SU898065A1 - Method of excavating minerals by auger-drill unit - Google Patents

Method of excavating minerals by auger-drill unit Download PDF

Info

Publication number
SU898065A1
SU898065A1 SU792853615A SU2853615A SU898065A1 SU 898065 A1 SU898065 A1 SU 898065A1 SU 792853615 A SU792853615 A SU 792853615A SU 2853615 A SU2853615 A SU 2853615A SU 898065 A1 SU898065 A1 SU 898065A1
Authority
SU
USSR - Soviet Union
Prior art keywords
wells
pillars
roof
rocks
drilling
Prior art date
Application number
SU792853615A
Other languages
Russian (ru)
Inventor
Анатолий Ильич Зильберман
Валентин Николаевич Кухарев
Юрий Николаевич Бабец
Владимир Васильевич Харченко
Анатолий Иванович Ковалев
Эдуард Григорьевич Кабат
Виктор Афанасьевич Протасов
Николай Андреевич Сетраков
Original Assignee
Днепропетровский Ордена Трудового Красного Знамени Горный Институт Им.Артема
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Днепропетровский Ордена Трудового Красного Знамени Горный Институт Им.Артема filed Critical Днепропетровский Ордена Трудового Красного Знамени Горный Институт Им.Артема
Priority to SU792853615A priority Critical patent/SU898065A1/en
Application granted granted Critical
Publication of SU898065A1 publication Critical patent/SU898065A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

II

Изобретение относитс  к горной Промышленности и может быть использовано при разработке буроугольных и рудных осадочного происхождени  месторождений полезных ископ-аемых, залегающих в рыхлых, слабых породах.The invention relates to the mining industry and can be used in the development of lignite and ore sediments of mineral deposits found in loose, weak rocks.

Известен способ выемки полезных ископаемых бурошнековой установкой без остановлени  целиков с применением пневматических кондукторов 1,1 J.There is a method of excavation of minerals with a brown-screw installation without stopping the pillars using pneumatic conductors 1.1 J.

Однако этот способ, обеспечива  сокращение потерь в междускваженных целиках, требует больших денежных и трудовых затрат на приобретение кондукторов с пневмобаллонами и их монтаж и демонтаж в скважинах.However, this method, ensuring the reduction of losses in between-pillar pillars, requires large monetary and labor costs for the purchase of conductors with air bellows and their installation and disassembly in wells.

Известен также способ выемки полезных ископаемых бурошнековой установкой , включающий бурение скважин по полезному ископаемому с оставлением между ними целиков и последующее их выбуривание f 2.There is also known a method of excavation of minerals by a blast-type installation, including the drilling of wells for the mineral, leaving the pillars between them and their subsequent drilling out f 2.

Недостаток этого способа заключаетс  в том, что он, исключа  по-.The disadvantage of this method lies in the fact that it, excluding -.

тери и разубоживание полезного ископаемого , требует больших материальных и трудовых ресурсов.teri and dilution of minerals, requires large material and labor resources.

Цель изобретени  - повышение эффективности .The purpose of the invention is to increase efficiency.

Указанна  цель достигаетс  тем, что перед выбуриванием целиков обрушают породы кровли и заполн ют ими предварительно пробуренные скважины.This goal is achieved by the fact that, before the pillars are drilled, roof rocks collapse and pre-drilled wells are filled with them.

На чертеже приведена схема выемки пластов полезного ископаемого.The drawing shows a diagram of the excavation of mineral deposits.

