SU737289A1 - Floating transfer dock - Google Patents

Floating transfer dock Download PDF

Info

Publication number
SU737289A1
SU737289A1 SU772553785A SU2553785A SU737289A1 SU 737289 A1 SU737289 A1 SU 737289A1 SU 772553785 A SU772553785 A SU 772553785A SU 2553785 A SU2553785 A SU 2553785A SU 737289 A1 SU737289 A1 SU 737289A1
Authority
SU
USSR - Soviet Union
Prior art keywords
dock
support
coastal
air
valve
Prior art date
Application number
SU772553785A
Other languages
Russian (ru)
Inventor
Владимир Никодимович Викторов
Геннадий Владимирович Филатов
Михаил Сергеевич Лавриненко
Original Assignee
Предприятие П/Я М-5957
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я М-5957 filed Critical Предприятие П/Я М-5957
Priority to SU772553785A priority Critical patent/SU737289A1/en
Application granted granted Critical
Publication of SU737289A1 publication Critical patent/SU737289A1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

(54) ПЕРЕДАТОЧНЫЙ ПЛАВУЧИЙ ДОК(54) TRANSFER FLOATING DOCK

1one

Изобретение относитс  к судостроению и суиоремо ту, а именно к передаточным плавучим докам.This invention relates to shipbuilding and suioremo, namely to transfer floating docks.

Известен передаточный док, содержащий береговую и мористую опоры, т ги и укосиньт, соединенные посредствен шар-, ниров с башн ми дока и опорами 13.The transfer dock is known, which contains coastal and seaward supports, ti and ukosint, connected by a mediocre ball and dock with dock towers and supports 13.

Недостатками, такого плавучего пока  вл5п6тс  сложность и высока  стоимость гидротехнических сооружений.Disadvantages, such floating while Vl5p6ts complexity and high cost of hydraulic structures.

Наиболее близким техническим решенивм к предлагаемому изобретению  вл ет-г с  передаточный плавучий док, содержащий мористые опоры в виде поворотного ,5 кринолина к береговую опору 2J.The closest technical solution to the present invention is to-g with a transfer floating dock containing seaward supports in the form of a swivel, 5 crinoline to the shore support 2J.

Недостатком известного устройства Явл етс  наличие береговых опор, опирающихс  на передаточный причал, причем то дл  воспри ти  нагрузок от опор дока причал рассчитываетс  на большие нагрузки, что удорожает строительную и эксплуата ционную стоимость сооружений.A disadvantage of the known device is the presence of coastal supports resting on the transfer berth, and for receiving loads from the berth docks, the pier is designed for heavy loads, which increases the construction and operational cost of the facilities.

изобретени  - улучшение эксплуатационных качеств дока и снижение стоимости гидротехнических сос(ужений.invention - improving the operational qualities of the dock and reducing the cost of hydraulic engineering units.

Указанна  цель достигаетс  тем, что берегова  опора установлена под водой и выполнена в виде колонны, состоввдей из стационарной подушки и съемного, измёнйшгбго по высоте основани , причемThis goal is achieved by the fact that the shore support is installed under water and is made in the form of a column, composed of a stationary cushion and a removable one, which varies over the height of the base, and

расположены BjBepaiBHax равнобедренного треугольники , псдаерхности опирани  которых наход тс  на различных по глубине о -метКаХ при этом носовой понтон ДОК1Э ОбОрудсшан втмступом, а берегова  опора впадиной , которае взаимодействуют между собой.BjBepaiBHax of isosceles triangles are located, the surfaces of which are at different depths of o-metrics, while the bow pontoon DOK1E Obrudshan is located at the entrance, and the shore support is a depression that interacts with each other.

Кроме того, съемное, измен емое по высоте основание береговой опоры выполнено в виде плавучей WIKOCTH с воэfyw fSlL uS Scr an W ic inovieiiitaitMii йнизу шпигатами.In addition, the removable, height-adjustable base of the coastal support is made in the form of a floating WIKOCTH with a wave fSlL uS Scr an W ic inovieiiitait Mii bottom scuppers.

