A method of pre-casting component used in building engineering is provided, which comprises steps of: providing spiral stirrup and steel beam, the steel beam is assembled to the inside the spiral stirrup with combination device to form structure frame, and the structure frame made of combination of the steel beam and the spiral stirrup is molded and grouted to manufacture pre-casting component. The method of pre-casting component has advantages of simple in manufacture.
TW94106205A2005-03-022005-03-02Pre-casting method for steel reinforced concrete structure
TWI268977B