SU918171A1 - Method of protecting tender cargo in ship holds againsi condensate - Google Patents
Method of protecting tender cargo in ship holds againsi condensate Download PDFInfo
- Publication number
- SU918171A1 SU918171A1 SU802962771A SU2962771A SU918171A1 SU 918171 A1 SU918171 A1 SU 918171A1 SU 802962771 A SU802962771 A SU 802962771A SU 2962771 A SU2962771 A SU 2962771A SU 918171 A1 SU918171 A1 SU 918171A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- cargo
- hold
- condensate
- ventilation
- top layer
- Prior art date
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Heat Treatments In General, Especially Conveying And Cooling (AREA)
- Packages (AREA)
Description
(5) СПОСОБ ЗАЩИТЫ ОТ КОНДЕНСАТА ТРАНСПОРТИРУЕМЫХ В ТРЮМАХ СУДОВ РЕЖИМНЫХ ГРУЗОВ(5) METHOD OF PROTECTION AGAINST CONDENSATE TRANSPORTABLE IN ROUTS OF SHIPS OF REGULAR LOADS IN SHIPS
. . . .
Изобретение относитс к судоотроению , в частности к,способам защиты от конденсата транспортируемых в трюмах судов режимных грузов.The invention relates to piling, in particular, to methods of protection against condensate of regime cargoes transported in the holds of vessels.
Известен способ защиты от конденсата транспортируемых в трюмах судов режимных грузов, заключающийс в укладке на верхний слой штабел груза защитного покрыти и вентилйрбваиии трюма р }There is a known method of protection against condensate of regime cargoes transported in the holds of vessels, which consists in laying a protective coating and a ventilator and a hold p on the top layer of the cargo stack}
Однако такой способ защиты .судового груза от конденсата малоэффективен .However, this method of protecting cargo cargo from condensate is ineffective.
Цель изобретени - повышение эффективности способа защиты от конденсата транспортируемых в тр1бмах судов режимных грузов,The purpose of the invention is to increase the efficiency of the method of protection against condensate of regime cargoes transported in the territory of vessels,
Поставленна цель достигаетс тем, что на верхний слой штабел груза укладывают защитное покрытие из теплоизол ционного материала, а вентилируют только надштабельное пространство трюма.The goal is achieved by placing a protective coating of thermal insulation material on the top layer of the cargo stack, and ventilating only the superstructure space of the hold.
На фиг. 1 схематически изображено, судно с решенным грузом, покрытым теплоизол ционным материалом, поперечный разрез; на фиг. 2 - график распределени температур в трюме судна .FIG. 1 is a schematic representation of a ship with a decided cargo covered with thermal insulation material, a cross section; in fig. 2 is a plot of temperatures in a vessel's hold.
Предложеннь способ реализуетс следующим образом.The proposed method is implemented as follows.
После укладки груза в трюм на верхний слой ётабеп 1 укладывают After placing the cargo in the hold on the top layer, etapep 1 is placed
10 теплоизол ционное покрытие 2, раздел трюм в тепловом отношении на две зоны - зону, где находитс груз, и надштабельное пространство 3, которое вентилируют в период транспортиIS ровани груза.10 thermal insulation coating 2, thermally divided the hold into two zones - the zone where the cargo is located, and the super-scale space 3, which is ventilated during the transportation of the cargo.
