TNSN04029A1 - Procede pour la gestion de production en flux tire assiste par ordinateur - Google Patents

Procede pour la gestion de production en flux tire assiste par ordinateur

Info

Publication number
TNSN04029A1
TNSN04029A1 TNP2004000029A TNSN04029A TNSN04029A1 TN SN04029 A1 TNSN04029 A1 TN SN04029A1 TN P2004000029 A TNP2004000029 A TN P2004000029A TN SN04029 A TNSN04029 A TN SN04029A TN SN04029 A1 TNSN04029 A1 TN SN04029A1
Authority
TN
Tunisia
Prior art keywords
needs
determining
components
determined
digital table
Prior art date
Application number
TNP2004000029A
Other languages
English (en)
Inventor
Jean-Pierre Levionnois
Original Assignee
Calvasoft B V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=8866780&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=TNSN04029(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Calvasoft B V filed Critical Calvasoft B V
Publication of TNSN04029A1 publication Critical patent/TNSN04029A1/fr

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

LA PRESENTE INVENTION CONCERNE UN PROCEDE POUR LA GESTION DE PRODUCTION EN FLUX TIRE ASSISTE PAR ORDINATEUR; COMPORTANT: UNE ETAPE DE CONSTRUCTION D'UNE NOMENCLATURE SOUS FORME DE TABLE NUMERIQUE COMPRENANT LES INFORMATIONS RELATIVES AUX LIENS ENTRE UN PRODUIT FINI DETERMINE; ET LES COMPOSANTS COMPOSANT LEDIT PRODUIT FINI; ET UNE ETAPE DE CONSTRUCTION D'UNE TABLE NUMERIQUE CONCERNANT LES PARAMETRES DE CHACUN DESDITS COMPOSANTS; UNE ETAPE DE DETERMINATION DU NOMBRE DE BESOINS DE PRODUITS CONSISTANT A CONSTRUIRE UNE TABLE NUMERIQUE DES BESOINS CALENDAIRES SUR UNE PERIODE DETERMINEE [12 MOIS PAR EXEMPLE]; CARACTERISE EN CE QUE: L'ETAPE DE CONSTRUCTION DE LA TABLE DES COMPOSANTS COMPRENANT UN DESCRIPTEUR SPECIFIANT LE MODE DE GESTION [KANBAN; SEUIL DE COMMANDE; SYNCHRONE; MRPII] ASSOCIE AUDIT COMPOSANT; ET EN CE QUE L'ETAPE DE DETERMINATION DU NOMBRE DE BESOINS DE PRODUITS CONCERNE LES BESOINS EN PRODUITS BRUTS; ET; POUR LES COMPOSANTS DONT LE DESCRIPTEUR PRESENTANT UNE ETAPE DE TYPE "KANBAN" OU "SEUIL"; DE CALCUL D'UN PARAMETRE DE CONSOMMATION MOYENNE JOURNALIERE CMJ PAR DETERMINATION DU RAPPORT DES BESOINS BRUTS SUR LE NOMBRE DE JOURS DE LADITE PERIODE DETERMINEE.
TNP2004000029A 2001-08-28 2004-02-16 Procede pour la gestion de production en flux tire assiste par ordinateur TNSN04029A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0111181A FR2829257B1 (fr) 2001-08-28 2001-08-28 Procede pour la gestion de production en flux tires assistee par ordinateur
PCT/FR2002/002953 WO2003019435A1 (fr) 2001-08-28 2002-08-28 Procede pour la gestion de production en flux tire assiste par ordinateur

Publications (1)

Publication Number Publication Date
TNSN04029A1 true TNSN04029A1 (fr) 2006-06-01

Family

ID=8866780

Family Applications (1)

Application Number Title Priority Date Filing Date
TNP2004000029A TNSN04029A1 (fr) 2001-08-28 2004-02-16 Procede pour la gestion de production en flux tire assiste par ordinateur

Country Status (10)

