TH14581C3 - Method for dismantling the base structure The substructure of a fixed offshore platform and its equipment. - Google Patents
Method for dismantling the base structure The substructure of a fixed offshore platform and its equipment.Info
- Publication number
- TH14581C3 TH14581C3 TH1703002591U TH1703002591U TH14581C3 TH 14581 C3 TH14581 C3 TH 14581C3 TH 1703002591 U TH1703002591 U TH 1703002591U TH 1703002591 U TH1703002591 U TH 1703002591U TH 14581 C3 TH14581 C3 TH 14581C3
- Authority
- TH
- Thailand
- Prior art keywords
- jacket
- hull
- lifting
- chain
- dismantling
- Prior art date
Links
- 238000005553 drilling Methods 0.000 claims abstract 3
- 238000004519 manufacturing process Methods 0.000 claims abstract 2
- 230000000712 assembly Effects 0.000 claims 2
- 238000000034 method Methods 0.000 claims 2
- 230000000149 penetrating Effects 0.000 claims 1
- 239000003208 petroleum Substances 0.000 abstract 1
Abstract
หน้า 1 ของจำนวน 1 หน้า บทสรุปการประดิษฐ์ การประดิษฐ์นี้เกี่ยวข้องกับวิธีการและอุปกรณ์สำหรับรื้อถอนโครงสร้างส่วนฐาน (substructure) ของ ของแท่นขุดเจาะและผลิตปิโตรเลียมนอกชายฝั่งแบบยึดติดพื้นทะเล โดยสามรถดำเนินการได้ง่ายรวมถึง ประหยัดเวลาและต้นทุน ที่มีลักษณะเฉพาะคือ วิธีดังกล่าวประกอบไปด้วยขั้นตอน ก) จัดให้มีเรือลอย (floating vessel) ที่มีท่ออย่างน้อย 2 ท่อบริเวณปลายด้านหนึ่งของลำเรือที่เจาะ ทะลุจากด้านบนของเรือลอยไปยังด้านใต้ของเรือลอย และ ท่ออีกอย่างน้อย 2 ท่อบริเวณกลางลำเรือที่เจาะ ทะลุจากด้านบนของเรือลอยไปยังด้านใต้ของเรือลอย, ชุดยกแจ็คเก็ต (jacket lifting assembly) ซึ่งถูกติดตั้ง บริเวณด้านบนของเรือลอย โดยที่ชุดยกแจ็คเก็ตอย่างน้อย 2 ชุด ถูกติดตั้งในทิศทางตามด้านยาวของเรือใน ตำแหน่งใกล้กับท่อที่บริเวณปลายด้านหนึ่งของลำเรือ และ โดยที่ ชุดยกแจ็คเก็ตอีกอย่างน้อย 2 ชุด ถูกติดตั้ง ในทิศทางตามด้านยาวของเรือในตำแหน่งใกล้กับท่อที่บริเวณกลางลำเรือ, และ สายโซ่อย่างน้อย 4 สาย ที่ต่อ กับชุดยกแจ็คเก็ต และร้อยผ่านท่อที่ปลายด้านหนึ่งของลำเรือ และ กลางลำเรือไปยังด้านใต้ของเรือลอย เพื่อ ผูกติดกับแจ็คเก็ตสำหรับยกแจ็คเก็ตขึ้น-ลง; ข) โยงสายโซ่ ที่เชื่อมต่อกับชุดยกแจ็คเก็ต ที่ติดตั้งอยู่ที่ปลายด้านหนึ่งของลำเรือไปยังส่วนบนของ แจ็คเก็ต; ค) โยงสายโซ่ ที่เชื่อมต่อกับชุดยกแจ็คเก็ต ที่ติดตั้งอยู่ที่ส่วนกลางลำเรือไปยังส่วนล่างของแจ็คเก็ต; ง) ดึงส่วนบนของแจ็คเก็ตขึ้นด้วยชุดยกแจ็คเก็ตที่ติดตั้งอยู่ที่ปลายด้านหนึ่งของลำเรือ จนกระทั่งส่วน ปลายของแจ็คเก็ตพ้นจากพื้นทะเล (seabed); จ) ดึงส่วนล่างของแจ็คเก็ตขึ้นด้วยชุดยกแจ็คเก็ตที่ติดตั้งอยู่ที่ส่วนกลางลำเรือ; ฉ) ปรับตำแหน่งของแจ็คเก็ต ด้วยการปรับสายโซ่โดยชุดยกแจ็คเก็ตจนกระทั่งแจ็คเก็ตอยู่ใน แนวขนานกับด้านใต้ของเรือลอย 1 page of the number 1 page summary of the invention The invention involves methods and equipment for dismantling the base structures. (substructure) of a seabed fixed offshore petroleum drilling and production platform The three cars are easily operated including Save time and cost Whose characteristics are This method consists of: a) a floating vessel with at least two tubes is placed at one end of the drilled hull. Penetrates from the top of the hull to the bottom of the hull and at least 2 more tubes in the middle of the hull being pierced. Throughout the top of the float to the bottom of the floating boat, a jacket lifting assembly is installed. On the top of the floating boat Where at least 2 jacket lifters are installed in the direction of the long side of the boat in Position near the tube at one end of the hull and where at least two other jacket lifts are