TW201000273A - Clamp changing device - Google Patents

Clamp changing device Download PDF

Info

Publication number
TW201000273A
TW201000273A TW97124128A TW97124128A TW201000273A TW 201000273 A TW201000273 A TW 201000273A TW 97124128 A TW97124128 A TW 97124128A TW 97124128 A TW97124128 A TW 97124128A TW 201000273 A TW201000273 A TW 201000273A
Authority
TW
Taiwan
Prior art keywords
hole
replacement
jig
gas passage
body portion
Prior art date
Application number
TW97124128A
Other languages
Chinese (zh)
Other versions
TWI339154B (en
Inventor
Zhi-Wei Wang
Ga-Lei Hu
Chun-Nan Ou
Jian-Long Xing
Original Assignee
Hon Hai Prec Ind Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hon Hai Prec Ind Co Ltd filed Critical Hon Hai Prec Ind Co Ltd
Priority to TW97124128A priority Critical patent/TWI339154B/en
Publication of TW201000273A publication Critical patent/TW201000273A/en
Application granted granted Critical
Publication of TWI339154B publication Critical patent/TWI339154B/en

Links

Landscapes

  • Manipulator (AREA)

Abstract

The present invention relates to a clamp changing device used to change a clamp for a manipulator. The manipulator includes a sixth axis. The clamp changing device includes a body portion connected with the sixth axis, a changing portion fixed to the body portion and a joining portion fixed to the clamp. The body portion includes a receiving space, a first gas channel, a second gas channel and a piston. The first gas channel and the second gas channel communicate with the receiving space respectively. The piston is received in the receiving space. The changing portion includes a projection defining a plurality of receiving holes on a side wall thereon, a plurality of ball bearings received in the corresponding receiving holes and a first hole through the projection. The first hole is corresponding to the piston. The joining portion includes a second hole cooperated with the projection. Along away from the body portion, the second hole' s wall is a incline graduating bigger to contact the ball bearings.

