SU806870A1 - Method of preparing mine working to transit of stoping set - Google Patents

Method of preparing mine working to transit of stoping set Download PDF

Info

Publication number
SU806870A1
SU806870A1 SU792772669A SU2772669A SU806870A1 SU 806870 A1 SU806870 A1 SU 806870A1 SU 792772669 A SU792772669 A SU 792772669A SU 2772669 A SU2772669 A SU 2772669A SU 806870 A1 SU806870 A1 SU 806870A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mine
transit
mine working
preparing
transition
Prior art date
Application number
SU792772669A
Other languages
Russian (ru)
Inventor
Сергей Иванович Соколов
Михаил Степанович Алексеев
Федор Андреевич Карасев
Лазарь Михайлович Гельфанд
Original Assignee
Подмосковный Научно-Исследовательскийи Проектно-Конструкторский Угольныйинститут
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Подмосковный Научно-Исследовательскийи Проектно-Конструкторский Угольныйинститут filed Critical Подмосковный Научно-Исследовательскийи Проектно-Конструкторский Угольныйинститут
Priority to SU792772669A priority Critical patent/SU806870A1/en
Application granted granted Critical
Publication of SU806870A1 publication Critical patent/SU806870A1/en

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Description

уплотнение среды по периметру горной выработки, вследствие чего предотвращаетс  предварительное разрушение массива при подходе очистного механизированного комплекса.compaction of the medium along the perimeter of the mine workings, as a result of which the preliminary destruction of the massif is prevented when the cleaning mechanized complex approaches.

Формулч1 изобретени Formula 1 inventions

Способ подготовки горной выработки дл  перехода очистным механизированным комплексом, включающий возведение перемычек, отличающийс  Тем, что, с целью снижени  трудоемкости и стоимости работ, .в горной выработке устанавливают костра из емкостей с воздухом, после чегс5 возвод т по концам горной выработки перемычки, подают через них воду до заполнени  горной выработки и замор ажи в ают е е .The method of preparing a mine for the transition by a cleaning mechanized complex, including the construction of bridges, characterized in that, in order to reduce labor-intensiveness and cost of work, a fire is installed in the mine working from air tanks, after jumps 5 they are filled with water before filling the mine and freezing them all.

Источники информации, прин тые во внимание при -экспертизеSources of information taken into account during the examination

1.Временна  инструкци  по переходу сбоек механизированнымиКомплексами ,. Новомосковск, ПНИУИ, 1971,1. Temporary instructions on the transfer of connections by mechanized Complexes,. Novomoskovsk, PNIU, 1971,

с. 12-13.with. 12-13.

2.Авторское свидетельство СССР 391274, кл. Е 21 D 13/02, 1971 (прототип).2. Authors certificate of the USSR 391274, cl. E 21 D 13/02, 1971 (prototype).

,:--t.j-..v.---yj| v;..f....-- .:. у-1-л .-.-.-:т-.--1:-АГ Л-..,: - t.j - .. v .--- yj | v; .. f ....--.:. y-1-l.-.-.-: t -.-- 1: -AH L- ..

iii-v-s----:.--К7L : vV лiii-v-s ----: .-- K7L: vV l

Фаг.1Phage.1

. -,4 « %-/) -л. - 4 "% - /) -l

-У: .....- .. :-.;--У -Y: .....- ..: -.; - Y

-:f- -: f-

iriiri

..

Claims (1)

Формулу изобретенияThe claims Способ подготовки горной выработки для перехода очистным механизированным комплексом, включающий возведение перемычек, отличающийся тем, что, с целью снижения трудоемкости и стоимости работ, в горной выработке устанавливают кост· ры из емкостей с воздухом, после чего возводят по концам горной выработки перемычки, подают через них воду до заполнения горной выработки и замор ажи в ают е е .A method of preparing a mine for transition with a mechanized waste treatment complex, including the construction of jumpers, characterized in that, in order to reduce the complexity and cost of work, fires are installed in the mine from tanks with air, after which the jumpers are erected at the ends of the mine and fed through water to fill the mine and freeze as much as possible. с Источники информации, принятые во внимание при -экспертизе 1. Временная инструкция по переходу сбоек механизированными·комплексами,. Новомосковск, ПНИУИ, 1971, in с’ *2“13.c Sources of information taken into account during the examination 1. Temporary instruction for the transition of failures by mechanized · complexes. Novomoskovsk, PNIUI, 1971, in with '* 2 “13. 1 2. Авторское свидетельство СССР № 391274, кл. Е 21 D 13/02, 1971 (прототип). 1 2. USSR author's certificate No. 391274, cl. E 21 D 13/02, 1971 (prototype).
SU792772669A 1979-05-31 1979-05-31 Method of preparing mine working to transit of stoping set SU806870A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792772669A SU806870A1 (en) 1979-05-31 1979-05-31 Method of preparing mine working to transit of stoping set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792772669A SU806870A1 (en) 1979-05-31 1979-05-31 Method of preparing mine working to transit of stoping set

Publications (1)

Publication Number Publication Date
SU806870A1 true SU806870A1 (en) 1981-02-23

Family

ID=20830482

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792772669A SU806870A1 (en) 1979-05-31 1979-05-31 Method of preparing mine working to transit of stoping set

Country Status (1)

Country Link
SU (1) SU806870A1 (en)

Similar Documents

Publication Publication Date Title
GB1296759A (en)
GB1466135A (en) Storage of residues
SU806870A1 (en) Method of preparing mine working to transit of stoping set
AR195388A1 (en) SUPPLYING DEVICE FOR THE CONTINUOUS ADMINISTRATION OF AN ACTIVE AGENT TO A CONTROLLED REGIME DURING A LONG PERIOD OF TIME
BE809105A (en) METHOD FOR INJECTING A LIQUID WITHIN A FLUIDIZED SOLID
FR2314299A1 (en) Railway track transportation and laying wagon - has box girder frame with inclining platform controlled by hydraulic rams
JPS53131426A (en) Operation control method and equipment for water wheel
SU626191A1 (en) Method of drilling mud local circulating
JPS53145665A (en) Double length chord operating system of track deviation
Bieniawski Design procedures for coal mine tunnels.
JPS5675286A (en) Building method of cell structure for container ship
SU715798A1 (en) Method of mining gently sloping ore bodies
Swenson Possible development of water from Madison Group and associated rock in Powder River Basin, Montana-Wyoming
JPS54110504A (en) Ballast chemical liquid filler
JPS5436482A (en) Fuel transportation system
SU494490A1 (en) Way to strengthen the soil
SU147535A1 (en) Apparatus for forming sections of rafts from bundles of logs
SU665087A1 (en) Hanging-on elimination method
SU899951A1 (en) Method of restoring the surface and recultivating caving areas
GB1350180A (en) Water tower
JPS51145013A (en) Construction method of tank yard
SU414379A1 (en) ROTARY MECHANISM OF SELF-PROPELLED PLATFORM
FR1476101A (en) Bracing device for continuous mine tunnel drilling rig
AT245021B (en) Railway superstructure with reinforced concrete cross sleepers lined up closely
FR1488579A (en) Drilling platform for tunnel construction