SU690182A1 - Method of open-cast mining mineral field formations - Google Patents

Method of open-cast mining mineral field formations

Info

Publication number
SU690182A1
SU690182A1 SU742006072A SU2006072A SU690182A1 SU 690182 A1 SU690182 A1 SU 690182A1 SU 742006072 A SU742006072 A SU 742006072A SU 2006072 A SU2006072 A SU 2006072A SU 690182 A1 SU690182 A1 SU 690182A1
Authority
SU
USSR - Soviet Union
Prior art keywords
open
cast mining
mining mineral
mineral field
field formations
Prior art date
Application number
SU742006072A
Other languages
Russian (ru)
Inventor
Изя Львович Мордухович
Вадим Ильич Кабанов
Константин Ефимович Виницкий
Александр Николаевич Радевич
Original Assignee
Mordukhovich Izya L
Kabanov Vadim
Vinitskij Konstantin E
Radevich Aleksandr N
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mordukhovich Izya L, Kabanov Vadim, Vinitskij Konstantin E, Radevich Aleksandr N filed Critical Mordukhovich Izya L
Priority to SU742006072A priority Critical patent/SU690182A1/en
Application granted granted Critical
Publication of SU690182A1 publication Critical patent/SU690182A1/en

Links

Landscapes

  • Devices For Executing Special Programs (AREA)

Description

II

Иаобретение относитс  к промышленности и может ть- использовано при открытой разработке пластрвых месторождений полезных ископаемых.The invention relates to industry and can be used in the open cast mining of mineral deposits.

Известен способ разработки пластовых месторождений полезных ископаемых, вклк чающий разделение т ск аЬинсгЬ уступа на подуступы, последовательную поблочную отработку подуступов и ахтвэааго ископаемого и переэкскавацию горной массы во внутренние отвалы fl;).There is a method of developing reservoir deposits of minerals, including the division of the scaffolding of the ledge to the substeps, the sequential block-by-block mining of the substeps and the Achtweaago fossil and re-excavation of the rock mass into the internal dumps fl;).

Известен также способ отк  дтой разработки пластовых месторождений полезных ископаемых, включающий разделение вскрышного уступа на подуступы, отработку верхних подуступов с перевалкой горной массы во временный отвал, отработку нижнего подусчупа и попезногб ископаемоего с переэкскавацией породы из временного отвала в посто нный 21.There is also a known method of starting the development of stratum mineral deposits, including the separation of overburden ledge into sub-steppes, working out the upper sub-steppes with transshipment of the rock mass into a temporary dump, working out the lower substep and recovering the rock from the temporary dump into a permanent 21.

Однако оба указанных способа характеризуютс  недостаточно высокой эффективностью разработки в определенных горвогеологических услови х.However, both of these methods are characterized by insufficiently high efficiency of development in certain horological and geological conditions.

Целью изобретени   вл етс  повышение эффективности разработки.The aim of the invention is to increase the efficiency of development.

Поставленна  .шлЬ достигаетс  тем, что переэкскавацию горной массы верхних подуступов из временного отвала в посто нный осуществл ют до начала OTpa6oivки нижнего подуступа, отработку нижнего подуступа производ т поблочно; в первую .очередь производ т экскавацию части нижнего подуступа, примыкающей к выработанному пространству, с последующей выемкой полезного ископае лого и затем осу;ществл ют зкскавапто оставщейс  части нижнего подступа с размещением горной ; массы в выработанном пространстве вскры ваемой заходки.The delivered length is achieved by the fact that the rock mass of the upper sub-steps from the temporary dump into the permanent re-excavation is carried out before the beginning of the lower sub-step OTpa6oiv, the lower sub-step is tested block by block; first of all, a part of the lower sub-accessory adjacent to the developed space is excavated, followed by excavation of mineral resources and then an axis; there are subscapes of the remaining part of the lower approach with the placement of the mountain; masses in the developed space of the opened entry.

Изобретение по сн етс  чертежом, на котором представлена схема разработки.The invention is illustrated in the drawing, which shows a design diagram.

Способ заключаетс  в следующем. Вскрышной уступ дел т, например, на три прдуступа. При пр мом ходе драглайн отрабатывает верхний подуступ и часть среднего в объеме позиций 1, 2, 3, 4, 5, отСЫП6Ш породу во временный отвал в объемеThe method is as follows. The overburden ledge is divided, for example, into three steps. During the forward run, the dragline works out the upper sub-step and part of the middle in the volume of positions 1, 2, 3, 4, 5, and the rock into the temporary dump in the volume

SU742006072A 1974-03-20 1974-03-20 Method of open-cast mining mineral field formations SU690182A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU742006072A SU690182A1 (en) 1974-03-20 1974-03-20 Method of open-cast mining mineral field formations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU742006072A SU690182A1 (en) 1974-03-20 1974-03-20 Method of open-cast mining mineral field formations

Publications (1)

Publication Number Publication Date
SU690182A1 true SU690182A1 (en) 1979-10-05

Family

ID=20578869

Family Applications (1)

Application Number Title Priority Date Filing Date
SU742006072A SU690182A1 (en) 1974-03-20 1974-03-20 Method of open-cast mining mineral field formations

Country Status (1)

Country Link
SU (1) SU690182A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5636903A (en) * 1993-09-14 1997-06-10 Bhp Australia Coal Limited Mining system for removing overburden

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5636903A (en) * 1993-09-14 1997-06-10 Bhp Australia Coal Limited Mining system for removing overburden

Similar Documents

Publication Publication Date Title
SU690182A1 (en) Method of open-cast mining mineral field formations
SU812922A1 (en) Method of consolidating slopes
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU1831569A3 (en) Mining of mineral deposits
SU706530A1 (en) Trenching method
SU608970A1 (en) Method of filling-up mined-out space
SU723144A1 (en) Method of forming a cutting-off slit
SU703661A1 (en) Method of excavating gently sloping mineral beds
SU1751332A1 (en) Method of mining steep coal seams prone to gas-dynamic effects
SU855209A1 (en) Method of caving overlapping rocks
SU894196A1 (en) Method of mining deposits of unstable ores
SU398747A1 (en) METHOD FOR DEVELOPING THE USEFUL PURCHASED
SU887809A1 (en) Method of mining sloping and gently sloping coal beds
SU134242A1 (en) Chamber of mineral development system
SU581282A1 (en) Method of mining thick ore bodies
SU702170A1 (en) Method of mining thick steep coal seams
SU99209A1 (en) The method of hooking panels and blocks
RU1776793C (en) Method for working steep outburst-hazardous formations
RU1819997C (en) Method for mineral bed mining by stopes
SU622978A1 (en) Method of open-cut mining of mineral deposits
RU2099526C1 (en) Method for mining of gently dipping contiguous potassium beds
GB1252244A (en)
RU1786264C (en) Method for mining mineral deposits
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
SU1317128A1 (en) Method of mining thick ore deposits