Description

201000273 九、發明說明: 【發明所屬之技術領域】 尤其涉及一種應用於 本發明涉及一種夾具更換裝置 機械臂的夾具更換裝置。 【先前技術】 在工業生產中,機械臂越來越多地用來取代工 環境惡劣、勞耗度大、高危險性、重複性大的作業 如鈑金折f或搬運等作業等。機械f在作業過程中y 根據作業内容的不同及針對的產品不同而更換夹且。 傳統地,給機械臂更換夾具通常係人工使用板手 ,刀等工具將夾具從機械臂上拆卸下來,再安裝所需要的 夾具。此種方式費時、費力,制約了工業領域的自動化生 產’尤其會給流水線生產造成生產停頓,降低了生 【發明内容】 有,於此’有必要提供—種能夠實現自動快速更換央 具以提高生產效率的夾具更換裝置。 、-種夾具更換裝置,其用以給機械臂更換夾具,該機 械臂包括-個第六軸。該夾具更換裝置包括—個與該第六 軸相連的本體部、-個固定於該本體部上的更換部、以及 個口疋於4夾具上的連接部。該本體部包括—個收容空 間:-,第:氣體通道、一個第二氣體通道以及一個活塞。 »亥第,氣體通道及该第二氣體通道均與該收容空間相連 〔口亥活塞收谷於δ亥收容空間内。言亥更換冑包括一個側壁 開》又有複數收谷it孔的突台、複數收容於該複數收容通孔 201000273 内的滚珠、以及一個貫通該突台的第一通孔。該第一通孔 與該活塞相對應。該連接部包括一個與該突台相配合的第 二通孔,沿遠離該本體部的方向,該第二通孔的孔壁為逐 漸增大的斜坡以與該複數滾珠緊密接觸。 #與先前技術相比,本發明提供的夾具更換裝置利用向 該第一氣體通道通入氣體推動該活塞壓迫該複數滾珠,從 而使該複數滾珠與該第二通孔的孔壁緊密接觸,以使該更 換部與該連接部吸合,並利用向該第二氣體通道通入氣體 推動該活塞解除該複數滚珠受到的壓ϋ,從而使該更換部 與該連接部分離,最終實現夾具的快速更換。 【實施方式】 下面將結合附圖,對本發明作進一步的詳細說明。 請一併參閱圖ί及圖2,本發明提供的夾具更換裝置 用於給機械臂200更換夾具3〇〇。該機械f 2〇〇包括一 個第五軸202以及一個第六軸2〇4,該第六軸2〇4 第五轴202。 咬丧於这 ^夾具更換農置1〇〇包括一個與該第六轴2〇4 本體部lio、一個更換部120、一個連接部13〇、三個 螺釘140、以及複數第二螺釘15〇。 一 請一併參閱圖1、圖2及圖3,該本體部11() 收容空間112、一個第一氣體通道114、一— 固 -、-個一三個與該第一螺釘14。=道 螺孔⑴、複數與該複數第二螺釘15〇相對應的第 115、以及兩個定位銷117。該第一氣體通道 二二、 ^及该第二 8 201000273 氣體通道116均與該收容空間112相連通。該活塞118收 容於該收容空間112内,該活塞118包括一個本體118a、 一個從該本體118a延伸的圓柱體118b、一個從該圓柱體 118b延伸的圓台118c以及一個套設於該本體部118a上的 止擋部118d。 該更換部120包括一個位於其側壁120a的電訊號母接 頭121、一個突台122、複數滾珠124、一個貫通該突台122 的第一通孔126、三個與該第一螺孔113相對應的第一沉孔 123、複數與該第二螺孔115相對應的第二沉孔125、兩個 與該定位銷117對應的第一定位通孔127以及一個第三氣 體通道129。該突台122的側壁122a開設有複數收容通孔 128。該複數滾珠124收容於該複數收容通孔128内。每個 滾珠124的直徑大於每個收容通孔128沿該突台122徑向 的深度,且該收容通孔128的孔徑小於該滾珠124的直徑。 該第一通孔126與該活塞118相對應。該更換部120藉由 該第一螺釘140依次穿過該第一沉孔123及該第一螺孔113 而固定於該本體部110上。該本體部110與該更換部120 藉由該第二螺釘150依次穿過該第二沉孔125及該第二螺 孔115並從該本體部110伸出而與該第六軸204相連。 該連接部130包括一個位於其側壁132的電訊號公接 頭134、一個第二通孔136、一個第四氣體通道138、兩個 第二定位通孔137、以及複數固定孔139。該電訊號公接頭 134與該電訊號母接頭121相配合。該第二通孔136與該突 台122相配合,沿遠離該第六轴204的方向,該第二通孔 9 201000273 136的孔壁135為逐漸增大的斜坡以與該複數滾珠124緊密 接觸。該第四氣體通道138與該第三氣體通道129相配合。 該第二定位通孔137與該定位銷117及該第一定位通孔127 相對應。該連接部130藉由螺釘(圖未示)穿過該固定孔139 固定於該夾具300上。 使用該夾具更換裝置100給該機械臂200更換夾具300 時,首先,該更換部120與連接部130處於分離狀態(圖3 示),且該連接部130藉由螺釘(圖未示)穿過該固定孔139 固定於該夾具300上。 接著該更換部120與該連接部130處於快速吸合的階 段,請一併參閱圖1、圖2及圖4,該第六軸204帶動該本 體部110及該更換部120朝接近該連接部130的方向運動, 且保證該定位銷117伸入該第二定位通孔137内,此時該 第四氣體通道138與該第三氣體通道129逐漸配合,該電 訊號公接頭134與該電訊號母接頭121逐漸配合,氣體開 始通入該第一氣體通道114内推動該活塞118的本體118a 朝接近該第二通孔136的方向運動,該本體118a帶動該圓 台118c處的大角度圓錐面沿該第二通孔136徑向壓迫該複 數滾珠124,由於係大角度圓錐面壓迫該複數滾珠124,產 生的力度相對較小,因此該更換部120與該連接部130只 是快速吸合。 然後該更換部120與連接部130處於加力吸合階段, 請一併參閱圖1、圖2及圖5,當該電訊號公接頭134與該 電訊號母接頭121完全配合後,該第六軸204停止運動, 201000273 大量氣體繼續通入該第一氣體通道114内推動該活塞118 的本體118a朝接近該第二通孔136的方向運動,此時,該 圓柱體118b與該圓台118(:相接處壓迫該複數滾珠124,由 於該活塞118與每個滾珠124接觸面積變小而加大了給予 該滚珠124的力,從而使該更換部12〇與連接部緊緊 吸合在-起。同時’該第四氣體通道138與該第三氣體通 道129完全配合’且該機械臂2〇〇帶動該夹具3〇〇進行操 作時、’該第四氣體通道138與該第三氣體通道129相連通 可以為夾具200提供動力或者係用作其他辅助功能。 最後該更換部120與連接部13〇處於吸合鎖緊階段, 請參閱圖6,氣體繼續通入該第一氣體通道114内推動該活 塞118的本體118a朝接近該第二通孔136❸方向運動=至 該本體118a受到該止擋部md的阻擒。此時,該圓㈣ U8b的圓柱面壓迫該複數滾珠124,該連接部㈣與該央 具300的重力藉由該複數滾珠124作用在該活塞ιΐ8上, 而且此時即使不通入氣體至該第一氣體通道ιΐ4,該 :厂及該夾具300仍然與該更換部12〇吸合在一起而不會脫 洛·。 料料:該機械臂咖更換夹具時,賴械臂細必 須先將該爽具放置在夾具承載台(圖未示)上,即 該連接部⑽與該更換部m分離開。首先該第二氣體通 通入氣體,該氣體推動該活塞118的本體ma朝 u離以弟一通孔I36的方向運動,此時該滾珠124 p 回該收容通孔128内直至不受到該活塞==著退 11 201000273 該第六軸204帶動該本體部11〇及該更換部12〇朝遠離該 連接部130的方向運動,且使該定位銷117脫離該第二定 位通孔137,該電訊號公接頭134脫離該電訊號母接頭 121,以及該第四氣體通道138脫離該第三氣體通道129。 可以理解,本實施方式中的定位銷117、第一定位通孔 127以及第二定位通孔137並不局限於本實施方式中為兩 個,可以係任意個S,只需要起到定位作用方便該更換部 120與該連接部13〇吸合即可。該第一螺釘14〇、該第一螺 孔113、以及該第一沉孔123並不局限於本實施方式中為三 個,可以係至少兩個,只需要滿足該更換部12〇藉由該第 -螺釘14G依次穿過該第—沉孔123及該第—螺孔ιΐ3而 固定於該本體部11〇上即可。 .本發明提供的夾具更換裳置1〇〇利用向該第一氣體通 道二114通入氣體推動該活塞118遷迫該複數滾珠,從而 使該複數滾珠124與該第二通孔136的孔壁135緊密接觸, 以使該更換部120與該連接部13〇吸合,並利用向該第二 ^體通道m通入氣體推動該活塞118解除該複數滾珠124 文到的屢追,從而使該更換部120與該連接部⑽分離, 最終實現夾具300的快速更換。 