SU909128A1 - Device for cementing flush casings - Google Patents

Device for cementing flush casings Download PDF

Info

Publication number
SU909128A1
SU909128A1 SU802901923A SU2901923A SU909128A1 SU 909128 A1 SU909128 A1 SU 909128A1 SU 802901923 A SU802901923 A SU 802901923A SU 2901923 A SU2901923 A SU 2901923A SU 909128 A1 SU909128 A1 SU 909128A1
Authority
SU
USSR - Soviet Union
Prior art keywords
casing
cementing
rod
fingers
nut
Prior art date
Application number
SU802901923A
Other languages
Russian (ru)
Inventor
Евгений Львович Барсук
Михаил Константинович Рухлов
Виктор Васильевич Котов
Владимир Кузьмич Авраменко
Original Assignee
Туркменский Научно-Исследовательский Геологоразведочный Институт Управления Геологии Туркменской Сср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Туркменский Научно-Исследовательский Геологоразведочный Институт Управления Геологии Туркменской Сср filed Critical Туркменский Научно-Исследовательский Геологоразведочный Институт Управления Геологии Туркменской Сср
Priority to SU802901923A priority Critical patent/SU909128A1/en
Application granted granted Critical
Publication of SU909128A1 publication Critical patent/SU909128A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

1one

Изобретение относитс  к нефтедобывающей промышленности и водоснабжению и может быть применено при цементировании потайных обсадных колонн.FIELD OF THE INVENTION The invention relates to the oil industry and the water supply and can be used in the cementing of the blind casing.

Известно устройство дл  цементировани  потайных обсадных колонн, включающее муфту, узел подвески, трубчатый шток и уплотнение 1.A device for cementing blind casing strings is known, which includes a sleeve, a suspension assembly, a tubular rod, and a seal 1.

Недостатком устройства  вл етс  возможность зависани  шара в бурильных трубах, что может привести к оголению башмака обсадной колонны.The disadvantage of the device is the possibility of the ball hanging in the drill pipe, which can lead to the exposure of the casing shoe.

Наиболее близким к предлагаемому « вл етс  устройство дл  цементировани  потайных обсадных колонн, включающее муфту, левую гайку, трубчатый шток с уплотнением t2l.Closest to the proposed " is a device for cementing the blind casing strings including a sleeve, a left nut, a tubular rod with a t2l seal.

Недостатком известного устройства  вл етс  то, что при несрабатывании обратного клапана нарушаетс  процесс цементировани , а также, невозможность осуществлени  контрол  за процессом цементировани .A disadvantage of the known device is that the failure of the non-return valve disrupts the cementing process, as well as the impossibility of monitoring the cementing process.

Цель изобретений - повышение надежности работы устройства за счет обеспечени  возможности контрол  процесса разъединени .The purpose of the inventions is to increase the reliability of the device operation by making it possible to control the disengagement process.

Указанна  цель достигаетс  тем, что шток и гайка выполнены с взаимодействующими между собой шлицами при верхнем положении штока, а,последний заглушен снизу и имеет радиальные отверсти . This goal is achieved by the fact that the stem and the nut are made with interacting splines at the upper position of the stem, and the latter is plugged at the bottom and has radial holes.

Шток выполнен с радиальными несущими пальцами, а муфта - с фигурными пазами под пальцы.The rod is made with radial bearing fingers, and the coupling - with shaped grooves under the fingers.

На фиг. 1 изображено устройство в положении, соответствующем спуску FIG. 1 shows the device in the position corresponding to the descent