Claims (3)

Кроме тото, с целью повышени  качества к надёжнсжтй постановки дока па береговую опору стационарна  подводна  подушка береговой опоры снабжена ловител ми , выполненными с, симметрично расположенными плавучест мк и воздушной магистралью. На фиг. 1 изображен док, вид сбоку| на фиг. 2 - то же вид сверху; на фиг. 3 - узел Т на фиг. 1 в разрезе; .на фиг. 4 - вид по стрелке А на фиг, 3, Передаточный плавучий док 1 содержи береговую носовую подводную опору дока , состо щую из стационарной подводной подушки 2 и съемного измен емого по высоте основани  3. Нагрузки от веса накат1лваемого судна и дока на опору передаютс  через эстакаду дока 4 и подкреплени  5 в понтоне. Кормота  мориста  опора дока 6 выполнена в виде шарнирно закрепленного на кормовом торие дока кринолина, опирающегос  на две установленные по бортам подводные подушки 7. Рельсовые пути на эстакаде дока соедин ютс  с береговыми рельсовы ми пут ми переходными мостами 8, уложенными в карманы, утроенные набереговых рельсовых пут х и эстакаде дока. Док в момент посадки его на йпоры и при всплытии удерживаетс  кормовыми швартовными концами 9 с мертвыми  кор ми 1О и береговьп 1и швартовными концами 11. Берегова  подвбдна  стационарна  подушка 2 дока 1 снабжена поворотными л вител ми 12, фиксаторами 13 и симметрично расположенными емкост ми 14 пла вучести, закрепленными с дэух проти воположных сторон подушки. Пустотельте ловители 12 сообщень общей полостью с емкост ми плавучести 14 и (акреплены на подушке шарнирами 15. К ловител  мг по трубопроводу 16 подводитс  воздух от магистрали через клапан 17. Съемное основание опоры, соответственно с Двух сторон имеет вертикальные направл ющие 18. Воздушные емкости съемнбго основани  3 с помсчцью воздушнотх) патрубка 1 трубопровода 20 и клапана 21 соедин ю с  с воздушной магистралью. Носовой понтон дока имеет выступ 22, а берегова  опора - впадину 23. При положении дока порожнем он имеет осадку 24, а при положении на опорах - 25. Док совместно с опорами работает сладутршим образом. Воздух от береговой магистрали клапан 17 и трубопровод 16 подаетс;а к товител м 12 и емкост м 14 плавучести Вытесн ема  из емкостей плавучести вола замещаетс  воздухом, в результате чего положительна  плавучесть, создаваема  81 кост ми, создает подъемную силу, котора  заставл ет всппьгаать ловители, поворачивающиес  на шарнирах 15. При подъеме ловители вход т в.фиксаторы 13, подушки 2, предотвращающие отклонение (качание) ловителей на шарнирах, и после полной продувки воды занимают вертикальное положение. С помощью крана съемное основание 3 устанавливаетс  направл ющими 18 в ловители 12 и спускаетс  на воду, стропы крана отдаютс . Клапан 21 открываетс , и по мере выхода из опоры воздуха по трубопрово/ 20 опора плавно опускаетс  на подводную подушку In addition to this, in order to improve the quality of reliable installation of the dock on the coastal support, the stationary underwater cushion of the coastal support is equipped with catchers made with symmetrically arranged buoyancy and an air line. FIG. 1 depicts a dock, side view | in fig. 2 - the same top view; in fig. 3 - the node T in FIG. 1 in section; .on FIG. 4 is a view along arrow A in FIG. 3; Transfer floating dock 1 contains a coastal nasal underwater support of the dock consisting of a stationary underwater cushion 2 and a removable height-adjustable base 3. The loads from the weight of the rolled vessel and the dock are transferred through the ramp dock 4 and reinforcements 5 in the pontoon. The corista morista support of dock 6 is made in the form of a crinoline dock hinged at the stern of the dock of a dock crinoline supported by two underwater cushions mounted on the sides of the rail. put x and flyover dock. The dock at the time of its landing on the stems and ascent is held by the stern mooring ends 9 with dead ends 1O and coast 1 and the mooring ends 11. The coastal stationary cushion 2 of dock 1 is equipped with swivel headlights 12, retainers 13 and symmetrically located containers 14 Vuchemost, fixed with deuh opposite sides of the pillow. The hollow posts 12 each have a common cavity with buoyancy tanks 14 and (fixed on the cushion by the hinges 15. Air from the main line through valve 16 is supplied to the mg trap through valve 17. The removable support base has, respectively, 18 on two sides. Air tanks are removable the base 3 with the air line) pipe 1 of the pipe 20 and the valve 21 is connected to the air line. The dock's pontoon has a protrusion 22, and the shore support has a hollow 23. When the dock is empty, it has a draft of 24, and when it is placed on supports — 25. The dock, together with the supports, works in a sweet manner. Air from the shoreline valve 17 and pipe 16 is supplied, and to the consumers 12 and buoyancy tanks 14, the displaced ox from the buoyancy tanks is replaced by air, resulting in a positive buoyancy, created by 81 bones, creating lift, which causes the catchers turning on hinges 15. When lifting, catchers enter clips 13, pillows 2, which prevent deflecting (swinging) catchers on hinges, and after a full purge of water, they occupy a vertical position. With the help of a crane, the removable base 3 is installed by the guides 18 into the catchers 12 and lowered into the water, the crane sling is released. The valve 21 is opened, and as the air leaves the air support, the air support / 20 gradually descends onto the underwater cushion. 