SU928017A1 - Method of protecting vertical shafts from displacement of rock bed-wise - Google Patents

Method of protecting vertical shafts from displacement of rock bed-wise Download PDF

Info

Publication number
SU928017A1
SU928017A1 SU802943671A SU2943671A SU928017A1 SU 928017 A1 SU928017 A1 SU 928017A1 SU 802943671 A SU802943671 A SU 802943671A SU 2943671 A SU2943671 A SU 2943671A SU 928017 A1 SU928017 A1 SU 928017A1
Authority
SU
USSR - Soviet Union
Prior art keywords
support
permanent
trunk
plastic material
displacement
Prior art date
Application number
SU802943671A
Other languages
Russian (ru)
Inventor
Игорь Александрович Петухов
Александр Георгиевич Акимов
Евгений Владимирович Бошенятов
Борис Яковлевич Гвирцман
Рахмиель Абрамович Муллер
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority to SU802943671A priority Critical patent/SU928017A1/en
Application granted granted Critical
Publication of SU928017A1 publication Critical patent/SU928017A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

II

Изобретение относитс ,к горной промышленности и может быть использовано дл  защиты крепи и армировки вертикальных шахтных стволов, пересекающих зо-. йы сдвижеш  горных пород,. в которых имеют К4есто;подвйжки нород по напластованию .The invention relates to the mining industry and can be used to protect the lining and reinforcement of vertical shafts crossing the zo. You are shifting rocks ,. in which they have K4esto; substrates on strata.

Известны способы защиты вертикальных шахтных стволов от сдвижени  горных пород по напластованию посредством оставлени  дополнительных угольных I целиков-упоров, примыкающих р нижним границам предохранительных целиков f 1 3Недостатком указанных способов  вл етс  потер  значительных запасов полезного ископаемого в целиках.Methods are known for protecting vertical shafts from shifting rocks along the bedding by leaving additional coal I pillars adjacent the lower boundaries of the safety pillars f 1 3 The disadvantage of these methods is the loss of significant mineral reserves in the pillars.

Наиболее близким техническим решением к предлагаемому  вл етс  способ, включающий возведение посто нной внутренеей крепи и внешней временной крепи /и укладку в пространство между креп ми промежуточного сло  из пластичного материала , например нефт ного битума .2.The closest technical solution to the present invention is a method involving the erection of permanent internal lining and external temporary lining / and laying in the space between the supports of an intermediate layer of plastic material, such as petroleum bitumen .2.

Недостатком этого способа  вл етс  необходимость выполнени  большого объема 11роходческюс работ.The disadvantage of this method is the need to perform a large amount of advanced work.

Цель изобретени  - сокращение затрат на выполнение защитных меропри тий.The purpose of the invention is to reduce the cost of protective measures.

Указанна  цель достигаетс  тем, что согласно cno6to6y защиты вертикальных шахтных стволов от сдвижени  горных пород по напластованию, включающему возведение посто нной внутренней крепи This goal is achieved by the fact that, according to cno6to6y, the protection of vertical shafts from the displacement of rocks by stratification, including the erection of permanent internal support

Claims (2)

