TW201239783A - System and method for managing test people - Google Patents

System and method for managing test people Download PDF

Info

Publication number
TW201239783A
TW201239783A TW100110545A TW100110545A TW201239783A TW 201239783 A TW201239783 A TW 201239783A TW 100110545 A TW100110545 A TW 100110545A TW 100110545 A TW100110545 A TW 100110545A TW 201239783 A TW201239783 A TW 201239783A
Authority
TW
Taiwan
Prior art keywords
tester
test
test task
task
module
Prior art date
Application number
TW100110545A
Other languages
Chinese (zh)
Inventor
Yong-Zhao Huang
Original Assignee
Hon Hai Prec Ind Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hon Hai Prec Ind Co Ltd filed Critical Hon Hai Prec Ind Co Ltd
Publication of TW201239783A publication Critical patent/TW201239783A/en

Links

Landscapes

  • Debugging And Monitoring (AREA)

Abstract

The present invention provides a system for managing test people. The system includes a classifying module, a receiving module, a allocation module. The classifying module classifies each of the test people to a test level according to information of each of the test people. The receiving module receives corresponding test level and a standard test time of each test task set by a test manager. The allocation module allocates each test task to each of the test people according to the test level of each of the test people. If the test people has completed the test task in the standard test time of the test task, the allocation module further allocates other test task to the test people according to the test level of the test people.

