SU965988A1 - Method for installtaion of tower of power transmission line - Google Patents

Method for installtaion of tower of power transmission line Download PDF

Info

Publication number
SU965988A1
SU965988A1 SU813259714A SU3259714A SU965988A1 SU 965988 A1 SU965988 A1 SU 965988A1 SU 813259714 A SU813259714 A SU 813259714A SU 3259714 A SU3259714 A SU 3259714A SU 965988 A1 SU965988 A1 SU 965988A1
Authority
SU
USSR - Soviet Union
Prior art keywords
support
anchors
mounting
power transmission
transmission line
Prior art date
Application number
SU813259714A
Other languages
Russian (ru)
Inventor
Юрий Андреевич Болдин
Эдуард Васильевич Дмитриев
Original Assignee
Отделение Дальних Передач Ордена Октябрьской Революции Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института Энергетических Систем И Электрических Сетей "Энергосетьпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Отделение Дальних Передач Ордена Октябрьской Революции Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института Энергетических Систем И Электрических Сетей "Энергосетьпроект" filed Critical Отделение Дальних Передач Ордена Октябрьской Революции Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института Энергетических Систем И Электрических Сетей "Энергосетьпроект"
Priority to SU813259714A priority Critical patent/SU965988A1/en
Application granted granted Critical
Publication of SU965988A1 publication Critical patent/SU965988A1/en

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

Изобретение относится к строительству линий электропередач (ЛЭП) и может быть использовано при установке опор на косогорах и склонах.The invention relates to the construction of power lines (power lines) and can be used when installing supports on slopes and slopes.

Известен способ установки опоры ЛЭП с одним опорным узлом, заключающийся в том, что собранную опору поднимают в вертикальное положение путем поворота вокруг оси монтажного шарнира,опорного узла с помощью тросов, удерживая при этом опору монтажными оттяжками, прикрепленными к анкерам £1].There is a method of installing a power line support with one support node, which consists in raising the assembled support in a vertical position by turning around the axis of the mounting hinge, the support node using cables, while holding the support with mounting brackets attached to anchors £ 1].

Недостатком такого способа установки опоры является необходимость регулирования длины монтажных тросов, что повышает трудоемкость работ..The disadvantage of this method of installation of the support is the need to control the length of the installation cables, which increases the complexity of the work ..

Цель изобретения - снижение трудоемкости работ при установке опоры.The purpose of the invention is to reduce the complexity of the work when installing the support.

Для достижения цели анкеры устанавливают перед началом подъема опоры по разные стороны от опорного узла в двух точках, имеющих одинаковые с ними отметки высоты на местности, а ось монтажного шарнира располагают параллельно прямой, проходящей через точки крепления анкеров, затем монтажными оттяжками раскрепляют опору к анкерам.To achieve the goal, the anchors are installed before lifting the supports on opposite sides of the support node at two points having the same elevation marks on the ground, and the axis of the mounting hinge is parallel to the straight line passing through the anchor attachment points, then the support to the anchors is fastened with mounting braces.

На чертеже показана схема установки опоры.The drawing shows the installation diagram of the support.

Способ осуществляется следующим образом.The method is as follows.

Около места установки фундамента собирают и выкладывают' опору 2, затем определяют две точки,3 и 4, расположенные на прямой 5, проходящей через место установки фундамента 1, расположенные по разные стороны от него на любом расстоянии и имеющие с ним одинаковые отметки высоты на местности. После этого устанавливают фундамент 1 таким образом, чтобы при установке монтажного шарнира б на фундамент 1 ось 7 вращения шарнира при подъеме опоры была параллельна прямой 5. Опору 2 выкладывают так, чтобы ее ось была перпендикулярна оси 7 вращения шарнира 6, и соединяют опору 2 с шарниром 6, в точках 3 и 4 устанавливают временные анкеры 8 и 9, с помощью которых раскрепляют опору 2 монтажными тросами 10 и 11, один конец каждого из которых закрепляют на опоре 2, а другой - на временном анкере 8 или 9. Опору 2 лебедками или транспортными средствами 12 и 13 с помощью тяговых тросов 14 и 15 поднимают в вертикальное положение, при этом устойчивость опоры в плоскости, перпендикулярной плоскости подъема, в процессе всего подъема обеспечивается монтажными тросами 10 и 11 без дополнительной регулировки их натяже ния. После раскрепления опоры стационарными оттяжками 16 к стационарным анкерам 17 монтажные тросы 10 и 11 снимают и натяжением стационарных оттяжек 16 опору устанавливают в рабочее положение.Near the installation site of the foundation, support 2 is assembled and laid out, then two points, 3 and 4, are located on a straight line 5, passing through the installation site of the foundation 1, located on different sides of it at any distance and having the same elevation mark on it . After that, the foundation 1 is installed so that when the mounting hinge b is installed on the foundation 1, the hinge rotation axis 7 is parallel to the straight line 5 when the support is raised. The support 2 is laid out so that its axis is perpendicular to the hinge axis 6 7 and connect the support 2 to with a hinge 6, at points 3 and 4, temporary anchors 8 and 9 are installed, with which they support the support 2 with mounting cables 10 and 11, one end of each of which is fixed to the support 2, and the other to the temporary anchor 8 or 9. Support 2 with winches or vehicles 12 and 13 from to with the power of the traction cables 14 and 15, they are lifted to a vertical position, while the stability of the support in the plane perpendicular to the plane of the lift during the entire lift is provided by the mounting cables 10 and 11 without additional adjustment of their tension. After the support is unfastened with stationary guy wires 16 to the stationary anchors 17, the mounting cables 10 and 11 are removed and the stationary guy wires 16 are tensioned and the support is placed in the working position.