2. Клапан 17 открьшаетс , благодар  сообщению с атмосферой емкости 14 наполн ютс  водой и ловители, поворачива сь вокруг шарниров 15, опускаютс  из надводного в подводное положение. Опора готова к постансфке дока. , С помощью швартовных концов 9 и 11 док подводитс  к берегу до совмещени  выступа на доке 22 со впадиной 23 на береговой опоре, благодар  чему он центрируетс  с береговыми рельсовыми пут ми . Центровка дока до полного обеспечени  параллельности путей на доке с пут ми на берегу осуществл етс  кормовь1ми швартовными концами 9. После прин ти  балласта док из осадки 24 принимает осадку 25 и садитс  на подводные опорные подушки 2 и 7, расположенные в вершинах угле равнобедренного треугольника . Суднбнакатьюают в док, откачивают балласт, и док с судном всплывает над . После всплыти  дока и поворота мористой опоры в горизонтальное полрженне док отводитс  на котлован погружени  дл  спуска судна. Путем подачи Boaojrxa от магистрали через клапан 21 и труб м1ровоа 2О из отсеков съемного оснсжанйЯ 3 продуваетс  балласт, после чего он всплывает и с помощью крана ГО1И буксира устанавливаетс  на место хранени . Причальна  стенка в районе берегового стш1вл  может использоватьс  как достроечна  набережна , доступ судов к которой благодар .отсутствию стационарных подводных опор, загромождающих акваторию, обеспечен без ограничени  по осадкам.. Предлагаемый передаточный плавучий док по сравнению с известными обладает улучшенными эксплуатационными качества ми при меньшей его стоимости. Формула изобретени  1. Передаточный плавучий док, содержащий мористые опоры в виде поворотного кринолина и береговую опору, о т лич аюшийс  тем, что, с целью улучшени  эксплуатационных качеств дока и снижени  стоимости гидротехнических сооружений, опора устан жпена под водой и выполнена в виде копонны, состо щей из стационарной подушки и съйлного измен емого по высоте основани , причем берегова  и мористые опоры расположены в вершинах равнобедренного) треугольника, п ерхности опирани  которых наход тс  на различных по глубине отметках, при этом носовой понтон дока оборудован выступом, а берегова  опора впадиной, которые взаимодействуют межд собсЛ. 73 6 2 .Док по п. 1, отличающнйс   тем, что съемное, измен емое по высоте основание береговой опоры выполнено в виде плавучей;емкости с воздушной магистралью н расположенными снизу шпигатами , ,. 2. The valve 17 is opened, due to the communication with the atmosphere of the container 14, is filled with water and the catchers, turning around the hinges 15, are lowered from the surface to the underwater position. The prop is ready for the postdisk doc. , With mooring ends 9 and 11, the dock is brought ashore until the projection on dock 22 is aligned with depression 23 on the shore support, thanks to which it is centered with the coastal tracks. The dock alignment to the full parallelism of the docks with the paths on the coast is carried out by the feed mooring ends 9. After taking the ballast, the dock from draft 24 takes the draft 25 and sits on the submerged pillows 2 and 7 located at the vertices of the equilateral triangle. The ship is docked, the ballast is pumped out, and the dock with the ship floats over. After the dock emerges and the nautical support rotates, the horizontal dock is retracted to the immersion pit to lower the vessel. By feeding the Boaojrxa from the line through the valve 21 and the pipes M1 2A from the compartments of the removable base 3, the ballast is blown out, after which it floats and is placed in place with the help of the GO1I crane. The berth wall in the coastal area can be used as an extension of the embankment, access of vessels to which, thanks to the absence of stationary underwater supports that encumber the water area, is ensured without any restrictions on precipitation. The proposed transfer dock compared to the known ones has improved performance at a lower cost. . Claim 1. Transmission floating dock, containing seaward supports in the form of a rotary crinoline and a shore support, is due to the fact that, in order to improve the performance of the dock and reduce the cost of hydraulic structures, the support is installed under water and made in the form of a crane, consisting of a stationary pillow and a removable base varying in height, with the coastal and seaward supports located at the tops of an isosceles triangle, the surfaces of which are at different depths x, while the bow pontoon dock is equipped with a protrusion, and shore support hollow, which interact between themselves. 73 6 2. The door of claim. 1, characterized in that the removable, height-adjustable base of the coastal support is made in the form of a floating vessel, with an air line and spacers located underneath,,. 3.Док tip п. 1, 6 т л и ч а ю. щ   йс   тем, что, с цепью повышени  качес ва и надежности noctaHOBK дока на берегсдаую опс, стационарна  подводна  подушка берегсщой опоры снабжена ловител. ми, выполненными с симметрично располо. iffeHHbiMH емкост ми пловучес-г    Jвoaдyttной магистралью. Источники инфо| ац1Ш, щ щЯалёъо вн ман е ори эв&пёрПЕэе 1.Автфзков св детепьство СССР N9 464480, кл. В 63 С 1/02, OS.02.7ii. 2,Авт(фское сввдвгбльство СССР № 509488, tat. В 63 С 1/02, 02.07.74 (прототип).3.Dock tip p. 1, 6 tl and h and y. Also, with the noctaHOBK docking station safety chain and the safety chain, the stationary underwater cushion of the bank support is equipped with a catcher. mi, made with symmetrically arranged. iffeHHbiMH capacitance mi swimmer-Jvoyatny highway. Sources of information | ats1Sch, schYayalo vn man eor ev & perPEee 1.Autfzkov sv tdetpistvo USSR N9 464480, cl. B 63 C 1/02, OS.02.7ii. 2, Avt (FSS Soviet Union № 509488, tat. In 63 C 1/02, 02.07.74 (prototype).
SU772553785A 1977-12-13 1977-12-13 Floating transfer dock SU737289A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU772553785A SU737289A1 (en) 1977-12-13 1977-12-13 Floating transfer dock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU772553785A SU737289A1 (en) 1977-12-13 1977-12-13 Floating transfer dock

