TH97873A - Forecast of subsurface subsidence from tunneling with the clay-balanced borehole by the neural network. - Google Patents

Forecast of subsurface subsidence from tunneling with the clay-balanced borehole by the neural network.

Info

Publication number
TH97873A
TH97873A TH801002990A TH0801002990A TH97873A TH 97873 A TH97873 A TH 97873A TH 801002990 A TH801002990 A TH 801002990A TH 0801002990 A TH0801002990 A TH 0801002990A TH 97873 A TH97873 A TH 97873A
Authority
TH
Thailand
Prior art keywords
tunnel
neural network
soil
boring
layer
Prior art date
Application number
TH801002990A
Other languages
Thai (th)
Other versions
TH97873B (en
TH103959A (en
Inventor
สุวรรณสวัสดิ์ นายสุชัชวีร์
Original Assignee
นางสาวณิชยา สืบสุข
นางสาวพิมสหรา ยาคล้าย
สถาบันเทคโนโลยีพระจอมเกล้าคุณทหารลาดกระบัง
Filing date
Publication date
Publication of TH97873A publication Critical patent/TH97873A/en
Application filed by นางสาวณิชยา สืบสุข, นางสาวพิมสหรา ยาคล้าย, สถาบันเทคโนโลยีพระจอมเกล้าคุณทหารลาดกระบัง filed Critical นางสาวณิชยา สืบสุข
Publication of TH103959A publication Critical patent/TH103959A/en
Publication of TH97873B publication Critical patent/TH97873B/en

Links

Abstract

------15/11/2562------(OCR) หน้า 1 ของจำนวน 1 หน้า บทสรุปการประดิษฐ์ วิธีการพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดินสมดุลในดินเหนียวโดยโครงข่ายประสาทเทียมตามการประดิษฐ์นี้ ได้ทำการพัฒนาขึ้นเพื่อให้มีความเหมาะสมกับการก่อสร้างอุโมงค์ในสภาพที่เป็นดินเหนียว โดยสามารถที่จะสร้างความสัมพันธ์ของปัจจัยที่มีผลต่อการทรุดตัวที่มีความซับซ้อนสู่การพยากรณ์ค่าการทรุดตัวของผิวดินได้ ------------ ------10/01/2561------(OCR) หน้า 1 ของจำนวน 1 หน้า บทสรุปการประดิษฐ์ วิธีการพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดินสมดุล ในดินเหนียวโดยโครงข่ายประสาทเทียมตามการประดิษฐ์นี้ได้ทำการพัฒนาขึ้นเพื่อให้มีความเหมาะสมกับ การก่อสร้างอุโมงค์ในสภาพที่เป็นดินเหนียว โดยสามารถที่จะสร้างความสัมพันธ์ของป็จจัยที่มีผลต่อการทรุดตัว ที่มีความซับซ้อนสู่การพยากรณ์ค่าการทรุดตัวของผิวดินได้ ------------ การพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดิน สมดุลในดินเหนียวโดยโครงข่ายประสาทเทียมตามการประดิษฐ์นี้ ได้ทำการพัฒนาขึ้นเพื่อให้มี ความเหมาะสมกับการก่อสร้างอุโมงค์ในสภาพที่เป็นดินเหนียว โดยสามารถที่จะสร้าง ความสัมพันธ์ของปัจจัยที่มีผลต่อการทรุดตัวที่มีความซับซ้อนสู่การพยากรณ์ค่าการทรุดตัวของผิว ดินได้------15/11/2019------(OCR) Page 1 of 1 Summary of Invention The method for predicting surface settlement during tunnel boring with a compressed soil boring machine (CSO) in clay soil using an artificial neural network, as described in this invention, has been developed to be suitable for tunnel construction in clay soil conditions. It can establish relationships between complex settlement factors to predict surface settlement values. ------------ ------10/01/2018------(OCR) Page 1 of 1 Summary of Invention The method for predicting surface settlement during tunnel boring with a compressed soil boring machine (CSO) in clay soil using an artificial neural network, as described in this invention, has been developed to be suitable for tunnel construction in clay soil conditions. It can establish relationships between complex settlement factors to predict surface settlement values. ------------ Prediction of surface settlement during tunnel boring with a compressed soil boring machine (CSO) The neural network-based equilibrium in clay soil, as described in this invention, has been developed to be suitable for tunnel construction in clay soil conditions. It can establish relationships between complex settlement factors to predict surface settlement values.

