SU66989A1 - Prefab building - Google Patents

Prefab building

Info

Publication number
SU66989A1
SU66989A1 SU40025A SU40025A SU66989A1 SU 66989 A1 SU66989 A1 SU 66989A1 SU 40025 A SU40025 A SU 40025A SU 40025 A SU40025 A SU 40025A SU 66989 A1 SU66989 A1 SU 66989A1
Authority
SU
USSR - Soviet Union
Prior art keywords
columns
prefab building
beams
building according
installation
Prior art date
Application number
SU40025A
Other languages
Russian (ru)
Other versions
SU13732A1 (en
Inventor
Н.А. Залевский
Original Assignee
Н.А. Залевский
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application granted granted Critical
Publication of SU13732A1 publication Critical patent/SU13732A1/en
Application filed by Н.А. Залевский filed Critical Н.А. Залевский
Priority to SU40025A priority Critical patent/SU66989A1/en
Publication of SU66989A1 publication Critical patent/SU66989A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Изобретение- относитс  к конструкции сборных зданий, в которых применены колонны с консол ми, несущими нерекрытие, и заклю).чаетс  в том, что колонны св заны между собой при номощи горизонтальных рам, укрепленных своими углами на концах консолей. На колонны могут быть уложены выполненные в форме лотков балки, на которые опираютс  элементы крыши.The invention relates to the construction of prefabricated buildings in which columns are used with consoles bearing a non-opening, and consists in the fact that the columns are interconnected by means of horizontal frames reinforced with their corners at the ends of the cantilevers. Beam-shaped beams, on which the roof elements are supported, can be laid on the columns.

На чертеже фиг. 1 изображает пример выполнени  железобетонного здани  согласно изобретению в вертикальном разрезе; фиг. 2 - горизонтальный разрез - вид снизу; фиг. 3 - план расположени  рам, балок и опорных плит; фиг. 4 - схему последовательности монтажа сборного перекрыти , фиг. 5-соединение балок, с колонной; фиг. 6 - план крыши; фиг. 7- составные части сборного здани  и фиг. 8 - схема конструкции в плане , при значительном рассто нии между колоннами.In FIG. 1 shows an exemplary embodiment of a reinforced concrete building according to the invention in vertical section; FIG. 2 - horizontal section - bottom view; FIG. 3 shows the layout of the frames, beams and base plates; FIG. 4 is a diagram of the assembly sequence of the precast ceiling; FIG. 5-connection of beams, with a column; FIG. 6 - roof plan; FIG. 7 are components of a prefabricated building; and FIG. 8 is a diagram of the structure in plan, with a considerable distance between the columns.

В изображенном на чертеже примере применены колонны различных типов /, 2, 3, 4, 5 и 2 (фиг. 7). Тип колонны соответствует ее положению в здании:In the example shown in the drawing, columns of various types I, 2, 3, 4, 5 and 2 are applied (Fig. 7). The type of the column corresponds to its position in the building:

углова  колонна, бокова , основна  и т. д. Колонна выполн етс  с вутами За (фиг. 4) или капителью Зг,  вл юш,ейс  стаканом дл  ствола колонны. Заливка цементным раствором сборной крестовины (образуемой консол ми) осуществл етс  через отверстие Зв. Крепление металлической рамы 7 к консол м производитс  посредством анкеров 36. Квадратные , железобетонные плиты с выступами 6а (фиг. 5) надеваютс  на крестовины и служат опорой дл  железобетонных лотков 8, укладываемых во всех направлени х и  вл ющихс  в свою очередь опорой дл  базы 9 под фонарь 11 с крышкой 12. В безфонарной части перекрыти  (фиг. 1) примен етс  четырехскатна  крышка 1,0. Над фонар ми могут быть предусмотрены вентил ционные устройства 13. Дл  внутренних водостоков в балкахлотках 8 предусмотрены отверсти  8а.angular column, lateral, main, etc. The column is made with the input Za (Fig. 4) or the capital Zg, which is a glass for the barrel of the column. The cement mortar of the combined cross (formed by the consoles) is poured through the hole of Sv. The fastening of the metal frame 7 to the brackets is made by means of anchors 36. Square, reinforced concrete plates with protrusions 6a (Fig. 5) are put on crosses and serve as a support for reinforced concrete trays 8 that are laid in all directions and are in turn supporting the base 9 under the lantern 11 with a lid 12. In the non-ceiling part of the ceiling (Fig. 1) a chetyrehskatnaya lid 1.0 is used. Ventilation devices 13 may be provided above the lanterns. Holes 8a are provided for internal drainage in the beams 8.

