publication number Publication date
TWI656264B (en) 2019-04-11

Similar Documents

Publication Publication Date Title
CN210659122U (en) Cracking-proof structure of epoxy millstone terrace
JP2014231733A (en) Execution method for waterproof sheet
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN110778062A (en) Facing paving structure of floor heating area and construction method thereof
RU2685513C2 (en) Method of making hydro-sealed surfaces from cement-based materials
AU2010246910B2 (en) Floor for a modular building
KR101902836B1 (en) Concrete repair and joint construction method using organic and inorganic hybrid water proofing material laminated self-adhesive seal reinforcing and waterproofing sheet
KR100400825B1 (en) A joint finishing method of waterproof course for membrane using sheet and the same structure
TWI656264B (en) Construction method of soundproof floor mat engineering
CN110453884A (en) Complete float builds vibration damping soundproof floor and its construction method
CN107675811B (en) Bathroom waterproof system and construction method
GB2437370A (en) Floor for wet area
JP2008069269A (en) Member-bonding technique using adhesive-impregnated substrate, bonding member used therefor and member-bonded structure
CN110485675A (en) A kind of self-adhesive coiled material builds vibration isolation sound insulationg board method is used in combination with floating
KR19990032487A (en) Building panel with reinforced bending and surface impact strength and its manufacturing method
CN210530251U (en) Full floating construction vibration-damping sound-insulating floor
TWM601261U (en) Floor sound insulation structure
KR101115082B1 (en) Hybrid waterproof panel and waterproofing method using the same
JPH11148202A (en) Waterproof modification method
TWI736324B (en) Floor sound insulation structure
CN214272795U (en) Waterproof floor structure of bathroom
CN216142328U (en) Assembled sound insulation thermal protection composite panel and mounting structure thereof
CN216641492U (en) Device for preventing heat preservation ground fracture
CN216616703U (en) Dampproofing structure of making level in indoor bottom viscose floor ground
KR20180136227A (en) Noise-proof flooring structure and its builing methoed