CN201209423Y - Oilfield workover treatment cement squeeze device - Google Patents
Oilfield workover treatment cement squeeze device Download PDFInfo
- Publication number
- CN201209423Y CN201209423Y CNU2008200134398U CN200820013439U CN201209423Y CN 201209423 Y CN201209423 Y CN 201209423Y CN U2008200134398 U CNU2008200134398 U CN U2008200134398U CN 200820013439 U CN200820013439 U CN 200820013439U CN 201209423 Y CN201209423 Y CN 201209423Y
- Authority
- CN
- China
- Prior art keywords
- mortar
- oil
- fluid
- well
- ash
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to an oil water maintaining device used in the oil field, in particular to an ash squeezing device for the well repairing operation used in the oil field, which belongs to the extractive industry. The oil water maintaining device is composed of a well head device, an ash squeezing pipe column, a manual bottom hole and a sleeve, wherein displacement fluid, mortar with a bridge plug and pre-posed fluid are filled into the ash squeezing pipe column; bridge plug agent and the mortar are contained in a perforated interval on the wall of the sleeve and in an outer stratum, and the well head device is communicated with a ground mortar stirring tank through a high-pressure pipeline, and the displacement fluid is composed of fresh water and retardant. Because the displacement fluid, the mortar with the bridge plug and the pre-posed fluid are filled and matching devices are arranged in the ash squeezing pipe column of the oil water maintaining device, the oil well stratum with severe leakage loss can be plugged to avoid the problems that the cement is leaked and oil layer channels are plugged, thereby the used retardant can also ensure the construction security.
Description
Technical field:
The utility model belongs to extractive industry oilfield oil well maintenance unit, and especially a kind of oil well repairing operation squeezes apparatus for ash.
Background technology:
At present oil-water well carry out the shutoff envelope generally adopt when scurrying simple in the device adding cement paste and improve the cement additive method of performance on a small quantity, these devices are transplanted from the oil drilling well shaft fixing technology and are come, because it is poor to form the shut-off capacity of cement paste, can not form at suitable position effectively and stop up, cause the once construction shutoff success rate of oil field shutoff operation to be had only about 30%, other utilizes cement paste to comprise the A level, G level and superfine cement slurry carry out the shutoff mode, annotate apparatus for ash and have this type of problem equally, can not effectively satisfy the on-the-spot needs that layer shutoff of leakiness lost territory and envelope are scurried.
The utility model content:
The purpose of this utility model is in order to overcome above-mentioned shortcoming, and a kind of oil well repairing operation that provides squeezes apparatus for ash, utilize this device to contain the mortar that bridging plug agent mortar and retarding agent are mixed with in adding in the mortar stirring pool, after being squeezed in the oil well it in stratum, can form strong blocking ability, stop up effect raising oil-water well shutoff efficient thereby increase, prolong effective duration of congestion.
Technical scheme:
The task of Ti Chuing for achieving the above object, for this reason the utility model adopted comprise wellhead assembly, squeeze grey tubing string, artificial bottom of a well, sleeve pipe form; In the described crowded grey tubing string displacement fluid is housed from top to bottom, contains the bridging plug mortar, prepad fluid includes the agent of part bridging plug in the stratum of well-case perforating well section outside.The described wellhead assembly of mortar is connected with ground mortar stirring pool by high pressure line.
Described prepad fluid is mud, contain the bridging plug mortar is that dry cement, clear water, foam quartz powder mixture are formed, and displacement fluid is made up of clear water, retarding agent.
The utility model is finished by following working method:
During use, at first carry out the drifting operation by this device, keep unimpeded in the well, carry out anti-flushing well then, clear water is injected into well from sleeve pipe and crowded ash pipe band of column shape space, greasy dirt on the borehole wall is gone out from squeezing grey tubing string internal return, and then in the cement that mixes, add a certain amount of bridging plug agent mortar and retarding agent, carry out the direct circulation operation, quantitative prepad fluid is injected into squeezes in the grey tubing string, and then agent of cement bridging plug and the retarding agent of preparing in the mortar stirring pool be injected in the stratum, promote subsequently and squeeze grey tubing string to certain position, replace out unnecessary mortar.Just can finish the task on cementing plugging leakage stratum.
Because the utility model has adopted by the fluid column and the corollary apparatus thereof that squeeze displacement fluid in the grey tubing string, contain bridging plug agent mortar, prepad fluid is formed, carry out shutoff to missing in the serious oil well stratum, can avoid cement to stop up the phenomenon generation of oil reservoir passage in formation leakage or appearance, this device also can utilize retarding agent control to the cement solidifies the time, guarantees construction safety.
Description of drawings:
Accompanying drawing 1 is the utility model structural representation.
Among the figure by 1, wellhead assembly, 2, high pressure line, 3, the mortar stirring pool, 4, displacement fluid, 5, contain the bridging plug mortar, 6, prepad fluid, 7, perforated interval, 8, the artificial bottom of a well, 9, squeeze grey tubing string, 10, sleeve pipe forms.
The specific embodiment:
The utility model is provided by following examples, is illustrated below in conjunction with accompanying drawing.