15 обсадной колонны, промывке ее раствором , закачке цементного и расчетного (в, объеме бурильных труб) продавочного растворов; на фиг. 2 разрез А-А на фиг. 1; на фиг. 3 .30 вид Б на фиг. 1(положение несущего пальца в фигурном пазу); на фиг. устройство в положении при продавке цементного раствора; на фиг. 5 39 вид в на фиг. i (положение несущего пальца в фигурном пазу). Устройство содержит трубчатый шток 1, который  вл етс  передовым наконечником подвесной колонны 2 труб. Между муфтой (обсадной трубой ) 3 и штоком 1 помещена составна лева  г.айка М с уплотнительным элементом 5, который взаимодействует с проход щим через него трубчатым штоком 1. Трубчатый шток 1 перекрыт на своем нижнем торце заглушкой 6, котора  имеет на своем верхнем торце шлицы 7; шлицам 7 соответствуют шлицы 8 на нижнем торце гайки . Шл цевое соединение служит дл  передачи вращени  от подвесной колоннь| на левую гайку. При этом гайка 4 имеет левую резьбу и при сопр жении шлицов 7 и 8 и передаче вращени  вывинчиваетс  из обсадной трубы 3- На своей боковой поверхности трубчатый шток 1 имеет радиальные отверсти  9, сообщающие полость обсадной трубы 3 с полостью спускной колонны 2. Обща  площадь отверстий 9 обеспечивает прохождение через них жидкости (цементный и буровой раствор) без дополнительного сопротивлени . В штоке 1 симметрично укреплены радиальные несущие пальцы 10, которые вход т в фигурные пазы 11, выполненные на боковой поверхности муфты обсадной колонны. Каждый из фигурных пазов 11 выполнен из двух продольных смещенных вертикальных умаетков - верхнего 12 и нижнего 13 сообщенных между собой поперечным участком таким образбм, что нижний конец продольного участка 12 плавно переходит в участок 1, а над сопр жением другого конца участка И с участком 13 имеетс  тупикова  масть Участок 12 фигурного паза (сквозной) выходит иа верхний торец муфты 3- На наружной поверхности муфты 3 укреплены центраторы 15, обеспечивающие цент ровку головы обсадной колонны в -сгвоЛе скважины. В обсадной колонне 16 под трубчатым штоком 1 помещаетс  цементировочна  пробка 17, выполненна , например, из резины или другого упругого материала. При спуске устройства пробка 17 помещаетс  между группами отверстий 18 и 19 в обсадной колонне, закрытых снаружи кольцевым кожухом 20. Устройство работает следующим образом . В скважину опускают подвеску, состо щую из колонны 16 обсадных труб с навернутой на ее верхний конец муфтой 3, соединенной с подвесной колонной посредством несущих пальцев 10. Пальцы 10 помещаютс  в фигурных пазах 11 муфты, в тупиковых част х пазов 13.. Шлицевое соединение 7-8 разомкнуто , а цементировочна  пробка 17 находитс  между отверсти ми 18 и 19 в обсадной колонне. Полости обсадной и подвесной колонн заполн ют по мере спуска промывочным раствором, По достижении устройством интервала установки обсадной колонны давлением в трубах создают циркул цию промывочного раствора через нижний конец колонны. Далее закачивают цементный раствор и частично в объеме подвесной колонны продавочную жидкость . Производ т посадку подвесной колонны. В гидрогеологических скважинах осуществл етс  посадка и подвесной и обсадной колонн. При посадке трубчатых шток 1 сдвигает цементировочную пробку 17 вниз до перекрыти  ею отверстий 19 в обсадной колонне. Давлением насоса, закачивающего продавочную жидкость, обеспечиваетс  дальнейшее движение цементировочной пробки 17 по обсадной колонне. После закачки продавочной жидкости и получени  на манометре давлени  Стоп восстанавливаетс  . циркул ци . Дл  скважин на нефть и газ обсадна  колонна подвешиваетс  на клиновом или упорном подвесном устройстве. Дл  гидрогеологических скважин возможна частична  разгрузка веса обсадной колонны на забой. Приподнимают подвесную колонну 2, одновременно прилага  к ней направленный влево крут щий момент. Тем самым обеспечиваетс  горизонтальное перемещекие несущих пальцев 10 по промежуточным участкам фигурных пазоа 11. Отверсти  9 на трубчатом штоке попадают в зону над уплотнительным элементом. Выход несущих пальцев 10 из вертикальных участков 12 пазов 11 на торце муфт 3 отмечен ростом нагрузки на крюке после подъема подвесной колонны. 