Работы по возведению здани  производ тс  в следующем пор дке .The construction works are carried out in the following order.

До начала строительства разрабатываетс  проект организации работ с учетом наличи  механизмовPrior to construction, a project for the organization of work is developed taking into account the availability of mechanisms

и местнШх средстй Стройки. Все элементы покрытий поступают с завода на стройку точно замаркированными . Наиболее громоздкие части транспортируютс  в разобранном , компактном виде. Склад готовых конструкций целесообразно организовать у железнодорож ного пути с устройством между ним и складом параллельного пути дл  крана. Последний производит выгрузку конструкций, прибывающих по железной дороге на платформах . Перемещение конструкций на монтажной площадке возможно различными способами: на крюке железнодорожного крана; на платформах , перемещаемых железно.дорожным краном, производ щим погрузку конструкций; на платформах или салазках с помощью мотовозов или тракторов; вручную на вагонетках.and local construction tools. All elements of the coating come from the factory to the construction site accurately labeled. The most bulky parts are transported in a disassembled, compact form. It is advisable to arrange a warehouse of finished structures near the railway with a device between it and a warehouse parallel to the crane. The latter unloads structures arriving by rail on platforms. Moving structures on the installation site is possible in various ways: on the hook of a railway crane; on the platforms moved by the railway crane making loading of the structures; on platforms or sleds with the help of truck or tractors; manually on trolleys.

Последовательность монтажных работ: I) установка и выверка колонн , 2) установка консольных крестовин, 3) прив зка колонн металлическими рамами, 4) укладка опорных плит б и по ним лотков 8, 5) установка по бортам лотков крышек 10 и четырехскатных фо.нарных баз 9, 6) установка фонарей 11 (без остеклени ), 7) монтаж крышек фонар  12 или аэрационных козырьков 13, 8) залив швов сопр жений отдельных частей цементным раствором или асфальтовым гудроном, 9) остекление фонарей и покраска.The sequence of installation works: I) installation and alignment of columns, 2) installation of cantilever crosses, 3) slinging of columns with metal frames, 4) laying of base plates b and along them trays 8, 5) installation on the sides of the trays of covers 10 and four-sided forwards bases 9, 6) installation of lamps 11 (without glazing), 7) installation of covers of lantern 12 or aeration peaks 13, 8) flood of joints of interfaces of individual parts with cement mortar or asphalt tar, 9) glazing of lamps and painting.

Подъем и установка т желых колонн производитс  с помощью монтажного крана. Монтаж крыши возможно производить кранами, перемещающимис  по смонтированной части перекрыти  и ведущими навесную установку «впереди себ . При полумеханизированном монтаже возможно поднимать части с коротких стрел, укрепл емых за верхушки колонн.The lifting and installation of heavy columns is carried out using a mounting crane. It is possible to install the roof with cranes moving along the mounted part of the ceiling and leading the outboard installation in front. With semi-mechanized installation, it is possible to lift parts from short booms attached to the tops of the columns.

При этом способ креплени  стрел должен обеспсчивпть быструю перестановку их ir;i новую позицию .In this case, the method of fastening the arrows must provide a quick rearrangement of their ir; i new position.

Описанные выше и приведенные на чертеже решени  в основном касаютс  пролетов с сеткой колонн 6,0 X 6,0 м, 6,0 X 9,0 м, 6,0 X 12,0 м ,- весьма часто встре чаюшейс  в здани х среднего и легкого машиностроени , текстильной промышленности, складских и вспомогательных сооружени х коммунального строительства.The solutions described above and shown in the drawing mainly concern spans with a grid of columns of 6.0 X 6.0 m, 6.0 X 9.0 m, 6.0 X 12.0 m, which is quite common in buildings and light mechanical engineering, textile industry, storage and auxiliary facilities of municipal construction.

При осуществлении конструкции в здани х с большими рассто ни ми между колоннагйи целесообразно смежные рамы 7 св зывать между собой дополнительными балками 1.4 (фиг. 8), на которые опираютс  лотковые балки 8.When implementing the structure in buildings with large distances between the colonnades, it is advisable to connect adjacent frames 7 with additional beams 1.4 (Fig. 8), on which the tray beams 8 rest.