Claims (2)

По пласту полезного ископаемого, залегающего в слабых, рыхлых породах, провод т выемочную выработку 1 с верхней подрывкой в которой устанавливают две бурошнековые установки 2 и 3. Установка 2 начинает работать выбуривани  скважины 4 с оставлением между ними целиков 5, при этом шири20 на целиков 5 равна ширине спаренных скважин. Крепление скважин 1 не производ т , но устанавливают убранную дл  прохода шнеков штрековую крепь. в -случае залегани  в кровле плас та пород, дл  обрушени  которых в скважины и последующего уплотнени  требуетс  значительное врем  (1-2 мес), производ т принудительное обрушение , например, с использованием буровзрывных работ. Если в кровле слабые, рь1хлые породы , обрушение их производ т за счет использовани  гравитационных сил. Под действием веса породы, пре одолевающего силы сцеплени , через 5-15 сут после.начала работы бурошн ковой установки 2 в первоначальнопробуренных ею скважинах происходит обрушение кровли (глин, песков) и полное заполнение (забучивание) ими этих скважин. Обрушенные породы уплотн ютс  и сцепл ютс  с породами кро ли, расположенными над целиками 5,в р зультате чего эти целики получают опор ные полосы 6.Это позвол ет производит выбуривание целиков 5 другой бурошнековой установкой 3 с несуществен ными процентами разубоживани  и потерь полезного ископаемого. Испытани  показали,, что в произ ,водственных услови х разрушение оставл емых целиков 5 при обрушении пород кровли в выбуренные ранее скв жины k практически не происходит, причем, чем более слаба  и рыхла  порода залегает над пластом полезного ископаемого, тем более устойчивым оказываетс  целик к разрушению , и тем более эффективен предлагаемый способ, так как простой второй бурошнековой установки 3, определ емый временем полного обрушени  пород кровли, заполнени  ранее пробуренных установкой 2 скважин k и уплотнени  сокращаетс  до минимума (1-3 сут). Применение предлагаемого способа выемки полезных ископаемых бурошнековой установкой при разработке маломощных буроугольных и рудных осадочного происхождени  пластов полезных ископаемых позвол ет сократить материальные и трудовые затраты; повысить нагрузку на забой за счет использовани  одновременной работы двух машин в одной выработке и ликвидации простоев бурошнековой установки из-за необходимости креплени  скважин пневмобаллонами; повысить концентрацию горных работ, а также эффект 1вность использовани  конвейерного транспорта; сократить практически в два раза врем  отработки выемочного участка, что, в свою очередь , снижает затраты на поддержание выемочных выработок. Годовой экономический эффект только за счет отказа от креплени  скважин пневмобаллонами составл ет 1820 тыс. руб. дл  одного выемочного участка. Формула изобретени  Способ выемки полезных ископаемых бурошнековой установкой, включающий бурение скважин по полезному ископаемому с оставлением между ними целиков и последующее их выбуривание, отличающийс  тем, что, с целью повышени  эффективности, перед выбуриванием целиков обрушают породы кровли и заполн ют ими предварительно пробуренные скважины. Источники- информации, прин тые во внимание при экспертизе 1.Авторское свидетельство СССР № 381767, кл. Е 21 С 41/00, 1972. Mineral deposits, which lie in weak, loose rocks, carry out excavation production 1 with an upper undermining in which two drill-screw installations 2 and 3 are installed. Installation 2 begins to work the drilling of well 4, leaving only 5 pillars between them, with a width of 20 on the pillars 5 equal to the width of the paired wells. The fastening of the boreholes 1 is not carried out, but a drift guard is installed for the passage of augers. In the case of a bed in the roof of the rock sheet, for which it takes considerable time (1-2 months) to collapse into the wells and subsequent compaction, forcibly collapse, for example, using drilling and blasting operations. If the roof is weak, weak rocks, their collapse is due to the use of gravitational forces. Under the influence of the weight of the rock, which overcomes the adhesion forces, 5–15 days after the beginning of the operation of the drilling unit 2 in the wells drilled by it in the roof, the roof (clays, sands) collapses and the wells are filled (started). The collapsed rocks are compacted and bonded to the rocks that are located above the pillars 5, as a result of which these pillars receive support strips 6. This allows the pillars 5 to be pounded out by another brown-screw installation 3 with insignificant percentages of dilution and loss of mineral. Tests have shown that under production conditions, the destruction of the remaining pillars 5 during the collapse of the roof rocks in the drilled holes of the former well k practically does not occur, and the weaker and loose rock lies above the mineral layer, the more stable it is destruction, and the more effective is the proposed method, since the simple second drilling machine 3, determined by the time of complete collapse of the roof rocks, the filling of the previously drilled with installation 2 wells k and compaction is reduced to min Imum (1-3 days). The application of the proposed method of excavating minerals with a brown-screw installation in the development of low-power lignite and ore sediments of mineral deposits allows to reduce material and labor costs; increase the load on the bottom due to the use of simultaneous operation of two machines in one development and the elimination of downtime of a drilling auger installation due to the need to mount the wells with pneumocylinders; increase the concentration of mining operations, as well as the effect of the use of conveyor transport; reduce the mining time of the excavation site by almost two times, which, in turn, reduces the cost of maintaining excavation workings. The annual economic effect only due to the refusal to mount the wells with pneumatic cylinders amounts to 1,820 thousand rubles. for one excavation site. Claims of the method of excavation by a brown-screw installation, including drilling of minerals with the remaining pillars between them and their subsequent drilling, characterized in that, in order to increase efficiency, before breaking the pillars, the roof rocks collapse and fill the previously drilled wells. Sources - information taken into account during the examination 1. USSR author's certificate No. 381767, cl. E 21 C 41/00, 1972. 2.Авторское свидетельство СССР № 503020, кл. Е 21 С 41/0t, 1975 (прототип).2. USSR Author's Certificate No. 503020, cl. E 21 C 41 / 0t, 1975 (prototype).
SU792853615A 1979-12-17 1979-12-17 Method of excavating minerals by auger-drill unit SU898065A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792853615A SU898065A1 (en) 1979-12-17 1979-12-17 Method of excavating minerals by auger-drill unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792853615A SU898065A1 (en) 1979-12-17 1979-12-17 Method of excavating minerals by auger-drill unit