綜上所述,本發明確已符合發明專利之要件,遂依法 二出:利申請。惟’以上所述者僅為本發明之較佳實施方 式:自不能以此限制本案之申請專利範圍。舉凡熟悉本案 技藝之人士援依本發明之精神所作之等效修飾或變化,皆 應涵蓋於以下申請專利範圍内。 12 201000273 【圖式簡單說明】 圖1 一為本發明提供的夹具更換裝置與第六轴及央具相連的 立體示意圖。 圖2為圖1中夾具更換裝置的立體分解圖。 圖3為圖1中爽具更換裝置的更換部與連接部分離狀態的 示意圖。 f 4為圖1中夾具更換裝置的更換部與連接部快速吸合狀 態的示意圖。 圖5為圖1中夾具更換裝置的 態的示意圖。 圖6為圖1中夾具更換裝置的 態的示意圖。 更換部與連接部加力吸合狀 更換部與連接部吸合鎖緊狀 【主要元件符號說明】 本體部 110 收容空間 112 第二螺孔 115 定位銷 117 活塞 118 圓柱體 118b 止擋部 118d 側壁 120a、122a、132 第一沉孔 123 第二沉孔 125 夾具更換裝置 100 第一螺孔 113 第一氣體通道 114 第二氣體通道 116 本體 118a 圓台 118c 更換部 120 突台 122 滾珠 124 第一通孔 126 收容通孔128 第一定位通孔127 13 129201000273 連接部 130 第三氣體通道 孔壁 135 電訊號母接頭 第二通孔 136 電訊號公接頭 固定孔 139 第二定位通孔 第一螺釘 140 第四氣體通道 第二螺釘 150 機械臂 第五轴 202 第六軸 夾具 300 121 134 137 138 200 204 14201000273 IX. Description of the Invention: [Technical Field of the Invention] In particular, the present invention relates to a jig replacing device for a jig of a jig changing device. [Prior Art] In industrial production, mechanical arms are increasingly used to replace jobs with harsh industrial conditions, high labor consumption, high risk, and high repetitive operations such as sheet metal folding or handling. The machine f is changed during the operation y according to the content of the job and the product to be replaced. Conventionally, the replacement of the jig for the robot arm is usually performed by manually using a wrench, a tool such as a knife to remove the jig from the arm, and then installing the required jig. This method is time-consuming and laborious, and restricts the automatic production in the industrial field. In particular, it will cause production pauses in the production line and reduce the production. [Inventive content] Yes, it is necessary to provide an automatic quick change of the implement to improve Production efficiency fixture replacement device. A jig replacement device for replacing a jig with a mechanical arm including a sixth shaft. The jig changing device includes a body portion connected to the sixth shaft, a replacement portion fixed to the body portion, and a connecting portion connected to the 4 jig. The body portion includes a receiving space: -, a: gas passage, a second gas passage, and a piston. »Hai Di, the gas passage and the second gas passage are connected to the accommodating space. The 亥 胄 胄 胄 胄 胄 胄 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 》 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 The first through hole corresponds to the piston. The connecting portion includes a second through hole that cooperates with the protruding portion. The wall of the second through hole has a gradually increasing slope to be in close contact with the plurality of balls in a direction away from the body portion. Compared with the prior art, the fixture changing device provided by the present invention pushes the piston to press the plurality of balls by introducing gas into the first gas passage, so that the plurality of balls are in close contact with the hole wall of the second through hole, The replacement portion is brought into contact with the connecting portion, and the piston is released by pushing the gas into the second gas passage to release the compression of the plurality of balls, so that the replacement portion is separated from the connecting portion, and finally the clamp is fast. replace. [Embodiment] Hereinafter, the present invention will be further described in detail with reference to the accompanying drawings. Referring to Fig. 2 and Fig. 2, the jig changing device provided by the present invention is used to replace the jig 3 with the arm 200. The machine f 2 〇〇 