SU80481A1 - Scaffolding and method of their rearrangement - Google Patents

Scaffolding and method of their rearrangement

Info

Publication number
SU80481A1
SU80481A1 SU390830A SU390830A SU80481A1 SU 80481 A1 SU80481 A1 SU 80481A1 SU 390830 A SU390830 A SU 390830A SU 390830 A SU390830 A SU 390830A SU 80481 A1 SU80481 A1 SU 80481A1
Authority
SU
USSR - Soviet Union
Prior art keywords
scaffolding
crane
floor
beams
racks
Prior art date
Application number
SU390830A
Other languages
Russian (ru)
Inventor
И.И. Аппель
Original Assignee
И.И. Аппель
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by И.И. Аппель filed Critical И.И. Аппель
Priority to SU390830A priority Critical patent/SU80481A1/en
Application granted granted Critical
Publication of SU80481A1 publication Critical patent/SU80481A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

, Предметом насто щего изобретени   вл ютс  строительные леса с установленным на них самоходным краном, отличаюии;ес  применением в них нереставл емых но высоте стоек, нричем на врем  поочередного подъема стоек с этажа на этаж рамы настила лесов поднимаютс  к иодкрановым балкам катучего крана. Благодар  такой схеме нерестановки подъем лесов осуществл етс  без их разборки, чем достигаетс  ускорение иродесса работ.The object of the present invention is a scaffolding with a self-propelled crane mounted on them, distinguished, using racks that cannot be repaired at height, but at the time of alternate lifting of racks from floor to floor of the scaffolding frame are raised to the iodcrane beams of the rolling crane. Thanks to such a non-restoration scheme, scaffolding is erected without disassembling, thus accelerating the work of the hero and herd.

Строительные леса нредназначаютс  дл  кладки стен, устаиовки элементов междуэтажных и чердачных перекрытий, стропил и кровли. Они устанавливаютс  по периметру наружных стен здани  с внутренней стороны, и опираютс  на балки междуэтажных перекрытий.The scaffolding is intended for laying walls, fixing elements of interfloor and attic floors, rafters and roofs. They are installed around the perimeter of the external walls of the building from the inside, and are supported on the joists of the floors.

На фиг. 1 изображена схема строительных лесов в поперечном разрезе; на фиг. 2-4-детали /, 2 и 3 узлов 1, II, 111 по фиг. 1 стоек строительных лесов в разрезе нормальном крановой балке; на фиг. 5- вид верхнего угла стойки (узел I с фасада); на фиг. 6-вид нижнего угла стойки строительных лесов (узел II в плане); на фиг. 7-вид рабочего нижнего настила в поперечном разрезе; на фиг. 8-схемы установки и последовательные стадии перемещени  лесов в процессе работ, вид сбоку.FIG. 1 shows a diagram of scaffolding in cross section; in fig. 2-4 parts /, 2 and 3 nodes 1, II, 111 of FIG. 1 racks of scaffolding in the context of a normal crane beam; in fig. 5- view of the upper corner of the stand (node I from the facade); in fig. 6-view of the lower corner of the scaffold rack (node II in plan); in fig. 7 is a view of the working lower flooring in cross section; in fig. 8-diagrams of installation and successive stages of movement of scaffolding in the course of work, side view.

Леса состо т из следующих составных частей;The forests consist of the following components;

1.Трубчатых стоек 3 (фиг. 1) из газовых труб диаметром 2,5йл, длиной 4,5 м с отверстием дл  креплени  каркасов настила и кранового пути. Нижний конец стойки опираетс  на металлический башмак (фиг. 3 и 4), состо щий из опорной плиты / и муфты 2, через который нагрузка от стойки передаетс  на междуэтажное перекрытие. В верхнем конце стойки 4 (фиг. 2 и 5) укрепл етс  штырь с роликом 5 дл  троса 6 от ручной лебедки дл  подъема настила и кранового пути.1. Pipe racks 3 (Fig. 1) made of gas pipes with a diameter of 2.5 yl and a length of 4.5 m with an opening for fastening the frameworks of the flooring and the crane way. The lower end of the rack rests on a metal shoe (Figs. 3 and 4), consisting of a base plate / and a sleeve 2, through which the load from the rack is transferred to the floor slab. At the upper end of the post 4 (Figs. 2 and 5), the pin with roller 5 for the cable 6 from the hand winch for lifting the floor and the crane path is fastened.

