KR200200364Y1 - High building construction apparatus - Google Patents

High building construction apparatus Download PDF

Info

Publication number
KR200200364Y1
KR200200364Y1 KR2020000013337U KR20000013337U KR200200364Y1 KR 200200364 Y1 KR200200364 Y1 KR 200200364Y1 KR 2020000013337 U KR2020000013337 U KR 2020000013337U KR 20000013337 U KR20000013337 U KR 20000013337U KR 200200364 Y1 KR200200364 Y1 KR 200200364Y1
Authority
KR
South Korea
Prior art keywords
floor
building
installation
rise building
pillar
Prior art date
Application number
KR2020000013337U
Other languages
Korean (ko)
Inventor
정용찬
Original Assignee
주식회사삼우공간건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사삼우공간건축사사무소 filed Critical 주식회사삼우공간건축사사무소
Priority to KR2020000013337U priority Critical patent/KR200200364Y1/en
Application granted granted Critical
Publication of KR200200364Y1 publication Critical patent/KR200200364Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

본 고안은 고층 건축물 시공장치에 관한 것으로, 특히 최상층 건축물을 구축하고 잭업(Jack-up)하면서 하층을 순차적으로 구축할수 있게 구성된 고층 건축물 시공장치에 관한 것이다.The present invention relates to a high-rise building construction apparatus, and more particularly, to a high-rise building construction apparatus configured to sequentially build a lower floor while building and jacking up a top-floor building.

따라서, 본 고안의 고층 건축물 시공장치는 건축하여야 할 건축물(A) 최상층에 1층계분을 신축하는 잭기둥(a)이 하층기둥에 설치되고, 최상층과 지붕(2)으로 이루어지는 최상층(Fm)이 구축되며, 최상층 하부 천장 주행크레인(Crane)에 건축부재가 가설되고, 조립장치(b)에 건축부재를 공급하는 수직승강장치(c)와, 지상부 처리장(G)에 설치되어 건축부재를 수평운반하는 차(Car)가 주행하는 수평운반장치(d)와, 각 장치의 자동제어장치(e)로 구성된다.Therefore, the high-rise building factory of the present invention is provided with a jack pillar (a), which expands and contracts the first floor on the uppermost floor of the building (A) to be built, and the uppermost floor (Fm) consisting of the uppermost floor and the roof (2). The building member is constructed on the uppermost floor running crane (Crane), the vertical elevating device (c) for supplying the building member to the assembling device (b), and installed on the ground treatment plant (G) to carry the building member horizontally. It consists of a horizontal conveying device (d) in which a car (Car) is traveling, and an automatic control device (e) of each device.

그러므로, 상승층을 구축할 때마다 승강로를 신연하며, 잭기둥에 지지된 상승층을 1층분 잭업하여 그 층 하부에 1층계 구축공간(K)을 형성하고, 운반장치로부터 순차적으로 건축부재를 운반하여 조립장치에 의하여 큰보, 작은보로 이루어지는구조물 및 판재를 조립하여 상기 상판재상의 콘크리트 타설장치를 설치하여 바닥 콘크리트를 타설하고 외벽조립장치(f)를 설치하여 외벽부재(6)를 소정 위치에 설치한다.Therefore, each time the building is constructed, the hoistway is stretched, the jacks supported by the jack pillars are jacked up for one floor, the first floor construction space K is formed under the floor, and the building members are sequentially transported from the transport device. By assembling device to assemble the structure and plate consisting of large beams and small beams to install the concrete placing device on the top plate to pour the floor concrete and to install the outer wall assembly device (f) to the outer wall member (6) in a predetermined position Install.

