SU827692A1 - Method of providing foundation under existing buildings and structures - Google Patents

Method of providing foundation under existing buildings and structures Download PDF

Info

Publication number
SU827692A1
SU827692A1 SU792783755A SU2783755A SU827692A1 SU 827692 A1 SU827692 A1 SU 827692A1 SU 792783755 A SU792783755 A SU 792783755A SU 2783755 A SU2783755 A SU 2783755A SU 827692 A1 SU827692 A1 SU 827692A1
Authority
SU
USSR - Soviet Union
Prior art keywords
structures
foundation
existing buildings
under existing
piles
Prior art date
Application number
SU792783755A
Other languages
Russian (ru)
Inventor
Явдат Шафагутдинович Зиязов
Владимир Александрович Максимов
Original Assignee
Научно-Исследовательский Институтпромышленного Строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Институтпромышленного Строительства filed Critical Научно-Исследовательский Институтпромышленного Строительства
Priority to SU792783755A priority Critical patent/SU827692A1/en
Application granted granted Critical
Publication of SU827692A1 publication Critical patent/SU827692A1/en

Links

Landscapes

  • Foundations (AREA)

Description

1one

Изобретение относитс  к области строительства , в частности к способам усилени  фундаментов существующих зданий и сооружений .The invention relates to the field of construction, in particular, to methods for strengthening the foundations of existing buildings and structures.

Известен способ подведени  фундамента под существующие здани  или сооружени  путем отрывки котлована и проходки из него под существующим фундаментом горизонтальной выработки с последующим погружением из нее свай 1.There is a known method of laying the foundation for existing buildings or structures by extracting a pit and sinking from it under the existing foundation of horizontal excavation followed by immersion of piles from it 1.

Этот способ материалоемок и трудоемок. Кроме того, он не исключает возникновени  дополнительных осадок существующих зданий или сооружений при производстве работ .This method is material and labor intensive. In addition, it does not exclude the occurrence of additional sedimentation of existing buildings or structures during work.

Наиболее близким к изобретению  вл етс  способ подведени  фундамента под существующие здани  и сооружени  путем отрывки котлована и проходки из него горизонтальной выработки посредством продавливани  из него полых секций с одновременным извлечением грунта из полости и последующим погрулсением из нее свайThe closest to the invention is a method of laying the foundation for existing buildings and structures by extracting the excavation pit and penetrating horizontal excavation from it by forcing hollow sections out of it while simultaneously removing soil from the cavity and subsequently sinking pile from it.

,2., 2.

Недостатком этого способа подведени  фундамента  вл етс  большой расход материалов и трудозатрат особенно при залегании коренных пород на больщих глубинах. В этих случа х погружаемые сваи работают обычно как вис чие, что не позвол етThe disadvantage of this method of laying the foundation is the high consumption of materials and labor costs, especially when the bedrock is located at great depths. In these cases, the immersed piles usually work as hanging, which does not allow

полностью использовать их несущую способность по материалу. Кроме того, горизонтальна  выработка не воспринимает нагрузок от фундамента, а  вл етс  лищьmake full use of their material carrying capacity. In addition, the horizontal development does not take the loads from the foundation, and is

технологическим элементом, что вызывает повышенный расход материалов.technological element, which causes an increased consumption of materials.

Целью изобретени   вл етс  сокращение материалоемкости и трудоемкости при производстве работ.The aim of the invention is to reduce material consumption and labor intensity in the production of works.

Это достигаетс  тем, что согласно способу подведени  фундамента под существующие здани  или сооружени  путем отрывки котлована и проходки из него под существующим фундаментом горизонтальной выработки , горизонтальную выработку образуют глубины активной зоны сжати  грунта под фундаментом, а сваи из выработки задавливают снизу вверх до соединени  их с подошвой фундамента.This is achieved by the fact that, according to the method of laying the foundation for existing buildings or structures, by extracting the excavation pit and sinking from it under the existing foundation of the horizontal excavation, the horizontal excavation is formed by the depth of the active zone of compression of the soil under the foundation upwards before connecting them to the sole foundation.

На фиг. 1 изображен продольный разрезFIG. 1 shows a longitudinal section.

котлована и горизонтальной выработки; наexcavation and horizontal development; on

фиг. 2 - поперечный разрез подведенногоFIG. 2 - cross section of the failed

фундамента.foundation.

Подведение фундамента под существующие здани  или сооружени  предлагаемым способом осуществл етс  следующим образом .The laying of the foundation for existing buildings or structures by the proposed method is carried out as follows.