installed in the longitudinal direction of the hull, near the pipes at the hull, and the chain. At least 4 cables connected to the jacket hoist. And threaded through a tube at one end of the hull and in the middle of the hull to the southern side of the hull to be tied to a jacket for lifting the jacket up-down; B) Chain a chain that connects to the jacket hoist. Mounted at one end of the hull to the top of the jacket; C) Link a chain that connects to the jacket hoist. Installed in the middle of the hull to the lower part of the jacket; D) Pull the top of the jacket up with a jacket lifting set mounted on one end of the hull. Until part The end of the jacket is off the seabed (seabed); E) pull up the lower part of the jacket with the jacket lifting gear installed in the middle of the hull; F) adjust the position of the jacket By adjusting the chain by lifting the jacket until the jacket is in Parallel to the southern side of the floating boat
Claims (9)
Publications (2)
Publication Number | Publication Date |
---|---|
TH14581C3 true TH14581C3 (en) | 2018-11-12 |
TH14581A3 TH14581A3 (en) | 2018-11-12 |
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7044685B2 (en) | Method of installation of a tension leg platform | |
US9266586B2 (en) | Offshore vessel and method of operation of such an offshore vessel | |
EP2514914A1 (en) | Method of installing wellhead platform using an offshore unit | |
US20140205383A1 (en) | Jack-up drilling unit with tension legs | |
NO329333B1 (en) | Apparatus and method of overhauling hydrocarbon wells at sea using coil tubes, as well as using the apparatus and method | |
NO334831B1 (en) | Offshore structure and procedure for installing the structure | |
US7278801B2 (en) | Method for deploying floating platform | |
RU2672362C2 (en) | Mounting and dismounting of flexible line | |
NO166050B (en) | PROCEDURE FOR HANDLING A BROWN HEAD CONSTRUCTION. | |
US9139260B2 (en) | Tension leg connection system and method of installing | |
WO2011099869A2 (en) | A method of installing a flexible, elongate element | |
TH14581C3 (en) | Method for dismantling the base structure The substructure of a fixed offshore platform and its equipment. | |
TH14581A3 (en) | Method for dismantling the base structure The substructure of a fixed offshore platform and its equipment. | |
KR102260454B1 (en) | Semi-submersible marine structure | |
AU2011101650A4 (en) | Self installing tension leg platform and subsea storage tank | |
US20100186965A1 (en) | Method for installing an off-shore structure | |
NL2016759B1 (en) | Assembly of a Vessel and a Floating Module | |
RU2676927C1 (en) | Installation method of a drilling ship with a turret on an anchor-mooring system in ice conditions | |
KR20170053245A (en) | Offshore structure | |
KR20160023044A (en) | Drilling equipment of offshore and install structure of draw work | |
RU2508220C2 (en) | Installation method of drilling ship with mooring turret onto anchor retention system under ice conditions | |
TH15402A3 (en) | Top (topside) decommissioning equipment of a fixed offshore platform decommissioning rig | |
TH15402C3 (en) | Top (topside) decommissioning equipment of a fixed offshore platform decommissioning rig | |
KR101894942B1 (en) | Apparatus for controlling center of mass of jack-up leg, and method of installing jack-up leg | |
NO20131180A1 (en) | Moonpool in downtown |