Description

201239783 六、發明說明: 【發明所屬之技術領域】 [0001]本發明涉及一種人員管理系統及方法,尤其涉及一種測 試人員管理系統及方法。 【先前技術】 [0002]隨著電腦系統的進一步開發,電腦系統越來越複雜,對 電腦的測試亦越來越複雜,各種測試的測試工程師亦越 來越多,目前藉由人工分配測試任務,存在由於測試任 務分配不恰當,造成有些測試人焉於完成測試任務後, . ... - 沒有測試任務而出現空間現象,遠有些測試人員由於分 配的測試任務過多,而出現今規定的測試完成時間卻沒 有完成測試任務。造成了人員資源的分配不均,不能於 規定的時間内完成測試任務,降低了工作效率。 【發明内容】 [0003] [0004] 繁於以上内容,有必要提供—種測試人員管理系統及方 法,能夠根據人員具體情況分配測試柱務。 ;..r 1 -. 入 測貝管理系統’運行_射’該電腦連接 資料庫’該料料料了所有測試人貞的基本資料 該系統包括:歸類模組,用於根據每個測試人員的基 資料,將每個測試人員歸類到相應的測試人員等級中 接收模組,料魏測試㈣設置的每個_任務對 的測試人員等級及每個職任務對應的鱗完成時間 及分配模組,用於根據每個測試任務對應的測1 級,對每個測試人員分配測試任務,當測試人員於則 任務的標準完成時_完成了該測試任務時,該分配 100110545 表單編號A0101 第4頁/共15頁 201239783 組重新根據該測試人員對應的測試人員等級 任務給該測試人員。 分配測試 [0005] Ο [0006] ❹ [0007] [0008] 100110545 種測試人員管理方法,應用於電腦,該方法包括如下 步驟·根據每個測試人員的基本諸,將每個測試人員 歸類到相應的職人員等級m職經理設置的每 個測试任務對應的賴人貞等級及每姻試任務對應的 標準完成時間’·及根據每個測試任務對應的測試人員等 級’對母個測試人員分配測試任務;當測試人員於測試 任務的標準完成時間内完成了該測試任務時,重新根據 該測試人員對應的測試人員等級,分配測試任務給該測 試人員。 t - ' \ :, 相較於習知技術,所賴試人員管理純及方法,對測 忒人員的能力進行综合分析,根據每個測試人員能力的 不同及測試任務㈣急情況,對職人㈣當分配任務 ,提高工作效率,及時完成測試任務。 【實施方式】 如圖1所示’是本發明測試人員管理系統較佳實施例的運 行環境圖·>該測試人員管理线1Q運行於電腦i中該電 腦1連接於資料庫2 ’該資料庫2中儲存有每個測試人員的 基本資料°本較佳實施财,該基本資料包括:測試人 員的學歷、資歷、外語水平、擅長領域、技術等級等。 該資料庫2中還儲存了需要測試的測試專案。 如圖2所不,是圖J中測試人員管理系統1〇的功能模組圖 。所述測試人員管理系統1〇包括:歸類模組1〇()、接收模 組ιοί、分配模組102、判斷模組1〇3及提示模組1〇4。所 表單編號A0101 ------- 第5頁/共15頁 1002017723-0 201239783 述模組是具有特定功能的軟體程式段,該軟體儲存於電 腦可讀儲存介質或其他儲存設備,可被電腦或其他包含 處理器的計算裝置執行,從而完成本發明中測試人員的 管理作業流程。 [0009] 歸類模組100用於根據資料庫2中儲存的每個測試人員的 基本資料對測試人員進行評比,將每個測試人員歸類到 相應的測試人員等級中。例如將學歷為大學本科、資歷 為三年以上的測試人員歸類為B等級。 [0010] 接收模組101用於接收測試經理設置的每個測試任務對應 的測試人員等級及每個測試任務對應的標準完成時間。 本實施例中,測試經理藉由測試任務的難度係數來設置 執行該測試任務的測試人貝等級。 [0011] 分配模組1 0 2用於根據所接收的每個測試任務對應的測試 人員等級,對每個測試人員分配測試任務,測試人員執 行所分配的測試任務。 [0012] 判斷模組103用於判斷是否存在測試人員於測試任務的標 準完成時間内執行中斷。若測試人員於測試任務的標準 完成時間内沒有執行中斷,則測試人員繼續執行所分配 的測試任務。 [0013] 若測試人員於測試任務的標準完成時間内執行中斷,則 該判斷模組103判斷該測試任務是否執行完成。若該測試 任務執行完成,則所述分配模組102對該測試人員重新分 配測試任務。若該測試任務沒有執行完成,即該測試任 務的執行出現了錯誤,則所述判斷模組103還用於判斷該 100110545 表單編號A0101 第6頁/共15頁 1002017723-0 201239783 測試任務的錯㈣料Μ糊試 該測試任務的錯誤,』忒任務。右 示模組1H心提T為該職人員_試任務,則提 調試。若_=^7以對制試任務的錯誤進行 任務,則所料誤賴不是動mAS的測試 試作為-㈣ 2還祕將㈣m任務的錯誤調 " 的測試任務增加到測試任務中, [0014] θ [0015] 模組1_新根_試人員料級進行分配。"-mr。,是本發明測試人M管理方法較佳實施例的作201239783 VI. Description of the Invention: [Technical Field of the Invention] [0001] The present invention relates to a personnel management system and method, and more particularly to a test personnel management system and method. [Prior Art] [0002] With the further development of computer systems, computer systems are becoming more and more complex, and the testing of computers is becoming more and more complicated. There are more and more test engineers for various tests. Currently, test tasks are manually assigned. There is an inappropriate allocation of test tasks, causing some testers to succumb to the completion of the test task. ... - There is no space for the test task, and some testers have the test that is required due to too many test tasks assigned. The completion time did not complete the test task. This has resulted in uneven distribution of personnel resources, failure to complete test tasks within the specified time, and reduced work efficiency. SUMMARY OF THE INVENTION [0003] [0004] In the above, it is necessary to provide a test personnel management system and method, which can allocate test columns according to the specific situation of personnel. ;..r 1 -. into the test management system 'running _ shoot' the computer connection database 'this material is expected to be the basic information of all testers 该 The system includes: categorization module for each test The basic data of the personnel, each tester is classified into the corresponding tester level in the receiving module, and the tester level of each _task pair set by Wei test (4) and the scale completion time and allocation corresponding to each job task The module is configured to assign a test task to each tester according to the test level corresponding to each test task, and when the tester completes the test task when the task is completed, the assignment 100110545 form number A0101 4 pages/total 15 pages 201239783 The group is re-submitted to the tester according to the tester level task corresponding to the tester. Distribution Test [0005] Ο [0006] 0007 [0007] [0008] 100110545 Tester management methods, applied