TW201512503A - Method for constructing cylindrical tank - Google Patents

Method for constructing cylindrical tank Download PDF

Info

Publication number
TW201512503A
TW201512503A TW103122223A TW103122223A TW201512503A TW 201512503 A TW201512503 A TW 201512503A TW 103122223 A TW103122223 A TW 103122223A TW 103122223 A TW103122223 A TW 103122223A TW 201512503 A TW201512503 A TW 201512503A
Authority
TW
Taiwan
Prior art keywords
groove
top cover
jack
inner groove
side wall
Prior art date
Application number
TW103122223A
Other languages
Chinese (zh)
Other versions
TWI551759B (en
Inventor
Juichiro Yamada
Shigeki Kato
Original Assignee
Ihi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ihi Corp filed Critical Ihi Corp
Publication of TW201512503A publication Critical patent/TW201512503A/en
Application granted granted Critical
Publication of TWI551759B publication Critical patent/TWI551759B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/04Containers for fluids or gases; Supports therefor mainly of metal
    • E04H7/06Containers for fluids or gases; Supports therefor mainly of metal with vertical axis
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/18Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material
    • E04H7/20Prestressed constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

This is a method for constructing a cylindrical tank that has a metal inner vessel and a concrete outer vessel. This method includes: a step of providing knuckle supports (10) on a knuckle plate (9); a step of mounting gondola rails (13) on the knuckle supports (10); a step of assembling the inner vessel by hanging up the knuckle plate (9) using jack-up devices (19) and mounting inner vessel side plates (7) below the raised knuckle plate (9); a step of mounting an inner vessel roof (14) on the knuckle plate (9); a step of mounting an outer vessel roof (26) on the inner vessel roof (14); a step of, after assembling the inner vessel, fixing the outer vessel roof (26) to side walls (3) of the outer vessel; and a step of, after fixing the outer vessel roof (26), mounting the gondola rails (13) on the outer vessel roof (26) by removing the knuckle supports (10) from the knuckle plate (9) and hanging up the knuckle supports (10) to raise the gondola rails (13). With this construction, it is possible to provide a method for constructing a cylindrical tank in which the gondola rails can be quickly set at different heights at low cost.

Description

圓筒型槽的建構方法 Construction method of cylindrical groove

本發明係關於一種圓筒型槽的建構方法。 The present invention relates to a method of constructing a cylindrical groove.

本案係基於2013年6月27日在日本提出申請的特願2013-135163號而主張優先權,且將該內容援用於此。 The present application claims priority based on Japanese Patent Application No. 2013-135163, filed on Jun.

具有內槽和外槽的雙層殼體構造之圓筒型槽,係用於LNG(液化天然氣)或LPG(液化石油氣)等低溫液體之貯藏。在專利文獻1中,已有揭示一種具有金屬製之內槽和混凝土製之外槽的圓筒型槽之建設工法。 A cylindrical tank having a double-shell structure with an inner tank and an outer tank for storage of a cryogenic liquid such as LNG (liquefied natural gas) or LPG (liquefied petroleum gas). Patent Document 1 discloses a construction method of a cylindrical groove having a metal inner groove and a concrete outer groove.

在專利文獻1中,已有揭示一種為了謀求圓筒型槽之工期縮短化,而同時對金屬製之內槽和混凝土製之外槽施工的手法。具體而言,其是使千斤頂(jack)架台豎設於外槽之底部,且使千斤頂頂起(jack up)裝置支撐於預定高度(參照專利文獻1之第4圖(b))。然後,在進行外槽之側壁工事時,在外槽之底部上組裝內槽頂蓋和外槽頂蓋,接著,藉由千斤頂頂起裝置一邊使內槽頂蓋和外槽頂蓋上升,一邊將複數層之內槽側板從最上層朝向最下層依序安裝於內槽頂蓋。藉此,實現金屬製之內槽和混凝土之外槽的同時施工。 Patent Document 1 discloses a method for constructing a groove made of a metal groove and a groove made of concrete in order to shorten the cycle time of the cylindrical groove. Specifically, the jack stand is erected at the bottom of the outer tub, and the jack up device is supported at a predetermined height (refer to FIG. 4(b) of Patent Document 1). Then, when performing the side wall work of the outer tank, the inner tank top cover and the outer tank top cover are assembled on the bottom of the outer tank, and then the inner tank top cover and the outer tank top cover are raised by the jack jacking device, while The inner side plates of the plurality of layers are sequentially mounted on the inner tank top cover from the uppermost layer toward the lowermost layer. Thereby, simultaneous construction of the inner groove of the metal and the groove other than the concrete is realized.

〔先前技術文獻〕 [Previous Technical Literature] 〔專利文獻〕 [Patent Document]

專利文獻1:日本特開平7-62924號公報 Patent Document 1: Japanese Patent Laid-Open No. Hei 7-62924

在上述之先前技術中,為了針對內槽側板間之熔接線等進行檢查或其補修,而需要檢查用空中纜車(sky gondola)懸垂用之纜車軌道(gondola rail)。又,尤其是在上述之先前技術中,係同時形成外槽之側壁以及側部襯套(liner),且將側部襯套當作外槽之側壁形成用的模箱(molding flask)來使用。但是,在採用例如形成外槽之側壁之後才貼設側部襯套的襯套後貼工法的情況,就需要襯套懸垂用之纜車軌道。更且,在貼設側部襯套之後,有必要對側部襯套噴吹抗冷熱緩和材料,而也需要抗冷熱緩和材料施工用之纜車軌道。 In the above prior art, in order to inspect or repair the weld line between the inner groove side plates, it is necessary to inspect the gondola rail for hanging with the sky gondola. Further, particularly in the above prior art, the side wall of the outer groove and the side liner are simultaneously formed, and the side bushing is used as a molding machine for forming the side wall of the outer groove. . However, in the case of a bushing after attaching a side bushing after forming a side wall of the outer groove, for example, a cableway for hanging the bushing is required. Furthermore, after the side bushing is attached, it is necessary to blow the side bushing against the cold heat absorbing material, and it is also necessary to use the cable car track for the construction of the cold heat absorbing material.

可是,抗冷熱緩和材料施工用之纜車軌道、和檢查用空中纜車懸垂用之纜車軌道或襯套懸垂用之纜車軌道,例如因有必要針對使內槽頂蓋上升時所用的關節(knuckle)部配置於不同的高度,故而有必要分別設置。但是,在分別設置各纜車軌道時,用以設置纜車軌道的時間就會變長而使得工期長期化,且成本也變高。 However, the cable car track for the construction of the anti-cold tempering material and the cable car track for the suspension of the cable car for hanging in the inspection, for example, the knuckle portion used for raising the inner tank top cover, for example, is necessary. They are arranged at different heights, so it is necessary to set them separately. However, when the respective cable car tracks are separately provided, the time for setting the cable car tracks becomes long, and the construction period is prolonged, and the cost is also high.

本發明係有鑑於前述情事而開發完成者,其目的在於提供一種能在短時間內且以低成本將纜車軌道設置於不同之高度的圓筒型槽的建構方法。 The present invention has been developed in view of the above circumstances, and an object of the present invention is to provide a method of constructing a cylindrical groove capable of providing a cable car track at a different height in a short time and at a low cost.

本發明之第一態樣,係一種具有金屬製之內槽和混凝土製之外槽的圓筒型槽的建構方法,其包括:在前述外槽之內側組裝圓環狀之關節部的步驟;在前述關節部設置與複數個千斤頂頂起裝置連結的複數個被懸吊構件之步驟;在前述複數個被懸吊構件安裝纜車軌道的步驟;在前述外槽之側壁設置用以懸吊前述複數個千斤頂頂起裝置的複數個懸吊部之步驟;在前述外槽之前述側壁的前述複數個懸吊部與前述關節部之前述複數個被懸吊構件之間分別安裝前述複數個千斤頂頂起裝置的步驟;以及藉由前述複數個千斤頂頂起裝置將前述關節部吊起並使其上升,在上升後的前述關節部之下側安裝內槽側板而組裝前述內槽的步驟;組裝前述內槽的步驟,係具有:在前述關節部上安裝內槽頂蓋的步驟;以及在前述內槽頂蓋上安裝外槽頂蓋的步驟;在組裝前述內槽的步驟之後,進行將前述外槽頂蓋固定於前述外槽之前述側壁的步驟;在將前述外槽頂蓋固定於前述外槽之前述側壁的步驟之後,進行以下的步驟:將前述複數個被懸吊構件從前述關節部拆下,利用前述複數個千斤頂頂起裝置將前述複數個被懸吊構件吊起,使被安裝於前述複數個被懸吊構件的前述纜車軌道上升,以將前述纜車軌道安裝於前述外槽頂蓋。 A first aspect of the present invention is a method of constructing a cylindrical groove having a metal inner groove and a concrete outer groove, comprising: a step of assembling an annular joint portion inside the outer groove; a step of providing a plurality of suspended members coupled to the plurality of jack jacking devices at the joint portion; a step of installing the cable car track in the plurality of suspended members; and a side wall of the outer groove for suspending the plurality of a step of jacking up a plurality of suspension portions of the device; mounting the plurality of jacks between the plurality of suspension portions of the side wall of the outer groove and the plurality of suspended members of the joint portion a step of arranging the joint portion by the plurality of jack jacking devices and raising the joint portion, and attaching the inner groove side plate to the lower side of the raised joint portion to assemble the inner groove; assembling the inner portion The step of installing the inner tank top cover on the joint portion; and the step of installing the outer tank top cover on the inner tank top cover; assembling the inner groove After the step, the step of fixing the outer tank top cover to the side wall of the outer tank is performed; after the step of fixing the outer tank top cover to the side wall of the outer tank, the following steps are performed: the plurality of The suspension member is detached from the joint portion, and the plurality of suspended members are lifted by the plurality of jack lifting devices to raise the cableway track mounted on the plurality of suspended members to lift the cable car The rail is mounted on the outer tank top cover.

又,本發明之第二態樣,係如上述第一態樣的圓筒型槽的建構方法,其中,在前述內槽頂蓋上安裝前述外槽頂蓋的步驟,係藉由組合複數根頂蓋骨而形成前 述外槽頂蓋,且在前述複數根頂蓋骨間配置前述複數個千斤頂頂起裝置。 Moreover, a second aspect of the present invention is the method of constructing a cylindrical groove according to the first aspect, wherein the step of installing the outer groove top cover on the inner groove top cover is performed by combining a plurality of roots Before the cap bone is formed The outer tank top cover is described, and the plurality of jack jacking devices are disposed between the plurality of top cover bones.

又,本發明之第三態樣,係如上述第一或第二態樣的圓筒型槽的建構方法,其中,具有:將前述外槽之前述側壁形成至最頂部之後,於前述側壁之內周面貼設側部襯套的步驟。 Further, a third aspect of the present invention is the method for constructing a cylindrical groove according to the first or second aspect, further comprising: forming the side wall of the outer groove to the topmost portion, and the side wall The step of attaching the side bushing to the inner peripheral surface.

又,本發明之第四態樣,係如上述第一至第三態樣的圓筒型槽的建構方法,其中,在組裝前述關節部的步驟中,係藉由在事先組裝的圓環狀之內槽側板的上側安裝前述關節部而組裝前述關節部;在組裝前述內槽的步驟中,係在藉由前述複數個千斤頂頂起裝置而使上升的前述關節部之下側的內槽側板,安裝下一個內槽側板。 Further, a fourth aspect of the present invention is the method for constructing a cylindrical groove according to the first to third aspects described above, wherein in the step of assembling the joint portion, the ring is assembled in advance The joint portion is attached to the upper side of the inner side groove plate to assemble the joint portion, and in the step of assembling the inner groove, the inner groove side plate on the lower side of the joint portion which is raised by the plurality of jack lifting devices Install the next inner slot side panel.