Около существующего фундамента 1 отрывают котлован 2 в ограждении 3. ПолыеAround the existing base 1 tear off the pit 2 in the fence 3. Hollow

секции 4 подают в котлован 2 и вдавливают их домкратами 5 ниже глубины активной зоны 6 сжати  грунта. По мере вдавливани  секций грунт в забое разрабатываетс  и извлекаетс . После образовани  горизонтальной выработки в нее подают сваи 7. В местах расположени  свай 7 в верхней части полых секций 4 выполн ют отверсти  8, через которые сваи 7 вдавливаютс  короткими звень ми, объедин  сь стыками 9..sections 4 are fed into the pit 2 and are pressed into the jacks 5 below the depth of the core 6 for compressing the soil. As the sections are pressed, the soil in the bottomhole is developed and removed. After the formation of the horizontal excavation, the piles 7 are fed into it. At the locations of the piles 7 in the upper part of the hollow sections 4, holes 8 are made through which the piles 7 are pressed in by short links, joining joints 9 together.

Количество свай выбираетс  в зависимости от грунта и требуемой несущей способности . После вдавливани  свай 7 горизонтальную выработку заполн ют бетоном, образу  тем самым единую конструкцию. Размеры выработки принимаютс  из расчета воспри ти  усилий от фундамента, усилий задавливани  свай и давлени  грунта.The number of piles is chosen depending on the soil and the required bearing capacity. After the piles 7 are pressed in, the horizontal excavation is filled with concrete, thereby forming a uniform structure. The dimensions of the development are taken from the calculation of the perception of forces from the foundation, the forces of crushing of piles and the pressure of the soil.

Преимущество предлагаемого способа п том, что после подведени  свай под существующий фундамент и замоноличивани  их концов в горизонтальной выработке нагрузка от фундамента передаетс  на горизонтальную выработку, а сваи работают как сваи-стойки, что позвол ет полностью использовать их несущую способность по материалу и сократить их количество.The advantage of the proposed method is that after laying the piles under the existing foundation and monolithing their ends in a horizontal mine, the load from the foundation is transferred to the horizontal mine, and the piles work as pile racks, which allows them to fully utilize their bearing capacity over the material and reduce their .

Claims (2)

1.Ганичев И. А. Устройство искусственных оснований и фундаментов. М., Стройиздат , 1969, с. 268-277, рис. VI.12-VI.14.1. Ganichev I. A. Arrangement of artificial bases and foundations. M., stroiizdat, 1969, p. 268-277, fig. VI.12-VI.14. 2.Авторское свидетельство СССР № 386066, кл. Е 02D 27/48, 1973 (прототип).2. USSR author's certificate number 386066, cl. E 02D 27/48, 1973 (prototype). А(г, /A (g, / --чxr l --r- i :ч :- hr l --r- i: h: ;г-Ч чV°--.°. ; g-hhV ° -. °. - , .Iг гт. -Ч ......I. -.-т-.-, .Ig rm. -H ...... i. -.- t- I. Х .у .-N; У-Х т 1. r iNV , I. x. Y. -N; Y-X t 1. r iNV, vx vx: y// yxxxy/x 4 /Xvvvx vx: y // yxxxy / x 4 / Xvv VAVyX X/X y/V(.: . 2VAVyX X / X y / V (.... 2
SU792783755A 1979-06-19 1979-06-19 Method of providing foundation under existing buildings and structures SU827692A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792783755A SU827692A1 (en) 1979-06-19 1979-06-19 Method of providing foundation under existing buildings and structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792783755A SU827692A1 (en) 1979-06-19 1979-06-19 Method of providing foundation under existing buildings and structures

Publications (1)

Publication Number Publication Date
SU827692A1 true SU827692A1 (en) 1981-05-07

Family

ID=20835315

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792783755A SU827692A1 (en) 1979-06-19 1979-06-19 Method of providing foundation under existing buildings and structures

Country Status (1)

Country Link
SU (1) SU827692A1 (en)

Similar Documents

Publication Publication Date Title
SU827692A1 (en) Method of providing foundation under existing buildings and structures
RU2338033C1 (en) Method of erection of concrete in situ piles in laminated driven wells
US3245222A (en) Construction of underground dams
US3423944A (en) Method for forming end bearing concrete piles
RU2063497C1 (en) Method for erecting foundation
US1665796A (en) Method of providing and placing piers
RU2141020C1 (en) Process of deep compaction of soil
SU996626A1 (en) Method of constracting a cast-in-place pile
JPH0684619B2 (en) Root cutting method
SU386066A1 (en) METHOD OF CONDUCTING THE FOUNDATION UNDER EXISTING BUILDINGS AND FACILITIES
CN213268026U (en) Load-reducing heightening structure of existing retaining wall
US791927A (en) Method of making foundations in water-logged ground.
SU749984A1 (en) Drilled and filled foundation
SU787556A1 (en) Method of levelling-out a structure
SU1470869A1 (en) Method of constructing foundation on sagging soils
RU2056476C1 (en) Pile foundation
SU609834A1 (en) Continuous footing
SU969824A1 (en) Method of constructing a pile foundation
SU1763573A1 (en) Method of erecting cast-in-place pile
SU675130A1 (en) Method of making multifork filling pile in soil
SU1613529A1 (en) Method of erecting plain earth dam
SU966167A1 (en) Method of strengthening foundation on constructed building
RU2122069C1 (en) Pile
RU2094567C1 (en) Method for erection of underground structures
SU903484A1 (en) Method of reinforcing foundation