includes a fifth shaft 202 and a sixth shaft 2〇4, the sixth shaft 2〇4 and the fifth shaft 202. The jig replacement device includes a body portion lio with the sixth shaft 2〇4, a replacement portion 120, a connecting portion 13A, three screws 140, and a plurality of second screws 15A. Referring to FIG. 1, FIG. 2 and FIG. 3 together, the body portion 11() receives a space 112, a first gas passage 114, a solid-, a one-three and the first screw 14. = a screw hole (1), a plurality 115 of the plurality of second screws 15A, and two positioning pins 117. The first gas passages 22, ^ and the second 8 201000273 gas passages 116 are all in communication with the receiving space 112. The piston 118 is received in the receiving space 112. The piston 118 includes a body 118a, a cylinder 118b extending from the body 118a, a circular table 118c extending from the cylinder 118b, and a sleeve 118a. The upper stop portion 118d. The replacement portion 120 includes a telecommunication female connector 121 on the side wall 120a, a projection 122, a plurality of balls 124, a first through hole 126 extending through the projection 122, and three corresponding to the first screw hole 113. The first counterbore 123, the second counterbore 125 corresponding to the second screw hole 115, the first positioning through hole 127 corresponding to the positioning pin 117, and a third gas passage 129. A plurality of receiving through holes 128 are defined in the side wall 122a of the boss 122. The plurality of balls 124 are received in the plurality of receiving through holes 128. The diameter of each of the balls 124 is greater than the depth of each of the receiving through holes 128 along the radial direction of the projections 122, and the diameter of the receiving through holes 128 is smaller than the diameter of the balls 124. The first through hole 126 corresponds to the piston 118. The replacing portion 120 is fixed to the main body portion 110 by the first screw 140 passing through the first counterbore 123 and the first screw hole 113 in sequence. The body portion 110 and the replacement portion 120 are sequentially connected to the second counterbore 125 and the second screw hole 115 through the second screw 150 and extend from the body portion 110 to be connected to the sixth shaft 204. The connecting portion 130 includes an electrical signal male connector 134 at its side wall 132, a second through hole 136, a fourth gas passage 138, two second positioning through holes 137, and a plurality of fixing holes 139. The electrical signal connector 134 is mated with the electrical female connector 121. The second through hole 136 cooperates with the protruding base 122. In the direction away from the sixth shaft 204, the hole wall 135 of the second through hole 9 201000273 136 is a gradually increasing slope to be in close contact with the plurality of balls 124. . The fourth gas passage 138 cooperates with the third gas passage 129. The second positioning through hole 137 corresponds to the positioning pin 117 and the first positioning through hole 127. The connecting portion 130 is fixed to the clamp 300 through a fixing hole 139 by a screw (not shown). When the jig replacement device 100 is used to replace the jig 300 with the jig 200, first, the replacement portion 120 and the connecting portion 130 are in a separated state (shown in FIG. 3), and the connecting portion 130 is passed through a screw (not shown). The fixing hole 139 is fixed to the jig 300. The replacement part 120 and the connecting part 130 are in a stage of rapid engagement. Referring