又,本發明之第五態樣,係如上述第一至第四態樣的圓筒型槽的建構方法,其中,在組裝前述內槽的步驟中,係在前述關節部之下側安裝一個內槽側板的處理、與在前述一個內槽側板之下方安裝另一個內槽側板的處理之間,具有以下的處理:在比前述外槽之前述側壁的前述複數個懸吊部還靠上方設置複數個第2懸吊部,在前述第2懸吊部與前述複數個被懸吊構件之間分別重新安放前述複數個千斤頂頂起裝置,且藉由前述複數個千斤頂頂起裝置將前述關節部更進一步往上方吊起而使其上升。 Further, a fifth aspect of the present invention is the method of constructing the cylindrical groove according to the first to fourth aspects described above, wherein in the step of assembling the inner groove, a lower side of the joint portion is attached The treatment of the inner groove side plate and the process of attaching the other inner groove side plate to the lower one of the inner groove side plates have a process of providing a plurality of suspension portions above the side wall of the outer groove a plurality of second suspension portions, wherein the plurality of jack jacking devices are respectively repositioned between the second suspension portion and the plurality of suspended members, and the joint portion is assembled by the plurality of jack jacking devices Lift it further up and raise it.

依據本發明的圓筒型槽的建構方法,則藉由將纜車軌道安裝於被懸吊構件,也能使纜車軌道伴隨被 懸吊構件之上升而上升。因而,可以使例如檢查用空中纜車或側部襯套懸垂於纜車軌道。 According to the method of constructing the cylindrical groove of the present invention, the cable car track can be accompanied by the cable track being attached to the suspended member. The suspension member rises and rises. Thus, for example, an inspection gondola or a side liner can be suspended from the cable car track.

又,將外槽頂蓋固定於外槽之側壁之後,將被懸吊構件從關節部拆下並利用千斤頂頂起裝置吊起,而使安裝於被懸吊構件的纜車軌道上升,以將纜車軌道安裝於外槽頂蓋。藉由如此地拉升纜車軌道之高度,也可以將該纜車軌道用於抗冷熱緩和材料之施工中。 Moreover, after the outer tank top cover is fixed to the side wall of the outer tank, the suspended member is detached from the joint portion and lifted by the jack jacking device, and the cableway rail mounted on the suspended member is raised to lift the cable car The rail is mounted on the outer tank top cover. By raising the height of the cable car track in this way, the cable car track can also be used in the construction of anti-cold heat absorbing materials.

因而,藉由用於內槽之組裝的千斤頂頂起裝置,來重新安放為了不同之用途而有必要設置於不同之高度的纜車軌道,藉此就可以將纜車軌道設置於配合各個用途的高度。因可以在短時間內以低成本進行如此的纜車軌道之重新安放,故而可以縮短工期,且削減成本。 Therefore, by means of the jack jacking device for the assembly of the inner tank, it is necessary to reposition the cable car tracks which are necessary to be installed at different heights for different purposes, whereby the cable car track can be placed at a height suitable for each use. Since the reinstallation of such a cable car track can be performed at a low cost in a short time, the construction period can be shortened and the cost can be reduced.

1‧‧‧基礎底板 1‧‧‧Basic base plate

2‧‧‧內槽錨箍 2‧‧‧Internal groove anchor

3‧‧‧外槽之側壁 3‧‧‧Side sidewalls

4‧‧‧工事口 4‧‧‧Works

5‧‧‧懸垂鷹架 5‧‧‧Overhanging scaffolding

6‧‧‧帶腳架台 6‧‧‧With foot stand

7‧‧‧內槽側板 7‧‧‧Inch side panel

8‧‧‧頂蓋架台 8‧‧‧Top cover

9‧‧‧關節板(關節部) 9‧‧‧ joint plate (joint part)

10‧‧‧關節支承(被懸吊構件) 10‧‧‧ Joint support (suspended member)

10a‧‧‧支承板 10a‧‧‧support plate

10b‧‧‧被懸吊板 10b‧‧‧suspension board

10c‧‧‧補強板 10c‧‧‧ reinforcing plate

10d‧‧‧切口 10d‧‧‧ incision

11‧‧‧空間銜鐵 11‧‧‧Space armature

11a‧‧‧H鋼 11a‧‧‧H steel

11b‧‧‧鋼板 11b‧‧‧ steel plate

12‧‧‧頂蓋骨 12‧‧‧Top bone

13‧‧‧纜車軌道 13‧‧‧ cable car track

14‧‧‧內槽頂蓋(槽頂蓋部) 14‧‧‧Inner tank top cover (slot top cover)

16‧‧‧環形部 16‧‧‧Rings

16a‧‧‧環形板 16a‧‧‧ring plate

17‧‧‧千斤頂頂起裝置用鷹架 17‧‧‧ Jacks jacking device with scaffolding

18‧‧‧懸吊架台(懸吊部) 18‧‧‧suspension platform (suspension)

19‧‧‧千斤頂頂起裝置 19‧‧‧ jack jacking device

19a‧‧‧螺帽 19a‧‧‧ nuts

20‧‧‧千斤頂頂起桿 20‧‧‧ jack jack

20a‧‧‧千斤頂本體 20a‧‧‧ jack body

20b‧‧‧桿 20b‧‧‧ pole

21‧‧‧懸吊天平 21‧‧‧hanging balance

21a‧‧‧天平桿 21a‧‧‧balance pole

21b‧‧‧錘 21b‧‧‧ hammer

23a、23b‧‧‧珍珠岩混凝土塊 23a, 23b‧‧‧ Perlite concrete blocks

24‧‧‧構造用輕量混凝土塊 24‧‧‧Lightweight concrete blocks for construction

25‧‧‧第2懸吊架台(第2懸吊部) 25‧‧‧2nd suspension frame (2nd suspension section)

26‧‧‧外槽頂蓋 26‧‧‧ outer tank top cover

27‧‧‧資材 27‧‧‧ Materials

28‧‧‧作業鷹架 28‧‧‧Working scaffolding

29‧‧‧安裝端 29‧‧‧Installation end

30‧‧‧安裝構件 30‧‧‧Installation components

31‧‧‧軌道支承 31‧‧‧Track support

32‧‧‧行走裝置 32‧‧‧Traveling device

33‧‧‧捲揚裝置 33‧‧‧Winding device

33a‧‧‧滾筒 33a‧‧‧Roller

33b‧‧‧鉤 33b‧‧‧ hook

100‧‧‧圓筒型槽 100‧‧‧Cylinder groove

X‧‧‧環形區域 X‧‧‧ring area

Y‧‧‧槽構成構件 Y‧‧‧ trough components

第1圖係用以說明本發明之一實施形態之步驟的側剖視圖。 BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第2圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 2 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第3圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 3 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第4圖係用以說明關節支承(knucklesupport)、空間銜鐵(space keeper)之安裝狀態的主要部分側剖視圖。 Fig. 4 is a side cross-sectional view showing the main part of the installation state of the knuckle support and the space keeper.

第5圖係用以說明關節支承、空間銜鐵之安裝狀態的主要部分俯視圖。 Fig. 5 is a plan view showing the main part of the joint support and the space armature mounting state.

第6圖係用以說明關節支承、空間銜鐵之安裝狀態之包含外槽頂蓋之頂蓋骨的頂蓋側之俯視圖。 Fig. 6 is a plan view showing the top side of the cap bone including the outer groove top cover in the state in which the joint support and the space armature are mounted.

第7圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 7 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第8圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 8 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第9圖係用以說明本發明之一實施形態之步驟的主要部分側剖視圖。 Figure 9 is a side cross-sectional view showing the main part of the steps of an embodiment of the present invention.

第10圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 10 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第11圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 11 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第12圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 12 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第13圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 13 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第14圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 14 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第15圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 15 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第16圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 16 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第17圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 17 is a side cross-sectional view showing the steps of an embodiment of the present invention.

第18圖係用以說明本發明之一實施形態之步驟的主要部分側剖視圖。 Figure 18 is a side cross-sectional view showing the main part of the steps of an embodiment of the present invention.

第19圖係用以說明本發明之一實施形態之步驟的主要部分側剖視圖。 Figure 19 is a side cross-sectional view showing the main part of the steps of an embodiment of the present invention.

第20圖係用以說明本發明之一實施形態之步驟的主要部分側剖視圖。 Figure 20 is a side cross-sectional view showing the main part of the steps of an embodiment of the present invention.

第21圖係用以說明本發明之一實施形態之步驟的側剖視圖。 Figure 21 is a side cross-sectional view showing the steps of an embodiment of the present invention.

以下,參照圖式詳細說明本發明的圓筒型槽的建構方法的一實施形態。另外,在以下之圖式中,因是將各構件設為可辨識的大小,故而要適當地變更各構件之縮尺。在以下之說明中,作為圓筒型槽,係例示貯藏LNG的地上式之PC(prestressed concrete:預力混凝土)雙層殼體儲槽。 Hereinafter, an embodiment of a method of constructing a cylindrical groove according to the present invention will be described in detail with reference to the drawings. Further, in the following drawings, since each member is made recognizable, the scale of each member is appropriately changed. In the following description, as the cylindrical groove, a PC (prestressed concrete) double-layered storage tank in which LNG is stored is exemplified.

首先,如第1圖所示,進行大致圓板狀之基礎底板(外槽之底部)1的工事,且在基礎底板1之上面形成底部襯套(未圖示)。當時,本實施形態,係在比基礎底板1之外周緣部還更靠內側,沿著基礎底板1之圓周方向設置內槽錨箍(anchor strap)2。 First, as shown in Fig. 1, a work of a substantially disk-shaped base plate (the bottom of the outer groove) 1 is performed, and a bottom bush (not shown) is formed on the base plate 1. At this time, in the present embodiment, an inner arm strap 2 is provided along the circumferential direction of the base plate 1 further than the outer peripheral portion of the base plate 1.

其次,在基礎底板1之外周緣部之比內槽錨箍2還更靠外側,形成外槽之側壁(PC壁)3的一部分,例如形成至全部由9層堆起所形成的側壁3之第5層(#5)為止。 Next, the outer peripheral portion of the base plate 1 is further outside than the inner groove anchor 2, and a part of the side wall (PC wall) 3 of the outer groove is formed, for example, formed to the side wall 3 formed by stacking all of the 9 layers. The fifth layer (#5) is up.

另外,在此所形成的外槽之側壁(PC壁)3 的一部分之下層側、例如從第2層至第3層,形成工事口4。又,因是在側壁3的一部分之上堆起其餘層之側壁而最終形成由9層所構成的側壁3,故而有必要組裝其餘層用的模箱。因此,要事先在側壁3的一部分之上部側、例如第4層以上之部位設置懸垂鷹架5。 In addition, the side wall (PC wall) of the outer groove formed here 3 A part of the lower layer side, for example, from the second layer to the third layer, forms the work opening 4. Further, since the side walls of the remaining layers are piled up on a part of the side wall 3 to finally form the side walls 3 composed of nine layers, it is necessary to assemble the mold boxes for the remaining layers. Therefore, the overhanging eagle 5 is provided in advance on a part of the upper side of the side wall 3, for example, the fourth layer or more.

如此地形成外槽之側壁3的一部分之後,在側壁3之內周面側沿著其圓周方向,設置內槽側板組裝用之複數個帶腳架台6。帶腳架台6,為用以支撐後述之內槽側板7的門型架台。帶腳架台6,係以橫跨環形(annular)區域X之方式而設置於基礎底板1上,該環形區域X係作為可供複數個內槽側板7組合所形成的圓筒狀之內槽最終放下的區域。 After a part of the side wall 3 of the outer tank is formed in this manner, a plurality of the lead frame stages 6 for assembling the inner groove side plates are provided on the inner circumferential side of the side wall 3 along the circumferential direction thereof. The tripod stand 6 is a portal type stand for supporting the inner groove side plate 7 to be described later. The tripod stand 6 is disposed on the base plate 1 in a manner spanning an annular area X which serves as a cylindrical inner groove formed by a combination of a plurality of inner groove side plates 7 The area that was put down.

其次,如第2圖所示在側壁3之一部分的上方灌注混凝土,而形成第6層(#6)之側壁。另外,在進行側壁3之施工時,係伴隨依序形成側壁3之上部側,而連懸垂鷹架5也依序在上側堆起,且依序撤去下側之已成為不需要的懸垂鷹架5。 Next, as shown in Fig. 2, concrete is poured over a portion of the side wall 3 to form a side wall of the sixth layer (#6). In addition, when the construction of the side wall 3 is performed, the upper side of the side wall 3 is sequentially formed, and even the overhanging eagle 5 is sequentially piled up on the upper side, and the lower side of the suspended overhang which has become unnecessary is sequentially removed. 5.