Таким образом, предлагаемый.способ установки опоры упрощает монтажное оборудование за счет отсутствия монтажных блоков и лебедок для регулирования длины монтажных тросов, устраняет операцию по регулировке монтажных тросов в процессе подъема, тем самым снижая трудоемкость работ по установке опоры.Thus, the proposed method of installing the support simplifies the installation equipment due to the absence of mounting blocks and winches for regulating the length of the installation cables, eliminates the operation of adjusting the installation cables during the lifting process, thereby reducing the complexity of the installation of the support.

Claims (1)

Формула' изобретенияClaim Способ установки опоры ЛЭП, заключающийся в том, что собранную опору поднимают в вертикальное положение путем поворота вокруг оси монтажного шарнира опорного узла с помощью тросов, удерживая при этом опору монтажными оттяжками, прикрепленными к анкерам, отличающий с г тем, что, с целью снижения трудоемкости работ при установке опоры, анкеры устанавливают перед началом подъема опоры по разные стороны от опорного узла в двух точках, имеющих одинаковые с ним отметки высоты на местности, а ось монтажного шарнира располагают параллельно прямой, проходящей через точки крепления анкеров, затем монтажными оттяжками раскрепляют опору к анкерам.The method of installing the power transmission line support, namely, that the assembled support is raised to a vertical position by turning around the axis of the mounting hinge of the support unit using cables, while holding the support with mounting brackets attached to the anchors, characterized in that, in order to reduce the complexity work when installing the support, the anchors are installed before starting to lift the support on opposite sides of the support node at two points having the same elevation marks on the ground, and the axis of the mounting hinge is parallel in parallel passing through the anchor attachment points, then with the help of mounting brackets, the support to the anchors is fastened.
SU813259714A 1981-03-11 1981-03-11 Method for installtaion of tower of power transmission line SU965988A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813259714A SU965988A1 (en) 1981-03-11 1981-03-11 Method for installtaion of tower of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813259714A SU965988A1 (en) 1981-03-11 1981-03-11 Method for installtaion of tower of power transmission line

Publications (1)

Publication Number Publication Date
SU965988A1 true SU965988A1 (en) 1982-10-15

Family

ID=20947389

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813259714A SU965988A1 (en) 1981-03-11 1981-03-11 Method for installtaion of tower of power transmission line

Country Status (1)

Country Link
SU (1) SU965988A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083479A (en) * 2018-08-09 2018-12-25 绵阳鹏志远科技有限公司 A kind of anti-collapse monitoring lever apparatus applied to hillside

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083479A (en) * 2018-08-09 2018-12-25 绵阳鹏志远科技有限公司 A kind of anti-collapse monitoring lever apparatus applied to hillside

Similar Documents

Publication Publication Date Title
US4420917A (en) Guyline tension device for communication towers
EP0680540B1 (en) Scaffolding system
SU965988A1 (en) Method for installtaion of tower of power transmission line
CN110846955A (en) Tunnel track laying machine and hydraulic cylinder support arm for track laying machine
SU1041497A1 (en) Device for securing tower of building crane to erected structure
SU850785A1 (en) Method of erecting the span structure of a gallery
SU1219767A1 (en) Method of erecting vertical structures
SU1291541A1 (en) Method of erecting supports of power transmission line
SU1039870A1 (en) Method for installation of elongated structure on foundation
SU802483A1 (en) Method of constructing power transmission lines on rockable intermediate supports
JPH04247175A (en) Level raising method of steel tower for power transmission
SU823550A1 (en) Structure erecting method
SU1079606A1 (en) Method of erecting a power transmission line support
SU477939A1 (en) The method of installation of power transmission lines
SU1260503A1 (en) Method of erecting a drilling boreholes
SU1331823A1 (en) Arrangement for placing power transmission line mast onto foundation
SU637326A1 (en) Load-hoisting device for erection of masts
SU1008157A1 (en) Method of lifting long structures
SU937684A1 (en) Method and apparatus for erecting a mast
SU943180A1 (en) Gantry crane erecting method
SU846503A1 (en) Method of hoisting long-sized structures
SU898026A1 (en) Power transmission line construction method
SU544740A1 (en) The method of installation of vertical structures
JP2001271351A (en) Moving method and moving equipment for excavator
JP3066218B2 (en) Rotation erection method and its rotation device