SU965988A1 - Method for installtaion of tower of power transmission line - Google Patents
Method for installtaion of tower of power transmission line Download PDFInfo
- Publication number
- SU965988A1 SU965988A1 SU813259714A SU3259714A SU965988A1 SU 965988 A1 SU965988 A1 SU 965988A1 SU 813259714 A SU813259714 A SU 813259714A SU 3259714 A SU3259714 A SU 3259714A SU 965988 A1 SU965988 A1 SU 965988A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- support
- anchors
- mounting
- power transmission
- transmission line
- Prior art date
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Description
Изобретение относится к строительству линий электропередач (ЛЭП) и может быть использовано при установке опор на косогорах и склонах.The invention relates to the construction of power lines (power lines) and can be used when installing supports on slopes and slopes.
Известен способ установки опоры ЛЭП с одним опорным узлом, заключающийся в том, что собранную опору поднимают в вертикальное положение путем поворота вокруг оси монтажного шарнира,опорного узла с помощью тросов, удерживая при этом опору монтажными оттяжками, прикрепленными к анкерам £1].There is a method of installing a power line support with one support node, which consists in raising the assembled support in a vertical position by turning around the axis of the mounting hinge, the support node using cables, while holding the support with mounting brackets attached to anchors £ 1].
Недостатком такого способа установки опоры является необходимость регулирования длины монтажных тросов, что повышает трудоемкость работ..The disadvantage of this method of installation of the support is the need to control the length of the installation cables, which increases the complexity of the work ..
Цель изобретения - снижение трудоемкости работ при установке опоры.The purpose of the invention is to reduce the complexity of the work when installing the support.
Для достижения цели анкеры устанавливают перед началом подъема опоры по разные стороны от опорного узла в двух точках, имеющих одинаковые с ними отметки высоты на местности, а ось монтажного шарнира располагают параллельно прямой, проходящей через точки крепления анкеров, затем монтажными оттяжками раскрепляют опору к анкерам.To achieve the goal, the anchors are installed before lifting the supports on opposite sides of the support node at two points having the same elevation marks on the ground, and the axis of the mounting hinge is parallel to the straight line passing through the anchor attachment points, then the support to the anchors is fastened with mounting braces.
На чертеже показана схема установки опоры.The drawing shows the installation diagram of the support.
Способ осуществляется следующим образом.The method is as follows.
Около места установки фундамента собирают и выкладывают' опору 2, затем определяют две точки,3 и 4, расположенные на прямой 5, проходящей через место установки фундамента 1, расположенные по разные стороны от него на любом расстоянии и имеющие с ним одинаковые отметки высоты на местности. После этого устанавливают фундамент 1 таким образом, чтобы при установке монтажного шарнира б на фундамент 1 ось 7 вращения шарнира при подъеме опоры была параллельна прямой 5. Опору 2 выкладывают так, чтобы ее ось была перпендикулярна оси 7 вращения шарнира 6, и соединяют опору 2 с шарниром 6, в точках 3 и 4 устанавливают временные анкеры 8 и 9, с помощью которых раскрепляют опору 2 монтажными тросами 10 и 11, один конец каждого из которых закрепляют на опоре 2, а другой - на временном анкере 8 или 9. Опору 2 лебедками или транспортными средствами 12 и 13 с помощью тяговых тросов 14 и 15 поднимают в вертикальное положение, при этом устойчивость опоры в плоскости, перпендикулярной плоскости подъема, в процессе всего подъема обеспечивается монтажными тросами 10 и 11 без дополнительной регулировки их натяже ния. После раскрепления опоры стационарными оттяжками 16 к стационарным анкерам 17 монтажные тросы 10 и 11 снимают и натяжением стационарных оттяжек 16 опору устанавливают в рабочее положение.Near the installation site of the foundation, support 2 is assembled and laid out, then two points, 3 and 4, are located on a straight line 5, passing through the installation site of the foundation 1, located on different sides of it at any distance and having the same elevation mark on it . After that, the foundation 1 is installed so that when the mounting hinge b is installed on the foundation 1, the hinge rotation axis 7 is parallel to the straight line 5 when the support is raised. The support 2 is laid out so that its axis is perpendicular to the hinge axis 6 7 and connect the support 2 to with a hinge 6, at points 3 and 4, temporary anchors 8 and 9 are installed, with which they support the support 2 with mounting cables 10 and 11, one end of each of which is fixed to the support 2, and the other to the temporary anchor 8 or 9. Support 2 with winches or vehicles 12 and 13 from to with the power of the traction cables 14 and 15, they are lifted to a vertical position, while the stability of the support in the plane perpendicular to the plane of the lift during the entire lift is provided by the mounting cables 10 and 11 without additional adjustment of their tension. After the support is unfastened with stationary guy wires 16 to the stationary anchors 17, the mounting cables 10 and 11 are removed and the stationary guy wires 16 are tensioned and the support is placed in the working position.