又,與此同時在帶腳架台6上,沿著側壁3之圓周方向豎設成為內槽之側壁之一部分的複數個內槽側板7,且一體地熔接橫向相鄰的內槽側板7。藉此,將各內槽側板7組裝成圓環狀。另外,在此組裝的內槽側板7,係成為內槽之最上層(在本實施形態中為第9層[#9])的內槽側板7。內槽側板7,係藉由具備優異之韌性和強度的鎳(Ni)鋼材料等所形成。 Further, at the same time, on the pedestal stand 6, a plurality of inner groove side plates 7 which are a part of the side walls of the inner groove are vertically arranged along the circumferential direction of the side wall 3, and the laterally adjacent inner groove side plates 7 are integrally welded. Thereby, each of the inner groove side plates 7 is assembled into an annular shape. Further, the inner groove side plate 7 assembled here is the inner groove side plate 7 which is the uppermost layer of the inner groove (the ninth layer [#9] in the present embodiment). The inner groove side plate 7 is formed of a nickel (Ni) steel material or the like having excellent toughness and strength.

又,在側壁3之內部,係利用基礎底板1之中央部來組裝頂蓋架台8。 Further, inside the side wall 3, the top cover stand 8 is assembled by the center portion of the base plate 1.

其次,如第3圖所示在最上層的內槽側板7之上端部安裝複數個關節板(knuckle plate)9(關節部),藉此組裝關節板9。關節板9,係與後述的內槽頂蓋14之外周緣部連接,且朝向下方彎曲。如前述般,在關節板9之下端部連接有最上層的內槽側板7之上端部。 Next, as shown in Fig. 3, a plurality of knuckle plates 9 (joint portions) are attached to the upper end portion of the uppermost inner groove side plate 7, whereby the joint plate 9 is assembled. The joint plate 9 is connected to the outer peripheral edge portion of the inner tank top cover 14 to be described later, and is bent downward. As described above, the upper end portion of the uppermost inner groove side plate 7 is connected to the lower end portion of the joint plate 9.

如第4圖至第6圖所示,在關節板9之外周面,係分別安裝有關節支承10和空間銜鐵11和纜車軌道13。在本實施形態中,如第6圖所示,沿著關節板9之圓周方向以等間隔設置有複數個(例如30個)關節支承10,且在其等之間分別設置有空間銜鐵11各一個。又,如第4圖所示,在關節支承10之下端部,透過安裝構件30安裝有纜車軌道13。另外,在第6圖中,符號12為後述的外槽頂蓋之頂蓋骨,關節支承10係以位在配置成輻射狀之相鄰的頂蓋骨12、12間之方式,安裝於關節板9。 As shown in Figs. 4 to 6, the joint support 10 and the space armature 11 and the cable car track 13 are attached to the outer peripheral surface of the joint plate 9, respectively. In the present embodiment, as shown in Fig. 6, a plurality of (for example, 30) joint supports 10 are provided at equal intervals along the circumferential direction of the joint plate 9, and space armatures 11 are respectively provided between them. One. Further, as shown in Fig. 4, the cable car track 13 is attached to the lower end portion of the joint support 10 through the attachment member 30. In addition, in Fig. 6, reference numeral 12 is a top cover bone of an outer tank top cover which will be described later, and the joint support 10 is attached to the joint so as to be positioned between the adjacent top cover bones 12 and 12 which are arranged in a radial shape. Board 9.

關節支承10,為鋼板製,且成為與後述之千斤頂頂起裝置連結的被懸吊構件。如第4圖、第5圖所示,關節支承10,係藉由一對支承板10a、10a、被懸吊板10b及補強板10c所形成,一對支承板10a、10a係形成為側面觀察呈大致三角形狀,被懸吊板10b係夾持於支承板10a、10a間而俯視觀察呈大致正方形狀,補強板10c係夾持於支承板10a、10a間,且連結於被懸吊板10b之上面,用以補強支承板10a、10a與被懸吊板10b之間。 The joint support 10 is made of a steel plate and is a suspended member that is coupled to a jack jacking device to be described later. As shown in Figs. 4 and 5, the joint support 10 is formed by a pair of support plates 10a, 10a, a suspended plate 10b, and a reinforcing plate 10c, and the pair of support plates 10a, 10a are formed to be viewed from the side. The suspension plate 10b is sandwiched between the support plates 10a and 10a and has a substantially square shape in plan view. The reinforcing plate 10c is sandwiched between the support plates 10a and 10a and is coupled to the suspended plate 10b. Above, between the support plates 10a, 10a and the suspended plate 10b.

如第4圖所示,支承板10a、10b之一邊部,係對應關節板9之彎曲形狀而彎曲,且藉由熔接等而安裝固定於關節板9之彎曲面。被懸吊板10b和補強板10c,係在藉由熔接等而相互地連結之狀態下,如第5圖所示藉由熔接或螺桿固定等而安裝固定於支承板10a、10a間。在被懸吊板10b之外側端(側壁3側之端)與支承板10a、10a之外側端呈一致的狀態下,被懸吊板10b係被固定於支承板10a、10a間。在被懸吊板10b,係形成有朝向關節板9之相反側、即外槽之側壁3側而開口的切口10d。切口10d,係成為與後述之千斤頂頂起裝置連結的被懸吊點。 As shown in Fig. 4, one of the side portions of the support plates 10a and 10b is bent in accordance with the curved shape of the joint plate 9, and is fixed to the curved surface of the joint plate 9 by welding or the like. The suspended plate 10b and the reinforcing plate 10c are attached to and fixed between the support plates 10a and 10a by welding or screw fixing as shown in Fig. 5 in a state of being joined to each other by welding or the like. The suspension plate 10b is fixed between the support plates 10a and 10a in a state in which the outer side end (end of the side wall 3 side) of the suspension plate 10b is aligned with the outer side ends of the support plates 10a and 10a. The suspended plate 10b is formed with a slit 10d that opens toward the opposite side of the joint plate 9, that is, the side wall 3 side of the outer groove. The slit 10d is a suspended point that is coupled to a jack jacking device to be described later.

如第4圖、第5圖所示,空間銜鐵11,係以從關節板9之外周面朝向外側突出的方式所設置。如第6圖所示,空間銜鐵11,係沿著關節板9之圓周方向而配設於以等間隔所設置的關節支承10之各個之間。空間銜鐵11,係配設於相鄰的關節支承10、10間之大致中央部,藉此,空間銜鐵11,也是沿著關節板9之圓周方向而以等間隔設置。因而,空間銜鐵11和關節支承10,係沿著關節板9之圓周方向而相互以等間隔交互地配置。 As shown in FIGS. 4 and 5, the space armature 11 is provided so as to protrude outward from the outer peripheral surface of the joint plate 9. As shown in Fig. 6, the space armature 11 is disposed between the joint supports 10 provided at equal intervals along the circumferential direction of the joint plate 9. The space armature 11 is disposed at a substantially central portion between the adjacent joint supports 10 and 10, whereby the space armatures 11 are also disposed at equal intervals along the circumferential direction of the joint plate 9. Therefore, the space armature 11 and the joint support 10 are alternately arranged at equal intervals in the circumferential direction of the joint plate 9.

如第4圖、第5圖所示,空間銜鐵11,係藉由一對鋼板(未圖示)、H鋼11a及鋼板11b所形成,該未圖示之一對鋼板係例如與支承板10a同樣地安裝於關節板9,該H鋼11a係夾持於此等鋼板間,該鋼板11b係貼設於H鋼11a之外端面。空間銜鐵11,在本實施形態中,係以空間銜鐵11之外側端位於比被懸吊板10b之外側端還更靠 外側(外槽之側壁3側)的方式所形成配置。 As shown in Fig. 4 and Fig. 5, the space armature 11 is formed by a pair of steel plates (not shown), H steel 11a, and steel plate 11b, and the pair of steel plates are not shown, for example, and the support plate 10a. Similarly, the joint plate 9 is attached, and the H steel 11a is interposed between the steel plates, and the steel plate 11b is attached to the outer end surface of the H steel 11a. In the present embodiment, the space armature 11 is located at the outer end of the space armature 11 at a side closer than the outer end of the suspended plate 10b. The outer side (the side wall 3 side of the outer groove) is formed in such a manner.

亦即,以從關節板9之中心至空間銜鐵11之外側端的距離,比從關節板9之中心至被懸吊板10b之外側端的距離還更為長之方式形成配置空間銜鐵11。藉由如此配置,可以藉由空間銜鐵11來縮小外槽之側壁3與關節板9間之實質上的間隙。因而,在藉由後述之千斤頂頂起裝置來將關節板9吊起時,即便關節板9因地震等的影響而朝向水平方向位移,仍可以減小位移量而緩和空間銜鐵11撞擊到外槽之側壁3時的撞擊。 That is, the arrangement space armature 11 is formed such that the distance from the center of the joint plate 9 to the outer side end of the space armature 11 is longer than the distance from the center of the joint plate 9 to the outer side end of the suspension plate 10b. With this configuration, the space armature 11 can be used to reduce the substantial gap between the side wall 3 of the outer groove and the joint plate 9. Therefore, when the joint plate 9 is lifted by the jack jacking device described later, even if the joint plate 9 is displaced in the horizontal direction due to the influence of an earthquake or the like, the displacement amount can be reduced to alleviate the impact of the space armature 11 to the outer groove. The impact of the side wall 3 .

如第4圖所示,纜車軌道13,係透過安裝構件30而安裝於關節支承10之一對支承板10a、10a的下端部之間。如第6圖所示,纜車軌道13,係沿著外槽之側壁3之圓周方向而形成為環狀。安裝構件30,係由例如鋼板或H鋼、槽鋼(channel)等所構成,且藉由熔接或螺桿固定等而安裝、固定於支承板10a、10a。 As shown in Fig. 4, the cable car track 13 is attached between the lower end portions of one of the pair of support plates 10a, 10a via the attachment member 30. As shown in Fig. 6, the cable car track 13 is formed in an annular shape along the circumferential direction of the side wall 3 of the outer groove. The mounting member 30 is made of, for example, a steel plate, H steel, a channel, or the like, and is attached and fixed to the support plates 10a and 10a by welding or screw fixing.

另外,在纜車軌道13,係設置有與安裝構件30不同之如第5圖所示的軌道支承31。軌道支承31,係設置於:在纜車軌道13之圓周方向,與被安裝於關節支承10的安裝構件30不同之部位,即與頂蓋骨12對應的部位。藉此,如後述般當將關節支承10從關節板9拆下,且藉由千斤頂頂起裝置將纜車軌道13吊起時,就可以使用軌道支承31將纜車軌道13安裝於頂蓋骨12。軌道支承31,亦與安裝構件30同樣,是由鋼板或H鋼、槽鋼等所構成,而在第3圖所示之步驟中是單純地安裝、固定於纜車軌道 13之上側。 Further, the cable car track 13 is provided with a rail support 31 as shown in Fig. 5 which is different from the mounting member 30. The rail support 31 is provided in a portion different from the attachment member 30 attached to the joint support 10 in the circumferential direction of the cable car rail 13, that is, a portion corresponding to the roof bone 12. Thereby, when the joint support 10 is detached from the joint plate 9 as will be described later, and the cable car track 13 is lifted by the jack jacking device, the cable stay 13 can be attached to the roof bone 12 using the rail support 31. Similarly to the mounting member 30, the rail support 31 is made of a steel plate, H steel, channel steel, etc., and is simply mounted and fixed to the cable car track in the step shown in Fig. 3. 13 above the side.