Description

고층 건축물 시공장치 {HIGH BUILDING CONSTRUCTION APPARATUS}High-rise building construction device {HIGH BUILDING CONSTRUCTION APPARATUS}

본 고안은 고층 건축물 시공장치에 관한 것으로, 종래 건축물 최상층을 잭업하여 구축하는 시공장치는, 구축하는 건축물의 하층 구조체에 가지주가 설치되고, 상기 가지주 상부에 건물 최상층으로 이루어지는 기둥·보·지붕이 구축된 지붕 구조체와, 상기 가지주를 하층을 반력으로 하여 상승되는 리프트 업(Lift-up)장치와, 가구 프레임에 천장 주행레일을 설치하고 수평 운반하는 트롤리 호이스트(Trolley-hoist)가 설치됨으로 구성된다.The present invention relates to a high-rise building construction apparatus, and the factory factory which jacks up and constructs the uppermost floor of a conventional building has a column head installed on the lower floor structure of the building to be constructed, and a pillar, beam, and roof made of the top floor of the building above the branch column. The built-up roof structure, lift-up device that is raised by using the lower column as a reaction force, and a trolley-hoist for horizontally carrying a ceiling running rail on the furniture frame are installed. do.

따라서, 양중장치를 구비한 건설장치에 의하여 리프트 업 장치에 연동한 기지주에 지지된 지붕 구조체를 상승하여 상기 양중장치로부터 지상으로 건축부재를 공급받아 천장주행레일을 주행하는 트롤리 호이스트에 의하여 설치 위치까지 운반하여 그 하층 구체를 조립하여 이하 상기 공정을 반복하여 상방으로 구축되고, 전천후형으로 기후에 좌우되자 않고 노동환경의 향상·자동화를 목적으로 한 건축물 시공장치이다.Therefore, the installation position by the trolley hoist to run the ceiling running rail by lifting the roof structure supported on the base column linked to the lift-up device by the construction device equipped with the lifting device and receiving the building member from the lifting device to the ground. It is a building construction device for the purpose of improving and automating the working environment without being dependent on the climate by all weather type by repeating the above process below by assembling the lower sphere by assembling.

최상층이나 가설지붕에 덮혀 전천후형으로 기후에 좌우되지 않고 하방으로 부터 상방으로 구축되는 고층 건축물 시공장치에 있어서는 상기 최상층이나 가설지붕을 상승시키는 수단으로서 가설 기둥에 리프트 업 장치를 장착하여 상승시키든가 본 설치기둥이나 기둥에 유압 잭 등에 의한 잭장치를 설치하여 상승하는 것이고, 그 대부분이 유압잭에 다른 구조체를 이용하여 실린더를 상하시켜 상승하는 것이지만, 유압 잭의 신축 길이의 범위(스트로크)가 짧고 수회에 걸쳐 반복조작되기 때문에 조작이 번잡하고, 또한 가설기둥에 지지되고 하부 구조체를 반력으로 하는 경우는 지붕 구조체 구조에도 한계가 있고, 최상층이나 죄하층 지붕 중량이 제약된다.In a high-rise building construction device that is covered by the top floor or temporary roof and is built up from the bottom without being influenced by the climate, it is possible to raise the top floor or temporary roof by attaching a lift-up device to the temporary column. The jack is installed by using a hydraulic jack or the like on an installation pillar or a column, and most of them are lifted up and down by using a structure other than the hydraulic jack. However, the extension length of the hydraulic jack is short (stroke) and can be raised several times. The operation is complicated because the operation is complicated, and the roof structure is limited when the supporting structure is supported by the temporary column and the lower structure is used as a reaction force, and the upper and lower roof weights are restricted.

또한, 구축에 수반되는 건축자재의 수직·수평운반은 선행하여 구축된 가설 지붕 이나 상방구조물 하방에 천장을 주행하는 천장 주행크레인의 전동으로 주행하는 호이스트는 와이어나 로프를 풀어 내 건물 외부나 내부 승강로로부터 특별한 지그나 받침대가 설치된 와이어를 이용하여 건축부재에 직접 볼을 설치하여 건축부재를 달아 매어 소정 위치에 수직·수평으로 운반하여 설치되어 있지만, 다음과 같은 문제가 있다.In addition, the vertical and horizontal transportation of building materials involved in the construction is performed in advance by the construction of hoist that runs by the electric power of the ceiling running crane that runs the ceiling under the temporary roof or upper structure. Although the ball is installed directly on the building member using a special jig or pedestal from the wire, the building member is hung and vertically and horizontally transported at a predetermined position. However, the following problems exist.