Wellhead assembly 1 is the operation well mouth of oil well in the accompanying drawing, connecting a high pressure line 2 by the high pressure line valve, this pipeline leads in the mortar stirring pool 3, the mortar stirring pool is that square metal trough is the apparatus of job site preparation mortar, displacement fluid 4 is clear water and retarding agent liquid, as pushing the liquid that injects in the oil well, bridging plug mortar 5 is by dry cement, clear water, retarding agent, the foam quartz powder mixture is formed, when prepad fluid 6 is the mud reservoir plugging, aforesaid liquid or mortar are respectively put in the mortar stirring pool, and then be injected in the oil well by ground pump truck and high pressure line 2, thereby the mortar 5 that will contain the bridging plug agent according to the injection order again is injected into and carries out in the stratum missing serious oil well plugging.
Claims (1)
1, a kind of oil well repairing operation squeezes apparatus for ash, comprises by wellhead assembly (1), crowded grey tubing string (9), artificial bottom of a well (8), sleeve pipe (10) forming; It is characterized in that displacement fluid (4) is housed in the described crowded grey tubing string (9) from top to bottom, contain bridging plug agent mortar (5), prepad fluid (6), perforated interval (7) in sleeve pipe (10), the outside includes part bridging plug agent mortar (5) in the stratum, and described wellhead assembly (1) is connected with ground mortar stirring pool (3) by high pressure line (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200134398U CN201209423Y (en) | 2008-06-13 | 2008-06-13 | Oilfield workover treatment cement squeeze device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200134398U CN201209423Y (en) | 2008-06-13 | 2008-06-13 | Oilfield workover treatment cement squeeze device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201209423Y true CN201209423Y (en) | 2009-03-18 |
Family
ID=40480155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200134398U Expired - Fee Related CN201209423Y (en) | 2008-06-13 | 2008-06-13 | Oilfield workover treatment cement squeeze device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201209423Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858084A (en) * | 2010-07-05 | 2010-10-13 | 天津建岩岩土工程有限公司 | Cement injection machine used for reinforcing and preventing leakage in underground tunnel construction |
CN108131114A (en) * | 2017-11-14 | 2018-06-08 | 中国石油天然气集团公司 | Chemical drive injection well shut-in well process |
CN110485975A (en) * | 2019-07-29 | 2019-11-22 | 西南石油大学 | A kind of horizontal well acidizing large scale acidizing wormhole simulator and experimental method |
CN113494267A (en) * | 2020-03-18 | 2021-10-12 | 中国石油化工股份有限公司 | Oil-gas-water well leak-point plugging operation method |
-
2008
- 2008-06-13 CN CNU2008200134398U patent/CN201209423Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858084A (en) * | 2010-07-05 | 2010-10-13 | 天津建岩岩土工程有限公司 | Cement injection machine used for reinforcing and preventing leakage in underground tunnel construction |
CN108131114A (en) * | 2017-11-14 | 2018-06-08 | 中国石油天然气集团公司 | Chemical drive injection well shut-in well process |
CN108131114B (en) * | 2017-11-14 | 2019-10-11 | 中国石油天然气集团公司 | Chemical drive injection well shut-in well process |
CN110485975A (en) * | 2019-07-29 | 2019-11-22 | 西南石油大学 | A kind of horizontal well acidizing large scale acidizing wormhole simulator and experimental method |
CN113494267A (en) * | 2020-03-18 | 2021-10-12 | 中国石油化工股份有限公司 | Oil-gas-water well leak-point plugging operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109339736A (en) | A kind of mash gas pumping drilling solid-liquid two-phase hole sealing device and technique | |
CN105199685B (en) | A kind of water-base drilling fluid of inductivity crack leak-proof leak-stopping | |
CN102587858B (en) | Method for blocking water for fracture and hole type reservoir | |
CN103289013A (en) | Gel and method thereof used for plugging and method for plugging killing well | |
CN209179725U (en) | A kind of mash gas pumping drilling solid-liquid two-phase hole sealing device | |
CN103321606A (en) | Low-permeability fractured reservoir oil well water-plugging and screening method | |
CN201209423Y (en) | Oilfield workover treatment cement squeeze device | |
CN104762072A (en) | Penetrating selective plugging agent and preparation method and application method thereof | |
CN101225740A (en) | Annular filling method for space between freezing pipe and surrounding rock | |
RU2315171C1 (en) | Method for water influx zone isolation inside well | |
CN102703043A (en) | Novel plugging material | |
CN204677155U (en) | A kind of down-hole coal bed high strength rapid drilling hole sealing device | |
CN204252934U (en) | Test boring device for plugging | |
CN105178910A (en) | Water-plugging process tubing string and method of horizontal wells | |
CN102767353A (en) | Comprehensive mining technology of drowned well | |
CN101319604B (en) | Inverse squeezing tie-back sealing plug | |
CN107882544B (en) | A kind of mixing heat release method for removing blockage for carbonate cementation molding sand rock heavy oil wells | |
CN102618232B (en) | Plugging agent for fractured-vuggy oil reservoir | |
CN105199693B (en) | A kind of oil base gel leak stopping slurry | |
CN201196059Y (en) | Oil well cementing system | |
CN106351603A (en) | Crack or cave serious leakage plugging method and plugging material feeding pipe string | |
RU2183724C2 (en) | Method of recovery of bottom-hole formation zone of gas well | |
CN101280674B (en) | Oil well cementing system with inverse squeezing and pouring functions | |
CN204591208U (en) | A kind of double-deck grouting pipe | |
CN2837505Y (en) | Down-hole grouting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090318 Termination date: 20110613 |