to FIG. 1 , FIG. 2 and FIG. 4 , the sixth shaft 204 drives the main body 110 and the replacement part 120 toward the connecting part. The direction of movement of 130 is ensured, and the positioning pin 117 is inserted into the second positioning through hole 137. At this time, the fourth gas passage 138 is gradually matched with the third gas passage 129, and the electrical signal connector 134 and the electric signal are The female connector 121 gradually cooperates, and the gas starts to enter the first gas passage 114 to push the body 118a of the piston 118 to move toward the second through hole 136. The body 118a drives the large-angle conical surface at the circular table 118c. The plurality of balls 124 are radially pressed along the second through hole 136. Since the plurality of balls 124 press the plurality of balls 124 to generate a relatively small force, the replacement portion 120 and the connecting portion 130 are only quickly sucked. Then, the replacement portion 120 and the connecting portion 130 are in the energizing and attracting phase. Please refer to FIG. 1 , FIG. 2 and FIG. 5 together. When the electrical signal male connector 134 is fully engaged with the electrical female connector 121, the sixth The shaft 204 stops moving, 201000273 a large amount of gas continues to pass into the first gas passage 114 to push the body 118a of the piston 118 toward the second through hole 136. At this time, the cylinder 118b and the circular table 118 ( The pressing portion 124 presses the plurality of balls 124, and the contact area of the piston 118 with each of the balls 124 becomes smaller, thereby increasing the force given to the balls 124, so that the replacement portion 12〇 and the connecting portion are tightly attracted to each other - At the same time, 'the fourth gas passage 138 is fully engaged with the third gas passage 129' and the mechanical arm 2 〇〇 drives the clamp 3 〇〇 to operate, the fourth gas passage 138 and the third gas passage The 129 phase communication can provide power to the clamp 200 or be used as other auxiliary functions. Finally, the replacement portion 120 and the connecting portion 13 are in the suction locking phase. Referring to FIG. 6, the gas continues to pass into the first gas passage 114. Pushing the piston 118 118a moves toward the second through hole 136 = = until the body 118a is blocked by the stop portion md. At this time, the cylindrical surface of the circle (4) U8b presses the plurality of balls 124, the connecting portion (four) and the centering device The gravity of 300 acts on the piston ι 8 by the plurality of balls 124, and at this time, even if gas is not supplied to the first gas passage ι 4, the factory and the jig 300 are still sucked together with the replacement portion 12 It will not be detached. Material: When the robot arm is replaced, the arm must first be placed on the fixture carrier (not shown), that is, the connection (10) is separated from the replacement part m. First, the second gas is passed through a gas, and the gas pushes the body ma of the piston 118 to move away from the through hole I36. At this time, the ball 124 p is returned to the receiving through hole 128 until the piston is not received. == 退 11 201000 273 The sixth shaft 204 drives the main body portion 11 〇 and the replacement portion 12 运动 to move away from the connecting portion 130 , and the positioning pin 117 is disengaged from the second positioning through hole 137 , the telecommunications The male connector 134 is disengaged from the electrical female