В процессе морской перевозки груза в районы высоких широт в осеннезимне-весенний период температура наружного воздуха (t.j,) резко понижаетг During the maritime transport of goods to areas of high latitudes in the autumn-autumn-spring period, the temperature of the outside air (t.j,) sharply decreases
20 с . Температура верхней палубы (tn) практически йсегда близка температуре наружного воздуха, так как теплоизол ци палубы отсутствует. Так как тепло от |;руза передаетс в надштабельное пространство 3 через слой теплоизол ционного материала 2, то теплопоступлени в пространство 3 незначительны . Дл исключени нагрева воз духа в надштабельном пространстве ор ганизуетс его вентилирование. Воздух подаетс нагнетательным вентил тором , проходит над поверхностью теп лоизол ционного материала и удал етс из трюма выт жным вентил тором. При этом температура нижней поверхности теплоизол ционного материала будет равна температуре груза, а верхн его поверхностьпреобретает температуру надштабельного пространства . Теплотехнические расчеты показыва что наружна поверхность теплоизол ц онного материала в процессе транспортировки не нагреваетс , так как с ее поверхности осуществл етс посто нный теплосъем струей приточного,бо лее холодного воздуха. Таким образом, в результате укладки теплоизол ционного материала трюм судна делитс на две температур ные зоны СФиг. 2). Температура зоны 1 равна температуре груза (tpp), а в зоне II при вентилировании температура 1цр практически равна температуре наружного воздуха t. При этом температурный перепад At tpp- tj происходит непосредственно в слое теплоизол ционного материала. Поскольку в предлагаемом способе температура подволока трюма (tpj) рав на температуре надштабельного простр ства (), этим исключаетс причина образовани конденсата.20 s. The temperature of the upper deck (tn) is almost always close to the outside air temperature, since there is no thermal insulation of the deck. Since the heat from | Ruz is transferred to the super-scale space 3 through the layer of thermal insulating material 2, the heat input to the space 3 is insignificant. To prevent air heating in the above-scale space, it is ventilated. Air is supplied by an injection fan, passes over the surface of the heat insulating material, and is removed from the hold by an exhaust fan. At the same time, the temperature of the lower surface of the heat insulating material will be equal to the temperature of the cargo, and its upper surface will acquire the temperature of the superstructure space. Thermal calculations showing that the outer surface of the heat-insulating material is not heated during transportation, since its surface is continuously heated by a stream of fresh, more cold air. Thus, as a result of laying the heat insulating material, the vessel's hold is divided into two temperature zones. 2). The temperature of zone 1 is equal to the temperature of the cargo (tpp), and in zone II during ventilation, the temperature of 1cr is almost equal to the temperature of the outside air t. In this case, the temperature difference At tpp-tj occurs directly in the layer of heat insulating material. Since, in the proposed method, the temperature of the hold ceiling (tpj) is equal to the temperature of the scale space (), this excludes the cause of the formation of condensate.
йth
tntn
пP
11Л5511L55
tcczrtcczr
НПNP
zz
rJCrJC
I -CIiI2I -CIiI2
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802962771A SU918171A1 (en) | 1980-07-17 | 1980-07-17 | Method of protecting tender cargo in ship holds againsi condensate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802962771A SU918171A1 (en) | 1980-07-17 | 1980-07-17 | Method of protecting tender cargo in ship holds againsi condensate |
Publications (1)
Publication Number | Publication Date |
---|---|
SU918171A1 true SU918171A1 (en) | 1982-04-07 |
Family
ID=20910690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802962771A SU918171A1 (en) | 1980-07-17 | 1980-07-17 | Method of protecting tender cargo in ship holds againsi condensate |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU918171A1 (en) |
-
1980
- 1980-07-17 SU SU802962771A patent/SU918171A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3034309A (en) | Method for transporting gas | |
GB854705A (en) | Improvements in or relating to ships for carrying liquefied gases | |
US3039418A (en) | Tankers | |
Zakaria et al. | Boil-off gas formation inside large scale liquefied natural gas (lng) tank based on specific parameters | |
SU918171A1 (en) | Method of protecting tender cargo in ship holds againsi condensate | |
GB1061678A (en) | Externally thermally insulated hull structure | |
JPS6035687A (en) | Method of loading freight having possibility of sweating | |
US5423193A (en) | Low-maintenance system for maintaining a cargo in a refrigerated condition over an extended duration | |
Freeman | Marine fouling of fixed offshore installations | |
US3934451A (en) | Method of detecting imperfections in a heat-insulating lining | |
US3486553A (en) | Marine refrigeration | |
Linnow et al. | REFRIGERATED SHIP BLUMENTHAL EX HELENE JACOB | |
DE3460130D1 (en) | Ship for the transport of liquefied gas, method and device for the thermal insulation of its tanks | |
Larmi | Transient response model of low-speed diesel engine in ice-breaking cargo vessels. | |
Nelson | Relationship of parameters affecting the behaviour of lifeboats launched by free-fall | |
Simpson | INFRA-RED EMISSION FROM SHIPS | |
Robinson | CARGO CONTROL SYSTEM OF THE SAN DIEGO CLASS TANKER | |
SU1189732A1 (en) | Method of preventing freezing of loose cargoes in ship open holds | |
Laster et al. | ESTIMATED FUEL SAVINGS FROM UNDERWATER HULL AND PROPELLER CLEANING (FF 1052 CLASS SHIPS) | |
SU832233A1 (en) | Heat insulation pipeline | |
JPS6047784A (en) | Anti-freeze method of handrail in vessel | |
Peckham | SHIP ACCESS-THE KEY TO FAST TURN ROUND | |
Williams | A STRUCTURED APPROACH TO WARSHIP DESIGN | |
SE7900745L (en) | DEVICE BY SHIP | |
James | CARGO SECURING ON RO-RO VESSELS, CALCULATION OF FORCES ON CARGO AND IN LASHINGS |