又,如第4圖所示,在纜車軌道13上,係懸架有行走裝置32和捲揚裝置33。行走裝置32,為具備有一對滾子部(未圖示)及馬達部(未圖示)的公知行走裝置,該一對滾子部係懸掛於纜車軌道13之下端部,該馬達部係使滾子部旋轉驅動。又,捲揚裝置33,為具備有滾筒(drum)33a及鉤(hook)33b的公知捲揚裝置,該滾筒33a係透過保持構件(未圖示)而安裝於行走裝置32之滾子部,該鉤33b係透過鋼索而安裝於滾筒33a。 Further, as shown in Fig. 4, on the cable car track 13, a traveling device 32 and a hoisting device 33 are suspended. The traveling device 32 is a known traveling device including a pair of roller portions (not shown) and a motor portion (not shown). The pair of roller portions are suspended from the lower end portion of the cable car track 13, and the motor portion is The roller is driven by rotation. Further, the hoisting device 33 is a known hoisting device including a drum 33a and a hook 33b, and the roller 33a is attached to the roller portion of the traveling device 32 through a holding member (not shown). The hook 33b is attached to the drum 33a via a steel cable.

藉由使行走裝置32和捲揚裝置33事先懸架於纜車軌道13,就能夠在後段步驟中,為了進行內槽側板7間的熔接線等之檢查或其補修,而使檢查用空中纜車能夠移動地懸垂於纜車軌道13。又,形成外槽之側壁3之後,能使用以貼設於側壁3之內周面的側部襯套懸垂而吊起。更且,將側部襯套貼設於外槽之側壁3之後,能使用以對側部襯套噴吹抗冷熱緩和材料之抗冷熱緩和材料施工用的空中纜車能夠移動地懸垂。 By suspending the traveling device 32 and the hoisting device 33 to the cable car track 13 in advance, it is possible to move the inspection aerial cable car in order to perform inspection or repair of the weld line between the inner groove side plates 7 in the subsequent step. Hanging over the cable car track 13. Further, after the side wall 3 of the outer tank is formed, the side bushing attached to the inner circumferential surface of the side wall 3 can be suspended and suspended. Further, after the side bushing is attached to the side wall 3 of the outer tub, the aerial ropeway for the construction of the anti-cold heat-lowering material for injecting the anti-cold-tempering material against the side bushing can be movably suspended.

其次,如第7圖所示,在頂蓋架台8上搭載內槽頂蓋塊體,而組裝內槽頂蓋(槽頂蓋部)14。 Next, as shown in Fig. 7, the inner tank top cover block is mounted on the top cover stand 8, and the inner tank top cover (slot top cover portion) 14 is assembled.

又,將高處作業車(未圖示)駛入基礎底板1上。又,為了在帶腳架台6之下方的環形區域X形成環形部16,而對帶腳架台6之一部分施工。 Further, a high-level work vehicle (not shown) is driven into the base floor 1. Further, in order to form the annular portion 16 in the annular region X below the pedestal table 6, a portion of the pedestal table 6 is constructed.

又,外槽之側壁3也是依序在上側堆起,且如第7圖所示,將外槽之側壁3施工至成為最終層的第9層(#9)為 止。另外,在此時間點,用以形成側壁3的懸垂鷹架5,會留下來直到例如從第6層至第7層以上已被組成之狀態為止。 Further, the side walls 3 of the outer tank are also piled up on the upper side in order, and as shown in Fig. 7, the side wall 3 of the outer tank is applied to the ninth layer (#9) which becomes the final layer. stop. Further, at this point of time, the overhanging eagle 5 for forming the side wall 3 is left until, for example, the state from the sixth layer to the seventh layer has been formed.

其次,如第8圖所示,在關節板9上,以從外槽之側壁3之內周面分離的狀態,且不干涉懸垂鷹架5之高度,組裝千斤頂頂起裝置用鷹架17。千斤頂頂起裝置用鷹架17,係沿著形成環狀的關節板9之圓周方向而形成為環狀,藉此防止關節板9朝向半徑方向傾倒。又,當組裝千斤頂頂起裝置用鷹架17時,係在關節支承10支撐了千斤頂頂起裝置用鷹架17之大致整體的狀態下,將防止傾倒材料(未圖示)設置於千斤頂頂起裝置用鷹架17與關節板9或內槽頂蓋14之間。藉此,可形成被固定於關節板9或內槽頂蓋14的千斤頂頂起裝置用鷹架17。如第8圖所示,在本實施形態中,係在與從外槽之側壁3之大致第4層(#4)至第5層(#5)對應的位置,組裝千斤頂頂起裝置用鷹架17。 Next, as shown in Fig. 8, the yoke 17 for jacking up the jack is assembled on the joint plate 9 in a state of being separated from the inner peripheral surface of the side wall 3 of the outer groove without interfering with the height of the overhanging eagle 5. The jack up device 17 is formed in a ring shape along the circumferential direction of the annular joint plate 9, thereby preventing the joint plate 9 from falling in the radial direction. Further, when the eagle frame 17 for the jack-up device is assembled, the dumping prevention material (not shown) is placed on the jack top in a state where the joint support 10 supports the substantially the entire eagle frame 17 for the jack-up device. The device is between the scaffold 17 and the joint plate 9 or the inner groove top cover 14. Thereby, the jack stand 17 for the jacking device to be fixed to the joint plate 9 or the inner groove top cover 14 can be formed. As shown in Fig. 8, in the present embodiment, the eagle jacking device is assembled at a position corresponding to the substantially fourth layer (#4) to the fifth layer (#5) of the side wall 3 of the outer tub. Rack 17.

利用千斤頂頂起裝置用鷹架17,在側壁3之預定位置、而在本實施形態中為第5層(#5),以在側壁3之圓周方向成為等間隔之方式設置複數個懸吊架台18(懸吊部)。具體而言,將懸吊架台18,牢固且能夠裝卸地鎖緊連結固定於例如事先埋設於側壁3內的錨板(anchor plate),藉此設置為從側壁3朝向其內側大致水平地突出。 The jack stand 17 is provided with a eagle frame 17 at a predetermined position of the side wall 3, and in the present embodiment, a fifth layer (#5), and a plurality of suspension frames are provided at equal intervals in the circumferential direction of the side wall 3. 18 (suspension). Specifically, the suspension frame 18 is firmly and detachably locked and fixed to, for example, an anchor plate that is embedded in the side wall 3 in advance, and is provided so as to protrude substantially horizontally from the side wall 3 toward the inner side thereof.

其次,在懸吊架台18與關節支承10之被懸吊板19b之間,分別安裝千斤頂頂起裝置19。如第9圖 所示,千斤頂頂起裝置19為中心孔千斤頂(center hole jack),其具有:千斤頂本體20a,係卡合於懸吊架台18而被支撐;千斤頂頂起桿(jack up rod)20,其上端部被安裝於千斤頂本體20a上,下端部被安裝於關節支承10之被懸吊板10b;以及螺帽19a,用以將千斤頂頂起桿20之下端部安裝於被懸吊板10b。另外,在第9圖中,為了容易閱讀而省略千斤頂頂起裝置用鷹架17之記載。 Next, a jack jacking device 19 is attached between the suspension stand 18 and the suspended plate 19b of the joint support 10, respectively. As shown in Figure 9 As shown, the jack jacking device 19 is a center hole jack having a jack body 20a that is supported by the suspension frame 18 and supported; a jack up rod 20, the upper end thereof The portion is attached to the jack body 20a, the lower end portion is attached to the suspended plate 10b of the joint support 10, and the nut 19a is for attaching the lower end portion of the jack jack 20 to the suspended plate 10b. Further, in Fig. 9, the description of the eagle frame 17 for the jack jacking device is omitted for easy reading.

當安裝千斤頂頂起裝置19時,首先,是在使千斤頂本體20a卡合固定於懸吊架台18之上方的狀態下使千斤頂頂起桿20垂下,且將千斤頂頂起桿20之下端部插入關節支承10之被懸吊板10b的切口10d內。然後,藉由事先準備的螺帽19a將千斤頂頂起桿20之下端部固定於被懸吊板10b。 When the jack jacking device 19 is installed, first, the jack jack 20 is suspended in a state in which the jack body 20a is engaged and fixed above the suspension frame 18, and the lower end of the jack jack 20 is inserted into the joint. The inside of the slit 10d of the suspended panel 10b of the support 10 is supported. Then, the lower end portion of the jack jack 20 is fixed to the suspended panel 10b by a nut 19a prepared in advance.

將複數個千斤頂頂起裝置19,以預定間隔設置於外槽之側壁3之圓周方向,進而將各自的千斤頂頂起裝置19安裝於對應的關節支承10之被懸吊板10b,之後如第8圖所示地撤去頂蓋架台8。藉此,成為可藉由複數個千斤頂頂起裝置19保持槽構成構件之重量的狀態。 A plurality of jack jacking devices 19 are disposed at predetermined intervals in the circumferential direction of the side wall 3 of the outer tub, and then the respective jack jacking devices 19 are attached to the suspended panel 10b of the corresponding joint support 10, and then as shown in the eighth The top cover stand 8 is removed as shown. Thereby, the weight of the groove constituting member can be maintained by the plurality of jack jacking devices 19.

在此,如第8圖所示,在與側壁3之第5層(#5)對應的位置設置有懸吊架台18,在與側壁3之第3層(#3)對應的位置設置有關節支承10。千斤頂頂起桿20,係形成為與懸吊架台18與關節支承10之間的長度對應之足夠的長度。但是,如後述般,當使千斤頂頂起裝置19動作而使千斤頂頂起桿20上升時,千斤頂頂起桿20就會 與位在其正上方的懸垂鷹架5干涉。 Here, as shown in Fig. 8, a suspension stand 18 is provided at a position corresponding to the fifth layer (#5) of the side wall 3, and a joint is provided at a position corresponding to the third layer (#3) of the side wall 3. Support 10. The jack jack 20 is formed to have a sufficient length corresponding to the length between the suspension frame 18 and the joint support 10. However, as will be described later, when the jack jacking device 19 is actuated to raise the jack jack 20, the jack jack 20 will Interference with the overhanging eagle 5 located directly above it.

為了消除該問題,如第9圖所示,千斤頂頂起桿20,係藉由螺釘固定等而能夠裝卸地將複數個桿20b連結於長度方向,藉此所形成。 In order to eliminate this problem, as shown in Fig. 9, the jack jack 20 is formed by detachably connecting a plurality of rods 20b in the longitudinal direction by screwing or the like.

藉此,當使千斤頂頂起桿20上升時,就會將比懸吊架台18還更往上方突出的桿20b從其下側的桿20b切離,藉此可以防止千斤頂頂起桿20干涉到懸垂鷹架5。另外,第8圖中之符號21,為用以進行千斤頂頂起裝置19之各構成構件的吊起或懸掛、或是懸掛切離後之桿20b的公知懸吊天平,其具有:天平桿21a;以及設置於天平桿21a之一方端部的錘21b。懸吊天平21,係藉由未圖示之起重機(crane)來懸吊,藉此可控制升降或水平移動之各動作。 Thereby, when the jack jacking rod 20 is raised, the rod 20b protruding further above the suspension frame 18 is cut away from the rod 20b on the lower side thereof, thereby preventing the jack jacking rod 20 from interfering with Overhanging scaffold 5. Further, reference numeral 21 in Fig. 8 denotes a known suspension balance for lifting or suspending each of the constituent members of the jack jacking device 19 or for suspending the cut rod 20b, which has a balance rod 21a. And a hammer 21b provided at one end of the balance rod 21a. The suspension balance 21 is suspended by a crane (not shown), thereby controlling the movement of the lifting or horizontal movement.

又,在如此的步驟中,在基礎底板1上,係同時進行環形部16之保持工事及中央部之保冷工事。在環形部16之保冷工事中,如第9圖所示,係在帶腳架台6之下方且為底部抗冷熱緩和材料22之上方,組裝有珍珠岩混凝土塊(pearlite concrete block)23a、23b、構造用輕量混凝土塊24,且在其上方安裝有環形板16a。環形部16係最終支撐被組裝後的內槽側板7。因而,環形部16之環形板16a係形成為較厚,又其保冷構造亦由混凝土塊等之硬質材料所形成。 Further, in such a step, the holding work of the ring portion 16 and the cold keeping work at the center portion are simultaneously performed on the base plate 1. In the cold-keeping work of the annular portion 16, as shown in Fig. 9, a pearlite concrete block 23a, 23b is assembled under the bezel 6 and above the bottom anti-cold heat-releasing material 22. The lightweight concrete block 24 is constructed with an annular plate 16a mounted thereon. The annular portion 16 ultimately supports the assembled inner groove side plate 7. Therefore, the annular plate 16a of the annular portion 16 is formed to be thick, and the cold-preserving structure is also formed of a hard material such as a concrete block.