Хо 80481- 2 -Ho 80481-2 -

2.Нижних опорных рам 8 (фиг. 3) из двух швеллеров 10 жестко скрепленных между собой металлическими шайбами 7, в которых сделаны отверсти  дл  трубчатых стоек.2. The lower support frames 8 (fig. 3) of two channels 10 rigidly fastened together by metal washers 7, in which holes are made for tubular struts.

К нижней опорной раме крепитс  ручна  лебедка 9 дл  подъема лесов.A hand winch 9 is attached to the lower support frame for lifting scaffolding.

На н.ижнюю опорную раму (фиг. 6) при сборке лесов опираютс  и жестко креп тс  уголками // и болтами 12 с накладками 13 дерев нные прогоны из спареннь х 5X14 см досок 24 (фиг. 7). По прогонам укладываетс  рабочий настил 25 из досок толш,иной 4 см. Прогоны и настил устраиваютс  секци ми но длине в пределах понеречных стен.On the lower support frame (Fig. 6), when assembling the scaffolding, they are supported and rigidly fixed with corners // and bolts 12 with overlays 13 wooden girders from sparks 5X14 cm planks 24 (Fig. 7). The girders are laid on the girders 25 of the floorboards, another 4 cm. The girders and the flooring are arranged in sections along the length of the transom walls.

3.Верхних опорных рам 26 (фиг. 1, 2 и 5) из двух швеллеров 16, жестко скрепленных между -собой шайбами 14 с косынками 15 при номоши ребер жесткости 17 и уголков 18,, 19, 20 и 21. В шайбах 14 (фиг. 2) имеютс  отверсти  дл  трубчатых стоек.3. Upper support frames 26 (figs. 1, 2 and 5) of two channels 16, rigidly fastened between -swash washers 14 with kerchiefs 15 with nomoshi stiffeners 17 and corners 18, 19, 20 and 21. In washers 14 ( Fig. 2) there are openings for tubular racks.

4.Подкрановых балок 23 (фиг. 2) из двутавров № 14, прикрепленных к верхней опорной раме болтами 22.4. Subcrane beams 23 (Fig. 2) of I-beams No. 14, attached to the upper support frame with bolts 22.

По подкрановым балкам движетс  самоходный кран вдоль стро щегос  зДани . Подкрановые балки устраиваютс  непрерывными по всей длине здани . Отдельные звень  соедин ютс  между собой соединительными наклепками.A self-propelled crane moves along crane beams along the construction site. Crane beams are arranged continuous along the entire length of the building. The individual links are interconnected by connecting rivets.

Продольна  жесткость лесов обеспечиваетс  жестким креплением прогонов ннжнего рабочего настила и верхних покрановых иутей. Кроме того, по торцам лесов даетс  дополнительное крепление в виде раст жек 27 (фиг. 8) из стального троса (по 2 шт. в каждом торце).The longitudinal stiffness of the scaffolding is ensured by the rigid fastening of the runs of the required working deck and upper cut edges. In addition, at the ends of the scaffolding, an additional fastening is provided in the form of tension 27 (Fig. 8) from a steel cable (2 pieces at each end).

Поперечна  жесткость „тесов обеспечиваетс  жесткими верхними и НИЖНИМ рамами, имеющими ребра жесткости (косынки).The cross stiffness of the saw is provided by rigid upper and lower frames having stiffeners (gussets).

Рассто ние между стойками прин то 2,0 м в поперечном направлении и до 2,5 .11 в продольпом направлении. При этом в продольном направлении рассто ние может измен тьс  в зависимости от рассто ний между гюперечнымн стенкамп, но не должно превышать 2„5 м-.The distance between the posts was taken 2.0 m in the transverse direction and up to 2.5 .11 in the longitudinal direction. In this case, in the longitudinal direction, the distance can vary depending on the distance between the gyucereal walls and the stems, but should not exceed 2 ± 5 m.