받침대가 설치된 와이어를 이용하여 건축부재에 직접 볼을 설치하여 상기 건축부재를 매어 내려 수직·수평으로 운반하는 운반에 있어서는 받침대가 설치된 와이어를 건축부재에 걸거나 해체하는 작업을 입력으로 수행하기 때문에 성력화를 할수 없고, 지그에의 착탈이나 받침대가 설치된 와이어를 이용한 볼 걸이는 달아 맨 위치가 불안하여 설치 위치가 정확하게 계측되지 않고 자동화에 적합하지 않다.In the case of transporting vertically and horizontally by placing the ball directly on the building member by using the wire on which the pedestal is installed, the work to hook or dismantle the wire with the pedestal on the building member is performed as an input. Can not be attached to the ball hanger using a wire attached or detached to the jig or the pedestal is attached to the uneasy position of the man is not accurately measured and unsuitable for automation.

또한, 수직운반과 수평운반이 동일한 운반장치에 의하여 수행되기 때문에, 운반·설치까지의 시간을 요하고, 고층이 됨에 따라 더욱 그 시간을 요한다.In addition, since vertical conveyance and horizontal conveyance are performed by the same conveying apparatus, it takes time until conveyance and installation, and as the height rises, it further requires time.

따라서, 본 고안은 상기 종래기술이 가진 문제점을 감안하여 고안된 것으로 그 목적으로 하는 바는 최상층 건축물을 구축하고 잭업하면서 하층을 순차적으로 구축하는 시공장치에 의하여 정밀도 양호한 시공관리와 구축되는 모든 공정에 있어서 건축부재의 운반·설치를 자동화하고, 위험한 높은곳 작업을 없에고 전천후에 의한 노동환경의 향상과 현장 작업자를 저감하고 성력효과와 공기단축에 의한 경제성이 우수한 고층 건축물 시공장치를 제공하는데 있다.Therefore, the present invention has been devised in view of the problems of the prior art, and its purpose is to construct a top floor building and build up jacks sequentially while constructing a lower floor sequentially, and in all processes of construction with good construction accuracy. It aims to automate the transportation and installation of building members, eliminate dangerous high-floor work, improve the work environment by all-weather and reduce on-site workers, and provide a high-rise building factory with excellent economic efficiency due to reduced impact and reduced air.

상기 목적을 달성하기 위하여 본 고안에 의한 고층 건축물 시공장치는 잭기둥과 최상층 보와 지붕으로 이루어지는 상승층, 상기 상승층의 하부천장에 설치된 주행레인, 상기 주행레인에 자유롭게 이동될 수있도록 현장된 조립장치, 승강로에 설치된 수직승강장치, 지상부에 자유롭게 이동될 수 있도록 위치한 수평운반장치, 가설기둥에 설치된 외장조립장치로 구성된다.In order to achieve the above object, the high-rise building factory according to the present invention has an elevated floor consisting of a jack pillar and a top beam and a roof, a traveling lane installed at a lower ceiling of the raised floor, and assembled on site so as to be freely moved to the traveling lane. It consists of a device, a vertical elevating device installed on a hoistway, a horizontal transport device located freely on the ground, and an external assembly device installed on a temporary pillar.

따라서, 본 고안에 의한 고층 건축물 시공장치에 의한 시공은, 상승층을 상 승하면서 구축할 때마다 승강로가 신연하고 상기 잭기둥에 지지된 상승층을 1층계분을 잭업하여 상승층 하부에 1층계분의 구축공간을 형성하고, 상기 잭기둥을 수축하여 상기 운반장치로부터 본 설치 기둥을 공급받아 조립장치에 의하여 본 설치기둥을 소정 위치에 운반하여 설치하고, 상기 본 설치 기둥 사이에 상기 운반장치로부터 큰보을 공급받아 조립장치에 의하여 큰보을 소정 위치에 설치하고, 이어 상기 운반장치로부터 작은보을 공급받아 큰보 사이에 작은보을 설치하고, 이어 상기 큰보·작은보에 의하여 구성된 프레임에 상기 운반장치로부터 공급되는 바닥재를 설치하고, 상기 바닥재에 조립장치 콘크리트 타설장치에 의하여 바닥 콘크리트를 타설하여 1층을 구측하는 공정으로 이루어지고, 상기 공정을 반족하여 하방으로부터 상방으로 소정 층수를 구축하고, 최종층을 구축한 후에는 잭기둥을 해체철거하여 본 설치 기둥과 교체하여 외장설치장치에 의하여 상승층에 앞서 설치된 외장부재를 소정 위치에 설치하고 그후 상기 각 장치를 해체철거하여 고층 건축물이 시공된다.Therefore, the construction by the high-rise building construction apparatus by this invention raises an elevated floor. When building while riding, the hoistway is stretched and jacks up one floor of the rising floor supported by the jack pillar to form a building space of one floor below the rising floor, and contracts the jack pillar to see from the conveying device. The installation pillar is supplied and transported and installed in the predetermined position by the assembly device, and the beam is supplied from the transportation device between the installation pillars, and the beam is installed in the predetermined position by the assembly device. Receiving small beams from the device and installing the small beams between the large beams, and then installing the flooring material supplied from the conveying device to the frame composed of the large beams and small beams, and placing the floor concrete by the assembly device concrete placing device on the flooring material It consists of the process of measuring one layer, and satisfy | fills the said process, After building the number of floors and building the final floor, the jack pillar is dismantled and dismantled and replaced with this installation column, and the exterior member installed in advance of the elevated floor by the external installation device is installed at a predetermined position, and then each device is dismantled and dismantled. High-rise buildings are constructed.