其次,如第10圖所示,利用千斤頂頂起裝置19將關節板9吊起,藉此使包含關節板9和由此所支撐的內槽頂蓋14、內槽側板7、關節支承10、空間銜鐵11、 千斤頂頂起裝置用鷹架17的槽構成構件Y上升。具體而言,使千斤頂本體20a正轉驅動,藉此使千斤頂頂起桿20上升,同時用千斤頂頂起關節支承10和組裝途中之槽構成構件Y。 Next, as shown in Fig. 10, the joint plate 9 is lifted by the jack jacking device 19, thereby including the joint plate 9 and the inner groove top cover 14, the inner groove side plate 7, and the joint support 10 supported thereby. Space armature 11, The jack jacking device is raised by the groove constituent member Y of the eagle frame 17. Specifically, the jack body 20a is driven to rotate in the forward direction, whereby the jack jacking rod 20 is raised, and the joint support 10 and the groove in the assembly direction are used to form the member Y by the jack.

在此,因藉由千斤頂頂起裝置19所吊起的關節板9,係連接內槽頂蓋14和內槽側板7,故而其板厚比內槽側板7還更充分的厚,且強度較高。因而,即便附加有包含內槽側板7或內槽頂蓋14、甚至千斤頂頂起裝置用鷹架17的重量仍不會壓曲。因此,下層側之內槽側板7,雖然為了承受槽完成後所填充的內容液之比較大的液壓而形成較厚的板厚,但是上層側(尤其是最上層)之內槽側板7,只要能承受內容液之比較小的液壓即可,而可形成較薄的板厚。在本實施形態中,由於內槽側板7不會壓屈,所以可以利用如上述之最佳設置來形成內槽側板7,且能夠獲得輕量化及成本降低。 Here, since the joint plate 9 lifted by the jack jacking device 19 is connected to the inner tank top cover 14 and the inner groove side plate 7, the plate thickness is more thick than the inner groove side plate 7, and the strength is stronger. high. Therefore, even if the weight including the inner groove side plate 7 or the inner groove top cover 14 or even the jack jacking device 17 is attached, it does not buckle. Therefore, the inner groove side plate 7 on the lower layer side has a thicker plate thickness in order to receive a relatively large hydraulic pressure of the content liquid filled after completion of the groove, but the inner groove side plate 7 on the upper layer side (especially the uppermost layer) is only required It can withstand the relatively small hydraulic pressure of the content liquid, and can form a thin plate thickness. In the present embodiment, since the inner groove side plate 7 is not bent, the inner groove side plate 7 can be formed by the above-described optimum arrangement, and weight reduction and cost reduction can be obtained.

藉由千斤頂頂起裝置19使槽構成構件Y上升內槽側板7之大致一層份,之後將下一層之內槽側板7搬入內槽側板7之下方所形成的空間。內槽側板7之搬入,係透過設置於側壁3的工事口4而進行。在工事口4之周邊係設置有第1搬運裝置(未圖示),可藉由第1搬運裝置從側壁3之外通過工事口4將內槽側板7依序搬運至帶腳架台6上。又,在帶腳架台6上,係沿著側壁3之圓周方向設置有第2搬運裝置(未圖示)。第2搬運裝置,係具有沿著側壁3之圓周方向的軌道(未圖示)等,用以將搬運至 帶腳架台6上而來的內槽側板7,更進一步依序搬運至側壁3之圓周方向。 The groove forming member Y is raised by a portion of the inner groove side plate 7 by the jack jacking device 19, and then the inner groove side plate 7 of the next layer is carried into the space formed below the inner groove side plate 7. The loading of the inner tank side plate 7 is performed through the work opening 4 provided in the side wall 3. A first conveyance device (not shown) is provided around the work opening 4, and the inner groove side plate 7 can be sequentially conveyed to the bead stand 6 through the work opening 4 from the side wall 3 by the first conveyance device. Further, on the tripod stand 6, a second transport device (not shown) is provided along the circumferential direction of the side wall 3. The second conveying device has a rail (not shown) or the like along the circumferential direction of the side wall 3 for transporting to The inner groove side plates 7 from the leg stand 6 are further transported to the circumferential direction of the side walls 3 in order.

其次,將利用第2搬運裝置所搬運而來的內槽側板7豎設於帶腳架台6上,且以圓環狀配置於用千斤頂頂起後的內槽側板7之下方。然後,如第11圖所示,一體地熔接橫向相鄰的內槽側板7,且上下排列的內槽側板7彼此也一體地熔接,藉此將內槽側板7形成為一體的圓筒形狀。亦即,在成為最上層的第9層(#9)之內槽側板7之下方安裝第8層(#8)之內槽側板7。 Next, the inner groove side plate 7 conveyed by the second conveying device is erected on the bead stand 6 and arranged in an annular shape below the inner groove side plate 7 which is jacked up by the jack. Then, as shown in Fig. 11, the laterally adjacent inner groove side plates 7 are integrally welded, and the inner groove side plates 7 arranged up and down are integrally welded to each other, whereby the inner groove side plates 7 are formed into an integral cylindrical shape. That is, the inner side groove side plate 7 of the eighth layer (#8) is attached below the inner side groove 7 of the ninth layer (#9) which is the uppermost layer.

另外,亦可將複數個內槽側板7彼此在外槽之側壁3之外事先進行橫向連結,且將此取入側壁3內並形成為環狀之後,熔接上下排列的內槽側板7彼此。如此地藉由在作業空間之限制少的側壁3之外進行複數個內槽側板7之橫向連結,熔接作業就會變得容易,而可以效率佳地組裝內槽。 Further, a plurality of the inner groove side plates 7 may be laterally joined to each other outside the side wall 3 of the outer groove, and after the inner side wall 3 is taken into the side wall 3 and formed into a ring shape, the inner groove side plates 7 arranged up and down are welded to each other. By performing the lateral connection of the plurality of inner groove side plates 7 outside the side wall 3 having a small restriction in the working space, the welding operation becomes easy, and the inner grooves can be assembled efficiently.

當如此地進行千斤頂頂起時,就如第11圖所示,千斤頂頂起裝置19之千斤頂頂起桿20的上端會比懸吊架台18還更往上方突出。當千斤頂頂起桿20更進一步上升時就會干涉到位在其正上方的懸垂鷹架5。於是,在進行內槽側板7彼此之熔接等的期間,會將構成千斤頂頂起桿20的複數個桿20b當中比懸吊架台18還更往上方突出的桿20b從下側卸下。卸下後的桿20b,係透過事先設置於千斤頂頂起裝置用鷹架17之頂部的吊柱(davit)(未圖示),藉由第8圖所示的懸吊天平21而放下到內槽頂蓋 14上。桿20b之卸下,係利用千斤頂頂起裝置用鷹架17來進行。又,以千斤頂頂起裝置用鷹架17不與懸垂鷹架5干涉的方式,藉由懸吊天平21依序沿千斤頂頂起裝置用鷹架17之上部側撤去。 When the jack is jacked up as such, as shown in Fig. 11, the upper end of the jack jack 20 of the jack jacking device 19 protrudes further above the suspension frame 18. When the jack jack 20 is further raised, it will interfere with the overhanging scaffold 5 located directly above it. Then, during the period in which the inner-slot side plates 7 are welded to each other, the rod 20b that protrudes upward from the suspension stand 18 among the plurality of rods 20b constituting the jack-up lever 20 is detached from the lower side. The detached rod 20b is lowered by a suspension (davi) (not shown) provided in advance on the top of the jacking device for the jacking device 17, and is suspended by the hanging balance 21 shown in Fig. 8. Slot cover 14 on. The removal of the rod 20b is performed by the scaffold 17 using the jack jacking device. Further, the jacking device 17 is removed from the upper side of the scaffold 17 by the jacking jack 21 in such a manner that the scaffolding 17 does not interfere with the overhanging scaffold 5.

其次,藉由千斤頂頂起裝置19使槽構成構件Y上升內槽側板7之大致一層份,而更進一步將下一層之內槽側板7搬入內槽側板7之下方所形成的空間。與前述的第8層(#8)之內槽側板7的安裝同樣,如第12圖所示地安裝第7層(#7)之內槽側板7。當時也是卸下比懸吊架台18還更往上方突出的桿20b,且藉由懸吊天平21放下到內槽頂蓋14上。 Next, the groove constituting member Y is raised by the jack ejector unit 19 by a substantially one layer of the inner groove side plate 7, and the inner groove side plate 7 of the lower layer is further moved into the space formed by the lower side of the inner groove side plate 7. Similarly to the mounting of the inner groove side plate 7 of the eighth layer (#8) described above, the inner groove side plate 7 of the seventh layer (#7) is attached as shown in Fig. 12 . At that time, the rod 20b protruding further above the suspension stand 18 is also unloaded, and is lowered onto the inner tank top cover 14 by the suspension balance 21.

如此地安裝第9層(#9)至第7層(#7)之內槽側板7,之後如第13圖所示地撤去側壁3之內周面側的懸垂鷹架5。通常,在安裝第9層(#9)至第7層(#7)之內槽側板7的期間,外槽之側壁3係完成至成為最上層的第9層(#9)為止。因而,因能夠卸下用以形成側壁3的模箱等,故而可以撤去位在側壁3之內周面側的懸垂鷹架5。另外,就側壁3之外周面側的鷹架等而言,因在後段步驟中還需要故而並未撤去而是保留下來。 The inner side panel 7 of the ninth layer (#9) to the seventh layer (#7) is attached in this manner, and then the overhanging eagle 5 on the inner peripheral side of the side wall 3 is removed as shown in Fig. 13. Normally, during the installation of the inner side groove 7 of the ninth layer (#9) to the seventh layer (#7), the side wall 3 of the outer groove is completed until the ninth layer (#9) which is the uppermost layer. Therefore, since the mold case or the like for forming the side wall 3 can be removed, the overhanging eagle 5 positioned on the inner peripheral side of the side wall 3 can be removed. In addition, the scaffold or the like on the outer peripheral side of the side wall 3 is not removed but remains in the subsequent step.

其次,因進行千斤頂頂起裝置19之重新安放,故而如第13圖所示地在外槽之側壁3的頂部設置第2懸吊架台25。又,用千斤頂降下(jack down)而暫時將槽構成構件Y(亦包含第8層或第7層之內槽側板7)放下到帶腳架台6上。 Next, since the jack jacking device 19 is repositioned, the second hanging frame 25 is placed on the top of the side wall 3 of the outer tub as shown in Fig. 13. Further, the tank constituting member Y (including the inner side groove side plate 7 of the eighth layer or the seventh layer) is temporarily lowered by the jack down to the tripod stand 6.

接著,利用懸吊天平21或起重機等將第9圖所示的千斤頂頂起裝置19之千金頂頂起桿20暫時從關節支承10之被懸吊板10b卸下。又,將千斤頂頂起裝置19之千斤頂本體20a從懸吊架台18卸下。藉此,千斤頂頂起裝置19可從外槽之側壁3與關節板9之間卸下。更且,將懸吊架台18從側壁3卸下。 Next, the jacking up lever 20 of the jack jacking device 19 shown in Fig. 9 is temporarily removed from the suspended panel 10b of the joint support 10 by a suspension balance 21 or a crane or the like. Further, the jack body 20a of the jack jacking device 19 is detached from the suspension frame 18. Thereby, the jack jacking device 19 can be detached from between the side wall 3 of the outer tub and the joint plate 9. Further, the suspension stand 18 is detached from the side wall 3.