Publications (1)

Publication Number Publication Date
SU898065A1 true SU898065A1 (en) 1982-01-15

Family

ID=20865210

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792853615A SU898065A1 (en) 1979-12-17 1979-12-17 Method of excavating minerals by auger-drill unit

Country Status (1)

Country Link
SU (1) SU898065A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2468206C1 (en) * 2011-07-26 2012-11-27 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method for secondary treatment of salt bed
RU2769645C1 (en) * 2021-09-30 2022-04-04 Сергей Николаевич Кошколда Method for the development of reservoir deposits of minerals, including placers, and a device for its implementation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2468206C1 (en) * 2011-07-26 2012-11-27 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method for secondary treatment of salt bed
RU2769645C1 (en) * 2021-09-30 2022-04-04 Сергей Николаевич Кошколда Method for the development of reservoir deposits of minerals, including placers, and a device for its implementation

Similar Documents

Publication Publication Date Title
US3999804A (en) Longwall mining with chain pillar recovery
SU898065A1 (en) Method of excavating minerals by auger-drill unit
US2846205A (en) Mining method for supporting geological structures
CN112647947B (en) Non-coal-pillar mining method for mining area
SU1472673A1 (en) Method of mining a thick steep mineral bed with goaf-filling
Joughin Potential for the mechanization of stoping in gold mines
SU987103A1 (en) Method of working thick horizontal and gently sloping deposits
SU823576A1 (en) Method of open-cast mining of mineral deposits
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2755287C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2136887C1 (en) Powered complex for mining kimberlite
RU2132461C1 (en) Method for developing kimberlite pipe in ascending procedure with dry gobbing
RU2232894C1 (en) Method for subterranean excavation of mineral deposits by means of chamber-column method
RU1789737C (en) Method for formation of vertical working
SU639995A1 (en) Method of shoring slopes
SU1138508A1 (en) Method of erecting a framework roof support in front of working-face
Singh et al. Review of fill mining technology in Canada
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU1452992A1 (en) Method of remining of mineral deposits
SU1670153A1 (en) Method for preparing dynamically hazardous outlined extraction fields
SU1446344A1 (en) Method of reinforcing filling-up mass
RU2086765C1 (en) Method of preparing to mining flat-lying coal seam
RU2091583C1 (en) Method of mining of mineral upper horizons
SU621879A1 (en) Method of excavating orebodies