그리고, 상기 조립장치에는 기둥 전용 설치장치가 장비되어 있어 상기 운반장치로부터 본 설치 기둥을 공급받아 소정 위치에 운반하고, 상기 잭기둥을 수축하여 본 설치 기둥을 세워넣어 하부 기둥과 접합하여 설치하고, 이어 상기 조립장치에 설치되어 있는 큰보 설치장치에 의하여 상기 운반장치로부터 큰보을 공급받아 상기 본 설치 기둥 사이의 소정 위치에 큰보을 설치하고, 이어 상기 조립장치에 설치되어 있는 작은보 설치장치에 의하여 상기 운반장치로부터 작은보을 공급받아 상기 작은보을 상기 큰보 사이에 설치하고, 이어 상기 조립장치 바닥재 설치장치에 의하여 상기 큰보·작은보에 의하여 구성된 프레임에 상기 운반장치로부터 공급되 는 덱 플레이트(Deck plate), 바닥재 보강철근 등의 바닥재를 설치하고, 상기 바닥재상에 상기 조립장치 콘크리트 타설장치에 의하여 바닥 콘크리트를 타설하고, 이어 외장 장막벽은 상승층에 설치된 외장설치장치에 의하여 지상으로부터 소정 위치에 달아 올려 상기 위치에 설치함으로써 건축물 1층계를 구축하고, 이하 상기 공정을 반복하여 소정 층수를 구축하고, 최종층을 구축한 후에는 잭기둥을 해체철거하여 본 설치 기둥과 교체하여 상기 외장설치장치에 의하여 상승층에 앞서 설치된 외장부재를 소정 위치에 설치하고, 각 장치를 해체철거하여 소요계층 고층 건축물을 구축한다.In addition, the assembling device is equipped with a dedicated installation device for the pole is supplied with the installation pillar from the conveying device and transported to a predetermined position, the jack pillar is contracted to install the installation pillar to stand up and install the bottom pillar, Subsequently, when the beam is supplied from the conveying device by the beam mounting device installed in the assembly device, the beam is installed at a predetermined position between the mounting pillars, and then, by the beam mounting device installed in the assembly device. The small beam is supplied from the conveying device, and the small beam is installed between the large beams, and is then supplied from the conveying device to the frame constituted by the large beams and small beams by the assembly device bottom mounting device. Install flooring materials such as deck plate, floor reinforcement reinforcement, and the floor concrete is cast on the flooring material by the assembly device concrete placing device, and the exterior curtain wall is installed by the exterior installation device installed on the elevated floor. Building up the first floor of the building by attaching it to a predetermined position from the ground and installing it at the above position, and after repeating the above steps to build a predetermined number of floors, after the final floor is constructed, the jack pillar is dismantled and replaced with the main installation pillar. The exterior installation device is installed at a predetermined position by the exterior installation device at a predetermined position, and each device is dismantled and dismantled to construct a required hierarchical high-rise building.