to a computer, the method includes the following steps: According to the basics of each tester, each tester is classified into The corresponding staff level m manager sets the test level corresponding to each test task and the standard completion time corresponding to each test task '· and the tester level corresponding to each test task' Task; when the tester completes the test task within the standard completion time of the test task, the test task is assigned to the tester according to the tester level corresponding to the tester. t - ' \ :, compared with the prior art, the test personnel management pure and method, the comprehensive analysis of the ability of the test personnel, according to the different ability of each tester and the test task (four) emergency, the right person (four) When assigning tasks, improving work efficiency, and completing test tasks in time. [Embodiment] As shown in FIG. 1, 'is a running environment diagram of a preferred embodiment of the tester management system of the present invention.> The tester management line 1Q runs in the computer i, and the computer 1 is connected to the database 2' The basic information of each tester is stored in the library 2. The basic information includes: the qualifications, qualifications, foreign language level, field of expertise, and technical level of the tester. The database 2 also stores the test project to be tested. As shown in Fig. 2, it is a functional module diagram of the tester management system in Fig. J. The tester management system 1 includes: a categorization module 1 〇 (), a receiving module ιοί, an allocation module 102, a determination module 1 〇 3, and a prompt module 1 〇 4. Form No. A0101 ------- Page 5 of 15 1002017723-0 201239783 The module is a software program with specific functions. The software is stored in a computer readable storage medium or other storage device. A computer or other computing device including the processor executes to complete the management workflow of the tester in the present invention. [0009] The categorization module 100 is configured to evaluate the testers according to the basic data of each tester stored in the database 2, and classify each tester into a corresponding tester level. For example, a tester with a bachelor's degree or a qualification of three years or more is classified as a B grade. [0010] The receiving module 101 is configured to receive a tester level corresponding to each test task set by the test manager and a standard completion time corresponding to each test task. In this embodiment, the test manager sets the tester level of the test task by the difficulty coefficient of the test task. [0011] The distribution module 102 is configured to assign a test task to each tester according to the tester level corresponding to each test task received, and the tester performs the assigned test task. [0012] The determining module 103 is configured to determine whether there is a tester performing an interrupt during the standard completion time of the test task. If the tester does not perform an interrupt during the standard completion time of the test task, the tester continues to perform the assigned test task. [0013] If the tester performs an interrupt during the standard completion time of the test task, the determination module 103 determines whether the test task is completed. If the test task is completed, the distribution module 102 reassigns the test task to the tester. If the test task is not completed, that is, the execution of the test task has an error, the determining module 103 is further configured to determine the error of the test task (4) of the 100110545 form number A0101 page 6 / 15 pages 1002017723-0 201239783 Expect to test the error of the test task, 忒 忒 task. Right, the module 1H is called T for the staff member, and the debugging is performed. If _=^7 is tasked with the error of the test task, then the test error is not the test of the moving mAS as - (4) 2 The secret is to add the test task of the (4) m task error adjustment to the test task, [ 0014] θ [0015] Module 1_new root_test personnel level is assigned. "-mr. Is a preferred embodiment of the tester M management method of the present invention