connector 121 to The fourth gas passage 138 is separated from the third gas passage 129. It can be understood that the positioning pin 117, the first positioning through hole 127 and the second positioning through hole 137 in the embodiment are not limited to two in the embodiment. Any one of the Ss can be used, and only needs to be positioned to facilitate the replacement of the replacement portion 120 and the connecting portion 13. The first screw 14〇, the first screw hole 113, and the first counterbore 123 It is not limited to three in the present embodiment, and may be at least two, and only the replacement portion 12 is required to pass through the first counterbore 123 and the first screw hole ι 3 through the first screw 14G. It can be fixed to the main body portion 11〇. The clamp replacement device provided by the present invention uses the gas introduced into the first gas passage 2 114 to push the piston 118 to move the plurality of balls, so that the plurality of balls 124 and the second through hole 136 are bored. The 135 is in close contact with the connecting portion 13 and the connecting portion 13 is sucked, and the piston is released by pushing the gas into the second body passage m to release the repeated tracking of the plurality of balls 124. The replacement portion 120 is separated from the connection portion (10), and finally the quick replacement of the jig 300 is achieved. In summary, the present invention has indeed met the requirements of the invention patent, and the second application of the invention is as follows: However, the above description is only a preferred embodiment of the present invention: it is not possible to limit the scope of the patent application in this case. Equivalent modifications or variations made by persons skilled in the art in light of the present invention are intended to be included within the scope of the following claims. 12 201000273 [Simple description of the drawings] Fig. 1 is a perspective view showing the fixture changing device provided by the present invention connected to the sixth shaft and the center device. Figure 2 is an exploded perspective view of the jig changing device of Figure 1. Fig. 3 is a view showing a state in which the replacement portion and the connecting portion of the refreshing device of Fig. 1 are separated. F 4 is a schematic view showing the state in which the replacement portion and the connecting portion of the jig replacing device in Fig. 1 are quickly sucked. Fig. 5 is a schematic view showing the state of the jig replacing device of Fig. 1. Figure 6 is a schematic view showing the state of the jig replacing device of Figure 1. Replacement part and connection part force-increasing contact replacement part and connection part suction lock type [Description of main component symbols] Main body part 110 accommodating space 112 Second screw hole 115 Locating pin 117 Piston 118 Cylinder 118b Stop part 118d Side wall 120a, 122a, 132 first counterbore 123 second counterbore 125 fixture changing device 100 first screw hole 113 first gas passage 114 second gas passage 116 body 118a round table 118c replacement portion 120 boss 122 ball 124 first pass Hole 126 receiving through hole 128 first positioning through hole 127 13 129201000273 connecting portion 130 third gas passage hole wall 135 telecommunication female connector second through hole 136 telecommunication pin fixing hole 139 second positioning through hole first screw 140 Four gas passage second screw 150 robot arm fifth shaft 202 sixth shaft clamp 300 121 134 137 138 200 204 14