10 и внешней временной крепи и укладку в пространство между креп ми промежуточного сло  из пластичного материала, временную крепь возвод т эксцентрично посто нной крепи со смещением в сторо15 ну восстани  от последа1ей, а укладку 1фомежуточного сло  производ т только на участке смещени  со стороны восстани  от ствола, после чего в процессе сдвижени  горных пород нагревают пластич20 ный материйл до температуры плавлени . , На 4мг. 1 изображен вертикальный разрез в крест простирани ; на фиг. 2 вид сверху. 0 Способ осуществл етс  следующим образом. На участке сдвижени -пород по напластованию АВ, расположенном выше поверхности сдвига 1, ствол проходитс  диаметром большим, чем его остальна  часть на величину, равную величине ожи даемой горизонтальной составл ющей сдвижени  по напластованию .Л , определ ема  Б соответствии с действующими нормативно-методическими указани ми. При этом ось ствола Q( при подходке на данном участке смещают в сторону восстани  пласта на величину, равную 0,5 Д , в точку 02- Одновременно с проходкой ствола на участке сдвижени  по напластованию возводитс  временна  крепь 2 и посто нна  креаь 3. При этом геометрический центр временной крепи 2 должен совпадать с геометрическим цент ром ствола Р02. при проходке, а геомет рический центр посто нной крепи 3-е первоначальным центром ствола Т-О| . С внешней сторощ 1 посто нной крепи 3 со стороны восстани  от нее на участ ке сдвижени  по напластованию АВ устанавливаютс  нагревательные элементы 4 ив нескольких точках участка АВ - дат чики давлени  5 с дистанционным измерением . После этого пространство между посто нной крепью 3 и временной крепью 2 со стороны .восстани  от посто нной крепи 3 заполн етс  пластичным материалом , обладающим свойством плавитьс  при относительно невысоких темпера , турах, например нефт ным битумом, который и образует промежуточш хй слой 6 При ведении горных работ по падению от ствола у н1- жних; границ предохранительных целиков начало сдв1-1жени  горных пород по поверхности сдвига про вл етс  в виде увеличени  давлени  на посто нную крепь ствола, которое фиксируетс  датчиками давлени  5. Начало -сдважени  по напластованию служит сигналом дл  вхшючени  нагревательных элементов 4, что приводит пластичный материал в состо ние текучести в об- ласти, прилегающей к посто нной крепи ствола со стороны восстани . Под действием сдвигающегос  по напластованию массива 7, а вместе с ним и временной крепи 2, пластичный материал перетекает со стороны восстани  от посто нной крепи 3 ствола в направлений падени  пород. Посто нна  крепь 3 При этом 74 остаетс  неподвижной, а в результате перемещени  временной крепи 2 происходит уменьшение ширины промежуточного сло  6 со стороны восстани  от посто нной крепи 3 и его образование с постепенным увеличением со стороны падени . Посто нна  крепь 3 при обтекании ее пластичным материалом практически не испытывает дополнительных нагрузок со стороны сдвигающегос  по напластованию массива. На фиг. 1 и 2 показано положение 8 временной крепи 2 на промежуточную стадию сдвижени  горных пород, когда земна  поверхность 9 в результате сдвига пород по поверхности 1 переместилась в положение 10, а величина горизонтальной составл ющей сдвижени  по напластованию достигла величины пор дка О,6 Л ., В качестве пластичного материала может быть использован нефт ной битум, или другие материалы, обладающие соответствующими свойствами. В качестве нагревательных элементов могут быть применены любые нагревательные приборы , обеспечивающие текущее состо-  ние примен емого пластичного материала , например пожароопасные гибкие электрически нагревательные ленты . Основным преимуществом изобретени   вл етс  повышенна  эффективность защитных меропри тий зах счет уменьшени  деформаций посто нной крепи и затрат на ее ремонт. Формула изобретени  Способ защиты вертикальных шахтных стволов от сдвижени  горных пород по напластованию, включающий возведение посто нной внутренней крепи и внешней временной крепи и укладку в пространство между креп ми промежуточного сло  из пластичного материала, отличающийс  тем, что, с целью сокращени  затрат на выполнение защитных меропри тий, временную крепь возвод т эксцентрично посто нной крепи со смещением в сторону восстани  от последней, а укладку промежуточного сло  производ т только на участке смещени  со стороны восстани  от ствола, после чего в процессе сдвижени  горных пород нагревают пластичный материал до температуры плавлени . Источники информации, прин тые во внимание при экспертизе 1. Правила охраны сооружений и природных объектов от вредного вли ни  цодземных горных выработок в Чел бинс- 5 ком буроугопьном бассейне. Л., ВНИМИ, 1967, с. 23-25. 10 and external temporary support and installation into the space between the supports of the intermediate layer made of plastic material, temporary support is erected eccentrically constant support with offset to the side of the uprising from the rear, and laying of the intermediate layer is made only in the offset area from the side of the uprising from the trunk after which, in the process of displacing rocks, plastic material is heated to the melting temperature. , At 4mg. 1 shows a vertical incision in the strike cross; in fig. 2 view from above. 0 The method is carried out as follows. In the area of displacement - rock on the AV stratification, located above the shear surface 1, the trunk passes with a diameter larger than its remaining part by an amount equal to the expected horizontal component of the stratification of the stratification, L., defined by B according to the current regulatory guidelines mi At the same time, the barrel axis Q (when approaching on this section, is displaced towards the reservoir upsurge by an amount of 0.5 D to point 02. At the same time as the trunk penetrates, the lining 2 and permanent crest 3 are raised in the displacement section along the bedding. the geometric center of the temporary support 2 must coincide with the geometric center of the trunk P02 when penetrating, and the geometric center of the permanent support is the 3rd initial center of the trunk T-O |. From the outer side 1 of the permanent support 3 from the side of the rise from it AB shifts heating elements 4 are installed at several points in section AB - pressure sensors 5 with remote measurement, after which the space between the permanent support 3 and the temporary support 2 on the side of the outlet from the permanent support 3 is filled with a plastic material that has the property to melt at relatively low tempera ture, for example, petroleum bitumen, which forms the intermediate layer 6 When mining for the fall from the trunk of n1; the safety limits of the pillars, the beginning of displacement of rocks along the shear surface is manifested in the form of an increase in pressure on the permanent support of the trunk, which is fixed by pressure sensors 5. The beginning of the stratification on the bedding serves as a signal for inserting the heating elements flow in the area adjacent to the permanent support of the trunk from the side of the uprising. Under the influence of the mass-shifting bed 7, and with it the temporary support 2, the plastic material flows from the uprising from the permanent support 3 of the trunk in the direction of falling rocks. Permanent lining 3 In this case, 74 remains stationary, and as a result of the movement of temporary lining 2, the width of the intermediate layer 6 decreases on the side of the uprising from the permanent lining 3 and forms with a gradual increase on the side of falling. Permanent lining 3 when it is wrapped with plastic material is practically not subjected to additional loads from the side of the mass-shifting layer. FIG. Figures 1 and 2 show the position 8 of the temporary support 2 at the intermediate stage of displacement of rocks, when the earth's surface 9 as a result of rock shifting over the surface 1 moved to the position 10, and the value of the horizontal component of the displacement of the bedding reached about 0, 6 L. Petroleum bitumen, or other materials with appropriate properties, can be used as a plastic material. As heating elements, any heating devices can be used that provide the current state of the plastic material used, for example, fire-hazardous flexible electrically heating tapes. The main advantage of the invention is the increased effectiveness of protective measures for the arrests due to the reduction of permanent support deformations and the cost of repairing them. Claim Invention A method of protecting vertical shafts from displacement of rocks along strata, including erecting permanent internal support and external temporary support and laying in the space between the supports of the intermediate layer of plastic material, characterized in that in order to reduce the cost of protective measures The temporary support is erected by an eccentric constant support with an offset to the side of the uprising from the latter, and the intermediate layer is laid only on the offset portion from osstani from the trunk, after which the process of displacement of rock plastic material is heated to melting temperature. Sources of information taken into account during the examination 1. Rules for the protection of structures and natural objects from the harmful effects of underground mine workings in the Chelbin-Buryugene basin. L., VNIMI, 1967, p. 23-25. 2. Рекомендации по охране вертикальных стволов в Чел бинском бассейне. Л., - . ВНИМИ, 1969, с. 27-28 (прототип).2. Recommendations for the protection of vertical shafts in the Chel basin. L., -. VNIMI, 1969, p. 27-28 (prototype).
SU802943671A 1980-06-24 1980-06-24 Method of protecting vertical shafts from displacement of rock bed-wise SU928017A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802943671A SU928017A1 (en) 1980-06-24 1980-06-24 Method of protecting vertical shafts from displacement of rock bed-wise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802943671A SU928017A1 (en) 1980-06-24 1980-06-24 Method of protecting vertical shafts from displacement of rock bed-wise