2 на заранее измеренное известное рассто ние, Это рассто ние соответствует сдвигу цементировочной пробки 17 и отмечаетс  по началу разгрузки подвесной колонны 2. При этом дополнительным средством контрол  служит восстановление циркул ции раствора при давлени х меньших, чем при циркул ции через башмак обсадной колонны.15 casing, washing it with a solution, pumping cement and calculated (in, the amount of drill pipe) squeezing solutions; in fig. 2, section A-A in FIG. one; in fig. 3 .30 view B in FIG. 1 (the position of the bearing finger in the shaped groove); in fig. the device is in position when pushing cement mortar; in fig. 5 39 in FIG. i (the position of the bearing finger in the shaped groove). The device comprises a tubular rod 1, which is an advanced tip of a 2-pipe suspension string. Between the coupling (casing) 3 and the stem 1 there is a composite left gaika M with a sealing element 5, which interacts with the tubular rod 1 passing through it. The tubular rod 1 is blocked at its lower end by a stub 6, which has at its upper end slots 7; slots 7 correspond to the slots 8 on the lower end of the nut. The large joint is used to transmit the rotation from the suspended columns | on the left nut. At the same time, the nut 4 has a left-hand thread and is unscrewed from the casing 3 when mating the splines 7 and 8 and transmitting the rotation. On its side surface, the tubular rod 1 has radial holes 9 that connect the cavity of the casing 3 with the casing of the casing 2. The total area of the holes 9 ensures that fluids (cement and drilling mud) pass through them without additional resistance. In the rod 1, the radial bearing fingers 10 are symmetrically fastened, which are inserted into the shaped grooves 11, which are made on the side surface of the casing sleeve. Each of the shaped grooves 11 is made of two longitudinal displaced vertical umechik - top 12 and bottom 13 interconnected by a transverse section in such a way that the lower end of the longitudinal section 12 smoothly passes into section 1, and above the junction of the other end of section I with section 13 there is deadlock suit Section 12 of the figured groove (through) goes to the upper end of the coupling 3- On the outer surface of the coupling 3, the centralizers 15 are fastened, which ensure the centering of the casing head in the hole of the well. In the casing 16, a cement plug 17, made, for example, of rubber or other elastic material, is placed under the tubular rod 1. During the descent of the device, the plug 17 is placed between the groups of holes 18 and 19 in the casing, which are closed outside by an annular casing 20. The device operates as follows. A suspension consisting of a casing string 16 with a coupling 3 screwed on its upper end connected to the suspension string by means of carrying pins 10 is lowered into the well. The fingers 10 are placed in the figured grooves 11 of the coupling in dead ends of the grooves 13. Spline connection 7 -8 is open, and cement plug 17 is between holes 18 and 19 in the casing. The cavities of the casing and suspension columns are filled with flushing solution as the device descends. When the device reaches the casing installation interval, pressure in the pipes creates circulation of the washing solution through the lower end of the column. Next, pumped cement mortar and partially in the volume of the suspension column squeezing the liquid. Landing suspended column. In the hydrogeological wells, landing and casing strings are also carried out. When the tubular stem 1 is seated, the cement plug 17 moves downward until it closes the openings 19 in the casing. The pressure of the pump injecting the squeeze fluid provides further movement of the cementing plug 17 through the casing. After the injection fluid has been pumped and the pressure is obtained on the pressure gauge, the stop is restored. circulation For wells for oil and gas, the casing string is suspended on a wedge or thrust suspension device. For hydrogeological wells, a partial discharge of the weight of the casing string to the bottom is possible. Raise support column 2 while simultaneously applying a left-facing torque to it. This ensures horizontal displacement of the bearing fingers 10 along the intermediate sections of the shaped grooves 11. The holes 9 on the tubular rod fall into the area above the sealing element. The output of the bearing fingers 10 from the vertical sections 12 of the grooves 11 at the end face of the clutches 3 is marked by an increase in the load on the hook after lifting the suspension column. 2 at a predetermined known distance. This distance corresponds to the shift of the cementing plug 17 and is noted at the beginning of the unloading of the suspension string 2. In this case, an additional means of control is to restore the circulation of the solution at pressures lower than when circulating through the casing shoe.

