SU907246A1 - Explosion method of providing a screening slit - Google Patents
Explosion method of providing a screening slit Download PDFInfo
- Publication number
- SU907246A1 SU907246A1 SU802964084A SU2964084A SU907246A1 SU 907246 A1 SU907246 A1 SU 907246A1 SU 802964084 A SU802964084 A SU 802964084A SU 2964084 A SU2964084 A SU 2964084A SU 907246 A1 SU907246 A1 SU 907246A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- wells
- array
- rows
- slit
- blasting
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Description
(54) ВЗРЫВНОЙ СПОСОБ ОБРАЗОВАНИЯ ЭКРАНИРУЮЩЕЙ ЩЕЛИ(54) EXPLOSIVE METHOD OF FORMATION OF THE EQUIDING SCREENING Slit
1one
Изобретение относитс к ropHofi промышленности и может быть использовано при разработке твердых полезны.х ископаемы.х подзе.мным и открытым способами дл защиты горных пород и сооружений от сейсмического воздействи взрывов.The invention relates to the ropHofi industry and can be used in the development of solid minerals, minerals and underground methods for the protection of rocks and structures from seismic effects of explosions.
Известен способ образовани щелей, включаюпдий слоевую мелкощпуровую проходку щелей по вис чему и лежачему бокам рудного тела, магазинирование отбитой руды при проходке, отбойку полезного ископаемого между щел ми и выпуск отбитой руды 1 .There is a known method for the formation of cracks, including layered fine-tunneling of cracks in the hanging and supine sides of the ore body, the storage of broken ore during penetration, the breaking of the mineral between the holes and the production of broken ore 1.
Известен также взрывной способ образовапи экранирующей щели, включающий бурение р дов скважин в контурах образуемой щели, зар жание их взрывчатым вещество .м и короткозамедленное взрывание перед отбойкой сло полезного ископаемого 2 .Also known is the explosive method of forming a shielding slit, which includes drilling a series of wells in the contours of the formed slit, loading them with an explosive substance and short-delayed blasting before blasting the mineral layer 2.
Недостатком данного способа вл етс возможность повреждени охран емого объекта при образовании щели.The disadvantage of this method is the possibility of damage to the protected object when a slot is formed.
Цель изобретени - повыщение эффективности зан1иты .массива горных пород и с.оружений от сейсмического воздействи The purpose of the invention is to increase the efficiency of an array of rocks and structures from seismic impact.
массовых взрывов и улучщение дроблени добываемого полезного ископаемого.mass explosions and improvement of the crushing of the extracted mineral.
Поставленна цель достигаетс тем, что скважины р да смежного с отбиваемым массивом зар жают увеличенными зар дами,The goal is achieved by the fact that the wells of the row adjacent to the array are charged with increased charges,
5 а взрывание начинают с р да ближайшего к охран емому, причем часть массива скважин оставл ют незар женными. Кроме того, незар женные скважины бур т большего диаметра чем зар женные, а р ды скважин5 and the blasting starts from the row closest to the protected one, with a part of the array of wells left uncharged. In addition, uncharged wells are drilled with a larger diameter than the charged ones, and the rows of wells are
,0 бур т дугообразной формы, причем выпукла сторона р дов обращена в сторону охран емого массива., 0 is an arc-shaped bur, with the convex side of the rows facing the protected array.