Publications (1)

Publication Number Publication Date
SU737289A1 true SU737289A1 (en) 1980-05-30

Family

ID=20737506

Family Applications (1)

Application Number Title Priority Date Filing Date
SU772553785A SU737289A1 (en) 1977-12-13 1977-12-13 Floating transfer dock

Country Status (1)

Country Link
SU (1) SU737289A1 (en)

Similar Documents

Publication Publication Date Title
US3823681A (en) Barge carrying transport vessel
US3279407A (en) Surface vessel
KR102365572B1 (en) How to use a floating marine depot
GB2399329A (en) Mooring apparatus incorporating a semi-submersible floating dock
US3707934A (en) Floating stable terminal
SU893124A3 (en) Sea ship
EP0050382B1 (en) Work platform for ships
US4294331A (en) Method and system for escaping from an offshore drilling platform
US3835802A (en) Marine cargo vessel
US3939790A (en) Transport ship construction and method of loading floating cargo into a floatable cargo space of a ship
SU737289A1 (en) Floating transfer dock
CN212375795U (en) Structure of underwater ground anchor type yacht wharf
CN209798656U (en) Large ship, small wharf, artificial reef plate and marine tourism system facility
SU509488A1 (en) Transfer floating dock
SU738941A1 (en) Floating slipway
SU1326497A1 (en) Transfer ship lift
SU1373627A1 (en) Slipway of floating type for vessel
US20050257727A1 (en) Floating dock lift
SU1562233A1 (en) Arrangement for lifting and launching floating craft on water
KR900000214B1 (en) A leisure ship
RU2615026C1 (en) Floating transfer dock
SU1212867A1 (en) Transferring floating dock
US4011825A (en) Swash plate
SU1581652A1 (en) Transfer ship hoist
SU948767A1 (en) Arrangement for launching self-raising offshore platform