’歸類模組⑽根據資料庫2中儲存的每個測試人 貝的基本資料對測試人員進行評比,將每個測試人員歸 類到相應的測試人員等級中。例如將學歷為大學本科' 貝歷為二年以上的測試人員歸類為B等政V 闺#驟83卜接故模組1()1接收測試經理設置的每個測試任 務對應的測試人員等級及每個測試任務對應的標準完成 時間。本實施例中,測試經理藉由測試任務的難度係數 來設置執行該翊試任務的測試人員等級。 剛㈣S32,分配模組1()2根據所接收的每個測試任務對應 的測試人貞等級,對每侧試人貞分_試任務。 [0018]步驟S33,測試人員執行所分配的測試任務。 _ #驟S34 ’判斷模組1〇3判斷是否存在測試人員於測試任 務的標準完成時間内執行中斷。若測試人員於測試任務 的標準完成時間内執行中斷,則執行步驟S35。若測試人 員於標準70成時間内沒有執行中斷,則繼續執行步驟 1002017723-0 100110545 表單編號A0101 第7頁/共15頁 201239783 [0020] 步驟S35,判斷模組103判斷該測試任務是否執行完成。 若該測試任務執行完成,則重複執行步驟S32,由分配模 組102重新對該測試人員分配任務。若該測試任務沒有執 行完成,則執行步驟S 3 6。 [0021] 步驟S36,判斷模組103判斷該測試任務的錯誤調試是否 為該測試人員的測試任務。若該測試任務的錯誤調試為 該測試人員的測試任務,則執行步驟S37。若該測試任務 的錯誤調試不是該測試人員的測試任務,則執行步驟S38 〇 [0022] 步驟S37,提示模組104提示該測試人員對該測試任務的 錯誤進行調試,並結束流程。 [0023] 步驟S38,所述分配模組102將該測試任務的錯誤調試作 為一個新的測試任務增加到測試任務中,並轉至步驟S32 ,該分配模組1 02重新根據測試人員的等級進行分配測試 任務。 [0024] 最後所應說明的是,以上實施例僅用以說明本發明的技 術方案而非限制,儘管參照以上較佳實施例對本發明進 行了詳細說明,本領域的普通技術人員應當理解,可以 對本發明的技術方案進行修改或等同替換,而不脫離本 發明技術方案的精神和範圍。 【圖式簡單說明】 [0025] 圖1是本發明測試人員管理系統較佳實施例的運行環境圖 100110545 表單編號A0101 第8頁/共15頁 1002017723-0 201239783 [0026] 圖2是圖1中測試人員管理系統1 0的功能模組圖。 [0027] 圖3是本發明測試人員管理方法較佳實施例的作業流程圖 〇 【主要元件符號說明】 [0028] 電腦:1 [0029] 測試人員管理系統:1 0 [0030] 資料庫:2 [0031] 歸類模組:1〇〇 [0032] 接收模組:101 [0033] 分配模組:102 [0034] 判斷模組:103 [0035] 提示模組:104 1002017723-0 100110545 表單編號A0101 第9頁/共15頁The categorization module (10) evaluates the testers based on the basic data of each test person stored in the database 2, and classifies each tester into the corresponding tester level. For example, the undergraduate degree of the university is classified as a tester of two years or more. The class of the tester is classified as B. The other is the tester level of each test task set by the test manager. And the standard completion time for each test task. In this embodiment, the test manager sets the tester level for performing the test task by the difficulty coefficient of the test task. Just (4) S32, the distribution module 1 () 2 divides the test task for each side according to the test personnel level corresponding to each test task received. [0018] In step S33, the tester performs the assigned test task. _ #STEPS34' The decision module 1〇3 determines whether there is a tester performing an interrupt during the standard completion time of the test task. If the tester performs an interrupt during the standard completion time of the test task, step S35 is performed. If the tester does not perform the interruption within the standard 70% of the time, the process proceeds to 1002017723-0 100110545 Form No. A0101 Page 7 of 15 201239783 [0020] Step S35, the determination module 103 determines whether the test task is completed. If the execution of the test task is completed, step S32 is repeatedly executed, and the tester is re-assigned the task by the distribution module 102. If the test task is not completed, step S36 is performed. [0021] Step S36, the determining module 103 determines whether the error debugging of the test task is a test task of the tester. If the error debugging of the test task is the test task of the tester, step S37 is performed. If the error debugging of the test task is not the test task of the tester, step S38 is performed. [0022] Step S37, the prompting module 104 prompts the tester to debug the error of the test task, and ends the process. [0023] Step S38, the distribution module 102 adds the error debugging of the test task to the test task as a new test task, and proceeds to step S32, and the distribution module 102 re-based the tester's level. Assign test tasks. [0024] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to be limiting, although the present invention will be described in detail with reference to the above preferred embodiments. Modifications or equivalents of the technical solutions of the present invention are made without departing from the spirit and scope of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS [0025] FIG. 1 is an operating environment diagram of a preferred embodiment of a tester management system of the present invention. 100110545 Form No. A0101 Page 8 of 15 Page 1002017723-0 201239783 [0026] FIG. 2 is FIG. The tester manages the functional module diagram of the system 10. 3 is a flow chart of a preferred embodiment of the tester management method of the present invention. [Main component symbol description] [0028] Computer: 1 [0029] Tester Management System: 1 0 [0030] Database: 2 [0031] Classification module: 1〇〇[0032] Receiving module: 101 [0033] Distribution module: 102 [0034] Judgment module: 103 [0035] Prompt module: 104 1002017723-0 100110545 Form number A0101 Page 9 of 15