На фиг. 1 показан вариант схемы расположени скважин при образовании экранирующей щели с использованием незар женных (холостых) скважин, план; на фиг. 2 - щель вогнутой в сторону отбиваемого массива формы с вариантом схемы расположени скважин; на фиг. 3 - номограмма дл определени коэффициента отражени волны по энергии (Котр) зависимости от коэффициента разрыхлени породы (Кр) и щирины щели (В) при рассто ни х между скважинами в р ду 0,3-0,4 .м (1 - Котр 2-4 - Кр при 2-х 3-х и 4-х р дах скважин в щели соответственно). Предложенный взрывной способ образовани щели осуществл етс следующим образом . В контурах образуемой щели 1 разбуривают не менее двух сближенных вееров (р дов ) 2 сближенных скважин 3, которые взрывают короткозамедленно, начина нри нор дной схеме взрывани с р да (веера), смежного с защищаемым объектом, при этом в последнюю очередь взрывают скважины, смежные с отбиваемым массивом 4 полезHOio ископаемого, зар ды в которых увеличивают . Экранирующую щель при подземной разработке образуют на всю высоту надэтажа (этажа) разбуриванием вееров скважин из буровой выработки или параллельными р дами скважин, разбуриваемыми из заходок Экранирующую щель по необходимости распо .:1а1ают на границе отбиваемого и подI (jl авливаемого блока, у вис чего и лежачего боков, по бокам отбиваемого блока, при открытой разработке в уступах взрываемьгх блоков на пути распространени взрывных воли в направлении запшшаемых объектов . При образовании щели с по.мощью взрыва не менее двух р дов (вееров) скважин со.чдаетс объе.миа зона разрущени (пере11зме;1ьчени ) породы, экранирующие свойства которой завис т от ее раз.меров и соотпощепи плотностей пород в пределах разрушенной зоны и окружающем нераз )yuiennoM массиве. Оптимальна ширина экранируюидей щели зависит от конкретных горно-геологических условий и физико-механических гориых пород. Ко)()ткоза.медлеииое взрывание скважии р дов 2 может производитьс -по различиым схемам, что позвол ет лучше раздробить горные породы в щели 1 и повысить ее ,экраннруюп1,ую способность, а взрывание в последнюю очередь веера (р да) скваЖ1П1 с новыщеиным удельны.м расходо.м ВВ смежного с отбиваемы.м массивом 4 позво ./1 ет вытеснить отбитую горную массу в И1е/п1 к внeuJнeй стороне щели (к защищае .ю.му обьекту) и, таки.м образом, повысить отражающую способность разрущенной зоны у контакта с отбиваемым массиво.м 4 полезного ископае.мого, так как эффективliocTb отражени взрывных волн определ етс состо нием лищь тонкого сло обрушенного материала, непосредетвенно прилегающего к забою. Применение увеличенного зар да в веере (р ду) расиоложенного на границе е (1тбивае. массивом, нозвол ет повысить коэффициент разрыхлени в прнконтактной зоие и за счет этого увеличить долю энерi и отраженной волны идущей на дополни: Mi.iiue дробление массива. Так, например, iipii контакте .массива горных пород с .маг;риалом , имеюищм коэффициент разрыхлени 1,0 Кр 1,1 дол отраженной энергии волны составл ет 5-10%, при 1,1 С Кр 1. - о07о, при 1, 1,5 - до 80% и более. Указанным приемом достигают повыщенную экранирующую способность образуемой защитной щели. Кроме того, наиболее разрыхленную зону создают на внутренней стороне щели, что позвол ет более эффективно использовать энергию взрывной волг ны на дополнительное дробление отбиваемого массива. Если расположить усиленные зар ды на внешней стороне экранирующей щели и прин ть обратный пор док короткозамедленного взрывани скважин в образуемой щели, то экранирующа способность образованной таким образо.м щели не ухудщитс . Однако основна часть пр мой волны затухает в отбитой .массе са.мой щели и отражаетс незначительна ее часть, что не позвол ет эффективно использовать энергию взрывной волны на дополнительное дробление очередного отбиваемого блока. В зависимости от конкретных условий применени способа веера (р ды) зар дных и компенсационных скважин, а также зар ды в скважинах по отнощению друг к другу в веерах (р дах) .можно размещать следующим образом. Между зар жениы.ми веерами (р дами) скважин разбуривают комиенсационные скважины или зар жание в веерах (р дах) скважин производ т через скважину, а компенсационные скважины разбуривают большего диа.метра, чем зар дные скважины, что вли ет на коэффициент разрыхлени отбитой горной массы в пределах экранирующей щели. Дл более равномерного дроблени при зар жании скважин 3 в веере (р ду) через одну или две зар дные скважины одного р да с.мещают по отношению к зар дны.м скважинам смежного р да (веера) путем зар жани скважин одного веера (р да) по отнощению к скважинам смежного веера (р да) в щахматном пор дке. Взрывание скважинных зар дов может производитьс как по пор дной схеме, так же пб другим, напри.мер по винтовой схеме. Дл повышени эффекта вли ни отраженной волны на качество дроблени отбиваемого массива щель образуют по сферической или другой криволинейной в плане поверхности, вогнутой в сторону отбиваемого массива фор.