또한, 건축부재 운반은 전용 운반차에 의하여 수평 운반하고, 상기 운반차를 수직 운반장치에 직접 이승하고, 수직 운반장치에 의하여 설치작업층에까지 운반하고, 천장부에 주행이 자유롭게 현장된 조립장치의 각 설치장치에 의하여 소정 위치에 운반하고, 상기 위치에 설치되는 것이다.In addition, the conveyance of the building member is transported horizontally by a dedicated transporter, the transporter is transferred directly to a vertical transporter, transported to the installation work floor by a vertical transporter, and each of the assembling devices freely traveled on the ceiling. It is carried in a predetermined position by an installation apparatus, and is installed in the said position.

상기 조작은 자동제어장치실의 오퍼레이터(Operator)에 의하여 자동제어되는 조작장치를 조작함으로써 자동제어되고 각 부재는 소정위치에 운반·설치된다.The operation is automatically controlled by operating an operation device that is automatically controlled by an operator in the automatic control device room, and each member is transported and installed at a predetermined position.

또한, 잭기둥 1개마다 조작은 설치수순에 따라 조작하고, 상승층을 일제히 잭업할 때는 전기를 동조시켜 소정 높이에 자동상승한다.In addition, operation is performed for every one jack post according to the installation procedure, and when jacking up a floor simultaneously, electricity is synchronized and it automatically rises to a predetermined height.

이 때, 상승체에는 지붕부가 형성되어 있기 때문에, 풍우·직사일광을 막고 전천후에 대응하여 작업이 획기적으로 이루어짐과 아울러 작업환경이 향상된다.At this time, since the roof part is formed in the riser, the weather is prevented and direct sunlight, the work is performed in response to all weather, and the working environment is improved.

도 1은 본 고안에 관한 고층 건축물 시공장치를 이용한 하나의 실시예를 나타내는 일부 시공중인 건축물 종단면도이다.1 is a partial longitudinal cross-sectional view of a building under construction showing an embodiment using a high-rise building factory according to the present invention.

도 2는 실시예의 지상부에 설치된 건설장치 평면도이다.2 is a plan view of a construction apparatus installed in the ground portion of the embodiment.

도 3은 실시예의 상승층 하부에 설치된 주행레인과 조립장치 배치를 나타내는 조립작업층 평면도이다.Figure 3 is a plan view of the assembly operation floor showing the running lane and the assembly apparatus disposed below the raised floor of the embodiment.

도 4는 실시예로의 시공 공정인 잭기둥이 퇴축하는 상태를 나타내는 건축물 종단면도이다.It is a building longitudinal cross-sectional view which shows the state which jack pillar which is a construction process in an Example retreats.

도 5는 실시예의 다음 공정을 나타내고 잭기둥을 잭업하여 최상층과 그 하층에 구축공간을 형성하는 상태를 나타내는 종단면도이다.Fig. 5 is a longitudinal sectional view showing the next step of the embodiment and showing a state in which the jack pillar is jacked up to form a construction space on the uppermost layer and the lower layer.

도 6은 실시예의 다음 공정을 나타내고 기둥 조립장치에 의한 기둥설치를 나타내는 건축물 종단면도이다.6 is a longitudinal cross-sectional view of the building showing the next step of the embodiment and showing the column installation by the column assembling apparatus.

도 7은 실시예의 다음 공정을 나타내고 큰보 조립장치에 의한 큰보설치를 나타내는 건축물 종단면도이다.7 is a longitudinal cross-sectional view of the building showing the next step of the embodiment and showing the beam installation by the beam assembly device.

도 8은 실시예의 다음 공정을 나타내고 작은보 조립장치에 의한 작은보설치를 나타내는 건축물 종단면도이다.8 is a longitudinal cross-sectional view of the building showing the next step of the embodiment and showing the beam installation by the beam assembly device.

도 9는 실시예의 다음 공정을 나타내고 바닥 조립장치에 의하여 바닥재설치 와, 콘크리트 타설장치에 의하여 바닥 콘크리트 타설과 외장조립장치에 의한 외장설치를 나타내는 건축물 종단면도이다.Figure 9 shows the next process of the embodiment and flooring installation by floor assembly apparatus And, it is a longitudinal cross-sectional view of the building showing the concrete installation by the concrete placing device and the exterior installation by the exterior assembly device.