Предмет изобретени Subject invention

Claims (5)

1.Сборное здани4 с применением колонн, имеющих консоли, отличающеес  тем, что колонны св заны мелоду собой при помощи горизонтальных рам 7, укрепленных своими узлами на концах консолей .1. A prefab building with the use of columns having cantilevers, characterized in that the columns are tied together by means of horizontal frames 7, reinforced with their knots at the ends of the cantilevers. 2.Форма выполнени  сборного здани  по п. 1, о т л и ч а ю щ а   с   тем, что рамы 7 расположены своими сторонами под углом в 45° по отношению к консол м колонн.2. The form of the prefab building according to claim 1, of which is that the frames 7 are located on their sides at an angle of 45 ° relative to the columns of the columns. 3.Сборное здание по п.п. 1 и 2, отличающеес  тем, что на колонны уложены выполненные в форме лотков балки 8, на которые опираютс  элементы крыши 9, 10.3. The prefab building according to p. 1 and 2, characterized in that beams 8 in the form of trays are laid on the columns, on which the elements of the roof 9, 10 are supported. 4.Сборное здание по п.п. -3, о т л и ч а ю е е с   тем, что на колонны под к( иалок 8 уложены плиты 6.4. The prefab building according to p. -3, that is, with the fact that there are plates 6 on the columns under the cabinets (tales 8). 5.Сборное здание по п.н. 3 и 4, отличающеес  тем, что смежные рамы 7 св заны между собой дополнительными балками, на которые опираютс  лотковые балки 8.5. The prefab building according to p. 3 and 4, characterized in that the adjacent frames 7 are interconnected by additional beams on which the chute beams 8 are supported. 3 8 fiYnTrff, 0 j LUlLiJii3 8 fiYnTrff, 0 j LUlLiJii Фиг. 3FIG. 3 Фиг. 4FIG. four 1G
SU40025A 1941-01-18 1941-01-18 Prefab building SU66989A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU40025A SU66989A1 (en) 1941-01-18 1941-01-18 Prefab building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU40025A SU66989A1 (en) 1941-01-18 1941-01-18 Prefab building

Publications (2)

Publication Number Publication Date
SU13732A1 SU13732A1 (en) 1930-03-31
SU66989A1 true SU66989A1 (en) 1945-11-30

Family

ID=48246709

Family Applications (1)

Application Number Title Priority Date Filing Date
SU40025A SU66989A1 (en) 1941-01-18 1941-01-18 Prefab building

Country Status (1)

Country Link
SU (1) SU66989A1 (en)

Similar Documents

Publication Publication Date Title
DE69000188D1 (en) SHUTTERING DEVICE FOR CEILING.
US3748805A (en) Building structure and method of erecting same
CN204080843U (en) Movable plank house foundation structure
SU66989A1 (en) Prefab building
GB1446853A (en) Gantry cranes
CN109057309B (en) Suspension type operating platform and assembling and disassembling method thereof
JPH026185Y2 (en)
RU93010838A (en) METHOD OF CONSTRUCTION OF MONOLITHIC BUILDING AND MOBILE FORMWORK FOR ITS IMPLEMENTATION
JPH04146345A (en) Self-ascending device for large roof for architectural work, and constructing method for medium/high-rise building
SU1188274A1 (en) Method of erecting multistorey building with rigidity core by floor-lifting technique
JP2832278B2 (en) Building method
JPH1181679A (en) Construction for building
SU1263793A1 (en) Method of erecting buildings with prefabricated solid skeleton
SU1726703A1 (en) Method of constructing ferroconcrete span structure
JPH11125014A (en) Construction method of building
SU92040A1 (en) Coverage of promotions with crane rails
KR200200364Y1 (en) High building construction apparatus
JPH05171817A (en) Temporary house for all-weather type execution
JP2627705B2 (en) Automatic frame assembly method
JP2717154B2 (en) Building method
SU1735522A1 (en) Method for erection of pendant covering
JP2590671B2 (en) Construction method of steel frame using overhead crane frame
KR100195784B1 (en) Construction materials yard on a building
JP2536347B2 (en) Building construction method using traveling crane
SU1486577A1 (en) Method of erecting two-storey production building