мы. Массив в контурах образуемой щели разбуривают при пр моугольном сечении щели веера.ми скважин или параллельны.ми скважинами из заходок, при образовании вогнутой в сечении форме щели разбуривают коническими веерами скважин или р дами скважин из заходок. Расположение усиленных зар дов взрывчатого вещества в р ду (веере) скважии. смежных с отбиваемым массивом полезногоFIG. Figure 1 shows a variant of the well location scheme when a shielding slit is formed using uncharged (idle) wells; a plan; in fig. 2 - a slot of a shape concave toward the beating array with a variant of the well location scheme; in fig. 3 - nomogram for determining the energy reflection coefficient of the wave (Kotr) depending on the rock loosening coefficient (Kp) and the slit width (B) with the spacing between the wells in the range of 0.3-0.4. M (1 - Cat 2 -4 - Cr with 2 3 and 4 rows of wells in the slot, respectively). The proposed explosive slit formation method is carried out as follows. In the contours of the formed gap 1, at least two contiguous fans (rows) of 2 contiguous wells 3 are drilled, which explode in a short time, starting at the normal blasting scheme with a row (fan) adjacent to the object to be protected, while 4 useful minerals of fossil adjacent to the massif, in which charges increase. When underground mining, the screening slit is formed to the entire height of the top floor (floor) by drilling downhole fans from the drill working or parallel rows of wells drilled from the gateways. The screening slot is located as necessary: 1a1 on the border of the beating and below the I lying sideways, on the sides of the blocking unit, with open casting in the ledges of exploding blocks in the path of propagation of explosive will in the direction of fixed objects. When a gap is formed with at least two rows of explosions Boreholes) correspond to the volume of the destruction zone (area, 1%) of the rock, the shielding properties of which depend on its size and the corresponding density of rocks within the destroyed zone and the surrounding area. The optimal width of screened slits depends on the specific geological conditions and physico-mechanical upland rocks. Ko) () tkaza. Copper blasting of a borehole of rows 2 can be done according to different schemes, which makes it possible to better crush the rocks in slot 1 and increase it, screen, the ability, and the last fan of the cave with the new specific meters of consumption of explosives adjacent to the array 4 that is beaten off allows one to push the broken mountain mass in Ile / n1 to the inner side of the gap (to protect the object) and, thereby, increase the reflecting the ability of the destroyed zone in contact with a repulsive massif. 4 minerals. much, since the effects The biocTb reflection of the blast waves is determined by the condition of the thin layer of the collapsed material adjacent to the face. The use of increased charge in the fan (row) located at the border e (1tbivae array) increases the coefficient of loosening in the contact area and thereby increases the proportion of energy and the reflected wave going to the additional: Mi.iiue crushing of the array. So, for example , iipii contact of the rock mass with the magneto rial, has a coefficient of loosening of 1.0 Kp 1.1 of the share of the reflected wave energy is 5-10%, with 1.1 C Cu 1. - o07, with 1, 1, 5 - up to 80% or more. With the indicated technique, the increased shielding capacity of the protective gap formed is achieved. In addition, the most loosening zone is created on the inner side of the slot, which makes it possible to more efficiently use the energy of the explosive volga to further crush the battered array. That shielding ability of the gap formed in this way does not deteriorate. However, the main part of the direct wave decays in the broken mass of my slit and reflects a small part of it, which is not ozvol is effectively utilize the energy of the blast wave for additional crushing of the next block batters. Depending on the specific conditions of application of the method, fans (rows) of charge and compensation wells, as well as charges in wells with respect to each other in fans (rows). Can be placed as follows. Between the charges of the fans (rows) of the wells, the drilling wells are drilled or charged in the fans (rows) of the wells through the well, and compensation wells are drilled with a larger diameter than the wells, which affect rock mass within the shielding gap. To more evenly crush when charging wells 3 in the fan (row), through one or two charging wells of one row of s. Are displaced with respect to the charge of wells of the adjacent row (fan) by charging of wells of one fan (r yes) in relation to the wells of the adjacent fan (number of yes) in a shakhmatny order. Borehole charge blasting can be carried out as in a serial scheme, as well as others, for example, in a screw scheme. In order to increase the effect of the reflected wave on the quality of crushing of the beating array, a slit is formed along a spherical or other curvilinear in terms of surface, concave toward the beating array of the form. An array in the contours of the formed gap is drilled with a rectangular section of the slot with fan holes or parallel wells from the inlets, when a slot is concave in section, the holes are drilled with conical fan wells or rows of wells from the holes. The location of the enhanced explosive charges in the row (fan) of the well. adjacent to the beating array useful
ископаемого, и взрывание их в последнюю очередь, а также образование щели вогнутой в сторону отбиваемого массива формы позвол ет повысить вли ние отраженной волны на качество дроблени отбиваемого массива.the fossil, and their detonation as a last resort, as well as the formation of a slot in the shape of the shape that is concave towards the array, allows to increase the influence of the reflected wave on the fragmentation quality of the array.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802964084A SU907246A1 (en) | 1980-07-18 | 1980-07-18 | Explosion method of providing a screening slit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802964084A SU907246A1 (en) | 1980-07-18 | 1980-07-18 | Explosion method of providing a screening slit |
Publications (1)
Publication Number | Publication Date |
---|---|
SU907246A1 true SU907246A1 (en) | 1982-02-23 |
Family
ID=20911141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802964084A SU907246A1 (en) | 1980-07-18 | 1980-07-18 | Explosion method of providing a screening slit |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU907246A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2472105C1 (en) * | 2011-07-13 | 2013-01-10 | Учреждение Российской академии наук Институт химии и химической технологии Сибирского отделения РАН (ИХХТ СО РАН) | Method to outline mines and pillars in case of rock massif blasting |
RU2566354C2 (en) * | 2011-12-02 | 2015-10-27 | Общество с ограниченной ответственностью "Восточный научно-исследовательский горнорудный институт" (ООО "ВостНИГРИ") | Method of blasting primary chamber |
-
1980
- 1980-07-18 SU SU802964084A patent/SU907246A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2472105C1 (en) * | 2011-07-13 | 2013-01-10 | Учреждение Российской академии наук Институт химии и химической технологии Сибирского отделения РАН (ИХХТ СО РАН) | Method to outline mines and pillars in case of rock massif blasting |
RU2566354C2 (en) * | 2011-12-02 | 2015-10-27 | Общество с ограниченной ответственностью "Восточный научно-исследовательский горнорудный институт" (ООО "ВостНИГРИ") | Method of blasting primary chamber |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Singh et al. | Reducing environmental hazards of blasting using electronic detonators in a large opencast coal project-a case study | |
SU907246A1 (en) | Explosion method of providing a screening slit | |
Rymarchuk et al. | Ways of increase of efficiency of drilling-and-blasting | |
RU2741649C1 (en) | Method for cyclic-continuous mining of rocks | |
EP0582702A4 (en) | Blasting method and composition | |
RU2345319C2 (en) | Method of explosive ore and rock rupture within underground survey and open cast mining | |
RU2784839C1 (en) | Method for carrying out explosive operations in the circuit zone of quarry | |
SU1707201A1 (en) | Method of bench working by blasting | |
RU2066838C1 (en) | Method of rock crushing by blasting | |
RU2023877C1 (en) | Method of screened explosions | |
RU1403737C (en) | Method of blast breaking of low-drag ore bodies | |
Hemed et al. | PRE-SPLIT PERFORMANCE EVALUATION | |
RU2256873C1 (en) | Method for drilling blasting of rocks | |
SU1263868A1 (en) | Method of controlling the strained state of rock about mine working | |
RU2017960C1 (en) | Method for rock breaking by blasting | |
Petrenko et al. | Substantiating parameters of short-delay blasting and seismic safety while constructing the inclined tunnel | |
RU2225509C1 (en) | Method for explosive breaking in pit-faces of underground purifying enclosures | |
RU2410640C1 (en) | Method for rock blasting | |
RU2630004C1 (en) | Method of conducting drilling and blasting operations with shielding | |
SU1615540A1 (en) | Method of relieving a stressed rock mass | |
RU2023159C1 (en) | Method for protection of safety bench in open pit | |
Qian | Classification and safety precautions of blasting technology | |
SU1490283A1 (en) | Method of breaking-off ore body | |
SU922278A1 (en) | Method of breaking rock by closely located well discharges | |
RU2163001C1 (en) | Method for destruction of rocks |