Обща  ширина лесов, равна  2,5 м, достигаетс  за счет односторонней консоли длиной 0,5 м в сторону выкладываемой стены.The total width of the scaffolding, equal to 2.5 m, is achieved by a one-sided cantilever 0.5 m long in the direction of the wall being laid out.

Консольна  часть лесов  вл етс  рабочим местом, по которому движетс  каменнгик при кладке. Пространство между стойками в основном используетс  дл  складировани  материалов.The cantilever part of the forest is the workplace on which the stone moves during masonry. The space between the racks is mainly used for storing materials.

Псход  из прщщипа,, что все материалы подаютс  непосредственнок рабочему месту без горизонтального тр спортировани  их от подъемника , прин та  ширина лесов вполне обеснечивает нормальную и нравильную организацию рабочего .места.The fact that all materials are supplied directly to the workplace without horizontal transport from the elevator, the accepted width of the scaffolding completely eliminates the normal and moral organization of the working place.

Необходимо, чтобы нараметры самоходного крана соответствовали следующим услови м:It is necessary that the dimensions of the mobile crane meet the following conditions:

1.Наибольший вес .монтажных элементов или контейнеров с материалами не должен превышать 30 кг.1. The greatest weight of assembly elements or containers with materials should not exceed 30 kg.

2.Свободна  длина вылета стрелы крана за пределы здани  должна быть не менее 2 л.2. The free length of the boom of the crane outside the building must be at least 2 liters.

3.Вылет стрелы крана должен обеспечить дос гаемость не менее половины шир1шы здани .3. The departure of the boom of the crane must ensure at least half the breadth of the building.

4.Максимальна  ширина здани  принимаетс  13 л.4. Maximum building width is 13 l.

5.Два крана, установленные на лесах противоположных наружных стен, должны обслуживать всю ширину здани .5. Two cranes installed on the forests of opposite outer walls should serve the entire width of the building.

6.Вес крана с грузом и контргрузом, а также полезна  нагрузка на леса не должна превышать несущей способности стоек, на которые она распредел етс .6. The weight of the crane with the load and the counterweight, as well as the payload on the scaffolding, must not exceed the carrying capacity of the posts on which it is distributed.

7.Габарит крана (кроме стрелы) должен обеспечивать свободный проход его между стойками лесов (рассто дие между ос ми стоек 2 -и)ч7. The size of the crane (except the boom) must ensure its free passage between the posts of the scaffolding (the distance between the pillars of the uprights 2 and h)

8. Кран должен быть самоходным и полноповоротным.8. The crane must be self-propelled and fully rotatable.

Сборка лесов производитс  следующим пор дком.The scaffolding is done in the following order.

В пару трубчатых стоек вдеваютс  нижи  , а затем верхн   опорна  рамы и через отверсти  креп тс  к стойкам.Behind the pair of tubular uprights are lowers, and then the upper support frame and through the holes are attached to the uprights.

Собранна  конструкци  устанавливаетс  вертикальио и скрепл етс  низу дерев нными прогонами, по верху-металлическими крановыми балками.The assembled structure is mounted vertically and fastened to the bottom by wooden girders, along top-metal crane beams.

После сборки двух пар стоек устанавливаетс  самоходныГ кран, который, двр га сь по направлению сборки лесов, выполн ет все транспортные операции но сборке лесов (подъем стоек, прогонов и т. д.).After the assembly of two pairs of racks, a self-propelled crane is installed, which, moving in the direction of the assembly of the scaffolding, performs all transport operations on the assembly of the scaffolding (raising racks, runs, etc.).

В начале леса собираютс  в положение .4 (фиг. 8). С положени  А производитс  кладка первого  руса на высоту 1,1 м.At the beginning, forests are collected in position .4 (Fig. 8). From position A, the first Rus is laid to a height of 1.1 m.