Таким образом, предлагаемый.способ установки опоры упрощает монтажное оборудование за счет отсутствия монтажных блоков и лебедок для регулирования длины монтажных тросов, устраняет операцию по регулировке монтажных тросов в процессе подъема, тем самым снижая трудоемкость работ по установке опоры.Thus, the proposed method of installing the support simplifies the installation equipment due to the absence of mounting blocks and winches for regulating the length of the installation cables, eliminates the operation of adjusting the installation cables during the lifting process, thereby reducing the complexity of the installation of the support.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813259714A SU965988A1 (en) | 1981-03-11 | 1981-03-11 | Method for installtaion of tower of power transmission line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813259714A SU965988A1 (en) | 1981-03-11 | 1981-03-11 | Method for installtaion of tower of power transmission line |
Publications (1)
Publication Number | Publication Date |
---|---|
SU965988A1 true SU965988A1 (en) | 1982-10-15 |
Family
ID=20947389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813259714A SU965988A1 (en) | 1981-03-11 | 1981-03-11 | Method for installtaion of tower of power transmission line |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU965988A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083479A (en) * | 2018-08-09 | 2018-12-25 | 绵阳鹏志远科技有限公司 | A kind of anti-collapse monitoring lever apparatus applied to hillside |
-
1981
- 1981-03-11 SU SU813259714A patent/SU965988A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083479A (en) * | 2018-08-09 | 2018-12-25 | 绵阳鹏志远科技有限公司 | A kind of anti-collapse monitoring lever apparatus applied to hillside |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4420917A (en) | Guyline tension device for communication towers | |
EP0680540B1 (en) | Scaffolding system | |
SU965988A1 (en) | Method for installtaion of tower of power transmission line | |
CN110846955A (en) | Tunnel track laying machine and hydraulic cylinder support arm for track laying machine | |
SU1041497A1 (en) | Device for securing tower of building crane to erected structure | |
SU850785A1 (en) | Method of erecting the span structure of a gallery | |
SU1219767A1 (en) | Method of erecting vertical structures | |
SU1291541A1 (en) | Method of erecting supports of power transmission line | |
SU1039870A1 (en) | Method for installation of elongated structure on foundation | |
SU802483A1 (en) | Method of constructing power transmission lines on rockable intermediate supports | |
JPH04247175A (en) | Level raising method of steel tower for power transmission | |
SU823550A1 (en) | Structure erecting method | |
SU1079606A1 (en) | Method of erecting a power transmission line support | |
SU477939A1 (en) | The method of installation of power transmission lines | |
SU1260503A1 (en) | Method of erecting a drilling boreholes | |
SU1331823A1 (en) | Arrangement for placing power transmission line mast onto foundation | |
SU637326A1 (en) | Load-hoisting device for erection of masts | |
SU1008157A1 (en) | Method of lifting long structures | |
SU937684A1 (en) | Method and apparatus for erecting a mast | |
SU943180A1 (en) | Gantry crane erecting method | |
SU846503A1 (en) | Method of hoisting long-sized structures | |
SU898026A1 (en) | Power transmission line construction method | |
SU544740A1 (en) | The method of installation of vertical structures | |
JP2001271351A (en) | Moving method and moving equipment for excavator | |
JP3066218B2 (en) | Rotation erection method and its rotation device |