Method of pouring cement into the absorption zone during drilling

Info

Publication number
SU90731A1
SU90731A1 SU418097A SU418097A SU90731A1 SU 90731 A1 SU90731 A1 SU 90731A1 SU 418097 A SU418097 A SU 418097A SU 418097 A SU418097 A SU 418097A SU 90731 A1 SU90731 A1 SU 90731A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cement
absorption zone
during drilling
zone during
pouring cement
Prior art date
Application number
SU418097A
Other languages
Russian (ru)
Inventor
А.А. Колтаков
Original Assignee
А.А. Колтаков
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by А.А. Колтаков filed Critical А.А. Колтаков
Priority to SU418097A priority Critical patent/SU90731A1/en
Application granted granted Critical
Publication of SU90731A1 publication Critical patent/SU90731A1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)

Description

Дл  борьбы с уходод промывочио ЖИДКОСТИ В зону поглощени, при турбинно-роторном бурении скважин, нрнмен ютс  paзлив rыe быстросхватывающиес  смеси высокой в зкости. Эти смеси заполн ют зону поглощени  и преграждают уход промывочной жидкости. Чтобы избежать ухода быстрозахватывающейс  смеси и возможности удержат , се, В начале зоны поглои1сни  предлагаетс  исиользовать  вление вакуума дл  заме.п, продвижени  столба цементного раствора В зону пог.тощени .To combat flushing fluid, turbo-rotary drilling of wells is absorbed into the absorption zone by mixing high-viscosity mixtures. These mixtures fill the absorption zone and stop the washing liquid from escaping. In order to avoid the withdrawal of the quick-setting mixture and the possibility of retaining it, ce, At the beginning of the zone of absorption, it is proposed to use the phenomenon of vacuum to replace the advance of the column of cement slurry Into the area of the accumulated sludge.

Способ состоит В следующем. Перед началом бурени  в устье шахтового направлени  бетонируетс  на 5-6 м обсадна  труба диамет К )м 16-18 заканчиваюгиа с  вверху муфтой.The method consists in the following. Before starting drilling, the casing pipe of diameter K) m 16-18 with a coupling at the top is concreted for 5-6 m at the mouth of the mine direction.

При по вленш поглощени  во вре-м  бурени  скважины уровень промывочной жидкости упадет. Производитс  подсчет необходимого количества цементного раствора дл  заполнени  зоны поглощени .When absorption occurs during drilling, the level of flushing fluid will drop. The required amount of cement slurry is calculated to fill the absorption zone.

Через заливочную головку, установленную на муфте обсадной трубы , закачиваетс  необходимое количество п,емент1 ого раствора с 40-50°о консистениией цемента.Through the filling head installed on the casing coupling, the required amount of n, cement solution is pumped from 40-50 ° about the consistencies of the cement.

Заливочна  головка, краны и места соединений должны быть проверены на герметичность.The filler head, taps and connections must be leak tested.

После п юкачки цемента, закрываютс  краны как на головке, так и па за. ивочном агрегате.After pumping the cement, the taps are closed both on the head and the pas. spring assembly.

Закаченный в скважину цемент будет удерживатье  под заливочпой ГОЛОВКОЙ за счет образовавщегос  вакуума, который образуетс  пои передв11жении в скважине цементного столба.The cement pumped into the well will be held under the filling head due to the resulting vacuum, which is formed by penetration into the cement column in the well.

Предмет и з о б i5 е т е и :И  Subject and d i i e et e: i

Способ заливки цемента в зону поглощени  при бурении скважин, . о т л и ч а ю ш, и и с   гем, что, :с целью замедлени  продвижени  столбаMethod of pouring cement into the absorption zone during drilling,. About tl and h and y w, and with hem, that,: in order to slow down the progress of the column

цемента ВвЗрну ухода, непосредственно после прокачки цемента и нагнетани  его в зону ухода в KOfiH4ecT)3e по расчету, имеющиес  на заливочной толрвке и насосах :задвижки и краны перекрывают с тем, чтобы дальнейшее .-продвижел-Чие цементного столба создало вакуум под заливочной головкой, замедл ющий продвижение цемента .до его схватыCement VZRNU care, immediately after pumping cement and pumping it into the care zone in KOfiH4ecT) 3e by calculation, available on the primer and pumps: valves and taps overlap so that further. slowing the progress of the cement. to his arms

SU418097A 1950-05-15 1950-05-15 Method of pouring cement into the absorption zone during drilling SU90731A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU418097A SU90731A1 (en) 1950-05-15 1950-05-15 Method of pouring cement into the absorption zone during drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU418097A SU90731A1 (en) 1950-05-15 1950-05-15 Method of pouring cement into the absorption zone during drilling

Publications (1)

Publication Number Publication Date
SU90731A1 true SU90731A1 (en) 1950-11-30

Family

ID=48366832

Family Applications (1)

Application Number Title Priority Date Filing Date
SU418097A SU90731A1 (en) 1950-05-15 1950-05-15 Method of pouring cement into the absorption zone during drilling

Country Status (1)

Country Link
SU (1) SU90731A1 (en)

Similar Documents

Publication Publication Date Title
CN108756806A (en) Pipe leakage administering method is altered outside a kind of production of hydrocarbons well casing
CN106884624A (en) A kind of area of stress concentration crushed zone drilling and sealing device and method for sealing
CN109403914A (en) Water column only starches two fluid grouting method in a kind of down-hole extra-deep hole drilling
SU90731A1 (en) Method of pouring cement into the absorption zone during drilling
CN107654207B (en) Section method for fixed-point preset sand plug of coiled tubing horizontal well
CN108071376A (en) A kind of injection-production column jacket in coal bed gas well
CN201209423Y (en) Oilfield workover treatment cement squeeze device
RU2615188C1 (en) Well stage cementing method
CN204716213U (en) Pressure fluctuation meter drives self-balancing piston pump pumping equipment
CN104929595B (en) Fluctuation pressure drives self-balancing piston pump pumping equipment and its process
CN106014311A (en) Multifunctional casing pipe guiding device
US3139139A (en) Method of fracturing formations
RU2495231C1 (en) Flushing method for wells with lost-circulation formation
CN208330318U (en) Continuous impulse for general de-plugging is acidified tubing string and its continuous impulse generator
CN207701118U (en) A kind of automatic liquid filling pressure drilling priming devices of TCP
RU2645695C1 (en) Method of cementing of the additional column of pipes in the injection well
US2965171A (en) Cementing casing
SU30231A1 (en) Cement lamp for testing oil inflows in secured wells
US1819668A (en) Well cementing apparatus
SU15925A1 (en) Method for determining the level of liquid (oil) standing in boreholes when pumping the latter with a plunger pump
SU69702A1 (en) Method of preparing mortar for cementing wells in fractured rocks
SU73795A1 (en) Drilling method with reduced back pressure on the formation
RU54617U1 (en) DIVIDING LOWER TUBE FOR CEMENTING OF TAILS
SU137085A1 (en) Bottom plug for cementation wells
SU117903A1 (en) A device for delivering a plug to its installation site during cementing operations in a well