Подъем рабочего настила дл  кладки второго  руса (положение Б) производитс  отдельными звень ми. Длина каждого звена определ етс  рассто нием между поперечными степами здани .The raising of the working floor for the laying of the second Rus (position B) is carried out by separate links. The length of each link is determined by the distance between the transverse steppes of the building.

Дл  подъема рабочего настила трос от ручной лебедки, имеющийс  на каждой стойке, через ролик на стойке ирикренл етс  к нижней раме. Подъем производитс  одновременно всеми лебедками 9 стоек данного поднимаемого звена настила.To raise the working deck, the cable from the hand winch, which is located on each stand, is driven through the roller on the stand and dropped to the lower frame. The lifting is carried out simultaneously by all the winches of the 9 racks of the given raised link of the flooring.

После подъема на 1,,1 м, т. е. в положение Б (фиг. 8), нижние рамы креп тс  в новом положении теми же щтыр ми в соответствующие дыры стоек.After climbing up to 1, 1 m, i.e. to position B (Fig. 8), the lower frames are fixed in the new position with the same plugs into the corresponding strut holes.

Подъем настила в положении В и Г производитс  тем же пор дком, как и подъем в положеиие Б.The elevation of the flooring in position C and D is in the same order as the elevation in position B.

После подъема всех звеньев настила в положение Г, то есть после окончани  кладки этажа, производитс  вертикальное .перемещение лесов . Дл  этого в пределах длины одного звена (если оно не превышает 6м), а в противном случае в пределах части звена стойки освобождаютс  от крепленп  к настилу и раме кранового пути (выппмаютс  щтыри ) и стойки поднимаютс  иа всю свою свободную длину (положение Д). При этом вс  конструкци  лесов в пределах звена или части его держитс  на металлических балках краиового пути. Самоходный кран во избежание лищней нагрузки находитс  за пределамп этого звена.After all the links of the flooring have been lifted to the F position, i.e. after the completion of the masonry of the floor, a vertical movement of the scaffolding is carried out. For this, within the length of one link (if it does not exceed 6 m), otherwise, within the part of the link, the pillars are freed from the attachment to the floor and frame of the crane path (shafts) and the posts are raised all their free length (position D). In this case, the entire structure of the scaffolding within the link or part of it is held on the metal beams of the edge path. A self-propelled crane, in order to avoid an external load, is beyond the limit of this link.

Самоходный кран подходит к месту, где стойки подн ты, но ие входит в зону подн тых стоек, и. монтирует балки перекрыти  28. щиты паката и прочее. Затеу. стойки, немного опускаютс  до балок устанавливаютс  на последних.The self-propelled crane approaches the place where the pillars are raised, but not included in the raised racks, and. mounts beams overlap 28. pakata shields and stuff. Zateu. racks, a little lower until the beams are installed on the latter.

После того, как по всей длине выполнена эта операци , ироизво-Дптс  опускание рабочего настила и подъем крановых балок вместе с самоходным краном в положение, соответствующее исходному положению .After the entire length of this operation is completed, irois-Dptts lowering the working deck and raising the crane beams together with the mobile crane to the position corresponding to the initial position.

Подъем крановых балок вместе с крапом производитс  при помощи тех же ручных лебедок 9, прикрепленных к конструкции нижних рам (рабочий настил), но свббодный конец троса укрепл етс  к верхним рамам.Lifting the crane girders together with the specks is carried out using the same hand winches 9 attached to the structure of the lower frames (working deck), but the free end of the cable is fixed to the upper frames.

Подъем может производитьс  одновременно по всей длине или от .дельными част ми. В иоследием случае крановые балки разбалчиваютс  в стыках, а после подъема вновь сбалчиваютс .Lifting can be carried out simultaneously along the entire length or from individual parts. In the latter case, the crane beams flare up in the joints, and after lifting they are again flush.