Claims (1)

201239783 七 申請專利範圍: .一種測試人員管理系統,運杆 ;電腦中,該電腦連接 料庫,該資料庫中儲存了所 接於貝 啕利忒人貝的基本資料, 統包括: 邊糸 歸類模組’用於根據每個測試 Q 貝的基本資料,將每 試人員歸類到相應的測試人員等級中 母1U/IJ 接收核組’用於接收測試經理·^ ¥ k 。又置的每個測試任務 測試人員等級及每個測試任務對應的標準完成時門^的 分配模組,綠減每_試轉對應的職人員等級 對每個測試人員分配撕試任務,紙’ 田得蜮人員於測試任 標準完成時間内完成了該測試任務時,該分配模组 據該測試人員對應的測試人員等級,分配測試任務給該測 試人員。 .如申請專利範圍第1項所述之測試人g答 員管理糸統,該系統 還包括: 判斷模組,用於當測試人員於測試任務的標準完成時間内 執行中斷,且該測試任務沒有執行完成時,判斷該測試任 務的錯誤調試是否為該測試人員的浪丨試任務. 提示模組’用於當該測試任務的錯誤調試為該測試人㈣ 測試任務’則提示該測試人員對該剩試任務的錯誤進行調 試;及 所述分配模組’還用於當該測試任務的錯誤調試不是該測 試人員的測試任務時’將該測試任務的錯誤調試作為一個 新的測試任務增加到測試任務中’並根據該測試人員對應 的測試人員等級重新分配測試任務。 100110545 表單編號A0101 第10頁/共15頁 1002017723-0 201239783 .=申料利範圍第〗項所述之測試人員管理系統,所述測 试人=的基本資料包括:測試人員的學歷、資歷、外語水 平、擅長領域、技術等級。 .種κ人貝管理方法’應用於電腦,該方法包括如下步 驟: 根據母個測式人員的基本資料,將每個測試人員歸類到相 應的測試人員等級中; ^收測趣理設置的每侧試任務對應的測試人員等級及 Q 母個測試任務對應的標準完成哼間; 根據每個測試任務對應的_人員等級,對每^ 分配測試任務;及 …/ 胃職人貞於職任務的標準完婦翻完成了該測試任 務時重新根據該測試人員對應的測試人員等級,分配測 試任務給該測試人員。 5 .如申請專利範圍第4項所述之測試人員管理方法,該方 還包括步驟: 〇 田測試人員於測試任務:的標準气成時間内執行中斷,且該 測試任務沒有執行完成時,判七該測試任務的錯誤調試是 否為該測試人員的測試任務; 疋 、J試任務的錯誤調試為該測試人員的測試任務則提 不°亥測試人員對該測試任務的錯誤進行調試;及 當該測試任務的錯誤調試不是該測試人員的測試任務時, 、s丨試任務的錯誤調試作為一個新的測試任務增加到測 試任務中,並根據該測試人員對應的測試人員等級重 配測試任務。 100110545 如申請專鄕圍第4項所述之測試人M管理方法 表單編號A0101 所述測 第11頁/共15頁 1002017723-0 201239783 外語水 試人員的基本資料包括:測試人員的學歷、資歷 平、擅長領域、技術等級。 100110545 表單編號A0101 第12頁/共15頁 1002017723-0201239783 Seven patent application scope: A tester management system, a joystick; in the computer, the computer connection library, the database stores the basic data of the Bettyli people, including: The class module 'is used to classify each tester into the corresponding tester level in the parent 1U/IJ receive core group' for receiving the test manager·^ ¥ k according to the basic data of each test Q. The tester level of each test task and the standard completion module of each test task are completed. The green reduction is assigned to each tester. When the field personnel complete the test task within the standard completion time of the test, the distribution module assigns a test task to the tester according to the tester level corresponding to the tester. If the tester's management system is described in claim 1, the system further includes: a judgment module, configured to perform the interruption when the tester performs the standard completion time of the test task, and the test task does not have When the execution is completed, it is determined whether the error debugging of the test task is the test task of the tester. The prompt module 'used when the error of the test task is debugged as the tester (4) test task' prompts the tester to The error of the remaining test task is debugged; and the allocation module 'is also used when the error debugging of the test task is not the test task of the tester', and the error debugging of the test task is added to the test as a new test task. In the task, 'reassign the test task according to the tester level corresponding to the tester. 100110545 Form No. A0101 Page 10 / Total 15 Page 1002017723-0 201239783 .= The test personnel management system described in item 〗 〖, the basic information of the tester =: tester's qualifications, qualifications, Foreign language proficiency, areas of expertise, and technical level. The method for managing κ people is applied to a computer, and the method comprises the following steps: classifying each tester into a corresponding tester level according to the basic data of the parent tester; The tester level corresponding to each side test task and the standard corresponding to the Q mother test task are completed; the test task is assigned to each ^ according to the _person level corresponding to each test task; and.../ The stomach staff is employed in the task When the standard woman completes the test task, the test task is assigned to the tester according to the tester level corresponding to the tester. 5. The tester management method described in claim 4, the method further comprising the steps of: the Putian tester performs the interruption during the standard gas generation time of the test task: and the test task is not executed, the judgment is 7. The error debugging of the test task is the test task of the tester; 错误, J test task error debugging for the tester's test task is not to test the error of the test task; and when When the error debugging of the test task is not the test task of the tester, the error debugging of the test task is added to the test task as a new test task, and the test task is reconfigured according to the tester level corresponding to the tester. 100110545 If you apply for the tester M management method as described in item 4, Form No. A0101, page 11/15 pages 1002017723-0 201239783 The basic information of the foreign language water test personnel includes: the tester's qualifications and qualifications , good at areas, technical level. 100110545 Form No. A0101 Page 12 of 15 1002017723-0
TW100110545A 2011-03-25 2011-03-28 System and method for managing test people TW201239783A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100734641A CN102693460A (en) 2011-03-25 2011-03-25 Tester management system and method thereof