然後,將千斤頂頂起裝置19之千斤頂本體20a安裝於第13圖所示的第2懸吊架台25。又,在前面的步驟中,以不干涉到懸垂鷹架5之方式沿千斤頂頂起桿20之上部側暫時卸下,且放下到內槽頂蓋14上。然而,由於能夠藉由撤去側壁3之內周面側的懸垂鷹架5而使千斤頂頂起桿20自由地伸展,所以會將放下到內槽頂蓋14上的桿20b再度安裝於千斤頂頂起桿20,而使千斤頂頂起桿20延長。在本實施形態中,如第13圖所示,為了使千斤頂頂起桿20從成為外側之側壁3之最上層的第9層(#9)垂下至第5層(#5),而更進一步追加事先另外準備之預備的桿20b,來將千斤頂頂起桿20調整成所期望之長度。 Then, the jack body 20a of the jack jacking device 19 is attached to the second suspension stand 25 shown in Fig. 13. Further, in the previous step, the upper portion of the jack jack 20 is temporarily removed without interfering with the overhanging eagle 5, and is lowered onto the inner tank top cover 14. However, since the jack jack 20 can be freely extended by removing the overhanging eagle 5 on the inner circumferential side of the side wall 3, the rod 20b dropped onto the inner tank top cover 14 is again mounted on the jack. The rod 20 extends the jack 20 from the jack. In the present embodiment, as shown in Fig. 13, in order to lower the jack jack 20 from the ninth layer (#9) which is the uppermost layer of the outer side wall 3 to the fifth layer (#5), further A preliminary rod 20b prepared in advance is added to adjust the jack jack 20 to a desired length.

如此地將千斤頂頂起桿20調整成所期望之長度,之後,將千斤頂頂起桿20之下端側再度插入關節支承10之被懸吊板10b的切口10d內。然後,藉由螺帽19a將千斤頂頂起桿20之下端部固定於被懸吊板10b。藉此,重新安放千斤頂頂起裝置19。如此地結束千斤頂頂起裝置19之重新安放,之後如第13圖所示地撤去千斤頂頂起裝置用鷹架17。 Thus, the jack jack 20 is adjusted to a desired length, and then the lower end side of the jack jack 20 is again inserted into the slit 10d of the suspension plate 10b of the joint support 10. Then, the lower end portion of the jack jack 20 is fixed to the suspended panel 10b by the nut 19a. Thereby, the jack jacking device 19 is repositioned. Thus, the resetting of the jack jacking device 19 is completed, and then the jacking device 17 for the jack jacking device is removed as shown in Fig. 13.

其次,如第14圖所示,利用千斤頂頂起裝置19將關節板9吊起,使槽構成構件Y上升內槽側板7之大致一層份。 Next, as shown in Fig. 14, the joint plate 9 is lifted by the jack jacking device 19, so that the groove forming member Y rises by substantially one layer of the inner groove side plate 7.

接著,將下一層之內槽側板7更進一步搬入內槽側板7之下方所形成的空間,以下,與前述的第8層(#8)、第7層(#7)之內槽側板7的安裝同樣,如第15圖所示地安裝第6層(#6)之內槽側板7。 Next, the inner groove side plate 7 of the next layer is further carried into the space formed below the inner groove side plate 7, and is hereinafter described with the eighth groove (#8) and the seventh layer (#7) of the inner groove side plate 7 As in the installation, the inner side groove 7 of the sixth layer (#6) is attached as shown in Fig. 15.

其次,在內槽頂蓋14上安裝外槽頂蓋26。在本步驟中,如第6圖所示,外槽頂蓋26,係藉由將頂蓋骨12從外槽頂蓋26之中心部配置成輻射狀,且利用環狀之構件(未圖示)保持固定於此等配置成輻射狀的頂蓋骨12間所形成。在內槽頂蓋14上安裝由多數個槽鋼等所構成的連結材料(未圖示),且在此等連結材料上安裝外槽頂蓋26。如第5圖所示,由於是以關節支承10位在頂蓋骨12、12間的方式組合頂蓋骨12,所以與關節支承10連結的千斤頂頂起裝置19係配置於頂蓋骨12、12間。藉此,千斤頂頂起裝置19係以不干涉到外槽頂蓋26之方式所配置,且在該狀態下進行動作。 Next, an outer tank top cover 26 is mounted on the inner tank top cover 14. In this step, as shown in Fig. 6, the outer tank top cover 26 is arranged in a radial shape from the central portion of the outer tank top cover 26 by the top cover bone 12, and an annular member (not shown) It is formed to be fixed between the top bones 12 arranged in a radial shape. A connecting material (not shown) made of a plurality of channels or the like is attached to the inner tank top cover 14, and the outer tank top cover 26 is attached to the connecting material. As shown in FIG. 5, since the canopy bone 12 is combined so that the joint supports 10 positions between the canopy bones 12 and 12, the jack jacking device 19 coupled to the joint support 10 is disposed on the canopy bone 12, 12 rooms. Thereby, the jack jacking device 19 is disposed so as not to interfere with the outer tank top cover 26, and operates in this state.

又,開始將側部襯套(未圖示)貼設於外槽之側壁3之內周面的作業。使用懸架於第4圖所示之纜車軌道13的行走裝置32、捲揚裝置33,將側部襯套從基礎底板1側適當吊起,且將側部襯套依序貼設於外槽之側壁3之內周面。 Moreover, the work of attaching the side bushing (not shown) to the inner peripheral surface of the side wall 3 of the outer tank is started. The side bushing is appropriately lifted from the side of the base plate 1 by using the traveling device 32 and the hoisting device 33 suspended from the cable car track 13 shown in Fig. 4, and the side bushings are sequentially attached to the outer groove. The inner peripheral surface of the side wall 3.

另外,與側部襯套之吊起用途不同,而是在纜車軌道 13懸垂有檢查用空中纜車。進行內槽側板7間之熔接之後,與側壁襯套之貼設不同,其使用檢查用空中纜車進行內槽側板7間之熔接線等的檢查或補修。 In addition, it is different from the lifting effect of the side bushing, but in the cable car track. 13 drape has an aerial tramway for inspection. After the inner-slot side plate 7 is welded, unlike the side wall bushing, the inspection air cable car is used to inspect or repair the weld line between the inner-slot side plates 7.

以下,依序重複進行藉由千斤頂頂起裝置19致使的槽構成構件Y之上升、下一層之內槽側板7往內槽側板7(槽構成構件Y)之下方的搬入、搬入後的內槽側板7之往槽構成構件Y(內槽側板7)的安裝,而如第16圖所示地將內槽側板7安裝至最下層之第1層(#1)。藉此,完成內槽之側壁。 In the following, the rise of the groove constituting member Y by the jack ejector 19 and the movement of the inner groove side plate 7 of the lower layer to the lower side of the inner groove side plate 7 (the groove constituting member Y) and the inner groove after the loading are repeated. The side plate 7 is attached to the groove constituting member Y (the inner groove side plate 7), and the inner groove side plate 7 is attached to the first layer (#1) of the lowermost layer as shown in Fig. 16. Thereby, the side wall of the inner tank is completed.

另外,在進行如此的各層之內槽側板7的安裝時、即在將槽構成構件Y吊起並以其下方作為空間的期間,係與內槽側板7之搬入不同地將各種的資材27搬入側壁3內之基礎底板1上。又,在外槽頂蓋26之上方事先組合作業鷹架28。更且,持續進行側部襯套往外槽之側壁3之內周面的貼設、或內槽側板7間之熔接線等的檢查或補修,而使此等完成。 In addition, when the groove side plate 7 is attached to each of the layers, that is, while the groove constituting member Y is lifted and the space is below, the various materials 27 are carried in differently from the loading of the inner groove side plate 7. On the base plate 1 in the side wall 3. Further, the work scaffolding 28 is previously assembled above the outer tank top cover 26. Further, the inspection or repair of the inner circumferential surface of the side wall 3 of the outer groove or the welding line between the inner groove side plates 7 is continued, and this is completed.

其次,如第17圖所示地撤去帶腳架台6,且將槽構成構件Y之下方形成為空間。然後,藉由千斤頂頂起裝置19將槽構成構件Y用千斤頂降下,且如第18圖所示地將外槽頂蓋26之頂蓋骨12的外周端連結固定於安裝端29,該安裝端29係埋設於外槽之側壁3之頂部內周面。 Next, the foot stand 6 is removed as shown in Fig. 17, and the square below the groove forming member Y becomes a space. Then, the groove constituting member Y is lowered by the jack by the jack jacking device 19, and the outer peripheral end of the top cover bone 12 of the outer tank top cover 26 is joined and fixed to the mounting end 29 as shown in Fig. 18, the mounting end The 29 series is embedded in the top inner peripheral surface of the side wall 3 of the outer tank.

接著,將連結外槽頂蓋26與內槽頂蓋14之間的連結材料(未圖示)予以去除,而解除此等之間的連結。藉此, 外槽頂蓋26可保持於外槽之側壁3的安裝端29,而內槽頂蓋14以下的槽構成構件Y可保持於千斤頂頂起裝置19。 Next, the connecting material (not shown) connecting the outer tank top cover 26 and the inner tank top cover 14 is removed, and the connection between them is released. With this, The outer trough top cover 26 can be retained at the mounting end 29 of the side wall 3 of the outer trough, and the trough forming member Y below the inner trough top cover 14 can be retained by the jack jacking device 19.

其次,如第17圖所示,藉由千斤頂頂起裝置19將內槽頂蓋14以下的槽構成構件Y再度用千斤頂降下,而將內槽側板7之最下層的下端部放下到環形部16。然後,將內槽側板7之最下層的下端部安裝於被設置於基礎底板1的內槽錨箍2。 Next, as shown in Fig. 17, the groove forming member Y below the inner groove top cover 14 is lowered again by the jack by the jack jacking device 19, and the lower end portion of the lowermost layer of the inner groove side plate 7 is lowered to the ring portion 16. . Then, the lower end portion of the lowermost layer of the inner groove side plate 7 is attached to the inner groove anchor 2 provided on the base plate 1.

其次,如第19圖所示,將行走裝置32或捲揚裝置33從纜車軌道13卸下。接著,切斷關節支承10之關節板9側的端部,藉此將關節支承10從關節板9卸下並去除。然後,藉由千斤頂頂起裝置19將關節支承10吊起,而使被安裝於關節支承10的纜車軌道13、安裝構件30、軌道支承31,與關節支承10一起上升。 Next, as shown in Fig. 19, the traveling device 32 or the hoisting device 33 is detached from the cable car track 13. Next, the end portion of the joint support 10 on the joint plate 9 side is cut, whereby the joint support 10 is detached from the joint plate 9 and removed. Then, the joint support 10 is lifted by the jack jacking device 19, and the cable car rail 13, the attachment member 30, and the rail support 31 attached to the joint support 10 are lifted together with the joint support 10.

更且,繼續進行藉由千斤頂頂起裝置19致使關節支承10之吊起,而使纜車軌道13更進一步上升。如第20圖所示,使纜車軌道13上升至預定高度,之後,將被安裝於纜車軌道13的軌道支承31,如第6圖所示地安裝、固定於外槽頂蓋26之頂蓋骨12。藉此,進行纜車軌道13之重新安放。軌道支承31往頂蓋骨12之安裝,係藉由熔接或螺栓固定等來進行。 Further, the lifting of the joint support 10 by the jack jacking device 19 is continued, and the cable car track 13 is further raised. As shown in Fig. 20, the cable car track 13 is raised to a predetermined height, and thereafter, the rail support 31 to be mounted on the cable car track 13 is attached and fixed to the top cover of the outer tank top cover 26 as shown in Fig. 6. 12. Thereby, the reinstallation of the cable car track 13 is carried out. The mounting of the rail support 31 to the roof bone 12 is performed by welding or bolting or the like.

如此地進行纜車軌道13之重新安放之後,再度將行走裝置32或捲揚裝置33安裝於纜車軌道13,而使空中纜車懸垂於捲揚裝置33。 After the cable car track 13 is repositioned in this manner, the traveling device 32 or the hoisting device 33 is again mounted on the cable car track 13, and the aerial cable car is suspended from the hoisting device 33.

其次,進行外槽之側壁3的緊張工事。又,對已完成 側部襯套之貼設的外槽之側部3之內周面,利用空中纜車朝向側部襯套噴吹作為抗冷熱緩和材料的聚胺基甲酸乙酯泡棉(PUF)。另外,有的情況空中纜車到達不了外槽之側壁3之內周面的最上端部,而無法利用空中纜車進行抗冷熱緩和材料之噴吹。 Next, the tension work of the side wall 3 of the outer tank is performed. Again, the pair has been completed The inner peripheral surface of the side portion 3 of the outer groove to which the side bushing is attached is sprayed with a gondola foam (PUF) as a heat-resistant and heat-resistant material toward the side bushing by the gondola. In addition, in some cases, the gondola cannot reach the uppermost end portion of the inner peripheral surface of the side wall 3 of the outer tank, and the air-lifting cable cannot be used for the blowing of the heat-resistant and tempering material.