Country Link
US (1) US6970756B2 (fr)
EP (1) EP1430434A1 (fr)
JP (1) JP2005501344A (fr)
KR (1) KR20040037073A (fr)
CA (1) CA2458988A1 (fr)
FR (1) FR2829257B1 (fr)
MA (1) MA26209A1 (fr)
PL (1) PL373965A1 (fr)
TN (1) TNSN04029A1 (fr)
WO (1) WO2003019435A1 (fr)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005316826A (ja) * 2004-04-30 2005-11-10 Fujitsu Ltd トレーサビリティ管理データ作成方法、トレーサビリティ管理データ作成装置、およびトレーサビリティ管理データ作成プログラム
US7324860B2 (en) * 2005-03-14 2008-01-29 Hitachi Global Storage Technologies Netherlands B.V. Method, apparatus and program storage device for providing a cascading timeline of manufacturing events leading to completion of a manufactured product
US7434730B2 (en) * 2006-02-07 2008-10-14 The Boeing Company part availability business process
EP2469366B1 (fr) 2010-12-27 2013-08-14 Siemens Aktiengesellschaft Contrôle de production d'article JIT via des cartes Kanban
US10417595B2 (en) 2017-05-05 2019-09-17 DeHart Consulting, LLC Time-based, demand-pull production

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4827423A (en) * 1987-01-20 1989-05-02 R. J. Reynolds Tobacco Company Computer integrated manufacturing system
US5150288A (en) * 1989-12-18 1992-09-22 Honda Giken Kogyo Kabushiki Kaisha Production management system and method of transmitting data
US5193065A (en) * 1990-12-03 1993-03-09 Caterpillar Inc. System for requistioning and distributing material in a manufacturing environment
US5751580A (en) * 1996-07-26 1998-05-12 Chartered Semiconductor Manufacturing, Ltd. Fuzzy logic method and system for adjustment of priority rating of work in process in a production line
US5963919A (en) * 1996-12-23 1999-10-05 Northern Telecom Limited Inventory management strategy evaluation system and method
US6090262A (en) * 1998-09-30 2000-07-18 Kabushiki Kaisya Aoyama Seisakusyo Barrel plating method

Also Published As

Publication number Publication date
CA2458988A1 (fr) 2003-03-06
KR20040037073A (ko) 2004-05-04
FR2829257B1 (fr) 2006-09-22
JP2005501344A (ja) 2005-01-13
EP1430434A1 (fr) 2004-06-23
WO2003019435A1 (fr) 2003-03-06
MA26209A1 (fr) 2004-07-01
PL373965A1 (en) 2005-09-19
US20040186606A1 (en) 2004-09-23
US6970756B2 (en) 2005-11-29
FR2829257A1 (fr) 2003-03-07

Similar Documents

Publication Publication Date Title
Copus From core-periphery to polycentric development: concepts of spatial and aspatial peripherality
Crone Elements of an economic justification for municipal zoning
TNSN04029A1 (fr) Procede pour la gestion de production en flux tire assiste par ordinateur
Crenshaw et al. The distribution of income across national-populations: Testing multiple paradigms
Brink et al. Lowering urban speed limits to 30 km/h reduces noise annoyance and shifts exposure–response relationships: Evidence from a field study in Zurich
DE50101304D1 (de) Extrakte aus sophora-arten, verfahren zu ihrer herstellung und verwendung
Jackson et al. Creating shared value in an industrial conurbation: Evidence from the North Staffordshire ceramics cluster
Naik Estimating the Half-life of Advertisements
Reyhani et al. Environmental assessment of design choices of green walls based for materials combination and plants
Radoševic-Vidacek et al. Shiftworking families: parents' working schedule and sleep patterns of adolescents attending school in two shifts
Williams Rethinking the role of the retail sector in economic development
Kim Spatial Policies towards the Seoul Capital Region
Hirst et al. The consumer society
ATE367740T1 (de) Verfahren zur vorbeugung von schilddrüsenüberfunktion bei der katze sowie zusammensetzungen mit eingeschränktem selen- und jodgehalt
Rademacher History of Design Protection in Germany
Childs et al. Balancing people, policies, and resources in rural Tibet
Picado et al. The Ohio Statewide Short Distance Travel Model
Muyibi Planning water supply and sanitation projects in developing countries
Sumper et al. Sustainable Urban Transport: Improving Mobility Conditions for Vulnerable Road Users in Sub-Saharan Africa
Spengler Megaopolis: Resource Conserver or Resource Waster
US20040117232A1 (en) Timeliness rating
Alexander The copyright/design interface in Australia
Wells The Mortality Transition in Schenectady, New York, 1880–1930
Oakerson et al. The Neighborhood as Commons: Reframing the Problem of Neighborhood Decline
Bravo et al. Dental Manpower: specific situation in Spain