Claims (1)

201000273 十、申請專利範圍: 1. -種夾具更換裝置,其用於給機械臂更換夾具,該機械 臂包括-個第六轴,其改進在於,該爽具更換裝置包括: 一個與該第六軸相連的本體部,該本體 空間、-個第-氣體通道、-個第二氣體通道以及一^ 活塞,該第一氣體通道及該第二氣體通道均與該收容空 間相連通,該活塞收容於該收容空間内; 一個固定於該本體部上的更換部,該更換部包括一個侧 壁開設有複數收容通孔的突台、複數收容於該複數收容 通孔内的滾珠、以及一個貫通該突台的第一通孔,該第 一通孔與該活塞相對應;及 &個口疋於該夾具上的連接部,該連接部包括一個與該 突台相配合的第二通孔,沿遠離該本體部的方向,該第 二通孔的孔壁為逐漸增大的斜坡以與該複數滾珠緊密接 觸。 2.如申請專利範圍第工項所述之夾具更換裝置,其中,該 夾,更換裝置包括複數第—螺釘,該本體部上開設有複 數第一螺孔,該更換部上開設有複數與該複數第一螺孔 相對應的第-沉孔,該更換部藉由該第—騎依次穿過 該第一沉孔及該第一螺孔而固定於該本體部上。 3·如申請專利範圍第2項所述之夾具更換裝置,其中,該 夾具更換裝置包括複數第二螺釘,該本體部上開設有複 數第二螺孔,該更換部上開設有複數與該複數第二螺孔 相對應的第二沉孔,該本體部與該更換部藉由該第二螺 15 201000273 釘依次穿過該第^沉孔及該第二螺孔並從該本體部伸出 而與該第六軸相連。 4. 如申請專利範圍第1項所述之夾具更換裝置,其中,該 本體部還包括至少一個定位銷,該更換部上開設有至= —個與該至少一個定位銷相對應的第一定位通孔,該連 接部上開設有至少一個與該至少一個定位銷及該至少— 個第一定位通孔相對應的第二定位通孔,該定位銷依次 穿過該第一定位通孔及第二定位通孔。 5. 如申請專利範圍第1項所述之夾具更換裝置,其中,該 衷珠的直住大於該收谷通孔沿該突台徑向的深度,且該 收各通孔的孔徑小於該滾珠的直徑。 6. 如申請專利範圍第i項所述之夾具更換裝置,其中,該 更換部還包括一個第三氣體通道,該連接部包括一個第 7四氣體通道,該第三氣體通道與該第四氣體通道配合。 7. 如申請專利範圍第i項所述之夾具更換裝置,其中,該 更換部還包括一個位於該更換部側壁的電訊號母接頭, 忒連接部還包括一個位於該連接部侧壁的電訊號公接 頭’該電訊號母接頭與該電訊號公接頭相配合。 8. 如申請專利範圍第1項所述之夾具更換裝置,其中,該 舌基包括一個圓柱體,以及一個從該圓柱體延伸的圓台。 16201000273 X. Patent application scope: 1. A jig replacement device for replacing a jig for a robot arm, the robot arm comprising a sixth shaft, the improvement being that the device for replacing the device comprises: a sixth a body portion connected to the shaft, the body space, a first gas passage, a second gas passage, and a piston, wherein the first gas passage and the second gas passage are connected to the receiving space, and the piston receives a replacement portion fixed to the main body portion, the replacement portion includes a protrusion having a plurality of receiving through holes in the side wall, a plurality of balls received in the plurality of receiving through holes, and a through hole a first through hole of the boss, the first through hole corresponding to the piston; and a mouth portion connected to the clamp, the connecting portion includes a second through hole that cooperates with the protrusion The wall of the second through hole has a gradually increasing slope to be in close contact with the plurality of balls in a direction away from the body portion. 2. The jig changing device according to the application of the patent application, wherein the clamping device comprises a plurality of first screws, the main body portion is provided with a plurality of first screw holes, and the replacing portion is provided with a plurality of The first counterbore corresponding to the first screw hole is fixed to the body portion by the first riding through the first counterbore and the first screw hole. 3. The jig changing device of claim 2, wherein the jig changing device comprises a plurality of second screws, the body portion is provided with a plurality of second screw holes, and the replacing portion is provided with a plurality and the plural a second counterbore corresponding to the second screw hole, the body portion and the replacement portion sequentially pass through the second counterbore and the second screw hole and protrude from the body portion by the second screw 15 201000273 Connected to the sixth axis. 4. The jig changing device of claim 1, wherein the body portion further comprises at least one positioning pin, the replacement portion being provided with a first positioning corresponding to the at least one positioning pin a through hole, the connecting portion is provided with at least one second positioning through hole corresponding to the at least one positioning pin and the at least one first positioning through hole, the positioning pin sequentially passes through the first positioning through hole and the first Two positioning through holes. 5. The jig replacement device of claim 1, wherein the straight-aid of the bead is greater than a depth of the through-hole in the radial direction of the land, and the hole of the through-hole is smaller than the ball diameter of. 6. The jig changing device of claim i, wherein the replacement portion further comprises a third gas passage, the connecting portion comprising a seventh gas passage, the third gas passage and the fourth gas Channel fit. 7. The jig replacement device of claim i, wherein the replacement portion further comprises a telecommunication female connector on a side wall of the replacement portion, the 忒 connecting portion further comprising a telecommunication signal on a side wall of the connecting portion The male connector 'the electrical female connector is matched with the electrical male connector. 8. The jig changing device of claim 1, wherein the tongue base comprises a cylinder and a truncated cone extending from the cylinder. 16
TW97124128A 2008-06-27 2008-06-27 Clamp changing device TWI339154B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW97124128A TWI339154B (en) 2008-06-27 2008-06-27 Clamp changing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW97124128A TWI339154B (en) 2008-06-27 2008-06-27 Clamp changing device