Publications (1)

Publication Number Publication Date
TW201239783A true TW201239783A (en) 2012-10-01

Family

ID=46858872

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100110545A TW201239783A (en) 2011-03-25 2011-03-28 System and method for managing test people

Country Status (2)

Country Link
CN (1) CN102693460A (en)
TW (1) TW201239783A (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104537009B (en) * 2014-12-17 2017-09-29 武汉传神信息技术有限公司 Interpreter recommends method and device
CN105095570A (en) * 2015-07-07 2015-11-25 天津二十冶建设有限公司 Intelligent protection method for boiler pipe weld based on BIM
CN106447157A (en) * 2016-08-26 2017-02-22 隆鑫通用动力股份有限公司 Product testing and supervision method and monitoring system thereof
CN106844196B (en) * 2016-12-22 2019-12-10 福建瑞之付微电子有限公司 Payment terminal embedded software testing workload statistical system
CN107169639A (en) * 2017-04-27 2017-09-15 北京云测信息技术有限公司 A kind of test assignment distribution method and device
CN107895217A (en) * 2017-08-04 2018-04-10 平安普惠企业管理有限公司 Test and management method and application server
CN107767061A (en) * 2017-10-27 2018-03-06 郑州云海信息技术有限公司 A kind of system of software test Amount of work
CN108428042A (en) * 2018-01-26 2018-08-21 平安科技(深圳)有限公司 The automatic division method of electronic device, credit card collection case and storage medium
CN111159043B (en) * 2019-12-31 2024-02-27 中国银行股份有限公司 Automatic identification method and system for testing risk

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101510280A (en) * 2009-02-25 2009-08-19 中国网络通信集团公司 Platform for optimizing and scheduling task
CN101847227A (en) * 2009-03-24 2010-09-29 鸿富锦精密工业(深圳)有限公司 Product test management system and method
CN101917306B (en) * 2010-08-20 2012-08-15 北京星网锐捷网络技术有限公司 Method, system and device for automatic test

Also Published As

Publication number Publication date
CN102693460A (en) 2012-09-26

Similar Documents

Publication Publication Date Title
TW201239783A (en) System and method for managing test people
CN107516192B (en) Agile item management method, device, system, electronic device and storage medium
US11755319B2 (en) Code development management system
US8296615B2 (en) System and method for generating data migration plan
US8423960B2 (en) Evaluation of software based on review history
US8997052B2 (en) Risk-based test plan construction
US8719799B2 (en) Measuring coupling between coverage tasks and use thereof
US20120233596A1 (en) Measuring coupling between coverage tasks and use thereof
US20170123873A1 (en) Computing hardware health check
CN102393834B (en) A kind of method of testing of digital man-machine interface of nuclear power station and system
Misra et al. Survey on agile metrics and their inter-relationship with other traditional development metrics
Woehr et al. Distributional ratings of performance: More evidence for a new rating format
Jiménez et al. Checklists for compliance to DO-178C and DO-278A standards
Alkhawaja et al. Exploring and developing an instrument for measuring system quality construct in the context of e-learning
CN108469950A (en) A kind of development approach of computer software development technique
Hartawan et al. Interpretative Analysis and Testing Statistics to test questions testing the Mobile Government questionnaire against the model of readiness and successful adoption
Raventós et al. IncidencePrevalence: an R package to calculate population‐level incidence rates and prevalence using the OMOP common data model
Christensen et al. Lightweight and continuous architectural software quality assurance using the asqa technique
Felderer et al. On the role of defect taxonomy types for testing requirements: Results of a controlled experiment
Bayona-Oré et al. Applying CMMI best practices to improve processes
CN117172237A (en) Data analysis method and device, electronic equipment and storage medium
CN111127223A (en) Insurance product testing method and device and storage medium
CN116523244A (en) Testing manpower risk early warning method based on outsourcing resources
CN113791980A (en) Test case conversion analysis method, device, equipment and storage medium
US20130104104A1 (en) System and method for refactoring a block of software