在該情況,對於無法進行抗冷熱緩和材料之噴吹的部位,係在撤去千斤頂頂起裝置19或第2懸吊架台25等之後,另外使用起重機等,進行抗冷熱緩和材料之噴吹。 In this case, after the jack lifting device 19 or the second suspension frame 25 or the like is removed from the portion where the cold heat absorbing material is not sprayed, the cold heat absorbing material is sprayed using a crane or the like.

之後,如第21圖所示,撤去千斤頂頂起裝置19、第2懸吊架台25等。然後,閉鎖工事口4,而設置未圖示的泵筒(pump barrel),充填水量以實施耐壓、氣密試驗。 Thereafter, as shown in Fig. 21, the jack jacking device 19, the second suspension rack 25, and the like are removed. Then, the work compartment 4 is closed, and a pump barrel (not shown) is provided, and the amount of water is filled to perform a withstand voltage and airtight test.

最後,在內槽與外槽之間填充珍珠岩(perlite)等之保冷材料(未圖示)以進行內外槽間保冷工事。當進行塗裝工事、配管保冷工事時,就完成圓筒型槽100。 Finally, a cold-preserving material (not shown) such as perlite is filled between the inner tank and the outer tank to carry out the cold-keeping work between the inner and outer tanks. When the painting work and the piping cooling work are performed, the cylindrical groove 100 is completed.

當建構如此構成的圓筒型槽100時,由於會特別在關節支承10安裝纜車軌道13,所以藉由使關節支承10上升亦可以使纜車軌道13上升。藉由使檢查用空中纜車或側部襯套懸垂於纜車軌道13,就可以同時進行內槽之組裝步驟、以及內槽側板7之熔接線的檢查或其補修,又可以在外槽之側壁3貼設側部襯套。 When the cylindrical groove 100 thus constructed is constructed, since the cable car track 13 is attached to the joint support 10 in particular, the cable car track 13 can be raised by raising the joint support 10. By suspending the inspection gondola or the side bushing on the cable car track 13, the assembly process of the inner groove and the inspection of the weld line of the inner groove side plate 7 or the repair thereof can be simultaneously performed, and the side wall 3 of the outer groove can be attached. Set the side bushing.

又,將外槽頂蓋26固定於外槽之側壁3的安裝端29之後,將關節支承10從關節板9拆下,且利用千斤頂頂起裝置19將關節支承10吊起,藉此使被安裝於 關節支承10的纜車軌道13上升,而將纜車軌道13安裝於外槽頂蓋26之頂蓋骨12。因而,由於可以拉升纜車軌道13之高度,所以可以將纜車軌道13發揮作為抗冷熱緩和材料施工用之纜車軌道的功能。 Further, after the outer tank top cover 26 is fixed to the mounting end 29 of the side wall 3 of the outer tank, the joint support 10 is detached from the joint plate 9, and the joint support 10 is lifted by the jack jacking device 19, thereby Installed on The cable car track 13 of the joint support 10 is raised and the cable car track 13 is mounted to the roof bone 12 of the outer tank top cover 26. Therefore, since the height of the cable car track 13 can be lifted, the cable car track 13 can function as a cable car track for construction of a heat and cold tempering material.

因而,依據本實施形態的圓筒型槽的建構方法,則藉由用於內槽之組裝的千斤頂頂起裝置19來重新安放因用途不同而有必要設置於不同之高度的纜車軌道13,就可以藉此設置於配合各自之用途的高度。因可以在短時間內以低成本進行纜車軌道13之重新安放,故而能夠縮短工期,且削減成本。 Therefore, according to the method of constructing the cylindrical groove of the present embodiment, the jacking device 19 for assembling the inner groove is used to reposition the cable car track 13 which is required to be installed at different heights depending on the application. It can be set at a height suitable for the respective use. Since the cable car track 13 can be relocated at a low cost in a short time, the construction period can be shortened and the cost can be reduced.

又,在內槽頂蓋14上安裝外槽頂蓋26的步驟中,係藉由組合頂蓋骨12而形成外槽頂蓋26。由於在頂蓋骨12、12間設置關節支承10,所以在頂蓋骨12、12間配置有千斤頂頂起裝置19。為了重新安放纜車軌道13,而藉由千斤頂頂起裝置19來將關節支承10吊起,且使被安裝於關節支承10的纜車軌道13上升。此時,關節支承10,並不與外槽頂蓋26干涉,而是通過頂蓋骨12、12間被懸吊起到外槽頂蓋26上。因而,可以容易將安裝於關節支承10之下端部的纜車軌道13安裝於頂蓋骨12。 Further, in the step of attaching the outer tank top cover 26 to the inner tank top cover 14, the outer tank top cover 26 is formed by combining the top cover bones 12. Since the joint support 10 is provided between the canopy bones 12, 12, a jack jacking device 19 is disposed between the cap bones 12, 12. In order to reposition the cable car track 13, the jack support 10 is lifted by the jack jacking device 19, and the cable car track 13 mounted to the joint support 10 is raised. At this time, the joint support 10 does not interfere with the outer tank top cover 26, but is suspended between the roof bones 12, 12 to the outer tank top cover 26. Thus, the cable car track 13 attached to the lower end portion of the joint support 10 can be easily attached to the roof bone 12.

又,由於是採用將外槽之側壁3形成至最頂部之後,在側壁3之內周面貼設側部襯套的所謂襯套後貼工法,所以需要襯套懸垂用的纜車軌道。在本實施形態中,由於在關節支承10之下端部安裝纜車軌道13,所以不僅可以將纜車軌道13發揮作為用以進行內槽側板7之熔 接線的檢查或其修補之空中纜車懸垂用的功能,還可以發揮作為襯套懸垂用的功能。 Further, since the side wall 3 of the outer groove is formed to the topmost portion and the side bushing is attached to the inner circumferential surface of the side wall 3, a so-called bushing post-welding method is used. Therefore, a cable car track for bushing suspension is required. In the present embodiment, since the cable car track 13 is attached to the lower end portion of the joint support 10, not only the cable car track 13 but also the inner side plate 7 can be melted. The function of checking the wiring or the function of the repaired aerial cable car can also be used as a function of the bushing suspension.

又,在組裝關節板9的步驟中,係在事先組裝而成的內槽側板7之上側安裝關節板9。先將在高度方向並未彎曲的內槽側板7組裝成圓環狀,之後才將關節板9安裝於內槽側板7,係比最初就將朝向高度方向彎曲的關節板9組裝成圓環狀還更容易。因而,可以容易進行關節板9之組裝。 Further, in the step of assembling the joint plate 9, the joint plate 9 is attached to the upper side of the inner groove side plate 7 which has been assembled in advance. First, the inner groove side plates 7 which are not bent in the height direction are assembled into an annular shape, and then the joint plate 9 is attached to the inner groove side plates 7, and the joint plates 9 which are bent toward the height direction are assembled into a ring shape at the beginning. It's still easier. Thus, the assembly of the joint plate 9 can be easily performed.

又,在關節板9之下側安裝內槽側板7而組裝金屬製之內槽的步驟中,係可進行:將千斤頂頂起裝置19懸吊於懸吊架台18上而用千斤頂頂起槽構成構件Y的處理;以及在比懸吊架台18還更靠上方設置第2懸吊架台25而重新安放千斤頂頂起裝置19,在該狀態下用千斤頂頂起槽構成構件Y的處理。由於在關節支承10之下端部安裝有纜車軌道13,所以可以藉由重新安放千斤頂頂起裝置19而使纜車軌道13之高度變化。因而,可以毫無障礙地進行使用纜車軌道13之作業。 Further, in the step of attaching the inner groove side plate 7 to the lower side of the joint plate 9 and assembling the inner groove of the metal, it is possible to suspend the jack jacking device 19 on the suspension frame 18 and to form the groove with the jack. The processing of the member Y is performed, and the second suspension stand 25 is placed above the suspension stand 18 to reposition the jack jacking device 19, and in this state, the jack is used to lift the groove to constitute the member Y. Since the cable car track 13 is attached to the lower end of the joint support 10, the height of the cable car track 13 can be changed by reinstalling the jack jacking device 19. Thus, the work of using the cable car track 13 can be performed without any hindrance.

又,尤其是當在藉由千斤頂頂起裝置19使槽構成構件Y頂起的期間、或是在使槽構成構件Y懸垂的期間發生地震或強風時,就有內槽頂蓋14或外槽頂蓋26在外槽內朝向水平方向大幅地位移的可能性。然而,由於在關節支承10、10間,設置以位於比關節支承10還靠外側(外槽之側壁3側)之方式所配置的空間銜鐵11,所以可以藉由空間銜鐵11而縮小外槽之側壁3與關節板9之間的 實質間隙。因而,即便關節板9因地震等的影響而朝向水平方向位移,仍可以減小其位移量。藉此,可以緩和空間銜鐵11撞擊到外槽之側壁3時的撞擊,而防止外槽之側壁3的損傷。又,亦可以確實地防止千斤頂頂起裝置19與被懸吊板10b之間損傷。 Further, especially when an earthquake or strong wind occurs during the period in which the groove constituting member Y is jacked up by the jack jacking device 19 or during the period in which the groove constituting member Y is suspended, there is an inner tank top cover 14 or an outer groove. The top cover 26 is likely to be displaced largely in the horizontal direction in the outer groove. However, since the space armature 11 disposed outside the joint support 10 (the side of the side wall 3 of the outer groove) is provided between the joint supports 10 and 10, the outer groove can be narrowed by the space armature 11. Between the side wall 3 and the joint plate 9 Substantial gap. Therefore, even if the joint plate 9 is displaced in the horizontal direction due to the influence of an earthquake or the like, the amount of displacement can be reduced. Thereby, the impact when the space armature 11 hits the side wall 3 of the outer groove can be alleviated, and the damage of the side wall 3 of the outer groove can be prevented. Further, it is possible to surely prevent damage between the jack jacking device 19 and the suspended panel 10b.

以上,雖然已一邊參照圖式一邊就本發明之較佳實施形態加以說明,但是本發明並非被限定於前述實施形態。前述之實施形態中所示的各構成構件之諸多形狀或組合等乃為其一例,只要在未脫離本發明之主旨的範圍內均能基於設計要求等而進行各種變更。 Although the preferred embodiments of the present invention have been described above with reference to the drawings, the present invention is not limited to the embodiments described above. The various shapes, combinations, and the like of the respective constituent members shown in the above-described embodiments are merely examples, and various modifications can be made based on design requirements and the like without departing from the scope of the invention.

例如,將本發明應用於圓筒型槽的建構方法中,該建構方法係在上述之實施形態中將外槽之側壁3形成至途中之後,透過關節板9利用千斤頂頂起裝置19將內槽側板7吊起,且在其下側依序安裝下一層之內槽側板7而形成內槽。然而,亦可以將本發明應用於具有如下步驟的圓筒型槽的建構方法中。 For example, the present invention is applied to a method of constructing a cylindrical groove which, after forming the side wall 3 of the outer groove to the middle in the above embodiment, passes through the joint plate 9 and uses the jack jacking device 19 to form the inner groove. The side plates 7 are lifted, and the inner side grooves 7 are sequentially installed on the lower side thereof to form inner grooves. However, the present invention can also be applied to a method of constructing a cylindrical groove having the following steps.

亦即,亦可以將本發明應用於具有以下步驟的圓筒型槽的建構方法中,該建構方法的步驟係具有:在外槽之底部上將外槽之側壁從最下層朝向最上層依序堆起的期間,在比外槽之底部還更靠上方,且在內槽與外槽之間,將架台設置於外槽之側壁用以支撐千斤頂頂起裝置的步驟;在外槽之底部上一體地組裝內槽頂蓋和外槽頂蓋,一邊將內槽側板從最上層朝向最下層依序安裝於內槽頂蓋,一邊使被安裝後的內槽側板藉由千斤頂頂起裝置依序上升的步 驟。 That is, the present invention can also be applied to a method of constructing a cylindrical groove having the following steps, the step of the construction method having: sequentially stacking the side walls of the outer groove from the lowermost layer toward the uppermost layer on the bottom of the outer groove During the period from above, at the top of the outer tank, and between the inner tank and the outer tank, the gantry is disposed on the side wall of the outer tank for supporting the jack jacking device; on the bottom of the outer tank The inner tank top cover and the outer tank top cover are assembled, and the inner groove side plates are sequentially installed on the inner tank top cover from the uppermost layer toward the lowermost layer, and the installed inner groove side plates are sequentially raised by the jack jacking device. step Step.