Предмет изобретени Subject invention

Claims (2)

1. Строительные леса, состо щие из стоек и перемещаемых по ним в вертикальном направлении рам с рабочим настилом, отличающиес  тем, что над рабочим настилом на стойки надеты рамы, несущие1. Scaffolding consisting of racks and frames with working floor that are moved along them in the vertical direction, characterized in that above the working floor there are frames on the racks that carry - 3 -Ло 80481- 3 -Lo 80481 подкрановые балки катучего крана дл  подачи материалов и имеющиевозможность перемещени  относительно стоек в вертикальном направлении при перестановке лесов с этажа на этаж без разборки.the crane beams of the rolling crane for feeding materials and the possibility of moving relative to the uprights in the vertical direction when re-arranging the scaffolding from floor to floor without disassembling. 2. Способ перестановки лесов по п. 1 с этажа на этаж, отличающийс  тем, что рамы,, несущие рабочий настил, подвещивают посекционно к подкрановым балкам, поднимают стойки лесов, укладывают под подн тыми стойками балки перекрыти  здани  и стойки лесов опускают на эти балки, после чего осуществл ют подъем верхних рам, несущих, покрановые балки,, на более высокий уровень.2. The method of re-scaffolding according to p. 1 from floor to floor, characterized in that the frames carrying the working floor raise the section of the crane girders, raise the stands of scaffolding, lay the beams of the building under the raised stands of the beam and the scaffold stands down on these beams and then lifting the upper frames, bearing beams, to a higher level. Фиа. 1Fia. one Фиг. 2FIG. 2 .,,--Юс / . ,, - Yus / X н ii; X n ii; / . 13 7 н 1г J. H,..J ШГ/. 13 7 н 1г J. H, .. J ШГ л/г. бl / g b Фиг. 7 24 25FIG. 7 24 25 },;г,г-. - ..},; g, g-. - .. ... ,. . « ...,. . " :: t4Jt4J 33 4.6l «-,:;--,4.6l "-,:; -, ss ..
SU390830A 1949-02-01 1949-02-01 Scaffolding and method of their rearrangement SU80481A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU390830A SU80481A1 (en) 1949-02-01 1949-02-01 Scaffolding and method of their rearrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU390830A SU80481A1 (en) 1949-02-01 1949-02-01 Scaffolding and method of their rearrangement

Publications (1)

Publication Number Publication Date
SU80481A1 true SU80481A1 (en) 1949-11-30

Family

ID=48254143

Family Applications (1)

Application Number Title Priority Date Filing Date
SU390830A SU80481A1 (en) 1949-02-01 1949-02-01 Scaffolding and method of their rearrangement

Country Status (1)

Country Link
SU (1) SU80481A1 (en)

Similar Documents

Publication Publication Date Title
US4036466A (en) Flying deck-type concrete form installation
US4809814A (en) Scaffolding
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN109356167B (en) Deep foundation pit support dismantling system and construction method
WO2022252829A1 (en) Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building
CN107761961A (en) A kind of electronic climbing frame monolithic construction method of high-rise building
KR20200030196A (en) Outside workbench for offshore structures
US2142651A (en) Scaffolding
AU2010253486B2 (en) A loading platform
US3610368A (en) Vertically adjustable platform for scaffolding
WO2024104449A1 (en) Nuclear island reactor plant construction equipment integration platform and climbing method therefor
US2346033A (en) Circular scaffold
US3127996A (en) Climbing cranes
CN209568688U (en) A kind of elevating construction platform
SU80481A1 (en) Scaffolding and method of their rearrangement
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN212895943U (en) Operation platform device for binding small-section pier column reinforcing steel bars
CN210563531U (en) Steel structure support for building protection
CN112854702A (en) Large-span silo roof construction platform and erection method
GB541484A (en) Improvements in or relating to the erection of concrete structures
EP1801301B1 (en) Method of adding extra floors on a building
CN204703533U (en) A kind of lift-type discharging protection double-purpose platform
CN215167934U (en) Large-span silo roofing construction platform bottom pillar
CN215107081U (en) Large-span silo roofing construction platform shore
CN217379718U (en) Prefabricated stairwell operation protection platform