도 10은 실시예에 의한 건축물 시공수순을 나타내는 플로우챠트도이다.10 is a flowchart showing the building construction procedure according to the embodiment.

〈 도면의 주요부분에 대한 부호의 설명 〉<Description of reference numerals for the main parts of the drawings>

A : 건축물 Fm : 상승층A: Building Fm: Rising Floor

a : 잭기둥 a1: 잭기둥 신축로드부a: jack pillar a 1 : jack pillar expansion rod

a2: 협지장치 b : 조립장치a 2 : holding device b: assembly device

b′: 트래버서에 의하여 이행한 조립장치 c : 수직 승강장치b ′: Assembly device implemented by traverser c: Vertical hoisting device

c1: 승강가대 d : 수평운반장치c 1 : lifting platform d: horizontal transportation device

d1: 트래버서 e : 자동제어실d 1 : Traverser e: Automatic control room

e1: 자동제어장치 e2: 자동조작장치e 1 : Automatic control device e 2 : Automatic control device

f : 외장조립장치 g : 천장주행크레인f: Exterior assembly device g: Ceiling driving crane

G : 지상처리장 L : 주행레일G: Ground Treatment Plant L: Running Rail

L1,L2,L3: 주행레인 K : 구축공간L 1 , L 2 , L 3 : Running lane K: Construction space

Fx: 구축층 Fy: 최상층F x : Construction Floor F y : Top Floor

Fz: 옥탑F z : Rooftop

1 : 기둥 1′: 운반중인 기둥1: pillar 1 ′: pillar being transported

101 : 하층기둥 102 : 조립피스101: lower pillar 102: assembly piece

2 : 큰보 2′: 운반중인 큰보2: Big beam 2 ′: Big beam in transport

3 : 작은보 3 ′: 운반중인 작은보3: small beam 3 ′: small beam in transport

4 : 바닥 4′: 운반중인 바닥재4: Floor 4 ′: Flooring in transport

5 : 지붕 6 : 외벽부재(외장 장막벽)5: roof 6: outer wall member (exterior curtain wall)

10 : 승강로 11 : 가이드레일10: hoist 11: guide rail

20 : 기둥설치장치 22 : 큰보 설치장치20: pillar mounting device 22: taebo mounting device

24 : 작은보 설치장치 26 : 바닥 설치장치24: small beam mounting device 26: floor mounting device

27 : 콘크리트 타설장치 28 : 신축식 콘크리트 공급관27: concrete pouring device 28: stretchable concrete supply pipe

29 : 콘크리트 타설구 30 : 튀어 나온 수평 보29: concrete pouring 30: protruding horizontal beam

31 : 가설기둥 32 : 전동체인블럭31: temporary column 32: electric chain block

40 : 가설울타리40: temporary fence

이하 본 고안에 관한 고층 건축물 시공장치에 관하여 도시된 실시예에 의하 여 설명한다.By the embodiment shown below for a high-rise building construction apparatus according to the present invention Explain.

도 1은 도 1은 본 고안에 관한 고층 건축물 시공장치를 이용한 하나의 실시예를 나타내는 일부 시공중인 건축물 종단면도이다.1 is a longitudinal cross-sectional view of a building part of the construction showing one embodiment using a high-rise building factory factory according to the present invention.

A는 본 고안의 고층 건축물 시공장치에 의하여 시공중인 건축물로 기둥(1)과 큰보(2) 작은보(3) 바닥(4) 지붕(5) 및 외벽(6)(외장 장마벽)으로 구성되고, 본 실시예에 있어서는 F1으로부터 Fn층까지 구축되어 Fx는 구축중인 작업층을 나타낸다.A is a building under construction by the high-rise building construction device of the present invention, which is composed of a pillar (1), a large beam (2) a small beam (3) a floor (4) a roof (5) and an outer wall (6) In this embodiment, F 1 to F n are constructed and F x represents the working layer under construction.