Claims (2)

------15/11/2562------(OCR) หน้า 1 ของจำนวน 2 หน้า ข้อถือสิทธิ 1. วิธีการพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดินสมดุลในดินเหนียว โดยโครงข่ายประสาทเทียม จะประกอบไปด้วย 11 หน่วยย่อยในชั้นรับข้อมูล ซึ่งประกอบด้วย (1) ระยะจากจุดเริ่มต้นการขุดเจาะอุโมงค์ (m) (2) ค่า Stability Number 10 (N) ที่ส่วนยอดของอุโมงค์ (3) ค่า Stability Number (N) ที่ส่วนกลางของอุโมงค์ (4) ค่า Stability Number (N) ที่ส่วนล่างของอุโมงค์ (5) ความสูงของน้ำใต้ดินจากส่วนล่างสุดของอุโมงค์ (m) (6) ความดันหน้าหัวเจาะ (kPa) (7) ความเร็วขณะขุดเจาะ (mm/min) (8) มุมก้มหรือมุมเงยของหัวเจาะ (degree) (9) ความดันของการฉีดน้ำปูนเพื่ออุดข่องว่างหลังผนังอุโมงค์ (bar) (10) เปอร์เซ็นต์การเติมน้ำปูน (%) (11) ชนิดของหัวเจาะ โดยจำนวนและหน่วยย่อยของชั้นแฝง รวมถึงรอบการคำนวณ สามารถหาได้จากวิธีการลองผิดลองถูกโดยทำการแบ่งข้อมูลที่เลือกมาเป็น 2 กลุ่มคือ 1) ข้อมูลที่ใช้เรียนรู้ (Training set) ซึ่งมีจำนวนข้อมูล ร้อยละ 25ของข้อมูลทั้งหมด และ 2) ข้อมูลที่ใช้ทดสอบ (Testing set) หรือข้อมูลทั้งหมด โดยทดสอบหาโครงข่ายประสาทเทียมที่เหมาะสม (Optimum ANN) จากค่าผิดพลาดกำลังสองเฉลี่ย (RMSE) ที่น้อยที่สุดจากกระบวนการเรียนรู้ (Training) และกระบวนการทดสอบ (Testing) ซึ่งการคำนวณค่าในชั้นแฝง (Hidden layer) ในแต่ละหน่วยย่อย (Hidden node) จำนวนปัจจัยในชั้นรับข้อมูลจะถูกส่งถ่ายเพื่อใช้คำนวณในชั้นแฝงแบบถึงกันหมดโดยใช้ฟังก์ชัน Sigmoid และนำผลลัพท์ที่ได้ในแต่ละหน่วยย่อยมาคำนวณแบบถึงกับหมดอีกครั้งด้วยฟังก์ชันSigmoid ในชั้นส่งออกข้อมูล (Output layer) ซึ่งการคำนวณดังกล่าวนับเป็น 1 รอบ หลักจากนั้นโครงข่ายประสาทเทียมจะส่งผลย้อนกลับไปหน่วยย่อยแต่ละหน่วยย่อยของชั้นแฝงเพื่อทำการคำนวณซ้ำจนครบ3,000 รอบ โดยมีค่าเบี่ยงเบน (Bias) ในแต่ละรอบแตกต่างกัน โดยค่าผลลัพธ์ที่ได้จากการคำนวณจะถูกนำมาเปรียบเทียบกับค่าที่ให้โครงข่ายเรียนรู้ ซึ่งแสดงออกมาในรูปแบบค่าผิดพลาดกำลังสองเฉลี่ย (RMSE) หน้า 2 ของจำนวน 2 หน้าดังนั้นรูปแบบสถาปัตยกรรมของโครงข่ายประสาทเทียมที่เหมาะสมจะประกอบไปด้วยชั้นรับข้อมูลจำนวน11 หน่วยย่อย ขั้นแฝง 1 ชั้นแฝงจำนวน 15 หน่วยย่อย และรอบการคำนวณ 3,000 รอบ 2. วิธีการพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดินสมดุลในดินเหนียวโดยโครงข่ายประสาทเทียม ตามข้อถือสิทธิ 1 ที่ซึ่งใช้ 11 ปัจจัยในการคำนวณ ------------ ------10/01/2561------(OCR) หน้า 1 ของจำนวน 2 หน้า ข้อถือสิทธิ 1. วิธีการพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดินสมดุล ในดินเหนียว โดยโครงข่ายประสาทเทียม จะประกอบไปด้วย 11 หน่วยย่อยในขั้นรับข้อมูล ซึ่งประกอบด้วย (1) ระยะจากจุดเริ่มด้นการขุดเจาะอุโมงค์ (ทา) (2) ค่า Stability Number 10 (N) ที่ส่วนยอดของอุโมงค์ (3) ค่า Stability Number (N) ที่ส่วนกลางของอุโมงค์ (4) ค่า Stability Number (N) ที่ส่วนล่างของอุโมงค์ (5) ความสูงของน้ำใต้ดินจากส่วนล่างสุดของอุโมงค์ (ทา) (6) ความดันหน้าหัวเจาะ (kPa) (7) ความเร็วขณะขุดเจาะ (ทาทก/ทโปก) (8) มุมก้มหรือมุมเงยของหัวเจาะ (degree) (9) ความดันของการฉีดน้ำปูนเพื่ออุดฃ่องว่างหลังผนังอุโมงค์ (bar) (10) เปอร์เซ็นต์การเติมน้ำปูน (%) (11) ชนิดของหัวเจาะ โดยจำนวนและหน่วยย่อยของขั้นแฝง รวมถึงรอบการคำนวณ สามารถหาได้จากวิธีการลองผิดลองถูก โดยทำการแบ่งข้อมูลที่เลือกมาเป็น 2 กลุ่มคือ 1) ข้อมูลที่ใช้เรียนรู้ (Training set) ซี่งมีจำนวนข้อมูล ร้อยละ 25 ของข้อมูลทั้งหมด และ 2) ข้อมูลที่ใช้'ทดสอบ (Testing set) หรือข้อมูลทั้งหมด โดยทดสอบหาโครงข่าย ประสาทเทียมที่เหมาะสม (Optimum ANN) จากค่าผิดพลาดกำลังสองเฉลี่ย (RMSE) ที่น้อยที่สุดจากกระบวนการ เรียนรู้ (Training) และกระบวนการทดสอบ (Testing) ซึ่งการคำนวณค่าในขั้นแฝง (Hidden layer) ในแต่ละ หน่วยย่อย (Hidden node) จำนวนนีจจัยในขั้นรับข้อมูลจะถูกส่งถ่ายเพื่อใช้คำนวณในขั้นแฝงแบบถึงกันหมด โดยใช้ฟังก์ชัน Sigmoid และนำผลลัพทํที่ไดิในแต่ละหน่วยย่อยมาคำนวณแบบถึงกับหมดอีกครั้งด้วยฟังก์ชัน Sigmoid ในขั้นส่งออกข้อมูล (Output layer) ซึ่งการคำนวณดังกล่าวนับเป็น 1 รอบ หลักจากนั้นโครงข่าย ประสาทเทียมจะส่งผลย้อนกลับไปหน่วยย่อยแต่ละหน่วยย่อยของขั้นแฝงเพื่อทำการคำนวณขั้าจนครบ 3,000 รอบ โดยมีค่าเบี่ยงเบน (Bias) ในแต่ละรอบแตกต่างกัน โดยค่าผลลัพธ์ที่ได้จากการคำนวณจะถูกน่ามา เปรียบเทียบกับค่าที่ให้โครงข่ายเรียนรู้ ซึ่งแสดงออกมาในรูปแบบค่าผิดพลาดกำลังสองเฉลี่ย (RMSE) หน้า 2 ของจำนวน 2 หน้า ดังนั้นรูปแบบสถาปัตยกรรมของโครงข่ายประสาทเทียมที่เหมาะสมจะประกอบไปด้วยชั้นรับข้อมูลจำนวน 11 หน่วยย่อย ชั้นแฝง 1 ชั้นแฝงจำนวน 15 หน่วยย่อย และรอบการคำนวณ 3,000 รอบ 2. วิธีการพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดินสมดุล ในดินเหนียวโดยโครงข่ายประสาทเทียม ตามข้อถือสิทธิ 1 ที่ซึ่งใช้ 11 ปัจจัยในการคำนวณ ------------------15/11/2019------(OCR) Page 1 of 2 pages. Claims 1. A method for predicting surface settlement from tunnel boring with a balanced soil pressure tunnel boring machine in clay soil using an artificial neural network will consist of 11 sub-units in the data layer, which include: (1) distance from the tunnel boring starting point (m) (2) Stability Number 10 (N) at the top of the tunnel (3) Stability Number (N) at the middle of the tunnel (4) Stability Number (N) at the bottom of the tunnel (5) height of the groundwater from the bottom of the tunnel (m) (6) pressure at the tunnel boring face (kPa) (7) boring speed (mm/min) (8) tunnel boring head elevation angle (degree) (9) grout injection pressure to fill voids behind the tunnel walls (bar) (10) grout filling percentage (%) (11) type of tunnel boring machine. The number and sub-units of the latent layer, as well as the calculation cycles, The optimal neural network (ANN) can be found through trial and error by dividing the selected data into two groups: 1) the training set, which comprises 25% of the total data, and 2) the testing set, which contains all the data. The ANN is then tested to find the optimal neural network (Optimum ANN) based on the smallest Mean Squared Error (RMSE) obtained from the training and testing processes. In the hidden layer calculations, the number of factors from the input layer is passed through each hidden node for complete calculation using the Sigmoid function. The results from each hidden node are then recalculated using the Sigmoid function in the output layer. This calculation constitutes one iteration. The ANN then sends the results back to each hidden node for repetition of the calculation until 3,000 iterations are completed, with varying biases in each iteration. The resulting calculations are then compared to the input values used for learning the ANN. This is expressed as the mean square error (RMSE) on page 2 of 2. Therefore, the optimal neural network architecture will consist of 11 sub-units in the input layer, 1 latent layer with 15 sub-units, and 3,000 computation cycles. 2. Method for predicting surface settlement from tunnel boring with a stress-balanced soil boring machine in clay soil using a neural network, according to claim 1, which uses 11 factors in the calculation. ------------ ------10/01/2018------(OCR) Page 1 of 2. Claim 1. The method for predicting surface settlement from tunnel boring with a stress-balanced soil boring machine in clay soil using a neural network will consist of 11 sub-units in the input layer. This consists of (1) distance from the tunnel boring starting point (T), (2) Stability Number 10 (N) at the top of the tunnel, (3) Stability Number (N) at the middle of the tunnel, (4) Stability Number (N) at the bottom of the tunnel, (5) height of groundwater from the bottom of the tunnel (T), (6) pressure at the drilling head (kPa), (7) drilling speed (T/T), (8) elevation angle of the drilling head (degree), (9) pressure of grout injection to fill gaps behind the tunnel wall (bar), (10) percentage of grout filling (%), and (11) type of drilling head. The number and sub-units of latent steps, as well as the calculation cycles, can be found using trial and error by dividing the selected data into two groups: 1) Training set, which contains 25% of the total data, and 2) Testing set, which contains all the data, to test for network compatibility. An optimized neural network (ANN) minimizes the mean square error (RMSE) through training and testing processes. In the hidden layer, each hidden node uses a number of input factors passed through the input layer for computation. The results from each hidden node are then used in a computational process in the output layer using the Sigmoid function. This process is considered one iteration. The neural network then sends the results back to each hidden node for further calculations, repeating this process 3,000 times. Each iteration has a different bias, and the final results are compared to the input values used for learning. This is expressed as the mean square error (RMSE) on page 2 of 2. Therefore, the optimal neural network architecture will consist of 11 sub-layers, 1 latent layer, 15 latent layers, and 3,000 iterations. 2. A method for predicting surface settlement from tunnel boring with a balanced soil pressure tunnel boring machine in clay soil using a neural network according to claim 1, which uses 11 factors in the calculation. 1. การพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดัน ดินสมดุลในดินเหนียวโดยโครงข่ายประสาทเทียม จะประกอบไปด้วย 11 หน่วยย่อยในชั้นรับ ข้อมูล มีชั้นแฝง 1 ชั้น มีหน่วยย่อยอยู่ 15 หน่วยย่อยในชั้นแฝง และรอบการคำนวณ 3,000 รอบ ซึ่ง จะถือว่าโครงข่ายมีความเหมาะสมที่จะสมารถนำมาใช้พยากรณ์ทรุดตัวของผิวดินที่ เกิดขึ้นจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดันดินสมดุลในดินเหนียว1. Forecasting soil settlement from tunnel boring using a pressure-regulating soil equilibrium tunneling system in clay soil using an artificial neural network will involve 11 subunits in the receiving layer, one latent layer with 15 subunits, and 3,000 calculation cycles. This network will be considered suitable for forecasting soil settlement caused by tunnel boring with a pressure-regulating soil equilibrium tunneling system in clay soil. 2. การพยากรณ์การทรุดตัวของผิวดินจากการขุดเจาะอุโมงค์ด้วยหัวเจาะแบบปรับแรงดัน ดินในสมดุลดินเหนียวโดยโครงข่ายประสาทเทียมตามข้อ 1 ในส่วนของ 11 หน่วยย่อยในชั้นรับ ข้อมูล จะประกอบไปด้วย (1) ระยะจากจุดเริ่มต้นการขุดเจาะอุโมงค์ (2) ค่า Stability Number (N) ที่ส่วนยอดของอุโมงค์ (3) ค่า Stability Number (N) ที่ส่วนกลางของอุโมงค์ (4) ค่า Stability Number (N) ที่ส่วนล่างของอุโมงค์ (5) ความสูงของน้ำใต้ดินจากส่วนล่างสุดของอุโมงค์ (6) ความ ดันหน้าหัวเจาะ (7) ความเร็วขณะขุดเจาะ (8) มุมก้มหรือมุมเงยของหัวเจาะ (9) ความดันของการฉีด น้ำปูน เพื่ออุดช่องว่างหลังผนังอุโมงค์ (10) เปอร์เซ็นต์การเติมน้ไปูน และ (11) ชนิดของหัวเจาะ2. Forecasting of surface settlement from tunnel excavation with a pressure-regulating boring machine in clay equilibrium using an artificial neural network as per item 1. The 11 sub-units in the receiving layer will consist of: (1) distance from the tunnel excavation starting point, (2) Stability Number (N) at the tunnel top, (3) Stability Number (N) at the tunnel middle, (4) Stability Number (N) at the tunnel bottom, (5) groundwater height from the tunnel bottom, (6) boring machine face pressure, (7) excavation speed, (8) boring machine elevation angle, (9) grout injection pressure to fill voids behind the tunnel walls, (10) grout filling percentage, and (11) boring machine type.
TH801002990A 2009-08-21 Solution for testing lead in solder joints. TH97873B (en)

Publications (3)

Publication Number Publication Date
TH97873A true TH97873A (en) 2009-08-20
TH103959A TH103959A (en) 2010-09-14
TH97873B TH97873B (en) 2024-01-02

Family

ID=

Similar Documents

Publication Publication Date Title
Hsiung et al. Evaluation of the wall deflections of a deep excavation in Central Jakarta using three-dimensional modeling
Feng et al. Estimating mechanical rock mass parameters relating to the Three Gorges Project permanent shiplock using an intelligent displacement back analysis method
Le Van et al. Evaluating the critical performances of a CO2–Enhanced oil recovery process using artificial neural network models
CN103258091B (en) Unconventionaloil pool hides the method and device that net horizontal section three-dimensional mechanical models for rock mass is set up
Sun et al. Optimization of subsurface CO2 injection based on neural network surrogate modeling
US20130218538A1 (en) Simulation model optimization
CN114035228A (en) Tunnel seismic wave velocity inversion method and system based on deep learning
CN103913774A (en) Reservoir stratum geological mechanics parameter retrieval method based on micro seismic event
Jiang et al. Inverse analysis for geomaterial parameter identification using Pareto multiobjective optimization
Han et al. Intelligent back analysis of geotechnical parameters for time-dependent rock mass surrounding mine openings using grey Verhulst model
CN112064617B (en) Soil-stone mixture foundation quality detection method
He et al. Gas Injection Optimization Under Uncertainty in Subsurface Reservoirs: An Integrated Machine Learning-Assisted Workflow
Mishra et al. Adapting petroleum reservoir engineering principles to carbon capture & sequestration (CCS) and hydrogen underground storage (HUS) projects: opportunities and challenges
Feng et al. Hybrid intelligent method optimization of a soft rock replacement scheme for a large cavern excavated in alternate hard and soft rock strata
Chang et al. Data assimilation of coupled fluid flow and geomechanics using the ensemble Kalman filter
Javadi Estimation of air losses in compressed air tunneling using neural network
Thanh et al. Developing machine learning models to predict CO2 trapping performance in deep saline aquifers
WO2025076520A1 (en) Geologic chemical transport framework
Plumb et al. A new geomechanics process reduces operational risk from exploration to production
Li et al. SMT-GP method of prediction for ground subsidence due to tunneling in mountainous areas
Liem et al. Prior with far-field stress approximation for ensemble-based data assimilation in naturally fractured reservoirs
Sin et al. Determination of Mechanical Parameters of Anthracite Coal using Flying Squirrel Search Algorithm with Timber Load and Displacement Data
Parkes et al. Geotechnical Engineering Circular: Design, Analysis, and Testing of Laterally Loaded Deep Foundations that Support Transportation Facilities
Sivakumaran Development of a verified non-linear Winkler model for the seismic analysis of piles in improved ground
TH97875A (en) Forecast of subsurface subsidence from double tunneling with the equilibrium-balanced borehole by the neural network.