Publications (1)

Publication Number Publication Date
SU928017A1 true SU928017A1 (en) 1982-05-15

Family

ID=20903352

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802943671A SU928017A1 (en) 1980-06-24 1980-06-24 Method of protecting vertical shafts from displacement of rock bed-wise

Country Status (1)

Country Link
SU (1) SU928017A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2584174C1 (en) * 2015-02-26 2016-05-20 Федеральное Государственное Бюджетное Образовательное Учреждение Высшего Профессионального Образования "Донской Государственный Технический Университет" (Дгту) Support for submerged structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2584174C1 (en) * 2015-02-26 2016-05-20 Федеральное Государственное Бюджетное Образовательное Учреждение Высшего Профессионального Образования "Донской Государственный Технический Университет" (Дгту) Support for submerged structure

Similar Documents

Publication Publication Date Title
Reddish et al. Subsidence: occurrence, prediction and control
CN111411962A (en) Coal mine rock burst treatment method
Donnelly et al. Longwall mining-induced fault reactivation and delayed subsidence ground movement in British coalfields
CN112780276A (en) Fully-closed blasting pressure relief structure for grouting reconstruction of composite roof and self-retained roadway method
CN111022050B (en) Fully-closed blasting pressure relief and self-retained roadway method for grouting reconstruction of composite roof
SU928017A1 (en) Method of protecting vertical shafts from displacement of rock bed-wise
PL185118B1 (en) Method of performining mining work in tectonically hazarded sedimentary deposits in particular of coal
CN114294018B (en) Quick grouting passing method for advanced dense top protection layer in loose sliding area
DE3802671C2 (en)
Nermoen et al. Ground water maintenance and leakage control during construction of unlined rock caverns for pressurized gas storage, Mongstad
Sauer et al. NATM ground support concepts and their effect on contracting practices: Proc 1989 Rapid Excavation and Tunnelling Conference, Los Angeles, 11–14 June 1989 P67–86. Publ Littleton: SME, 1989
Majcherczyk et al. Variations in mechanical parameters of rock mass affecting shaft lining
SU1006751A1 (en) Method for protecting production well with gently sloping coal seams and with the well extending through water-bearing formation
Gentry Rock mechanics instrumentation program for Kaiser Steel Corporation's demonstration of shield-type longwall supports at York Canyon Mine, Raton, New Mexico
Gasser et al. The Stockholm bypass project
Kycl D8 motorway Dobkovičky landslide: the case history and repair options
Hörlein Hard rock tunnelling in Norway: Tunnelbau am Polarkreis
CN117868870A (en) High-position gas drainage roadway rapid tunneling construction method
Koçak et al. Highway tunnel design under river with shallow overburden-Terzili tunnel example
Gitchell et al. Investigation and Mitigation Design for a Highwall Rock Slope in Southwest Virginia
Tully Rock bolt reinforcement systems for coal mine roadways
SU1186739A1 (en) Method of protecting buildings and structures from harmful influence of underground mining of suit of seams
EP0170199A2 (en) Method of constructing a tubular subterranean hollow space
Siddle Groundwater control by drainage gallery at Aberfan, South Wales
RU2006585C1 (en) Gear for isolation of rock workings