SU711291A1 - Method of working thick gently sloping coal beds - Google Patents
Method of working thick gently sloping coal beds Download PDFInfo
- Publication number
- SU711291A1 SU711291A1 SU782631034A SU2631034A SU711291A1 SU 711291 A1 SU711291 A1 SU 711291A1 SU 782631034 A SU782631034 A SU 782631034A SU 2631034 A SU2631034 A SU 2631034A SU 711291 A1 SU711291 A1 SU 711291A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- layers
- layer
- roof
- sequence
- soil
- Prior art date
Links
Landscapes
- Soil Working Implements (AREA)
Description
1one
Изобретение относитс к горной промышленности и может быть использовано при разработке мощных пологих угольных пластов преимущественно под охран емыми объектами.The invention relates to the mining industry and can be used in the development of thick flat coal seams, mainly under protected objects.
Известен способ разработки мощных пологих угольных пластов под охран емыми объектами, включаюиий ныемку пласта- камерами с оставлением целиков угл 1.There is a known method of developing powerful flat coal seams under protected objects, including plastics, leaving the whole coal 1.
Однако данный способ характеризуетс значительными потер ми, угл .However, this method is characterized by significant losses, coal.
Известен также способ разработки мощных пологих угольных пластов трем наклонными сло ми, включающий проведение подготовительных выработок дл каждого из слоев до. начала отработки последнего и выемку слоев {2 .There is also known a method for developing thick, flat coal seams by three inclined layers, including carrying out preparatory workings for each of the layers up to. Begin working on the last and the seizure layers {2.
Целью изобретени вл етс повышение эффективности и безопасности ведени очистных работ под охран емыми объектами.The aim of the invention is to increase the efficiency and safety of the clean-up operations under protected objects.
Это достигаетс тем, что в первую очередь осуществл ют выемку верхнего сло тонкими щел ми в-последовательности от кровли к почве верхнего сло , затем сразу на полную мощность отрабатывают средний слой с обрушением кровли и подачей в обрушенныеThis is achieved by firstly removing the upper layer with thin gaps in the sequence from the roof to the soil of the upper layer, then immediately working out the middle layer at full capacity with the roof collapsing and feeding into the collapsed
породы из забо среднего сло твердеющей смеси, после чего тонкими щел ми отрабатывают нижний слой в последовательности от почвы пласта к кровле нижнего сло , причем выработки дл среднего и нижнего слоев образуют путем углублени соответственно выработок верхнего и среднего слоев, а слои соответственно отра0 батывают после окончани смещени кровли перед очистным забоем каждого последующего по очередности выемки сло .rocks from the bottom of the middle layer of hardening mixture, after which thin slits work the lower layer in sequence from the soil of the reservoir to the top of the lower layer, and the workings for the middle and lower layers are formed by dredging the workings of the upper and middle layers, respectively, and the layers displacement of the roof before clearing the bottom of each subsequent in-sequence excavation layer.
На фиг. 1 представлена схема отработки верхнего сло ; на фиг. 2 - то же, среднего сло ; на фиг. 3 - то же, нижнего сло .FIG. 1 shows the scheme of mining the upper layer; in fig. 2 - the same, the middle layer; in fig. 3 - the same, the bottom layer.
Способ заключаетс в следующем. Мощный пологий угольный пласт отрабатывают трем наклонными сло ми с проведением выработок дл каждого из слоев до начала отработки последнего . В первую очередь с помощью агрегата тонкощелевой выемки отраба5 бывают верхний слой 1 тонкими щел ми 2 в последовательности от кровли пласта к почве верхнего сло . После окончани смещени пород кровли приступают к выемке среднего сло 3The method is as follows. A powerful flat coal seam is worked out by three inclined layers with carrying out workings for each of the layers before the development of the latter. First of all, with the help of a thin-slit excavation unit 5, the upper layer 1 is thin gaps 2 in the sequence from the top of the layer to the soil of the upper layer. After the displacement of the roof rocks is completed, the middle layer 3 is dredged.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782631034A SU711291A1 (en) | 1978-06-16 | 1978-06-16 | Method of working thick gently sloping coal beds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782631034A SU711291A1 (en) | 1978-06-16 | 1978-06-16 | Method of working thick gently sloping coal beds |
Publications (1)
Publication Number | Publication Date |
---|---|
SU711291A1 true SU711291A1 (en) | 1980-01-25 |
Family
ID=20771150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU782631034A SU711291A1 (en) | 1978-06-16 | 1978-06-16 | Method of working thick gently sloping coal beds |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU711291A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4878712A (en) * | 1988-09-09 | 1989-11-07 | Wang Fun Den | Hydraulic method of mining coal |
-
1978
- 1978-06-16 SU SU782631034A patent/SU711291A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4878712A (en) * | 1988-09-09 | 1989-11-07 | Wang Fun Den | Hydraulic method of mining coal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6684922B2 (en) | Zero-discharging short-faced pillarless coal mining method | |
SU711291A1 (en) | Method of working thick gently sloping coal beds | |
SU926288A1 (en) | Method for hydraulically deposing muck in stock-piles and tail storage facilities | |
SU711293A1 (en) | Method of working thick gently sloping coal beds | |
SU711292A1 (en) | Method of working thick gently sloping coal beds | |
SU711290A1 (en) | Method of working thick gently sloping coal beds | |
SU727851A1 (en) | Method of mining thick gently sloping coal seams | |
SU715797A1 (en) | Method of mining thick sloping coal beds | |
SU715796A1 (en) | Method of mining thick sloping coal beds | |
SU715795A1 (en) | Method of mining thick sloping coal beds | |
SU1413244A2 (en) | Method of finishing open mines ,particularly, of rod-shaped deposits | |
SU125787A1 (en) | Method for developing thin and low-powered steeply dipping seams | |
SU662715A1 (en) | Method of excavating thick slightly inclined seams of minerals with hard rock | |
SU796425A1 (en) | Method of excavating gently sloping coal beds | |
SU866190A1 (en) | Method of working a mine face by bucket-wheel excavator | |
SU1028845A1 (en) | Method of working thick steep coal seams | |
SU723142A1 (en) | Method of mining thick gently sloping mineral seams of complex structure | |
SU1059184A1 (en) | Method of combination mining of seam mineral deposits | |
SU735777A1 (en) | Method of working thick coal beds | |
SU1151673A1 (en) | Method of mining adjoining coal seams | |
SU883437A1 (en) | Trenching method | |
SU611001A1 (en) | Method of borehole hydraulic winning | |
SU703661A1 (en) | Method of excavating gently sloping mineral beds | |
RU96108488A (en) | METHOD FOR DEVELOPING THE COAL FORMATION ENVIRONMENT IN THE EXTRAORDINARY ZONES OF THE CAREER | |
SU723143A1 (en) | Method of working coal seams |