б процессе циркул ции происходит отмывка головы обсадной колонны труб от излишка цементного раствора. Циркул ци  может производитьс  в течение всего периода ОЗЦ, но не должна быть менее одного цикла промывки. По окончании ОЗЦ вращением подвесной колонны 2 вправо провод т отворот упорной гайки i с уплотнительным элементом от обсадной трубы 16. Далее извлекают из скважины подвесную колонну 2 с трубчатым штоком 1 и уплотнительным элементом на нем.In the circulation process, the head of the casing string is washed out of excess cement slurry. Circulation may be performed during the entire RPF period, but there must be no less than one flushing cycle. At the end of the RPT, turning the suspension string 2 to the right holds the lid of the stop nut i with the sealing element from the casing 16. Next, the suspension column 2 with the tubular stem 1 and the sealing element on it is removed from the well.

Использование устройства позвол ет сократить аварийность при операци х по спуску и цементированию по- . тайных обсадных колонн и благодар  этому повышает производительность буровых работ.The use of the device makes it possible to reduce the accident rate during descending and cementing operations. secret casing strings and because of this increases the productivity of drilling operations.

Claims (2)

1. Устройство дл  цементировани  потайных обсадных колонн, включающее муфту, левую гайку, трубчатый шток с уплотнением, отличающеес   тем, что, с целью повышени  надежности работы за смет обеспечени  возможности контрол  процесса разъедииени , шток и гайка выполнены с взаимодействующими между собой шлицами при верхнем положении штока, а последний заглушен снизу и имеет радиальные отверсти .1. A device for cementing the blind casing strings, including a sleeve, a left nut, a tubular rod with a seal, characterized in that, in order to increase the reliability of the estimates, to ensure the control of the diversion process, the rod and nut are made with interacting splines at the upper position rod, and the latter is plugged from the bottom and has radial holes. 2. Устройство по п. 1, о т л и - : чающеес  тем, что трубчатый шток выполнен с радиальными несущими пальцами, а муфта - с фигурными Пазами под пальцы.2. The device according to p. 1, about t l and -: that the tubular rod is made with radial bearing fingers, and the coupling - with figured grooves for fingers. Источники информации,Information sources, прин тые во внимание при экспертизеtaken into account in the examination 1.Авторское свидетельство СССР Р 583283, кл. Е 21 В 33/1, 197-5.1. Author's certificate of the USSR P 583283, cl. E 21 B 33/1, 197-5. 2.Авторское свидетельство СССР № 583282, кл. Е 21 В ЗЗ/1t, 1976.2. USSR author's certificate number 583282, cl. Е 21 В ЗЗ / 1t, 1976. (прототип).(prototype). 8eight (Риг. г(Rig. G ЗидZid (Риг.з(Rig.z Фиг,1Fig, 1
SU802901923A 1980-03-28 1980-03-28 Device for cementing flush casings SU909128A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802901923A SU909128A1 (en) 1980-03-28 1980-03-28 Device for cementing flush casings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802901923A SU909128A1 (en) 1980-03-28 1980-03-28 Device for cementing flush casings

Publications (1)

Publication Number Publication Date
SU909128A1 true SU909128A1 (en) 1982-02-28

Family

ID=20886203

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802901923A SU909128A1 (en) 1980-03-28 1980-03-28 Device for cementing flush casings

Country Status (1)

Country Link
SU (1) SU909128A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2791318C1 (en) * 2022-06-28 2023-03-07 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Liner hanger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2791318C1 (en) * 2022-06-28 2023-03-07 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Liner hanger

Similar Documents

Publication Publication Date Title
RU2517294C1 (en) Device for dual injection operation to two formations of same well (versions)
RU2611792C1 (en) Method for isolation of watered intervals in horizontal section of wellbore
SU909128A1 (en) Device for cementing flush casings
US2916092A (en) By-pass liner hanging apparatus
RU2741882C1 (en) Method for multi-stage cuff cementing of wells
RU2615188C1 (en) Well stage cementing method
RU2255211C1 (en) Well plant for bed-wise joint-separate feeding and extraction of liquid
US3417816A (en) Method of cementing well casing
RU134574U1 (en) DEVICE FOR CEMENTING A TAIL IN A WELL
SU1752934A1 (en) Device for running and cementing the liners
CN112983290B (en) Oil well production pipe column, use method of oil well production pipe column and oil well production system
SU1714083A1 (en) Plugging back device for trouble zone isolation and well workover
RU2763560C1 (en) Method for cementing fiberglass casing pipes and device for its implementation
RU2014428C1 (en) Device for assembling casing bottom
US3171481A (en) Method of multiple string open hole cementing including the step of sealing off the annulus
RU2541981C1 (en) Completion method for well with horizontal shaft
RU2355866C1 (en) Facility for cementing tail piece in well
RU2780997C1 (en) Packer device
RU2503795C1 (en) Installation method of cement bridge in well under intake formation
RU1774986C (en) Method of cementing casing string
US2239295A (en) Cementing tool
RU2777240C1 (en) Method for installing a rotating liner in a well and a device for its implementation
RU52088U1 (en) DEVICE FOR CEMENTING A TAIL IN A WELL
RU44348U1 (en) DEVICE FOR CEMENTING A TAIL IN A WELL
RU2713819C1 (en) Bottom-hole fluid flow switch in well for various operating modes (embodiments)