上述之建構方法,係在進行外槽之側壁的施工時形成側部襯套,且將側部襯套作為外槽之側壁形成用的模箱來使用。因即便是在此情況,為了針對內槽側板間之熔接線等進行檢查或其補修而仍需要檢查用空中纜車懸垂用之纜車軌道,又需要用以使抗冷熱緩和材料施工用之纜車懸垂的纜車軌道,故而本發明變得有效。 In the above construction method, the side bushing is formed when the side wall of the outer tank is constructed, and the side bushing is used as a mold box for forming the side wall of the outer tank. In this case, in order to inspect the repaired wire between the side plates of the inner tank or the repair thereof, it is necessary to inspect the cable car track for the overhanging of the gondola cable, and to suspend the cable car for the construction of the anti-cold heat absorbing material. The cable car track, and thus the invention becomes effective.

〔產業上之可利用性〕 [Industrial Applicability]

依據本發明,可以提供一種能在短時間內且以低成本將纜車軌道設置於不同之高度的圓筒型槽的建構方法。 According to the present invention, it is possible to provide a construction method of a cylindrical groove which can set the cable car track to a different height in a short time and at a low cost.

3‧‧‧外槽之側壁 3‧‧‧Side sidewalls

7‧‧‧內槽側板 7‧‧‧Inch side panel

9‧‧‧關節板(關節部) 9‧‧‧ joint plate (joint part)

10‧‧‧關節支承(被懸吊構件) 10‧‧‧ Joint support (suspended member)

12‧‧‧頂蓋骨 12‧‧‧Top bone

13‧‧‧纜車軌道 13‧‧‧ cable car track

14‧‧‧內槽頂蓋(槽頂蓋部) 14‧‧‧Inner tank top cover (slot top cover)

19‧‧‧千斤頂頂起裝置 19‧‧‧ jack jacking device

20‧‧‧千斤頂頂起桿 20‧‧‧ jack jack

20a‧‧‧千斤頂本體 20a‧‧‧ jack body

25‧‧‧第2懸吊架台(第2懸吊部) 25‧‧‧2nd suspension frame (2nd suspension section)

26‧‧‧外槽頂蓋 26‧‧‧ outer tank top cover

29‧‧‧安裝端 29‧‧‧Installation end

31‧‧‧軌道支承 31‧‧‧Track support

Y‧‧‧槽構成構件 Y‧‧‧ trough components

Claims (5)

一種圓筒型槽的建構方法,係具有金屬製之內槽和混凝土製之外槽者,該建構方法包括:在前述外槽之內側組裝圓環狀之關節部的步驟;在前述關節部設置與複數個千斤頂頂起裝置連結的複數個被懸吊構件之步驟;在前述複數個被懸吊構件安裝纜車軌道的步驟;在前述外槽之側壁設置用以懸吊前述複數個千斤頂頂起裝置的複數個懸吊部之步驟;在前述外槽之前述側壁的前述複數個懸吊部與前述關節部之前述複數個被懸吊構件之間分別安裝前述複數個千斤頂頂起裝置的步驟;以及藉由前述複數個千斤頂頂起裝置將前述關節部吊起並使其上升,在上升後的前述關節部之下側安裝內槽側板而組裝前述內槽的步驟;組裝前述內槽的步驟,係具有:在前述關節部上安裝內槽頂蓋的步驟;以及在前述內槽頂蓋上安裝外槽頂蓋的步驟;在組裝前述內槽的步驟之後,進行將前述外槽頂蓋固定於前述外槽之前述側壁的步驟;在將前述外槽頂蓋固定於前述外槽之前述側壁的步驟之後,進行以下的步驟:將前述複數個被懸吊構件從前述關節部拆下,利用前述複數個千斤頂頂起裝置將前述複數個被懸吊構件吊起,使被安裝於前述複 數個被懸吊構件的前述纜車軌道上升,以將前述纜車軌道安裝於前述外槽頂蓋。 A method for constructing a cylindrical groove, comprising a metal inner groove and a concrete outer groove, the construction method comprising: assembling a ring-shaped joint portion on the inner side of the outer groove; and setting the joint portion a plurality of suspended members coupled to the plurality of jack jacking devices; a step of installing the cable car tracks in the plurality of suspended members; and a plurality of jack jacking devices for suspending the plurality of jacks on the side walls of the outer slots a plurality of steps of suspending; a step of mounting a plurality of jack jacking devices between said plurality of suspension portions of said side wall of said outer groove and said plurality of suspended members of said joint portion; The step of lifting and raising the joint portion by the plurality of jack jacking devices, and attaching the inner groove side plate to the lower side of the raised joint portion to assemble the inner groove; and assembling the inner groove Having: a step of installing an inner groove top cover on the joint portion; and a step of installing an outer groove top cover on the inner groove top cover; after the step of assembling the inner groove Performing the step of fixing the outer tank top cover to the side wall of the outer tank; after the step of fixing the outer tank top cover to the side wall of the outer tank, the following steps are performed: the plurality of suspended members are Removed from the joint portion, and the plurality of suspended members are lifted by the plurality of jack lifting devices to be installed in the foregoing A plurality of the cable car tracks of the suspended members are raised to mount the cable car track to the outer tank top cover. 如申請專利範圍第1項所述之圓筒型槽的建構方法,其中,在前述內槽頂蓋上安裝前述外槽頂蓋的步驟,係藉由組合複數根頂蓋骨而形成前述外槽頂蓋,且在前述複數根頂蓋骨間配置前述複數個千斤頂頂起裝置。 The method for constructing a cylindrical groove according to claim 1, wherein the step of installing the outer groove top cover on the inner groove top cover forms the outer groove by combining a plurality of top cover bones a top cover, and the plurality of jack jacking devices are disposed between the plurality of top cover bones. 如申請專利範圍第1項或第2項所述之圓筒型槽的建構方法,其中,具有:將前述外槽之前述側壁形成至最頂部之後,於前述側壁之內周面貼設側部襯套的步驟。 The method for constructing a cylindrical groove according to the first or second aspect of the invention, wherein the side wall of the outer groove is formed to the topmost portion, and the side surface is attached to the inner circumferential surface of the side wall. The step of the bushing. 如申請專利範圍第1項至第3項中任一項所述之圓筒型槽的建構方法,其中,在組裝前述關節部的步驟中,係藉由在事先組裝的圓環狀之內槽側板的上側安裝前述關節部而組裝前述關節部;在組裝前述內槽的步驟中,係在藉由前述複數個千斤頂頂起裝置而使上升的前述關節部之下側的內槽側板,安裝下一個內槽側板。 The method for constructing a cylindrical groove according to any one of claims 1 to 3, wherein in the step of assembling the joint portion, the groove is formed in an annular groove which is assembled in advance. The joint portion is attached to the upper side of the side plate to assemble the joint portion; and in the step of assembling the inner groove, the inner groove side plate on the lower side of the joint portion that is raised by the plurality of jack jacking devices is attached. An inner groove side panel. 如申請專利範圍第1項至第4項中任一項所述之圓筒型槽的建構方法,其中,在組裝前述內槽的步驟中,係在前述關節部之下側安裝一個內槽側板的處理、與在前述一個內槽側板之下方安裝另一個內槽側板的處理之間,具有以下的處理:在比前述外槽之前述側壁的前述複數個懸吊部還靠上方設置複數個第2懸吊 部,在前述第2懸吊部與前述複數個被懸吊構件之間分別重新安放前述複數個千斤頂頂起裝置,且藉由前述複數個千斤頂頂起裝置將前述關節部更進一步往上方吊起而使其上升。 The method for constructing a cylindrical groove according to any one of claims 1 to 4, wherein in the step of assembling the inner groove, an inner groove side plate is attached to a lower side of the joint portion. The treatment is performed between the process of attaching the other inner groove side plate to the lower side of the inner groove side plate, and the process of providing a plurality of the plurality of suspension portions above the plurality of suspension portions of the side wall of the outer groove 2 hanging a plurality of jack jacking devices respectively repositioned between the second suspension portion and the plurality of suspended members, and the joint portion is further lifted upward by the plurality of jack jacking devices And make it rise.
TW103122223A 2013-06-27 2014-06-27 Method for constructing cylindrical tank TWI551759B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013135163A JP6106539B2 (en) 2013-06-27 2013-06-27 Construction method of cylindrical tank

Publications (2)

Publication Number Publication Date
TW201512503A true TW201512503A (en) 2015-04-01
TWI551759B TWI551759B (en) 2016-10-01

Family

ID=52141987

Family Applications (1)

Application Number Title Priority Date Filing Date
TW103122223A TWI551759B (en) 2013-06-27 2014-06-27 Method for constructing cylindrical tank

Country Status (4)

Country Link
JP (1) JP6106539B2 (en)
PH (1) PH12015502385A1 (en)
TW (1) TWI551759B (en)
WO (1) WO2014208660A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI756899B (en) * 2019-11-21 2022-03-01 日商巴斯夫井上聚氨酯有限公司 Low temperature liquid storage tank and method for manufacturing the same, and method for constructing side cold and heat resistance mitigation layer
TWI756898B (en) * 2019-11-21 2022-03-01 日商巴斯夫井上聚氨酯有限公司 Low temperature liquid storage tank and method for manufacturing the same, and method for constructing side cold and heat resistance mitigation layer

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6468605B2 (en) * 2016-01-13 2019-02-13 有限会社 伊藤 Method for attaching traveling device in concrete formwork support device
JP6749820B2 (en) * 2016-09-26 2020-09-02 株式会社Ihiプラント Top support

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07253196A (en) * 1994-03-14 1995-10-03 Mitsubishi Heavy Ind Ltd Construction method for low temperature tank with concrete outer tank
CN102792084B (en) * 2010-03-17 2014-11-26 气体产品与化学公司 Cryogenic storage tank
JP5732527B2 (en) * 2011-04-01 2015-06-10 株式会社Ihi Construction method of cylindrical tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI756899B (en) * 2019-11-21 2022-03-01 日商巴斯夫井上聚氨酯有限公司 Low temperature liquid storage tank and method for manufacturing the same, and method for constructing side cold and heat resistance mitigation layer
TWI756898B (en) * 2019-11-21 2022-03-01 日商巴斯夫井上聚氨酯有限公司 Low temperature liquid storage tank and method for manufacturing the same, and method for constructing side cold and heat resistance mitigation layer

Also Published As

Publication number Publication date
TWI551759B (en) 2016-10-01
PH12015502385A1 (en) 2016-02-22
WO2014208660A1 (en) 2014-12-31
JP2015010360A (en) 2015-01-19
JP6106539B2 (en) 2017-04-05

Similar Documents

Publication Publication Date Title
CA2886664C (en) Method for constructing cylindrical tank
TWI551759B (en) Method for constructing cylindrical tank
US20170247877A1 (en) Method for constructing cylindrical tank
WO2014208670A1 (en) Method for constructing cylindrical tank
JP6349652B2 (en) Cylindrical tank construction method, side plate transfer device
CN105952228A (en) Construction method for double layer storage tank with flat suspended roof as inner tank roof
TWI557299B (en) Method for constructing cylindrical tank
TWI537459B (en) Method for constructing cylindrical tank
JP6018865B2 (en) Construction method of cylindrical tank
TWI502119B (en) Method for fabricating a cylindrical tank
TWI498470B (en) Construction method of cylindrical tank
WO2014208705A1 (en) Method for constructing cylindrical tank
TWI620861B (en) Method for constructing cylindrical tank
JPH07158300A (en) Method for installing vertical type vessel
TWI564462B (en) Construction method for cylindrical tank
TWI608153B (en) Construction method for cylindrical tank