бан 7, имеющий больший диаметр, навит канат 13, который пропускаетс через втулку 5 и крепитс на барабане 14 лебедкй 15. Барабаны 6 и 7 снабжены канатоукладчиком 16, смонтированным на оси 3 .посредством кронтейнов 17 и 18. возможно выполнение устройства с барабанами 6 и 7, имеющими одинаковый диаметр. При этом барабаны должны быть св заны промежуточной передачей таким образом, что число, оборотов барабана, на который наматываетс (сматываетс ) канат 11, меньше числа оборотов барабана , с которого сматываетс (наматываетс ) канат 13.Ban 7, having a larger diameter, wound a rope 13, which passes through sleeve 5 and fastens on reel 14 of winch 15. Reels 6 and 7 are equipped with rope-laying machine 16 mounted on axis 3. 7, having the same diameter. In this case, the drums must be connected by an intermediate gear in such a way that the number of turns of the drum on which the cable 11 is wound (wound) is less than the number of revolutions of the drum, from which the cable 13 is wound (wound).
Подъемно-опускное устройство доставл етс к высотному зданию на транспортном средстве. Лебедка 15 может быть установлена как на земле , так и на транспортном средстве. На барабане 7 находитс наибольшее число витков каната 13, а на барабане б - Несколько витков каната 11. Остальна длина каната 11 уложена в специальный контейнер. Конец уложенного каната 11 креп т к объекту 1 После этого на грузонесущую платФорму 2 помещают бойца-спасател и привод т в действие лебедку. При сматывании каната 13 с барабана 7 на барабан б наматываетс канат 11 и вследствие разности диаметров укладки канатов на барабанах б и 7 платформа 2 перемещаетс вверх до требуемого уровн . Затем лебедку 15 начинают вращать в другую сторону. При этом происходит стопорение барабанов 6 и 7 обгонной муфтой 8 и при дальнейшем.сматывании каната 13 с лебедки 15 платформа 2 приближаетс к стене здани . Спуск платформы 2 осуществл е с путем сматывани каната 13 с барабана 14. Тормоз 10 при зтом должен быть расторможен. Тормоз 10The lifting and lowering device is delivered to a high-rise building in a vehicle. Winch 15 can be installed both on the ground and on the vehicle. On the reel 7 there is the greatest number of turns of the rope 13, and on the drum b - a few turns of the rope 11. The remaining length of the rope 11 is packed in a special container. The end of the laid rope 11 is secured to the object 1. After this, a rescue soldier is placed on the load-carrying platform 2 and the winch is activated. When winding the rope 13 from the drum 7 onto the drum b, the rope 11 is wound and, due to the difference in the diameters of laying the ropes on the drums b and 7, the platform 2 moves up to the required level. Then the winch 15 begin to rotate in the other direction. When this occurs, the reels 6 and 7 are locked by an overrunning clutch 8 and upon further unwinding of the rope 13 from the winch 15, the platform 2 approaches the wall of the building. The platform 2 is descended by winding the rope 13 from the drum 14. The brake 10 at this must be disengaged. Brake 10
может быть поставлен на стопор, при этом платформа 2 под действием собственной массы перемещаете вниз, наматыва канат 13 на барабан 7 и сматыва канат 11 с барабана б. Скорость спуска платформы 2 регулируетс лебедкой 15.. Возможно выполнение устройства бе обгонной муфты 8, при этом необходимо растормаживать тормоз 10 при подъеме платформы 2 .can be put on the stopper, while the platform 2 under the action of its own weight move down, winding the rope 13 on the drum 7 and winding the rope 11 from the drum b. The speed of descent of the platform 2 is regulated by the winch 15 .. It is possible to carry out the device without the overrunning clutch 8, while it is necessary to release the brake 10 when lifting the platform 2.
Подъемно-опускное устройство может быть использовано при вертикапьном и наклонном подъеме-спуске.The lifting and lowering device can be used for vertical and inclined lifting and lowering.