Publications (2)

Publication Number Publication Date
TW201000273A true TW201000273A (en) 2010-01-01
TWI339154B TWI339154B (en) 2011-03-21

Family

ID=44824455

Family Applications (1)

Application Number Title Priority Date Filing Date
TW97124128A TWI339154B (en) 2008-06-27 2008-06-27 Clamp changing device

Country Status (1)

Country Link
TW (1) TWI339154B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109531611A (en) * 2017-09-22 2019-03-29 西南石油大学 A kind of control joint apparatus for automatic change
TWI733430B (en) * 2019-05-08 2021-07-11 日商克斯美庫股份有限公司 Component replacement device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109531611A (en) * 2017-09-22 2019-03-29 西南石油大学 A kind of control joint apparatus for automatic change
TWI733430B (en) * 2019-05-08 2021-07-11 日商克斯美庫股份有限公司 Component replacement device

Also Published As

Publication number Publication date
TWI339154B (en) 2011-03-21

Similar Documents

Publication Publication Date Title
KR101370247B1 (en) robot arm coupling device
US20090314113A1 (en) Clamp changing apparatus
JP4936329B2 (en) Robot arm coupling device
US7442155B2 (en) Automatic clamp changing apparatus
JP2016009701A (en) Component crimping device
TW201000273A (en) Clamp changing device
JP5869457B2 (en) Work pallet and fixture used therefor
JP2012121107A (en) Chuck device
WO2019181430A1 (en) Clamping system, clamping method, and clamping device
CN202240594U (en) Quick clamping component
US8079121B2 (en) Pressing device for latching and releasing chucking device
US7698973B2 (en) Machine with spindle and fixture coaxially aligned with the spindle
JP5058022B2 (en) Floating chuck device and floating chuck unit
CN212824877U (en) Pneumatic tool clamp
WO2022141964A1 (en) Industrial manufacturing robot having easily-replaceable chuck body, and replacement method therefor
JP2006123103A (en) Fastening device
TWM618111U (en) Origin positioning device
CN110911313B (en) Tray overturning platform
TWI796086B (en) Floating type clamping and positioning device capable of supporting and releasing objects
WO2022244071A1 (en) Component push-up device and component mounting device
TW202243791A (en) Positioning device
CN218170459U (en) Jig structure convenient to disassemble and assemble
TWI771195B (en) Diaphragm type quick change clamp
KR20120125418A (en) An Apparatus for attaching and detaching a substrate using a ring shape adhesive
TWM621259U (en) Pickup and placement jig

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees