TH19967Y - Precast wall panel formwork: Manufacturing process and installation method of precast prestressed concrete wall panels using a 2-axis steel wire tensioning system before concrete pouring. - Google Patents

Precast wall panel formwork: Manufacturing process and installation method of precast prestressed concrete wall panels using a 2-axis steel wire tensioning system before concrete pouring.

Info

Publication number
TH19967Y
TH19967Y TH1703001081U TH1703001081U TH19967Y TH 19967 Y TH19967 Y TH 19967Y TH 1703001081 U TH1703001081 U TH 1703001081U TH 1703001081 U TH1703001081 U TH 1703001081U TH 19967 Y TH19967 Y TH 19967Y
Authority
TH
Thailand
Prior art keywords
steel
concrete
precast
hollow
formwork
Prior art date
Application number
TH1703001081U
Other languages
Thai (th)
Other versions
TH19967A3 (en
TH19967U (en
TH19967C3 (en
Inventor
เคลือบแสน นายมงคล
Original Assignee
บริษัท ไลฟ แอนด์ ลีฟวิ่ง จำกัด
Filing date
Publication date
Application filed by บริษัท ไลฟ แอนด์ ลีฟวิ่ง จำกัด filed Critical บริษัท ไลฟ แอนด์ ลีฟวิ่ง จำกัด
Publication of TH19967Y publication Critical patent/TH19967Y/en
Publication of TH19967A3 publication Critical patent/TH19967A3/en
Publication of TH19967U publication Critical patent/TH19967U/en
Publication of TH19967C3 publication Critical patent/TH19967C3/en

Links

Abstract

------05/01/2564------(OCR) แบบหล่อแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนก่อนเทคอนกรีตชนิดกลวง (Hollow Core) ) ประกอบด้วยแบบหล่อเหล็กนอก เป็นเหล็กลักษณะรูปตัวเฮ็ท(H) ทำหน้าที่เป็นแบบหล่อนอกและเครื่องรับนํ้าหนักในการดึงลวดเหล็กอัดแรง โดยประกอบกันในลักษณะสอดเข้าลิ่มเจาะช่องสำหรับตัดลวดเหล็กสำหรับดึง และเจาะรูสำหรับสอดท่อเหล็กทำให้แผ่นผนังสำเร็จรูปคอนกรีตอัดแรงมีลักษณะกลวงกลาง และแบบหล่อเหล็กใน เป็นเหล็กลักษณะรูปตัวที(T) วางแนวนอนตั้งฉากกับแท่นผลิตแผ่นผนังสำเร็จรูป โดยใช้เหล็กฉากเข้ามุมสำเร็จรูปยึดมุม ทำให้แบบหล่อเหล็กในประกอบกันเป็นกรอบสี่เหลี่ยม และมีขอบคอนกรีตภายในเรียบเป็นแนวระราบตามแนวแบบหล่อเหล็กใน กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบดึงเหล็กแบบ 2 แกน ก่อนเทคอนกรีตชนิดกลวง มีลักษณะเป็นการอัดแรงด้วยลวดเหล็กรอบแผ่นผนังทั้ง 2 แกน ใช้ท่อเหล็กสอดเข้ากลางแผ่นผนังสำเร็จรูปคอนกรีตและดึงออกเมื่อคอนกรีตเริ่มแข็งตัว เพื่อให้ได้แผ่นผนังสำเร็จรูปคอนกรีตกลวงกลาง วิธีการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนชนิดกลวงทำการติดตั้งแผ่นผนังสำเร็จรูปบนคานคอดินคอนกรีต ใช้เหล็กก่อสร้างฝังไว้กับคานคอดินคอนกรีตนำแผ่นผนังสำเร็จรูปชนิดกลวงติดตั้งโดยให้เหล็กก่อสร้างทุกเส้นเข้ารูกลวงกลาง นำคอนกรีตเหลวเทเข้ารูกลวงกลางของแผ่นผนัง นำเหล็กก่อสร้างร้อยห่วงเหล็กข้างของแผ่นผนังยึดรอยต่อแผนผนัง ใช้คอนกรีตเหลวเทปิดรอยต่อ ใช้ข้อต่อเกลียว (Coupler) ต่อเหล็กก่อสร้างให้เชื่อมติดกันตลอดของอาคารวีธีการติดตั้งดังกล่าวจะทำให้แผ่นผนังสำเร็จรูปคอนกรีตที่ติดตั้งมีเหล็กก่อสร้างเชื่อมติดต่อกันตั้งแต่ชั้นล่างถึงชั้นบนสุด ทำให้มีลักษณะเป็นโครงสร้างคอนกรีตเสริมเหล็กที่แข็งแรงทั้งอาคาร ------------ ------03/04/2563------(OCR) หน้า 1 ของจำนวน 1 หน้า บทสรุปการประดิษฐ์ แบบหล่อแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนก่อนเทคอนกรีตชนิดกลวง (Hollow Core) ) ประกอบด้วยแบบหล่อเหล็กนอก เป็นเหล็กลักษณะรูปตัวเฮ็ท(H) ทำหน้าที่เป็นแบบหล่อนอกและเครื่องรับนํ้าหนักในการดึงลวดเหล็กอัดแรง โดยประกอบกันในลักษณะสอดเข้าลิ่มเจาะช่องสำหรับตัดลวดเหล็กสำหรับดึง และเจาะรูสำหรับสอดท่อเหล็กทำให้แผ่นผนังสำเร็จรูปคอนกรีตอัดแรงมีลักษณะกลวงกลาง และแบบหล่อเหล็กใน เป็นเหล็กลักษณะรูปตัวที(T) วางแนวนอนตั้งฉากกับแท่นผลิตแผ่นผนังสำเร็จรูป โดยใช้เหล็กฉากเข้ามุมสำเร็จรูปยึดมุม ทำให้แบบหล่อเหล็กในประกอบกันเป็นกรอบสี่เหลี่ยม และมีขอบคอนกรีตภายในเรียบเป็นแนวระราบตามแนวแบบหล่อเหล็กใน กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบดึงเหล็กแบบ 2 แกน ก่อนเทคอนกรีตชนิดกลวง มีลักษณะเป็นการอัดแรงด้วยลวดเหล็กรอบแผ่นผนังทั้ง 2 แกน ใช้ท่อเหล็กสอดเข้ากลางแผ่นผนังสำเร็จรูปคอนกรีตและดึงออกเมื่อคอนกรีตเริ่มแข็งตัว เพื่อให้ได้แผ่นผนังสำเร็จรูปคอนกรีตกลวงกลาง วิธีการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนชนิดกลวงทำการติดตั้งแผ่นผนังสำเร็จรูปบนคานคอดินคอนกรีต ใช้เหล็กก่อสร้างฝังไว้กับคานคอดินคอนกรีตนำแผ่นผนังสำเร็จรูปชนิดกลวงติดตั้งโดยให้เหล็กก่อสร้างทุกเส้นเข้ารูกลวงกลาง นำคอนกรีตเหลวเทเข้ารูกลวงกลางของแผ่นผนัง นำเหล็กก่อสร้างร้อยห่วงเหล็กข้างของแผ่นผนังยึดรอยต่อแผนผนัง ใช้คอนกรีตเหลวเทปิดรอยต่อ ใช้ข้อต่อเกลียว (Coupler) ต่อเหล็กก่อสร้างให้เชื่อมติดกันตลอดของอาคารวีธีการติดตั้งดังกล่าวจะทำให้แผ่นผนังสำเร็จรูปคอนกรีตที่ติดตั้งมีเหล็กก่อสร้างเชื่อมติดต่อกันตั้งแต่ชั้นล่างถึงชั้นบนสุด ทำให้มีลักษณะเป็นโครงสร้างคอนกรีตเสริมเหล็กที่แข็งแรงทั้งอาคาร ------------ ------25/01/2562------(OCR) หน้า 1 ของจำนวน 1 หน้า บทสรุปการประดิษฐ์ แบบหล่อแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนก่อนเทคอนกรีตชนิดกลวง (Hollow Core) ) ประกอบด้วยแบบหล่อเหล็กนอก เป็นเหล็กลักษณะรูปตัวเฮ็ท(H) ทำหน้าที่เป็นแบบหล่อนอกและเครื่องรับน้ำหนักในการดึงลวดเหล็กอัดแรง โดยประกอบกันในลักษณะสอดเข้าลิ่มเจาะช่องสำหรับตัดลวดเหล็กสำหรับดึง และเจาะรูสำหรับสอดท่อเหล็กทำให้แผ่นผนังสำเร็จรูปคอนกรีตอัดแรงมีลักษณะกลวงกลาง และแบบหล่อเหล็กใน เป็นเหล็กลักษณะรูปตัวที(T) วางแนวนอนตั้งฉากกับแท่นผลิตแผ่นผนังสำเร็จรูป โดยใช้เหล็กฉากเข้ามุมสำเร็จรูปยึดมุม ทำให้แบบหล่อเหล็กในประกอบกันเป็นกรอบสี่เหลี่ยม และมีขอบคอนกรีตภายในเรียบเป็นแนวระราบตามแนวแบบหล่อเหล็กใน กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบดึงเหล็กแบบ 2 แกน ก่อนเทคอนกรีตชนิดกลวง มีลักษณะเป็นการอัดแรงด้วยลวดเหล็กรอบแผ่นผนังทั้ง 2 แกน ใช้ท่อเหล็กสอดเข้ากลางแผ่นผนังสำเร็จรูปคอนกรีตและดึงออกเมื่อคอนกรีตเริ่มแข็งตัว เพื่อให้ได้แผ่นผนังสำเร็จรูปคอนกรีตกลวงกลาง วิธีการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนชนิดกลวงทำการติดตั้งแผ่นผนังสำเร็จรูปบนคานคอดินคอนกรีต ใช้เหล็กก่อสร้างฝังไว้กับคานคอดินคอนกรีตนำแผ่นผนังสำเร็จรูปชนิดกลวงติดตั้งโดยให้เหล็กก่อสร้างทุกเส้นเข้ารูกลวงกลาง นำคอนกรีตเหลวเทเข้ารูกลวงกลางของแผ่นผนัง นำเหล็กก่อสร้างร้อยห่วงเหล็กข้างของแผ่นผนังยึดรอยต่อแผนผนัง ใช้คอนกรีตเหลวเทปิดรอยต่อ ใช้ข้อต่อเกลียว (Coupler) ต่อเหล็กก่อสร้างให้เชื่อมติดกันตลอดของอาคารวีธีการติดตั้งดังกล่าวจะทำให้แผ่นผนังสำเร็จรูปคอนกรีตที่ติดตั้งมีเหล็กก่อสร้างเชื่อมติดต่อกันตั้งแต่ชั้นล่างถึงชั้นบนสุด ทำให้มีลักษณะเป็นโครงสร้างคอนกรีตเสริมเหล็กที่แข็งแรงทั้งอาคาร ------------ หน้า 1 ของจานวน 1 หน้า บทสรุปการประดิษฐ์ แบบหล่อแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนก่อนเทคอนกรีต ชนิดกลวง (Hollow Core) ) ประกอบด้วยแบบหล่อเหล็กนอก เป็นเหล็กลักษณะรูปตัวเฮ็ท(H) ทำหน้าที่ เป็นแบบหล่อนอกและเครื่องรับน้ำหนักในการดึงลวดเหล็กอัดแรง โดยประกอบกันในลักษณะสอดเข้าลิ่ม เจาะช่องสำหรับตัดลวดเหล็กสำหรับดึง และเจาะรูสำหรับสอดท่อเหล็กทำให้แผ่นผนังสำเร็จรูปคอนกรีต อัดแรงมีลักษณะกลวงกลาง และแบบหล่อเหล็กใน เป็นเหล็กลักษณะรูปตัวที(T) วางแนวนอนทั้งฉากกับ แท่นผลิตแผ่นผนังสำเร็จรูป โดยใช้เหล็กฉากเข้ามุมสำเร็จรูปยึดมุม ทำให้แบบหล่อเหล็กในประกอบกันได้ มุมฉากตามแบบที่กำหนด และมีขอบคอนกรีตภายในเรียบเป็นแนวระราบตามแนวแบบหล่อเหล็กใน กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบดึงเหล็กแบบ 2 แกน ก่อนเทคอนกรีต ชนิดกลวง มีลักษณะเป็นการอัดแรงด้วยลวดเหล็กรอบแผ่นผนังทั้ง 2 แกน ใช้ท่อเหล็กสอดเข้ากลางแผ่น ผนังสำเร็จรูปคอนกรีตและดึงออกเมื่อคอนกรีตเริ่มแข็งตัว เพื่อให้ได้แผ่นผนังสำเร็จรูปคอนกรีตกลวงกลาง วิธีการติดทั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกนชนิดกลวง ทำการติดตั้งแผ่นผนังสำเร็จรูปบนคานคอดินคอนกรีต ใช้เหล็กก่อสร้างฝังไว้กับคานคอดินคอนกรีต นำแผ่นผนังสำเร็จรูปชนิดกลวงติดตั้งโดยให้เหล็กก่อสร้างทุกเส้นเข้ารูกลวงกลาง นำคอนกรีตเหลวเทเข้ารู กลวงกลางของแผ่นผนัง ใช้ข้อต่อเกลียว (Coupler) ต่อเหล็กก่อสร้างให้เชื่อมติดกันตลอดของอาคาร วีธีการติดตั้งดังกล่าวจะทำให้แผ่นผนังสำเร็จรูปคอนกรีตที่ติดทั้งมีเหล็กก่อสร้างเชื่อมติดต่อกันตั้งแต่ชั้นล่าง ถึงชั้นบนสุด ทำให้มีลักษณะเป็นโครงสร้างคอนกรีตเสริมเหล็กที่แข็งแรงทั้งอาคาร------05/01/2564------(OCR) Precast Prestressed Concrete Wall Panels using a 2-Axis Steel Wire Tensioning System Before Pouring Hollow Core Concrete. This system consists of an outer steel formwork, an H-shaped steel piece acting as the outer formwork and weight-bearing component for tensioning the prestressed steel wires. It is assembled by inserting the steel wires into a wedge-shaped slot for cutting the wires and drilling holes for inserting steel pipes, resulting in a hollow core precast prestressed concrete wall panel. The inner steel formwork is a T-shaped steel piece placed horizontally, perpendicular to the panel manufacturing platform. Pre-fabricated angle iron is used to secure the corners, forming a rectangular frame with a smooth, level inner concrete edge along the formwork. The manufacturing process of precast prestressed concrete wall panels using the 2-axis steel wire tensioning system before pouring hollow core concrete involves prestressing the steel wires around the panel in both axes. A steel pipe is inserted into the center of the precast concrete panel and pulled out as the concrete begins to harden, resulting in a hollow core precast concrete wall panel. The method for installing precast prestressed concrete wall panels using a 2-core hollow core steel wire tensioning system involves installing the precast wall panels on concrete ground beams. Construction steel is embedded in the concrete ground beams. The hollow core precast wall panels are installed by inserting all construction steel bars into the hollow core. Liquid concrete is poured into the hollow core of the panel. Construction steel is threaded through the steel loops on the sides of the panel to secure the panel joints. Liquid concrete is then poured to seal the joints. Threaded couplers are used to connect the construction steel bars, ensuring a continuous connection throughout the building. This installation method ensures that the precast concrete wall panels are interconnected with construction steel from the bottom to the top floor, resulting in a strong reinforced concrete structure for the entire building. ------03/04/2020------(OCR) Page 1 of 1. Summary of the Invention: The formwork for precast prestressed concrete wall panels using a 2-core steel wire tensioning system (hollow core) consists of an outer steel formwork, shaped like an H, which serves as the outer formwork and load-bearing device for tensioning the prestressed steel wires. The precast prestressed concrete wall panels are assembled using a wedge-shaped mechanism with slots for cutting the steel wires for tensioning and holes for inserting steel pipes, resulting in hollow precast concrete wall panels. The formwork is a T-shaped steel structure placed horizontally, perpendicular to the panel manufacturing platform. Pre-fabricated angle iron is used to secure the corners, forming a rectangular frame with a smooth, level inner concrete edge along the formwork line. The manufacturing process of precast prestressed concrete wall panels uses a two-axis tensioning system before pouring the hollow concrete. This involves prestressing with steel wires around the panel in two directions, inserting a steel pipe into the center of the precast panel and pulling it out as the concrete begins to harden, creating a hollow precast wall panel. Installation of the two-axis tensioning hollow precast concrete wall panels involves mounting the panels on concrete ground beams. Construction steel is embedded in the ground beams, and the hollow precast panel is installed by inserting all the steel bars into the central hollow. Liquid concrete is poured into the hollow core of the panel, and steel bars are threaded through the side steel loops of the panel to secure the panel joints. Liquid concrete is then used to seal the joints. Threaded couplers are used to connect the construction steel, welded together along the entire length of the building. This installation method ensures that the precast concrete wall panels are continuously connected by the construction steel from the bottom to the top floor, resulting in a strong reinforced concrete structure throughout the building. ------25/01/2019------(OCR) Page 1 of 1. Summary of the Invention: A formwork system for precast prestressed concrete wall panels using a 2-axis steel wire tensioning system before pouring hollow core concrete consists of an outer steel formwork, shaped like an H, which acts as the outer formwork and load-bearing device for tensioning the prestressed steel wires. It is assembled by inserting the formwork into wedges, with holes for cutting the steel wires and holes for inserting steel pipes, resulting in a hollow core precast concrete wall panel. An inner steel formwork, shaped like a T, is placed horizontally perpendicular to the precast wall panel production platform. Pre-fabricated angle iron is used to secure the corners, forming a rectangular frame with a smooth, level inner concrete edge along the inner steel formwork. The manufacturing process of precast prestressed concrete wall panels using a 2-axis steel tensioning system before pouring hollow concrete involves prestressing with steel wires around the panel in both directions. A steel pipe is inserted into the center of the precast concrete panel and pulled out as the concrete begins to harden, resulting in a hollow precast wall panel. The installation method for these precast hollow prestressed concrete wall panels involves mounting the panels on concrete ground beams. Construction steel is embedded in the ground beams, and the hollow precast panels are installed by inserting all the steel bars into the hollow core. Liquid concrete is poured into the hollow core of the panel. Construction steel is threaded through the steel loops on the sides of the panel to secure the panel joints. Liquid concrete is then used to seal the joints. Threaded couplers are used to connect the construction steel bars, ensuring a continuous connection throughout the building. This installation method ensures that the precast concrete wall panels are interconnected with construction steel from the bottom to the top floor, resulting in a strong reinforced concrete structure for the entire building. ------------ Page 1 of 1 Summary of the Invention Precast prestressed concrete wall panels using a 2-axis steel wire tensioning system before concrete pouring (hollow core type) consist of an outer steel formwork, an H-shaped steel structure acting as the outer formwork and load-bearing component for tensioning the steel wires. It is assembled by a wedge-joint system, with holes for cutting the steel wires and holes for inserting steel pipes, resulting in a hollow core precast wall panel. An inner steel formwork, a T-shaped steel structure, is placed horizontally, perpendicular to the panel manufacturing platform. Pre-fabricated angle iron is used to secure the inner formwork at right angles as specified in the design, ensuring a smooth inner concrete edge along the inner formwork line. The manufacturing process of precast prestressed concrete wall panels using the 2-axis steel wire tensioning system involves prestressing the wall panel with steel wires in both directions. A steel pipe is inserted into the center of the precast wall panel and pulled out as the concrete begins to harden, resulting in a hollow core precast wall panel. The method of attaching precast prestressed concrete wall panels using a 2-core hollow wire tensioning system involves installing the precast wall panels on concrete ground beams. Construction steel is embedded in the ground beams. The hollow precast wall panels are then installed by inserting all the steel reinforcement bars into the central hollow core. Liquid concrete is poured into the hollow core of the panel. Threaded couplers are used to connect the steel reinforcement bars, welded together along the entire length of the building. This installation method ensures that the precast concrete wall panels are seamlessly connected by the steel reinforcement from the bottom to the top floor, resulting in a strong reinforced concrete structure for the entire building.

Claims (4)

------05/01/2564------(OCR) 1. แบบหล่อแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกน ก่อนเทคอนกรีตชนิดกลวง (Hollow Core) ประกอบด้วย แบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H) วางตามแนวนอน ขนานกับพื้นแผ่นเหล็ก เจาะรูกลม (7) ด้านข้างเป็นเครื่องรับนํ้าหนักสำหรับการดึงลวดเหล็กสำหรับดึง(4) และแบบหล่อเหล็กใน (3) เป็นเหล็กลักษณะรูปตัวที (T) ประกอบกันเป็นแบบหล่อกรอบสี่เหลี่ยม โดยมีเหล็กเข้ามุมฉากสำเร็จรูป (5) ยึดมุมเข้าฉากสี่เหลี่ยม เพื่อทำการหล่อคอนกรีตบริเวณตรงกลางระหว่างแบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก (2) และแบบหล่อเหล็กใน (3)โดยมีลักษณะพิเศษ คือ แบบ,หล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H) วางตามแนวนอนขนานกับพื้นแท่นเหล็กสำหรับผลิตแผ่นผนังสำเร็จรูป(1) เพื่อการหล่อคอนกรีตบริเวณตรงกลาง แบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก (2) มีรูช่องกลม(6) จำนวนหนึ่งบริเวณตรงกลางแกนเหล็ก และด้านแกนเหล็กรูปตัวเฮ็ท (H) ปลายด้านหนึ่งมีลักษณะเป็นลิ่ม(10) อีกด้านหนึ่งมีลักษณะเป็นช่องเสียบลิ่ม(11) เพื่อประกอบแบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก(2)ให้เป็นกรอบสี่เหลี่ยม และแบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก (2) มีรูกลวงพร้อมปลอกท่อ(12) ด้านแกนเหล็กรูปตัวเฮ็ท (H) ตามแนวขวาง เพื่อเชื่อมท่อเหล็กกลมตามแนวขวาง สำหรับใส่ท่อเหล็กพร้อมเหล็กหูดึง(13) และแบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก (2) มีรูกลม(7)ที่ด้านข้างเหล็กรูปตัวเฮ็ท (H) ที่มีขนาดใหญ่กว่าลวดเหล็กสำหรับดึง(4) เพื่อให้ลวดเหล็กสำหรับดึง(4) ลอดผ่าน และเป็นเครื่องรับนํ้าหนักสำหรับอุปกรณ์ยึด (Anchorage)(8) ในการดึงลวดเหล็กสำหรับดึง (4) ด้วย แบบหล่อเหล็กใน (3) เป็นเหล็กลักษณะรูปตัวที(T) (14) เจาะรูกลม(15) ที่แกนเหล็กวางตั้งฉากกับพื้นแผ่นเหล็กโดยใช้เหล็กเข้ามุมฉากสำเร็จรูป (5) เจาะรู(16)ยึดติดด้วยน็อต(17) กับแบบหล่อเหล็กใน (3) เป็นกรอบแบบสี่เหลี่ยม และจะเจาะรูสำหรับสอดลวดเหล็กสำหรับดึง(4) ให้ตรงกับรูที่เจาะไว้ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก(2) เพื่อการหล่อคอนกรีตบริเวณนอกแบบหล่อใน (3)2. กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็ก แบบ 2 แกน ประกอบด้วย ขั้นตอนที่ 1 ประกอบแบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก(2) และแบบหล่อเหล็ก ภายใน(3) วางตามแนวนอนขนานกับพื้นแผ่นเหล็กของแท่นเหล็กสำหรับผลิต แผ่นผนังสำเร็จรูป(1) โดยวางตามขนาดและรูปแบบที่กำหนดโดยมีลักษณะพิเศษ คือ ขั้นตอนที่ 2 นำท่อเหล็กพร้อมเหล็กหูดึง(13)ใส่เข้าไปตามรูกลวงพร้อมปลอกท่อ(12) ตรงกลางแผ่นผนังสำเร็จรูป จากนั้นนำลวดเหล็กสำหรับดึง (4) สอดตามรูที่เจาะ ไว้ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก(2) และแบบหล่อเหล็กภายใน(3) ทั้ง 2 แกนที่เจาะรูไว้ตรงกัน ขั้นตอนที่ 3 ติดตั้งอุปกรณ์ยึด(Anchorage)(8) ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับนํ้าหนัก (2)ทั้ง 2 แกน ตามตำแหน่งที่เจาะรูกลม(7) โดยให้ไล่อุปกรณ์ยึด(Anchorage)(8) ที่ปลายลวดเหล็กสำหรับดึง (4) ไว้ด้านหนึ่ง และใส่อุปกรณ์ยึด(Anchorage)(8) ที่ปลายอีกด้านหนึ่งสำหรับใช้ดึงลวดเหล็กสำหรับดึง(4) จากนั้นใช้เครื่องดึงเหล็ก ไฮโดรลิค(18) ดึงลวดเหล็กสำหรับดึง(4)ให้ตรึงจนได้แรงในเส้นลวดเหล็กเท่ากับ จำนวนที่ต้องการทั้ง 2 แกน คือแกนตั้ง และแกนนอน ขั้นตอนที่ 4 เทคอนกรีตลงในแบบหล่อเหล็ก ทิ้งระยะเวลาให้คอนกรีตแข็งตัวพอสมควร ใช้เครื่องดึงมอเตอร์(19) ดึงท่อเหล็กพร้อมเหล็กหูดึง(13)ออกทำให้เกิดรูกลวง ที่แผ่นผนังคอนกรีตสำเร็จรูป จากนั้นบ่มคอนกรีตให้มีกำลังอัดเพียงพอตาม การคำนวณทางวิศวกรรม ขั้นตอนที่ 5 ใช้กรรไกรตัดเหล็ก(20) ตัดลวดเหล็กสำหรับดึง(4) โดยตัดหัวและท้ายลวดเหล็ก สำหรับดึง (4) ทีละเส้น เพื่อให้เกิดการอัดแรงคอนกรีตตลอดทั้งแผ่นผนัง สำเร็จรูปคอนกรีต จากนั้นยกแผ่นผนังสำเร็จรูปจัดเก็บในสถานที่จัดเก็บต่อไป3. วิธีการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็กแบบ 2 แกน ประกอบด้วย ขั้นตอนที่ 1 ดำเนินการทำงานฐานรากอาคาร และคานคอดินคอนกรีต(21) โดยมีลักษณะพิเศษ คือ ขั้นตอนที่ 2 นำเหล็กเส้นก่อสร้าง(22) จำนวนเท่ากับรูกลวงของแผ่นผนังสำเร็จรูป ฝังเป็นแนวตั้งฉากไว้ในคานคอดินคอนกรีต(21) ให้มีขนาดความยาว สูงมากกว่าแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) ขั้นตอนที่ 3 จากนั้นนำแผ่นพื้นสำเร็จรูปเสริมเหล็ก(23) วางบนคานคอดินคอนกรีต(21) โดยให้นำเหล็กเส้นก่อสร้าง(22) ที่ฝังเป็นแนวตั้งฉากทุกเส้นตั้งขึ้น นำคอนกรีตสำเร็จรูปเทปรับพื้นทับแผ่นพื้นสำเร็จรูปเสริมเหล็ก(23) จากนั้นให้ทำการปรับแต่งผิวหน้าพื้นคอนกรีตให้เรียบร้อย ขั้นตอนที่ 4 ทิ้งระยะเวลาไว้จนผิวคอนกรีตเริ่มแข็งตัว บ่มพื้นคอนกรีตโดยฉีดนํ้าให้ชุ่ม จากนั้นนำแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) ติดตั้งประกอบ โดยนำเหล็กเส้นก่อสร้าง(22) ทุกเส้นที่ตั้งสูงจากพื้นคอนกรีตในขั้นตอนที่ 3 ร้อยสอดเข้ารูกลวงของแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) ขั้นตอนที่ 5 ใส่เหล็กเส้นก่อสร้าง(22) ร้อยเข้าช่องห่วงเหล็ก(27) ที่ฝังอยู่ด้านข้างของแผ่นผนัง สำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) เพื่อยึดรอยต่อระหว่างแผ่นผนังสำเร็จรูป ขั้นตอนที่ 6 นำคอนกรีตเหลว(26) เทในรูกลวง และปิดรอยต่อระหว่างแผ่นผนังสำเร็จรูป คอนกรีตอัดแรงชนิดกลวง(24) ให้แข็งตัว ขั้นตอนที่ 7 ทำการต่อเหล็กเส้นก่อสร้าง(22) โดยวิธีต่อเหล็กเส้นแบบเข้าเกลียวด้วยข้อต่อ (Coupler)(25) เพื่อให้เหล็กเส้นก่อสร้าง(22) ยาวตลอดความสูงของอาคารตั้งแต่ ชั้นที่ 1 ถึงขั้นสูงถัด ๆ ไป ขั้นตอนที่ 8 สำหรับการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ในชั้นถัดๆ ไปให้ทำ ตามขั้นตอนที่ 1-7 ------------ ------03/04/2563------(OCR) หน้า 1 ของจำนวน 3 หน้า ข้อถือสิทธิ1. แบบหล่อแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกน ก่อนเทคอนกรีตชนิดกลวง (Hollow Core) ประกอบด้วย1.1 แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H) วางตามแนวนอน ขนานกับพื้นแผ่นเหล็ก เจาะรูกลม (7)ด้านข้างเป็นเครื่องรับน้ำหนักสำหรับการดึงลวดเหล็กสำหรับดึง(4) และแบบหล่อเหล็กใน (3)เป็นเหล็กลักษณะรูปตัวที (T) ประกอบกันเป็นแบบหล่อกรอบสี่เหลี่ยม โดยมีเหล็กเข้ามุมฉากสำเร็จรูป (5) ยึดมุมเข้าฉากสี่เหลี่ยม เพื่อทำการหล่อคอนกรีตบริเวณตรงกลางระหว่างแบบหล่อเหล็กนอก(2) และแบบหล่อเหล็กใน (3)โดยมีลักษณะพิเศษ คือ แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H) วางตามแนวนอนขนานกับพื้นแท่นเหล็กสำหรับผลิตแผ่นผนังสำเร็จรูป(1) เพื่อการหล่อคอนกรีตบริเวณตรงกลาง แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) มีรูช่องกลม(6) จำนวนหนึ่งบริเวณตรงกลางแกนเหล็ก และด้านแกนเหล็กรูปตัวเฮ็ท (H) ปลายด้านหนึ่งมีลักษณะเป็นลิ่ม(10) อีกด้านหนึ่งมีลักษณะเป็นช่องเสียบลิ่ม(11) เพื่อประกอบแบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก(2)ให้เป็นกรอบสี่เหลี่ยม และแบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) มีรูกลวงพร้อมปลอกท่อ(12) ด้านแกนเหล็กรูปตัวเฮ็ท (H) ตามแนวขวาง เพื่อเชื่อมท่อเหล็กกลมตามแนวขวาง สำหรับใส่ท่อเหล็กพร้อมเหล็กหูดึง(13) และแบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) มีรูกลม(7)ที่ด้านข้างเหล็กรูปตัวเฮ็ท (H) ที่มีขนาดใหญ่กว่าลวดเหล็กสำหรับดึง(4) เพื่อให้ลวดเหล็กสำหรับดึง(4) ลอดผ่าน และเป็นเครื่องรับน้ำหนักสำหรับอุปกรณ์ยึด (Anchorage)(8) ในการดึงลวดเหล็กสำหรับดึง (4) ด้วย1.2 แบบหล่อเหล็กใน(3)โดยมีลักษณะพิเศษ คือ เป็นเหล็กลักษณะรูปตัวที(T) (14) เจาะรูกลม(15) ที่แกนเหล็กวางตั้งฉากกับพื้นแผ่นเหล็กโดยใช้เหล็กเข้ามุมฉากสำเร็จรูป (5) เจาะรู(16) ยึดติดด้วยน็อต(17) กับแบบหล่อเหล็กใน(3) เป็นกรอบแบบสี่เหลี่ยม และจะเจาะรูสำหรับสอดลวดเหล็กสำหรับดึง(4) ให้ตรงกับรูที่เจาะไว้ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก(2) เพื่อการหล่อคอนกรีตบริเวณนอกแบบหล่อใน(3) หน้า 2 ของจำนวน 3 หน้า2. กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็ก แบบ 2 แกน ประกอบด้วย ขั้นตอนที่ 1 ประกอบแบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก(2) และแบบหล่อเหล็ก ภายใน(3) วางตามแนวนอนขนานกับพื้นแผ่นเหล็กของแท่นเหล็กสำหรับผลิต แผ่นผนังสำเร็จรูป(1) โดยวางตามขนาดและรูปแบบที่กำหนดโดยมีลักษณะพิเศษ คือ ขั้นตอนที่ 2 นำท่อเหล็กพร้อมเหล็กหูดึง(13) ใส่เข้าไปตามรูกลวงพร้อมปลอกท่อ(12) ตรงกลางแผ่นผนังสำเร็จรูป จากนั้นนำลวดเหล็กสำหรับดึง (4) สอดตามรูที่เจาะ ไว้ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก(2) และแบบหล่อเหล็กภายใน(3) ทั้ง 2 แกนที่เจาะรูไว้ตรงกัน ขั้นตอนที่ 3 ติดตั้งอุปกรณ์ยึด(Anchorage)(8) ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2)ทั้ง 2 แกน ตามตำแหน่งที่เจาะรูกลม(7) โดยให้ใส่อุปกรณ์ยึด(Anchorage)(8) ที่ปลายลวดเหล็กสำหรับดึง (4) ไว้ด้านหนึ่งและใส่อุปกรณ์ยึด(Anchorage)(8) ที่ปลายอีกด้านหนึ่งสำหรับใช้ดึงลวดเหล็กสำหรับดึง(4) จากนั้นใช้เครื่องดึงเหล็ก ไฮโดรลิค(18) ดึงลวดเหล็กสำหรับดึง(4) ให้ตรึงจนได้แรงในเส้นลวดเหล็กเท่ากับ จำนวนที่ต้องการทั้ง 2 แกน คือแกนตั้ง และแกนนอน ขั้นตอนที่ 4 เทคอนกรีตลงในแบบหล่อเหล็ก ทิ้งระยะเวลาให้คอนกรีตแข็งตัวพอสมควร ใช้เครื่องดึงมอเตอร์(19) ดึงท่อเหล็กพร้อมเหล็กหูดึง(13) ออกทำให้เกิดรูกลวง ที่แผ่นผนังคอนกรีตสำเร็จรูป จากนั้นบ่มคอนกรีตให้มีกำลังอัดเพียงพอตาม การคำนวณทางวิศวกรรม ขั้นตอนที่ 5 ใช้กรรไกรตัดเหล็ก(20) ตัดลวดเหล็กสำหรับดึง(4) โดยตัดหัวและท้ายลวดเหล็ก สำหรับดึง (4) ทีละเส้น เพื่อให้เกิดการอัดแรงคอนกรีตตลอดทั้งแผ่นผนัง สำเร็จรูปคอนกรีต จากนั้นยกแผ่นผนังสำเร็จรูปจัดเก็บในสถานที่จัดเก็บต่อไป หน้า 3 ของจำนวน 3 หน้า3. วิธีการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็กแบบ 2 แกน ประกอบด้วย ขั้นตอนที่ ดำเนินการทำงานฐานรากอาคาร และคานคอดินคอนกรีต(21) โดยมีลักษณะพิเศษ คือ ขั้นตอนที่ 2 นำเหล็กเส้นก่อสร้าง(22) จำนวนเท่ากับรูกลวงของแผ่นผนังสำเร็จรูป ฝังเป็นแนวตั้งฉากไว้ในคานคอดินคอนกรีต(21) ให้มีขนาดความยาว สูงมากกว่าแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) ขั้นตอนที่ 3 จากนั้นนำแผ่นพื้นสำเร็จรูปเสริมเหล็ก(23) วางบนคานคอดินคอนกรีต(21) โดยให้นำเหล็กเส้นก่อสร้าง(22) ที่ฝังเป็นแนวตั้งฉากทุกเส้นตั้งขึ้น นำคอนกรีตสำเร็จรูปเทปรับพื้นทับแผ่นพื้นสำเร็จรูปเสริมเหล็ก(23) จากนั้นให้ทำการปรับแต่งผิวหน้าพื้นคอนกรีตให้เรียบร้อย ขั้นตอนที่ 4 ทิ้งระยะเวลาไว้จนผิวคอนกรีตเริ่มแข็งตัว บ่มพื้นคอนกรีตโดยฉีดน้ำให้ชุ่ม จากนั้นนำแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) ติดตั้งประกอบ โดยนำเหล็กเส้นก่อสร้าง(22) ทุกเส้นที่ตั้งสูงจากพื้นคอนกรีตในขั้นตอนที่ 3 ร้อยสอดเข้ารูกลวงของแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) ขั้นตอนที่ 5 ใส่เหล็กเส้นก่อสร้าง(22) ร้อยเข้าช่องห่วงเหล็ก(27) ที่ฝังอยู่ด้านข้างของแผ่นผนัง สำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) เพื่อยึดรอยต่อระหว่างแผ่นผนังสำเร็จรูป ขั้นตอนที่ 6 นำคอนกรีตเหลว(26) เทในรูกลวง และปิดรอยต่อระหว่างแผ่นผนังสำเร็จรูป คอนกรีตอัดแรงชนิดกลวง(24) ให้แข็งตัว ขั้นตอนที่ 7 ทำการต่อเหล็กเส้นก่อสร้าง(22) โดยวิธีต่อเหล็กเส้นแบบเข้าเกลียวด้วยข้อต่อ (Coupler)(25) เพื่อให้เหล็กเส้นก่อสร้าง(22) ยาวตลอดความสูงของอาคารตั้งแต่ ชั้นที่ 1 ถึงชั้นสูงถัด ๆ ไป ขั้นตอนที่ 8 สำหรับการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ในชั้นถัดๆ ไปให้ทำ ตามขั้นตอนที่ 1-7 ------------ ------25/01/2562------(OCR) หน้า 1 ของจำนวน 4 หน้า ข้อถือสิทธิ1. แบบหล่อแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงด้วยระบบการดึงลวดเหล็กแบบ 2 แกน ก่อนเทคอนกรีตชนิดกลวง (Hollow Core) ประกอบด้วย แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H)วางตามแนวนอน ขนานกับพื้นแผ่นเหล็ก เจาะรูกลม (7) ด้านข้างเป็นเครื่องรับน้ำหนักสำหรับการดึงลวดเหล็ก และแบบหล่อเหล็กใน (3) เป็นเหล็กลักษณะรูปตัวที (T) ประกอบกันเป็นแบบหล่อกรอบสี่เหลี่ยม โดยมีเหล็กเข้ามุมฉากสำเร็จรูป (5) ยึดมุมเข้าฉากสี่เหลี่ยม เพื่อทำการหล่อคอนกรีตบริเวณตรงกลางระหว่างแบบหล่อเหล็กนอก(2) และแบบหล่อเหล็กใน (3) โดย1.1 แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H) วางตามแนวนอนขนานกับพื้นแท่นเหล็กสำหรับผลิต แผ่นผนังสำเร็จรูป(1) เจาะรูช่องกลม(6) จำนวนหนึ่ง บริเวณตรงกลางแกนเหล็ก เพื่อใช้เป็นช่องสำหรับตัดลวดเหล็กสำหรับดึง (4) เจาะรู (7) ด้านข้างเหล็ก เพื่อใช้สำหรับสอดลวดเหล็กสำหรับดึง (4) เจาะรูกลวงพร้อมปลอกท่อ(12) ด้านแกนเหล็กรูปตัวเฮ็ท (H) ตามแนวขวาง เชื่อมท่อเหล็กกลมตามแนวขวาง สำหรับใส่ท่อเหล็กพร้อมเหล็กหูดึง(13) ปลายเหล็กรูปตัวเฮ็ท(H) ทั้งสองด้าน ด้านหนึ่งมีลักษณะเป็นลิ่ม(10)อีกด้านหนึ่งมี ลักษณะเป็นช่องเสียบลิ่ม(11) ประกอบกันลักษณะเข้าลิ่ม เป็นแบบหล่อกรอบสี่เหลี่ยมโดยมีลักษณะพิเศษ คือ แบบหล่อเหล็กนอก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H) วางตามแนวนอนขนานกับพื้นแท่นเหล็กสำหรับผลิตแผ่นผนังสำเร็จรูป(1) เพื่อการหล่อคอนกรีตบริเวณตรงกลางแบบหล่อเหล็กนอก(2) มีรูช่องกลม(6) จำนวนหนึ่งบริเวณตรงกลางแกนเหล็ก และด้านแกนเหล็กรูปตัวเฮ็ท (H) ปลายด้านหนึ่งมีลักษณะเป็นลิ่ม(10) อีกด้านหนึ่งมีลักษณะเป็นช่องเสียบลิ่ม(11)เพื่อประกอบแบบหล่อเหล็กนอก(2) ให้เป็นกรอบสี่เหลี่ยม และแบบหล่อเหล็กนอก(2) มีรูกลวงพร้อมปลอกท่อ(12) ด้านแกนเหล็กรูปตัวเฮ็ท (H) ตามแนวขวาง เพื่อเชื่อมท่อเหล็กกลมตามแนวขวาง สำหรับใส่ท่อเหล็กพร้อมเหล็กหูดึง(13) และแบบหล่อเหล็กนอก (2) มีรูกลม(7) ที่ด้านข้างเหล็กรูปตัวเฮ็ท (H) ที่มีขนาดใหญ่ว่าลวดเหล็กสำหรับดึง(4) เพื่อให้ลวดเหล็กสำหรับดึง(4) ลอดผ่าน และเป็นเครื่องรับน้ำหนักสำหรับอุปกรณ์ Anchorage(8) ในการดึงลวดเหล็กด้วย หน้า 2 ของจำนวน 4 หน้า1.2 แบบหล่อเหล็กในแผ่นผนังสำเร็จรูปชนิดกลวง(ร) เป็นเหล็กลักษณะรูปตัวที (T) (14) เจาะรูกลม(15)ที่แกนเหล็ก วางตั้งฉากกับพืนแผ่นเหล็ก โดยใช้เหล็กเข้ามุมฉากสำเร็จรูป (5) ประกอบเป็นกรอบสี่เหลี่ยม เพื่อการหล่อคอนกรีตบรเวณนอกแบบหล่อใน(3)โดยมีลักษณะพิเศษ คือ แบบหล่อเหล็กใน(ร) เป็นเหล็กลักษณะรูปตัวที(T) (14) เจาะรูกลม(15)ที่แกนเหล็กวางขั้งฉากกับพืนแผ่นเหล็กโดยใช้เหล็กเข้ามุมฉากสำเร็จรูป (5) เจาะรู(16) ยึดติดด้วยน็อต(17)กับแบบหล่อเหล็กใน (ร) เป็นกรอบแบบสี่เหลี่ยม และจะเจาะรูสำหรับสอดลวดเหล็กสำหรับดึง(4)ให้ตรงกับรูที่เจาะไว้ที่แบบหล่อเหล็กนอกพร้อมเค่รื่องรับนาหนัก(2) เพื่อการหล่อคอนกรีตบ่ร็เ'วณนอกแบบหล่อใน(3)2. กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็ก แบบ 2 แกน ประกอบด้วย ขั้นตอนที่ 1 ประกอบแบบหล่อเหล็กนอกพร้อมเครองรับนาหนัก(2) และแบบหล่อเหล็ก ภายใน(ร) วางตามแนวนอนขนานกับพืนแผ่นเหล็กของแท่นเหล็กสำหรับผลิต แผ่นผนังสำเร็จรูป(1) โดยวางตามขนาดและรูปแบบที่กำหนดโดยมีลักษณะพิเศษ คือ ขั้นตอนที่ 2 นำท่อเหล็กพร้อมเหล็กหูดึง(1 ร) ใล่เข้าไปตามรูกลวงพร้อมปลอกท่อ(1 2) ตรงกลางแผ่นผนังสำเร็จรูป จากนั้นนำลวดเหล็กสำหรับดึง (4) ลอดตามรูที่เจาะ ไว้ที่แบบหล่อเหล็กนอกพร้อมเครองรับนั้าหนัก(2) และแบบหล่อเหล็กภายใน(ร) ทั้ง 2 แกนที่เจาะรูไว้ตรงกัน ขั้นตอนที่ 3 ติดตํ่งอุปกรณ์ Anchorage(8) ที่แบบหล่อเหล็กนอกพร้อมเครองรับนำหนัก(2) ทั้งลองแกน ตามตำแหน่งที่เจาะรู (7) โดยให้ใส่อุปกรณ์ยึดที่ปลายลวดเหล็ก สำหรับดึง (4) ไว้ด้านหนึ่ง และใส'อุปกรณ์ Anchorage (8) ยึดที่ปลายอีกด้าน หนึ่งสำหรับใช้ดึงลวดเหล็กสำหรับดึง(4) จากนั้นใช้เครองดึงเหล็กไฮโดรลิค(18) ดึงลวดเหล็กสำหรับดึง(4) ให้ตึงจนได้แรงในเล็นลวดเท่ากับจำนวนที่ต้องการนั้ง 2 แกน คือแกนตํ่ง และแกนนอน หน้า 3 ของจำนวน 4 หน้า ขั้นตอนที่ 4 เทคอนกรตลงในแบบหล่อเหล็ก ทิงระยะเวลาให้คอนกรตแข็งตัวพอสมควร ใช้เครื่องดึงมอเตอร์(19) ดึงท่อเหล็กพร้อมเหล็กหูดึง(13)ออกทำให้เกิดรูกลวง ที่แผ่นผนังคอนกรตสำเร็จรูป จากนั้นบมคอนกรตให้มีกำลังอัดเพียงพอตาม การคำนวณทางวิศวกรรม ขั้นตอนที่ 5 ใช้กรรไกรตัดเหล็ก(20) ตัดลวดเหล็กสำหรับดึง(4) เพื่อให้เกิดการอัดแรงคอนกรต และถ่ายแรงอัดในคอนกรตแบบ 2 แกนโดยตัดหัวและท้ายลวดเหล็กสำหรับดึง (4) ทีละเส้น เพื่อให้เกิดการอัดแรงคอนกรต เนื่องจากลวดเหล็กสำหรับดึง (4) มีการยึดเหนี่ยวกับคอนก่รตตลอดเส้น เมื่อตัดลวดเหล็กสำหรับดึง (4) แรงดึงใน ลวดเหล็กสำหรับดึง (4) จะถ่ายเป็นแรงอัดในคอนกรตโดยผ่านแรงยึดเหนี่ยวที่ บริเวณปลายแผ่นผนังคอนกรต ตลอดทํ่งแเผ่นผนังสำเร็จรูปคอนก่ร็ต จากนั้น ยกแผ่นผนังสำเร็จรูปจัดเก็บในสถานที่จัดเก็บต่อไป3. วิธีการติดตํ่งแผ่นผนังสำเร็จรูปคอนกรตอัดแรง'ชนิดกลวง ด้วยระบบการดึงเหล็กแบบ 2 แกน ประกอบด้วย ขั้นตอนที่ 1 ดำเนินการทำงานฐานรากอาคาร และคานคอดินคอนกรต(21) โดยมีลักษณะพิเศษ คือ ขั้นตอนที่ 2 นำเหล็กเส้นก่อสร้าง(22) จำนวนเท่ากับรูกลวงของแผ่นผนังสำเร็จรูป ฝังเป็นแนวตํ่งฉาก1ไว้'ในคานคอดินคอนกรต(21) ให้มีขนาดความยาว สูงมากกว่าแผ่นผนังสำเร็จรูปคอนกัรตอัดแรงชนิดก?ลวง(24) ขั้นตอนที่ 3 จากนั้นนำแผ่นพีนสำเร็จรูปเส,รมเหล็ก(23) วางบนคานคอดินคอนกรต(21) โดยให้นำเหล็กเส้นก่อสร้าง(22) ที่ฝังเป็นแนวขั้งฉากทุกเส้นขั้งฃึน นำคอนกัรตสำเร็จรูปเทปรับพืนทับแผ่นพืนสำเร็จรูปเสรมเหล็ก(23) จากนั้นให้ทำการปรับแต่งผิวหน้าพืนคอนถ่ร็ตให้เรยบร้อย ขั้นตอนที่ 4 หลังจากที่ทำการปรับแต่งผิวหน้าพึ๋นคอนกรตแล้ว ต้องทีงระยะเวลาไว้ จนผิวคอนกรตเรื่มแข็งตัว ควรบ่มพีนคอนกรตโดยฉีดนำให้ชุ่ม เพื่อให้คอนถ่รตมีความคงทนแข็งแกร่งเต็มที่จากนั้นนำแผ่นผนังสำเร็จรูป คอนกรตอัดแรงชนิดกลวง(24) ติดตํ่งประกอบ โดยนำเหล็กเส้นก่อสร้าง(22) ทุกเส้นที่ขั้งสูงจากพีนคอนกัรตในขั้นตอนที่ 3 ร้อยลอดเข้ารูกลวงของแผ่นผนัง สำเร็จรูปคอนกรตอัดแรงชนิดกลวง(24) จะทำหน้าที่เป็นเหล็กเสรมในแผ่นผนัง สำเร็จรูปคอนกรตอัดแรงชนิดกลวง (24) หน้า 4 ของจำนวน 4 หน้า ขั้นตอนที่ 5 ใส่เหล็กเล็นก่อสร้าง(22) ร้อยเข้าช่องห่วงเหล็ก(27) ที่ฝังอยู่ด้านข้างของแผ่นผนัง สำเร็จรูปคอนกรตอัดแรงชนิดกลวง(24) เพื่อยึดรอยต่อระหว่างแผ่นผนังสำเร็จรูป ขั้นตอนที่ 6 นำคอนกรตเหลว(26) เทในรูกลวง และปิดรอยต่อระหว่างแผ่นผนังสำเร็จรูป คอนกรีตอัดแรงชนิดกลวง(24) ให้แข็งตัว ขั้นตอนที่ 7 ทำการต่อเหล็กเล็นก่อสร้าง(22) โดยวิธีต่อเหล็กเล็นแบบเข้าเกลียวด้วยข้อต่อ (Coupler)(25) เพื่อให้เหล็กเล็นก่อลร้าง(22) ยาวตลอดความสูงของอาคารตั้งแต่ ขั้นที่ 1 ถึงขั้นสูงถัด ๆ ไป ขั้นตอนที่ 8 สำหรับการติดตั้งแผ่นผนังสำเร็จรูปคอนกรตอัดแรง'ชนิดกลวง ในขั้นถัดๆ ไปให้ ทำตามขั้นตอนที่ 1-7 ------------ ------11/04/2561------(OCR) หน้า 1 ของจำนวน 2 หน้า ข้อถือสิทธิ 1. แบบหล่อเหล็กนอกแผ่นผนังสำเร็จรูปชนิดกลวง พร้อมเครื่องรับนำหนักระบบการดึงเหล็กแบบ 2 แกน ประกอบด้วย แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) เป็นเหล็กลักษณะรูปตัวเฮ็ท (H) วางตามแนวนอน บริเวณตรงกลางเจาะรูช่องกลม(6) ด้านแกนเหล็กรูปตัวเฮ็ท (H) ปลายเหล็กด้านหนึ่งมีลักษณะ เป็นลิ่ม (10) อีกด้านหนึ่งมีลักษณะเป็นช่องเลียบลิ่ม (11) เจาะรูกลวงกลม (12) ด้านแกนเหล็กรูปตัวเฮ็ท (H) ตามแนวขวาง เชื่อมท่อเหล็กกลมตาม แนวขวาง เจาะรูกลม (7) ด้านข้างเหล็กรูปตัวเฮ็ท (H) ขนาดใหญ่กว่าลวดเหล็กสำหรับดึง (4) ตามตำแหน่ง ที่วิศวกรกำหนด โดยมีลักษณะพิเศษ คือ เป็นเหล็กลักษณะรูปตัวเฮ็ท(H) วางตามแนวนอน โดยให้แกนกลางของเหล็กลักษณะรูป ตัวเฮ็ท (H) ทำหน้าที่เป็นเครื่องรับน้ำหนักแรงอัดจากการดึงลวดเหล็กแบบ 2 แกน การเจาะรูช่องกลม (6) ด้านแกนเหล็กรูปตัวเฮ็ท (H) เพื่อทำหน้าที่เป็นช่องสำหรับการตัดลวดเหล็ก สำหรับดึง(4) และเป็นช่องสำหรับตรวจสอบระยะการยืดของลวดเหล็กสำหรับดึง(4) ให้ถูกต้อง ตามหลักวิศวกรรมก่อนทำการตัดลวดเหล็กดังกล่าว การที่ปลายเหล็กด้านหนึ่งที่มีลักษณะเป็นลิ่ม(1 0) และอีกด้านหนึ่งช่องเลียบลิ่ม(11) โดยให้เหล็ก ทั้งสองลอดยืดติดกันในลักษณะเข้าลิ่มระหว่างกัน เพื่อทำหน้าที่ให้แบบหล่อเหล็กนอกยืดเข้า ระหว่างกันและประกอบกันเป็นมุมฉากตามแบบที่กำหนด การเจาะรูกลม (12) ด้านแกนเหล็กรูปตัวเฮ็ท (H) และเชื่อมท่อเหล็กตามแนวขวาง เพื่อใช้เป็นช่องผ่านดึงท่อเหล็กพร้อมเหล็กหูดึง(1 3) ในการผลิตแผ่นผนัง ซึ่งทำให้แผ่นผนัง สำเร็จรูประบบดึงลวดเหล็กแบบ 2 แกน มีลักษณะกลวงกลางในแผ่นผนังสำเร็จรูป 2. แบบหล่อเหล็กในแผ่นผนังสำเร็จรูปชนิดกลวง(3) ประกอบด้วย แบบหล่อเหล็กในแผ่นผนัง เป็นเหล็กลักษณะรูปตัวที (T) (14) เจาะรูกลม(15) ประกอบ เป็นกรอบลี่เหลี่ยม เหล็กเข้ามุมฉากสำเร็จรูป (5) เป็นเหล็กลักษณะแบน เชื่อมต่อกันเป็นฉากลามเหลี่ยมเข้ามุม เจาะรูกลม (16) สำหรับใส่น๊อตยืด (17) เข้ากับแบบหล่อเหล็กในแผ่นผนัง (3) ที่เจาะรูกลม(15) ไว้ หน้า 2 ของจำนวน 2 หน้า โดยมีลักษณะพิเศษ คือ แบบหล่อเหล็กใน (3) ถูกวางตัวให้ตั้งฉากกับแท่นเหล็กสำหรับผลิตแผ่นผนังสำเร็จรูป(1) โดยให้ แกนกลางของเหล็กลักษณะรูปตัวที(T) (14) อยู่ด้านใน เพื่อทำหน้าที่เป็นแกนกลางยึดประกอบมุม และเหล็กลักษณะรูปตัวที(T) (14) แนวราบอยู่ด้านนอก เพื่อทำหน้าที่เป็นกรอบช่องว่างภายในของ แผ่นผนังสำเร็จรูป และเป็นตัวตั้งที่ทำให้ขอบคอนกรีตภายในกรอบเรียบตั้งฉากเป็นแนวระนาบ ตามแบบที่กำหนด เหล็กเข้ามุมฉากสำเร็จรูป (5) ถูกนำมาวางยึดประกอบมุมแบบหล่อเหล็กใน (3) ตามระยะที่ กำหนดไว้ตามแบบ เพื่อทำหน้าที่ให้แบบหล่อเหล็กใน (3) ประกอบกันเข้าเป็นมุมฉาก และมีระยะ ของช่องว่างภายในที่ถูกต้องตามแบบที่กำหนด 3. กรรมวิธีการผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็กแบบ 2 แกน โดย จะมีการเจาะรูกลวง (12) และใส่ท่อเหล็กที่แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) ใส่ ท่อเหล็กพร้อมเหล็กสำหรับดึง(13) เข้าไปในรูกลวง (12) ผ่านกลางแผ่นผนังคอนกรีตสำเร็จรูปก่อน เทคอนกรีต มีการเจาะรู (7) ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) ใหญ่กว่าขนาด ลวดเหล็กสำหรับดึง (4) แล้วนำลวดเหล็กสำหรับดึง (4) เข้าไปในรู(7) ไปตำแหน่งที่กำหนดอีก ด้านหนึ่งทั้งแกนตั้งและแกนนอนให้ตรงกัน จากในั้นยึดลวดเหล็กสำหรับดึง(4) ไว้ ทั้งสองด้านใช้ เครื่องดึงเหล็กไฮโดรลิค(18) ดึงลวดเหล็กสำหรับดึง (4) ให้ตึงจนได้แรงในลวดเหล็กทุกเส้น เท่ากับจำนวนที่ต้องการทั้งแกนตั้งและแกนนอน จากนั้นเทคอนกรีต ทำผิวหน้าคอนกรีต ดึง ท่อเหล็กพร้อมเหล็กหูดึง (13) ออกจากแผ่นผนังสำเร็จรูป โดยมีลักษณะพิเศษ คือ การดึงท่อเหล็กพร้อมเหล็กหูดึง (1 3) ออกจากแผ่นผนังคอนกรีตสำเร็จรูปเพื่อทำให้เกิดรูกลวงใน แผ่นผนังคอนกรีตสำเร็จรูป โดยดึงในขณะที่คอนกรีตเริ่มจะแข็งตัวด้วยเครื่องดึงมอเตอร์ (1 9) จาก1นั้นทิ้งระยะเวลาให้คอนกรีตแข็งตัวได้กำลังตามการคำนวณทางวิศวกรรม แล้วทำการตัด ลวดเหล็กสำหรับดึง (4) ทำให้เกิดการอัดแรงคอนกรีต ลวดเหล็กสำหรับดึง (4) จะยึดเหนี่ยวกับ คอนกรีตตลอดเส้นลวดเหล็ก และถ่ายแรงอัดในคอนกรีตแบบ 2 แกน ตลอดทั้งแผ่นผนังสำเร็จรูป คอนกรีต ซึ่งกระบวนการดังกล่าวทำให้แผ่นผนังสำเร็จรูปชนิดกลวงมีความยืดหยุ่น หน้า 3 ของจำนวน 2 หน้า 4. วิธีการติดตังแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็กแบบ 2 แกน โดย จะมีเหล็กเล็นก่อสร้าง(22) ฝังไว้ที่คานคอดินคอนกรีต(21) วางแผ่นพื้นสำเร็จรูปเสริมเหล็ก(23) เทคอนกรตทับแผ่นพื้นสำเร็จรูปเสรมเหล็ก(23) ให้เหล็กเส้นก่อสร้าง (22) มีความสูงกว่าแผ่นผนัง สำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) นำแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง (24) ติดตั้งประกอบ โดยนำเหล็กเส้นก่อสร้าง(22) สอดเข้าในรูกลวงของแผ่นผนังสำเร็จรูปคอนกรีตอัด แรงชนิดกลวง(24) จากนั้นเทคอนกรีตเหลว(26) เข้าไปในรูกลวงของแผ่นผนังสำเร็จรูป โดยมีลักษณะพิเศษ คือ เหล็กเส้นก่อสร้าง(22) ที่สอดเข้าในรูกลวงของแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) จะสอดอยู่ในแผ่นผนังสำเร็จรูปคอนกรีต ตลอดทั้งแผ่น ต่อเหล็กเส้นก่อสร้าง(22) แบบเข้าเกลียว ด้วยข้อต่อ (Coupler)(25) ซึ่งทำให้เหล็กเส้นก่อสร้าง(22) เชื่อมต่อกันตั้งแต่คานคอดินชิ้น 1 ถึง ชั้นบนสุดของอาคาร จากนั้นเทคอนกรีตชนิดเหลว(26) เทเข้าในรูกลวงของแผ่นผนังสำเร็จรูป เพื่อ ยึดระหว่างเหล็กเส้นก่อสร้าง(22) กับแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง(24) ทำให้ อาคารที่ก่อสร้างขึ้นมีเหล็กก่อสร้างเชื่อมต่อยึดกันตลอดแนวอาคาร ------------------05/01/2021------(OCR) 1. Precast prestressed concrete wall formwork with a 2-axis steel wire tensioning system before pouring hollow core concrete. Consists of an outer steel formwork with load-bearing device (2) which is H-shaped steel placed horizontally parallel to the steel plate base, with round holes (7) on the sides as load-bearing devices for tensioning the steel wires (4), and an inner steel formwork (3) which is T-shaped steel assembled into a square frame formwork, with pre-fabricated corner steel (5) to hold the corners in a square shape for pouring concrete in the middle area between the outer steel formwork with load-bearing device (2) and the inner steel formwork (3). The special feature is that the outer steel formwork with load-bearing device (2) is H-shaped steel placed horizontally parallel to the steel plate base for producing precast wall panels (1) for pouring concrete in the middle area. The outer cast iron formwork with load-bearing device (2) has a number of round holes (6) in the center of the iron core, and on the H-shaped iron core (H) end, one end is wedge-shaped (10), the other end is a slot for a wedge (11) to assemble the outer cast iron formwork with load-bearing device (2) into a square frame, and the outer cast iron formwork with load-bearing device (2) has a hollow hole with a pipe casing (12) on the H-shaped iron core (H) in the transverse direction to weld a round steel pipe in the transverse direction for inserting a steel pipe with a steel pulley (13), and the outer cast iron formwork with load-bearing device (2) has a round hole (7) on the side of the H-shaped iron (H) that is larger than the steel wire for pulling (4) to allow the steel wire for pulling (4) to pass through and to be a load-bearing device. (Anchorage)(8) To pull the steel wire for tensioning (4) with the steel formwork inside (3) is a T-shaped steel (14) with round holes (15) drilled in the steel axis perpendicular to the steel plate using pre-fabricated corner steel (5) drilled holes (16) and fastened with nuts (17) to the steel formwork inside (3) as a square frame and will drill holes for inserting the steel wire for tensioning (4) to match the holes drilled in the outer steel formwork with weight-bearing device (2) for casting concrete outside the inner formwork (3).2. The process of producing hollow prestressed concrete precast wall panels with a 2-axis steel tensioning system consists of: Step 1 Assemble the outer steel formwork with weight-bearing device (2) and the inner steel formwork (3) placed horizontally parallel to the steel plate of the steel platform for producing precast wall panels (1) by placing them according to the size and shape specified with special characteristics, which is: Step 2 Insert the steel pipe with tensioning wire (13) into the hollow hole with pipe sleeve (12) in the center of the precast wall panel. Then insert the tensioning wire (4) into the drilled holes in the outer steel formwork with load-bearing (2) and the inner steel formwork (3) on both axes where the holes are drilled. Step 3 Install the anchorage (8) on the outer steel formwork with load-bearing (2) on both axes at the positions where the round holes (7) are drilled. Attach the anchorage (8) to one end of the tensioning wire (4) and attach the anchorage (8) to the other end for pulling the tensioning wire (4). Then use a hydraulic steel tensioner (18) to pull the tensioning wire (4) taut until the required force in the wire is obtained for both axes, namely the vertical and horizontal axes. Step 4 Pour the concrete into the steel formwork. Allow the concrete to harden sufficiently. Use a motor puller (19) to pull out the steel pipe with tensioning lugs (13) to create a hollow space in the precast concrete wall panel. Then cure the concrete to obtain sufficient compressive strength. Engineering calculations, Step 5: Use steel shears (20) to cut the steel wire for tensioning (4), cutting off the ends of the steel wire for tensioning (4) one by one, in order to create concrete compression throughout the precast concrete wall panel. Then lift the precast wall panel and store it in the storage area. 3. Method of installing hollow precast prestressed concrete wall panels with a 2-axis steel tensioning system, consisting of: Step 1: Perform the work on the building foundation and concrete ground beam (21), with special characteristics. Step 2: Insert construction steel bars (22) in an amount equal to the hollow of the precast wall panel, embed them perpendicularly in the concrete ground beam (21), with a length greater than the hollow precast prestressed concrete wall panel (24). Step 3: Then place the reinforced precast floor panel (23) on the concrete ground beam (21), making sure that all the construction steel bars (22) embedded perpendicularly are standing upright. Pour precast concrete over the reinforced precast floor panel (23), then smooth the surface of the concrete floor. Step 4: Allow time until the concrete surface begins to harden. Cure the concrete floor by spraying water to keep it moist. Then, install the hollow prestressed concrete wall panels (24) by threading all the construction steel bars (22) that are raised above the concrete floor in step 3 into the hollow holes of the hollow prestressed concrete wall panels (24). Step 5: Thread the construction steel bars (22) into the steel eyelets (27) embedded in the sides of the hollow prestressed concrete wall panels (24) to secure the joints between the prestressed wall panels. Step 6: Pour the liquid concrete (26) into the hollow holes and seal the joints between the hollow prestressed concrete wall panels (24) to harden. Step 7: Connect the construction steel bars (22) by threading them together with a connector. (Coupler)(25) to allow construction steel bars (22) to run along the entire height of the building from the 1st floor to the next higher level. Step 8 for the installation of hollow prestressed concrete precast wall panels in the next levels, follow steps 1-7. ------------ ------03/04/2020------(OCR) Page 1 of 3 pages. Claim 1. The formwork for prestressed concrete precast wall panels with a 2-axis steel wire tensioning system before pouring hollow core concrete consists of: 1.1 The outer steel formwork with load-bearing device (2) is H-shaped steel placed horizontally parallel to the steel plate, with round holes (7) on the sides as load-bearing devices for tensioning the steel wires (4), and the inner steel formwork (3) is T-shaped steel assembled into a square frame formwork, with pre-fabricated right-angle steel (5) to hold the corners in a square shape for pouring concrete in the middle between the outer steel formwork (2) and the inner steel formwork. (3) It has special characteristics, namely: the outer steel formwork with load-bearing device (2) is an H-shaped steel (H) placed horizontally parallel to the steel base for the production of prefabricated wall panels (1) for casting concrete in the center. The outer steel formwork with load-bearing device (2) has a number of round holes (6) in the center of the steel shaft, and on the H-shaped steel shaft (H) end, one end has a wedge-shaped (10) shape, and the other end has a slot for a wedge (11) to assemble the outer steel formwork with load-bearing device (2) into a square frame. And the outer steel formwork with load-bearing device (2) has a hollow hole with a pipe casing (12) on the H-shaped steel shaft (H) in the transverse direction to weld round steel pipes in the transverse direction for inserting steel pipes with steel pull tabs (13). And the outer steel formwork with load-bearing device (2) has round holes (7) on the side of the H-shaped steel (H) which are larger than the steel wire for pulling (4) to allow the steel wire for pulling (4) to pass through and to be load-bearing devices. (Anchorage)(8) to pull the steel wire for tensioning (4) with 1.2 the steel formwork inside (3) with special characteristics, which is a T-shaped steel (T) (14) with round holes (15) drilled in the steel axis perpendicular to the steel plate using pre-made corner steel (5) drilled holes (16) fixed with nuts (17) to the steel formwork inside (3) as a square frame and will drill holes for inserting the steel wire for tensioning (4) to match the holes drilled in the outer steel formwork with the load-bearing device (2) for casting concrete outside the inner formwork (3). Page 2 of 3. Page 2. Manufacturing process of hollow prestressed concrete precast wall panels with a 2-axis steel tensioning system consisting of: Step 1 Assemble the outer steel formwork with the load-bearing device (2) and the inner steel formwork (3) placed horizontally parallel to the steel plate of the steel platform for production. Prefabricated wall panels (1) are laid according to the specified size and shape, with special characteristics as follows: Step 2: Insert the steel pipe with tensioning wire (13) into the hollow hole with pipe casing (12) in the center of the prefabricated wall panel. Then insert the tensioning wire (4) through the drilled holes in the outer steel formwork with load-bearing device (2) and the inner steel formwork (3) on both axes where the holes are drilled. Step 3: Install the anchorage (8) on the outer steel formwork with load-bearing device (2) on both axes at the position where the round holes are drilled (7). Insert the anchorage (8) at one end of the tensioning wire (4) and insert the anchorage (8) at the other end for pulling the tensioning wire (4). Then use a hydraulic steel tensioning machine (18) to pull the tensioning wire (4) until the required force in the steel wire is obtained in both axes, namely the vertical and horizontal axes. Step 4: Pour concrete into the steel formwork and allow the concrete to harden sufficiently. Use a motor puller (19) to pull out the steel pipe with the tensioning wire (13), creating a hollow space in the precast concrete wall panel. Then cure the concrete to achieve sufficient compressive strength according to engineering calculations. Step 5: Use steel shears (20) to cut the tensioning wire (4), cutting the ends of each tensioning wire (4) one by one to create prestressing throughout the precast concrete wall panel. Then lift the precast wall panel and store it in the storage area. Page 3 of 3. Method of installing hollow precast prestressed concrete wall panels with a 2-axis steel tensioning system. It consists of: Step 1: Work on the building foundation and concrete ground beam (21), with special characteristics. Step 2: Embed construction steel bars (22) in an amount equal to the hollow space of the precast wall panel in a perpendicular direction in the concrete ground beam (21), with a length greater than the hollow precast prestressed concrete wall panel (24). Step 3: Then place the reinforced precast floor panel (23) on the concrete ground beam (21), ensuring that all the construction steel bars (22) that are embedded in a perpendicular direction are standing upright. Pour precast concrete over the reinforced precast floor panels (23). Then, smooth the surface of the concrete floor. Step 4: Allow the concrete surface to harden. Cure the concrete floor by spraying it with water. Then, install the hollow precast prestressed concrete wall panels (24). Insert all the construction steel bars (22) that are raised above the concrete floor in step 3 into the hollow holes of the hollow precast prestressed concrete wall panels (24). Step 5: Insert the construction steel bars (22) into the steel eyelets (27) embedded in the sides of the hollow precast prestressed concrete wall panels (24) to secure the joints between the precast wall panels. Step 6: Pour liquid concrete (26) into the hollow holes and seal the joints between the hollow precast prestressed concrete wall panels (24) until hardened. Step 7: Connect the construction steel bars (22) using the threaded connection method with connectors. (Coupler)(25) to make the construction steel bars (22) run along the entire height of the building from the 1st floor to the next higher floors. Step 8 for the installation of precast prestressed hollow core concrete wall panels in the next floors, do according to steps 1-7. ------------ ------25/01/2019------(OCR) Page 1 of 4 pages. Claim 1. The formwork for precast prestressed concrete wall panels with a 2-axis steel wire tensioning system before pouring hollow core concrete consists of: an outer steel formwork with a load-bearing device (2) which is an H-shaped steel placed horizontally parallel to the steel plate, with round holes (7) on the sides as load-bearing devices for tensioning the steel wires, and an inner steel formwork (3) which is a T-shaped steel assembled into a square frame formwork with precast corner steel (5) to hold the corners in a square shape. To cast concrete in the middle area between the outer steel formwork (2) and the inner steel formwork (3), 1.1 The outer steel formwork with load-bearing device (2) is made of H-shaped steel (H) placed horizontally parallel to the steel base for producing prefabricated wall panels (1). A number of circular holes (6) are drilled in the center of the steel core to be used as holes for cutting the steel wire for pulling (4). Holes (7) are drilled on the sides of the steel to be used for inserting the steel wire for pulling (4). Hollow holes with pipe casings (12) are drilled on the H-shaped steel core (H) in a transverse direction. Round steel pipes are welded in a transverse direction to insert steel pipes with pulling lugs (13). The ends of the H-shaped steel (H) on both sides, one side has a wedge shape (10), the other side has a slot for inserting the wedge (11), assembled in a wedge shape. It is a square frame formwork with special characteristics: the outer iron formwork (2) is an H-shaped iron (H) placed horizontally parallel to the iron base for the production of prefabricated wall panels (1) for casting concrete in the center of the outer iron formwork (2) has a number of round holes (6) in the center of the iron core and on the H-shaped iron core (H) one end has a wedge shape (10) and the other end has a slot for a wedge (11) to assemble the outer iron formwork (2) into a square frame and the outer iron formwork (2) has a hollow hole with a pipe casing (12) on the H-shaped iron core (H) in the transverse direction to weld a round steel pipe in the transverse direction. For inserting steel pipes with steel pull tabs (13) and external steel formwork (2), there are round holes (7) on the side of the H-shaped steel (H) which is larger than the steel wire for pulling (4) to allow the steel wire for pulling (4) to pass through and to be a weight-bearing device for Anchorage (8) for pulling the steel wire. Page 2 of 4 pages 1.2 Hollow precast steel formwork (R) is a T-shaped steel (14) with round holes (15) drilled in the steel shaft, placed perpendicular to the steel plate, using pre-fabricated corner steel (5) to assemble a square frame for casting concrete outside the internal formwork (3). It has a special characteristic: the internal steel formwork (R) is a T-shaped steel (14) with round holes (15) drilled in the steel shaft, placed perpendicular to the steel plate, using pre-fabricated corner steel (5) with holes (16) drilled and attached with nuts (17) to the internal steel formwork (R) as a square frame. and will drill holes for inserting steel wire for pulling (4) to match the holes drilled in the outer steel formwork with weight-bearing equipment (2) for casting concrete outside the inner formwork (3).2. The process of producing hollow prestressed concrete wall panels with a 2-axis steel pulling system consists of: Step 1 Assemble the outer steel formwork with weight-bearing equipment (2) and the inner steel formwork (R) placed horizontally parallel to the steel plate of the steel platform for producing precast wall panels (1), placed according to the specified size and shape with special characteristics: Step 2 Insert the steel pipe with the pulling steel (1 R) into the hollow hole with the pipe sleeve (1 2) in the center of the precast wall panel. Then insert the steel wire for pulling (4) through the drilled holes. Place the outer cast iron form with weight support (2) and the inner cast iron form (r) on both axes where the holes are drilled. Step 3 Install the Anchorage device (8) on the outer cast iron form with weight support (2) on both axes at the positions where the holes are drilled (7). Insert the anchorage device at one end of the steel wire for pulling (4) and insert the Anchorage device (8) at the other end for pulling the steel wire for pulling (4). Then use a hydraulic steel pulling machine (18) to pull the steel wire for pulling (4) taut until the required force in the wire is obtained for 2 axes, namely the vertical axis and the horizontal axis. Page 3 of 4. Step 4 Pour the concrete into the cast iron form. Allow the concrete to harden sufficiently. Use a motor puller (19) to pull out the steel pipe with the pulling lugs (13) to create a hollow space in the finished concrete wall panel. Then bake the concrete to achieve sufficient compressive strength. Engineering calculations, Step 5: Use steel shears (20) to cut the tensioning steel wire (4) to create concrete compression and transfer the compression force in the concrete in a 2-axis manner by cutting the ends of the tensioning steel wire (4) one by one to create concrete compression. Since the tensioning steel wire (4) is bonded to the concrete along its length, when the tensioning steel wire (4) is cut, the tensile force in the tensioning steel wire (4) will be transferred to the compression force in the concrete through the bonding force at the ends of the precast concrete wall panel along the entire length of the precast concrete wall panel. Then, lift the precast wall panel and store it in the storage area. 3. Method of installing precast prestressed concrete wall panels, hollow type, with a 2-axis steel tensioning system, consisting of: Step 1: Perform the work of the building foundation and concrete ground beam (21), which has a special characteristic: Step 2: Take the construction steel bars (22) in an amount equal to the hollow of the precast wall panel. Step 3: Then place the reinforced precast concrete floor panel (23) on the concrete ground beam (21), ensuring that all the construction steel bars (22) that are embedded perpendicularly are supported. Pour the precast concrete floor leveling over the reinforced precast concrete floor panel (23). Then smooth the concrete floor surface. Step 4: After smoothing the concrete floor surface, allow time for the concrete surface to harden. Cure the concrete floor by spraying it with water to ensure it is fully durable and strong. Then install the hollow precast concrete wall panel (24). By taking all the construction steel bars (22) that are elevated above the concrete floor in step 3 and threading them through the hollow holes of the hollow pre-stressed concrete wall panels (24), they will act as reinforcement in the hollow pre-stressed concrete wall panels (24). Page 4 of 4 pages. Step 5: Insert the construction steel bars (22) through the steel eyelets (27) embedded in the sides of the hollow pre-stressed concrete wall panels (24) to secure the joints between the pre-stressed wall panels. Step 6: Pour the liquid concrete (26) into the hollow holes and seal the joints between the hollow pre-stressed concrete wall panels (24) to harden. Step 7: Connect the construction steel bars (22) by threading them together with the couplings. (Coupler)(25) to allow the steel reinforcement (22) to extend along the entire height of the building from step 1 to the next higher step 8 for the installation of hollow precast reinforced concrete wall panels. In the next steps, follow steps 1-7. ------------ ------11/04/2018------(OCR) Page 1 of 2 pages. Claim 1. Formwork for the steel reinforcement outside the hollow precast wall panels. Equipped with a 2-axis steel pulling system load bearing device, consisting of an outer cast iron form with a load bearing device (2) made of H-shaped steel (H) placed horizontally, with a round hole (6) drilled in the middle. On the H-shaped steel (H) axis, one end of the steel is wedge-shaped (10), the other end is wedge-shaped (11), with a hollow round hole (12). On the H-shaped steel (H) axis in the transverse direction, weld a round steel pipe in the transverse direction, with a round hole (7). On the side of the H-shaped steel (H), the size is larger than the steel wire for pulling (4) at the position specified by the engineer. It has special characteristics, namely, it is a steel in the shape of an H (H) placed horizontally, with the central axis of the steel in the shape of an H (H) acting as a load-bearing device for the 2-axis steel wire tensioning. The drilling of a circular hole (6) on the side of the steel in the shape of an H (H) serves as a channel for cutting the steel wire for tensioning (4) and as a channel for checking the correct stretching distance of the steel wire for tensioning (4) according to engineering principles before cutting the steel wire. One end of the steel is wedge-shaped (1 0) and the other end has a wedge-shaped channel (11), allowing the two steels to pass through and be joined together in a wedge-like manner, to serve to allow the outer steel formwork to stretch between each other and assemble at a right angle according to the specified design. The drilling of a circular hole (12) on the side of the steel in the shape of an H (H) and welding of a steel pipe in the transverse direction are used as a channel for pulling the steel pipe with the tensioning lugs (1 3) in the production of the wall panel, which makes the wall panel 2. Hollow prefabricated steel wire pulling system (3) consists of a steel formwork in the wall panel, which is a T-shaped steel (14) with round holes (15) assembled into a square frame, and a prefabricated corner steel (5) which is a flat steel, welded together into a square corner, with round holes (16) for inserting nuts (17) into the steel formwork in the wall panel (3) which has round holes (15) on page 2 of 2 pages. It has a special characteristic that the steel formwork (3) is placed perpendicular to the steel base for producing the prefabricated wall panel (1), with the central axis of the T-shaped steel (14) inside to act as the central axis for assembling the corner, and the horizontal T-shaped steel (14) outside to act as the frame of the internal cavity of the prefabricated wall panel and as a vertical support that makes the concrete edge inside the frame flat and perpendicular to the plane according to the specified design. Pre-fabricated pre-stressed concrete wall panels (5) are placed to fasten the steel formwork (3) to the specified distances in the design, to serve to make the steel formwork (3) fit together into a right angle and have the correct internal space distances in accordance with the design. 3. Manufacturing process of pre-fabricated hollow pre-stressed concrete wall panels with a 2-axis steel tensioning system. A hollow hole (12) is drilled and a steel pipe is inserted into the outer steel formwork with the load-bearing device (2). A steel pipe with tensioning steel (13) is inserted into the hollow hole (12) through the center of the pre-fabricated concrete wall panel before pouring the concrete. A hole (7) is drilled in the outer steel formwork with the load-bearing device (2) larger than the size of the tensioning steel wire (4), and the tensioning steel wire (4) is inserted into the hole (7) to the specified position on the other side, aligning the vertical and horizontal axes. Then, the tensioning steel wire (4) is secured on both sides. A hydraulic tensioning device (18) is used to tension the tensioning steel wire (4) until the required force is obtained in all the steel wires, both in the vertical and horizontal axes. Then pour concrete, finish the concrete surface, pull the steel pipe with steel lugs (13) out of the precast wall panel. The special characteristic is that the steel pipe with steel lugs (13) is pulled out of the precast concrete wall panel to create a hollow space in the precast concrete wall panel. This is done by pulling while the concrete is beginning to harden with a motor puller (19). Then leave the time for the concrete to harden to the strength according to the engineering calculations, then cut the steel wire for pulling (4), causing the concrete to be compressed. The steel wire for pulling (4) will be bonded to the concrete along the length of the steel wire and transfer the compressive force in the concrete in 2 axes throughout the precast concrete wall panel. This process makes the precast hollow wall panel flexible. Page 3 of 2, Page 4. Method of installing precast hollow prestressed concrete wall panels with a 2-axis steel pulling system. There will be construction steel bars (22) embedded in the concrete ground beam (21), place the precast reinforced floor panel (23), pour concrete over the precast reinforced floor panel (23) so that the construction steel bars (22) are higher than the wall panel. Precast Prestressed Hollow Concrete Panels (24) are assembled by inserting construction steel bars (22) into the hollow holes of the precast prestressed hollow concrete panel (24). Then liquid concrete (26) is poured into the hollow holes of the precast wall panels. The special characteristic is that the construction steel bars (22) inserted into the hollow holes of the precast prestressed hollow concrete panel (24) are inserted throughout the entire precast concrete panel. The construction steel bars (22) are threaded together with a coupler (25), which connects the construction steel bars (22) from the first ground beam to the top floor of the building. Then liquid concrete (26) is poured into the hollow holes of the precast wall panels to connect the construction steel bars (22) with the precast prestressed hollow concrete panel (24), so that the constructed building has construction steel bars connected and held together along the entire length of the building. ------------ 1. แบบหล่อเหล็กนอกแผ่นผนังสำเร็จรูปชนิดกลวง พร้อมเครื่องรับน้ำหนักระบบการดังเหล็กแบบ 2 แกน แบบหล่อเหล้กนอกพร้อมเครื่องรับน้ำหนัก (2) จะเป็นเหล็กรูปแบบ H วางแนวนอน เจาะรูกลวงกลม (6) ด้านแกนเหล็กรูปแบบ H ปลายเหล้กด้านหนึ่งมีลักษณะเป็นลิ่ม (10) อีกด้านหนึ่งมีลักษณะเป็นช่องเสียบลิ่ม (11) และเจาะรูกลวงวงกลม (12) ด้านแกนเหล็กรูปแบบ H แนวขวาง เชื่อมท่อเหล็กกลมตามแนวขวาง เจาะรูกลม (7) ด้านข้างเหล็กรูปแบบ H ขนาดใหญ่กว่าลวดเหล็กสำหรับดึง (4) เล็กน้อย ตาม ตำแหน่งที่วิศวกรกำหนด โดยมีลักษณะพิเศษ คือ แบบหล่อเหล็กนอก จะใช้เป็นแบบหล่อเหล็กนอก และเป็นเครื่องรับน้ำหนักในระบบดึงลวดในตัว เจาะรู (6) กลวงกลมด้านแกนเหล็กรูปแบบ H จะใช้สำหรับตัดลวดเหล็กสำหรับดึง (4) ปลายเหล้กที่มีลักษณะเป็นลิ่ม (10) และช่องเสียบลิ่ม (11) จะเสียบยึดติดกันพอดีเพื่อล็อค ระหว่างกันเชื่อมท่อเหล็กตามแนวขวาง เพื่อใช้เป็นช่องผ่านท่อเหล็กพร้อมเหล็กหูดึง (13) เพื่อทำให้แผ่นผนังระบบดึงลวดมีลัษณะกลวงกลางแผ่นผนัง1. Hollow steel formwork outside prefabricated wall panels with a 2-axis steel tensioning system load bearing. The formwork outside with load bearing (2) is made of horizontal H-shaped steel, with a hollow circular hole (6) on the H-shaped steel axis, one end of which is wedge-shaped (10), and the other end is wedge-shaped (11), and a hollow circular hole (12) is drilled on the transverse H-shaped steel axis. A round steel pipe is welded transversely, with a round hole (7) drilled on the side of the H-shaped steel slightly larger than the steel wire for tensioning (4), at the position specified by the engineer. The special feature is that the formwork outside is used as an formwork outside and as a load bearing in the wire tensioning system. The hollow circular hole (6) on the H-shaped steel axis is used to cut the steel wire for tensioning (4). The wedge-shaped end (10) and wedge-shaped (11) are inserted and locked together. A steel pipe is welded transversely to be used as a passage for the steel pipe with tensioning lugs (13) to make the wire tensioning system wall panel hollow in the middle of the wall panel. 2. แบบหล่อเหล็กในแผ่นผนังสำเร็จรูปชนิดกลวง (3) จะเป็นเหล็กรูปตัวที (14) เจาะรู (15) ประกอบกันเป็นกรอบ ใช้เหล็กเพลทเชื่อมต่อกันเป็นฉากสามเหลี่ยม เป็นเหล็กเข้ามุมฉากสำเร็จรูป (5) เจาะรู (16) ใส่น๊อตยึด (17) โดยมีลัษณะพิเศษคือ แบบหล่อเหล็กใน (3) เป็นเหล็กรูปตัวที (14) เพื่อให้ช่องว่างภายในมีขอบคอนกรีตที่เรียบตามแบบ เหล็กเข้ามุมฉากสำเร็จรูป (5) เป็นเหล็กเพลทเชื่อมติดกันลัษณะเป็นกรอบสามเหลี่ยม เจาะรู (16) ใส่น๊อตยึด (17) เป็นกรอบสามเหลี่ยม ใช้ยึดแบบหล่อเหล็กใน (3) เพื่อให้ช่องว่างภายในได้มุมฉาก ทั้ง 4 มุม2. The formwork for hollow prefabricated wall panels (3) is made of T-shaped steel (14) with holes (15) drilled and assembled into a frame. Steel plates are welded together to form a triangular shape. Prefabricated corner steel (5) is drilled with holes (16) and fastened with nuts (17). It has a special characteristic: the formwork for hollow wall panels (3) is made of T-shaped steel (14) to ensure that the hollow space has a smooth concrete edge according to the design. Prefabricated corner steel (5) is made of steel plates welded together to form a triangular frame with holes (16) drilled and fastened with nuts (17). It is used to fasten the formwork for hollow wall panels (3) to ensure that the hollow space has a right angle at all four corners. 3. กรรมวิธีผลิตแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็กแบบ 2 แกน โดย จะมีการเจาะรูกลวง (12) และใส่ท่อเหล็กที่แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) ใส่ ท่อเหล็กพร้อมเหล็กสำหรับดึง (13) เข้าไปในรูกลวง (12) ผ่านกลางแผ่นผนังคอนกรีตสำเร็จรูปก่อน เทคอนกรีต มีการเจาะรู (7) ที่แบบหล่อเหล็กนอกพร้อมเครื่องรับน้ำหนัก (2) ใหญ่กว่าขนาด ลวดเหล้กสำหรับดึง (4) แล้วนำลวดเหล็กสำหรับดึง (4) เข้าไปในรู (7) ไปตำแหน่งที่กำหนดอีก ด้านหนึ่งทั้งแกนตั้งและแกนนอนให้ตรงกัน จากนั้นยึดลวดเหล็กสำหรับดึง (4) ไว้ ทั้งสองด้านใช้ เครื่องดึงเหล็กไฮโดรลิค (18) ดึงลวดเหล็กสำหรับดึง (4) ให้ตึงจนได้แรงในลวดเหล็กหมุนเส้น เท่ากับจำนวนที่ต้องการทั้งแกนตั้งและแกนนอน จากนั้นเทคอนกรีต ทำผิวหน้าคอนกรีต ดึง ท่อเหล็กพร้อมเหล็กหูดึง (13) ออกจากแผ่นผนังสำเร็จรูป โดยมีลักษณะพิเศษ คือ การดึงท่อเหล็กพร้อมเหล็กหูดัง (13) ออกจากแผ่นผนังคอนกรีตสำเร็จรูปเพื่อทำให้เกิดรูกลวงใน แผ่นผนังคอนกรีตสำเร็จรูป โดยดึงในขณะที่คอนกรีตเริ่มจะแข็งตัวด้วยเครื่องดึงมอเตอร์ (19) จากนั้นทิ้งระยะเวลาให้คอนกรีตแข็งตัวได้กำลังตามการคำนวณทางวิศวกรรม แล้วทำการตัด ลวดเหล็กสำหรับดึง (4) ทำให้เกิดการอัดแรงคอนกรีต ลวดเหล็กสำหรับดึง (4) จะยึดเหนี่ยวกับ คอนกรีตตลอดเส้นลวดเหล็ก และถ่ายแรงอัดในคอนกรีตแบบ 2 แกน ตลอดทั้งแผ่นผนังสำเร็จรูป คอนกรีต ซึ่งกระบวนการดังกล่าวทำให้แผ่นผนังสำเร็จรูปชนิดกลวงมีความยืดหยุ่น น้ำหนักไม่ มาก สามารถผลิตแผ่นผนังให้มีขนาดใหญ่ได้ โดยไม่แตกร้าว เสียหาย ในการขนย้าย และนำไปใช้ ประกอบอาคารสูงได้ตามหลักการคำนวณทางวิศวกรรม3. The process of producing precast prestressed hollow concrete wall panels using a 2-axis steel tensioning system involves drilling a hollow hole (12) and inserting a steel pipe into the outer steel formwork with the load-bearing device (2). A steel pipe with tensioning wire (13) is inserted into the hollow hole (12) through the center of the precast concrete wall panel before pouring the concrete. A hole (7) is drilled in the outer steel formwork with the load-bearing device (2) larger than the size of the tensioning wire (4), and the tensioning wire (4) is inserted into the hole (7) to the specified position on the other side, aligning both the vertical and horizontal axes. Then, the tensioning wire (4) is secured on both sides. A hydraulic tensioning device (18) is used to pull the tensioning wire (4) until the required force in the tensioning wire is achieved in both the vertical and horizontal axes. Then, concrete is poured, the concrete surface is made, and the steel pipe with tensioning wire (13) is pulled out of the precast wall panel. The special characteristic is that the steel pipe with tensioning wire (13) is pulled out of the precast concrete wall panel to create a hollow hole in the precast concrete wall panel. The tensioning is performed while the concrete is beginning to harden using a motor tensioner (19), after which the concrete is allowed to harden to the required engineering strength. The tensioning wire (4) is then cut, causing the concrete to be compressed. The tensioning wire (4) is bonded to the concrete along its length and transfers the compressive force in the concrete in a two-axis manner throughout the precast concrete panel. This process allows the hollow precast wall panels to be flexible, lightweight, and capable of being produced in large sizes without cracking or damage during transport and use in constructing high-rise buildings according to engineering calculations. 4. วิธีการติดตั้งแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง ด้วยระบบการดึงเหล็กแบบ 2 แกน โดย จะมีเหล็กเส้นก่อสร้าง (22) ฝังไว้ที่คานคอดินคอนกรีต (21) วางแผ่นพื้นสำเร็จรูปเสริมเหล็ก (23) เทคอนกรีตทับแผ่นฟื้นสำเร็จรูปเสริมเหล็ก (23) ให้เหล็กเส้นก่อสร้าง (22) มีความสูงกว่าแผ่นผนัง สำเร็จรูป คอนกรีตอังแรงชนิดกลวง (24) นำแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง (24) ติดตั้งประกอบ โดยนำเหล็กเส้นก่อสร้าง (22) สอดเข้าในรูกลวงของแผ่นผนังสำเร็จรูปคอนกรีตอัด แรงชนิดกลวง (24) จากนั้นเทคอนกรีตเหลว (20) เข้าไปในรูกลวงของแผ่นผนังสำเร็จรูป โดยมีลักษณะพิเศษ คือ เหล็กเส้นก่อสร้าง (22) ที่สอดเข้าในรูกลวงของแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง (24) จะสอดอยู่ในแผ่นผนังสำเร็จรูปคอนกรีต ตลอดทั้งแผ่น ตอ่เหล็กเส้นก่อสร้าง (22) แบบเข้าเกลียว ด้วยข้อต่อ (Coupler)(25) ซึ่งทำให้เหล็กเส้นก่อสร้าง (22) เชื่อมต่อกันตั้งแต่คานคอดินชั้น 1 ถึง ชั้นบนสุดของอาคาร จากนั้นเทคอนกรีตชนิดเหลว 22 เทเข้าในรูกลวงของแผ่นผนังสำเร็จรูป เพื่อ ยึดระหว่างเหล็กเส้นก่อสร้าง 18 กับแผ่นผนังสำเร็จรูปคอนกรีตอัดแรงชนิดกลวง 20 ทำให้อาคารที่ ก่อสร้างขึ้นมีเหล็กก่อสร้างเชื่อมต่อยึดกันตลอดแนวอาคาร4. Method of installing hollow prestressed concrete precast wall panels with a 2-axis steel tensioning system. Construction steel bars (22) are embedded in the concrete ground beam (21). Reinforced precast floor panels (23) are placed. Concrete is poured over the reinforced precast floor panels (23) so that the construction steel bars (22) are higher than the hollow prestressed concrete precast wall panels (24). The hollow prestressed concrete precast wall panels (24) are installed by inserting the construction steel bars (22) into the hollow holes of the hollow prestressed concrete precast wall panels (24). Then liquid concrete (20) is poured into the hollow holes of the precast wall panels. The special characteristic is that the construction steel bars (22) inserted into the hollow holes of the hollow prestressed concrete precast wall panels (24) are inserted throughout the entire precast concrete wall panel. The construction steel bars (22) are connected by threading with a coupler (25), which connects the construction steel bars (22) from the ground beam of the 1st floor to the top floor of the building. Next, liquid concrete type 22 is poured into the hollow cores of the precast wall panels to secure the 18 construction steel bars to the 20 precast hollow core prestressed concrete wall panels, ensuring that the constructed building has interconnected steel bars along its entire length.
TH1703001081U 2017-06-16 prefabricated wall formwork Production process and method of installation of pre-stressed concrete wall panels with a 2-axis steel wire pulling system before concrete is poured. TH19967C3 (en)

Publications (4)

Publication Number Publication Date
TH19967Y true TH19967Y (en) 2022-07-01
TH19967A3 TH19967A3 (en) 2022-07-01
TH19967U TH19967U (en) 2022-07-01
TH19967C3 TH19967C3 (en) 2022-07-01

Family

ID=

Similar Documents

Publication Publication Date Title
US11680401B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
CN107542190B (en) Composite structural wall and its construction method
CN105863275B (en) Assembled ring muscle fastens concrete shear wall system construction method
AU2022204051B2 (en) Method for constructing a concrete floor in a multistorey building
US8074414B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
HK1244857A1 (en) Composite structural wall and method of construction thereof
CN113818556A (en) Precast concrete truss wall structure and construction method using the same
US12410614B2 (en) Pre-stressed insulated concrete panels and methods for making and using the same
KR102105457B1 (en) Building Core System using Precast Concrete Box Shaped Modules with Connection Hardware at Corners And Core System Construction Method Using Thereof
CN105839846A (en) Prefabricated reinforced concrete composite beam
KR102079703B1 (en) Modular staircase and method of constructing the same
KR20120096605A (en) Bracket support type downward construction system and method
WO2020214086A1 (en) Precast building
CN113700139A (en) Prefabricated assembled bolted connection constructional column ring beam and construction method
JP3999931B2 (en) Construction method of tower structure
KR20140110491A (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
WO2016020932A2 (en) Deployable pre-fabricated reinforcement cage system
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
TH19967U (en) Precast wall panel formwork: Manufacturing process and installation method of precast prestressed concrete wall panels using a 2-axis steel wire tensioning system before concrete pouring.
US20090165408A1 (en) Construction elements and methods of construction
CN210369306U (en) Steel pipe takes assembled concrete frame beam column joint construction of U-shaped steel corbel
CN204590360U (en) A kind of cavity plate continuously
CN224016816U (en) PC component of assembled building
KR101229397B1 (en) Fill opening slab that use connection reinforcing rod and mold structure