먼저, 건설장치 구성에 관하여 설명하면 구축하여야 할 건축물 옥탑(Fz)을 포함하는 최상층(Fy)으로 이루어지는 상승층(Fm)과, 상기 상승층(Fm)을 잭업하는 잭기둥(a)과, 최상층 하부 천장에 가설한 주행레일(L)에 주행이 자유롭게 현장된 조립장치(b)와, 지상층(G)에 설치된 수평 운반장치((d)와, 상기 상승층(Fm)에 배설된 배설된 자동제어실(e)과 외벽설치장치(f)와 지상 처리장(G)에 배설된 천장주행 크레인(g), e1,e2는 자동제어실(e)에 설치한 자동제어장치 및 자동제어장치 및 자동조작장치으로 구성되어 있다.First, a description will be given of the construction device configuration ascending layer (F m ) consisting of the top floor (F y ) including the building rooftop (F z ) to be built, and jack pillar (a) jack-up the rising floor (F m ) ), The assembling device (b), which is free to travel on the running rail (L) installed on the lower ceiling of the uppermost floor, the horizontal conveying device (d) installed on the ground floor (G), and the rising floor (F m ). Exposed automatic control room (e) and external wall installation device (f) and ceiling running cranes (g), e 1 and e 2 installed in the ground treatment plant (G) are installed in the automatic control room (e); It is composed of automatic control device and automatic control device.

도 2는 실시예의 지상부에 설치된 건설장치 평면도이며, 도 3은 실시예의 상승층 하부에 설치된 주행레인과 조립장치 배치를 나타내는 조립작업층 평면도이다.Figure 2 is a plan view of a construction device installed on the ground portion of the embodiment, Figure 3 is a plan view of the assembly operation floor showing the arrangement of the running lane and the assembly device installed on the lower floor of the embodiment.

도 4 내지 도 9를 참조하여 실시예의 시공 수순을 설명하면 다음과 같다.Referring to Figures 4 to 9 the construction procedure of the embodiment is as follows.

도 4는 실시예로의 시공 공정인 잭기둥이 퇴축하는 상태를 나타내는 건축물 종단면도로서, 건축하여야 할 건축물 옥탑을 포함하는 최상층(F)에 1층계분을 신축 하는 잭기둥(a)을 구축층(Fx))인 잭기둥이 수축된 상태에서 본 설치 기둥(101)에 설치되고, 상기 건설장치가 설치되어 있다.4 is a longitudinal section of the building showing the state in which the jack pillar, which is a construction process according to the embodiment, is retracted, and a jack pillar (a) that stretches one story on the top floor F including a building rooftop to be built is a construction layer. The jack pillar (F x) ) is installed on the mounting pillar 101 in a contracted state, and the construction device is installed.

F1,F2는 이미 구축되어 있다.F 1 and F 2 are already built.

a1은 잭기둥(a) 신축로드, 30은 튀어 나온 수평보, 31은 가설기둥, 32는 전동체인블럭, 40은 가설울타리, 10은 수직 승강장치(c) 승강로 이다.a 1 is a jack pillar (a) extension rod, 30 is a horizontal beam protruding, 31 is a temporary pillar, 32 is a chain chain block, 40 is a temporary fence, 10 is a vertical hoist (c) hoistway.

도 5는 실시예의 다음 공정을 나타내고 잭기둥을 잭업하여 최상층과 그 하층에 구축공간을 형성하는 상태를 나타내는 종단면도로서, 잭기둥의 모든 1층계분을 잭업하여 최상층과 그 하층에 구축 공간(K)을 형성한다.Fig. 5 is a longitudinal cross-sectional view showing the next step of the embodiment and showing a state in which the jack pillar is jacked up to form a building space at the top floor and a lower floor thereof, and the first floor of the jack pillar is jacked up to have a building space K at the top floor and the lower floor thereof. ).

도 6은 실시예의 다음 공정을 나타내고 기둥 조립장치에 의한 기둥설치를 나타내는 건축물 종단면도로서, 본 설치 기둥(1′)은 지상부 처리장(G), 주행크레인(g)에 의하여 트럭으로부터 내려져 기복장치의 설치 운반차(d2)(도 2참조)에 이재하고, 수평으로 운반하고 그대로 수직 운반하는 승강가대(c1)로 이재하여 조립장치로 운반된다.Fig. 6 is a longitudinal cross-sectional view of the building showing the next step of the embodiment and showing the column installation by the column assembling device, wherein the installation column 1 'is lowered from the truck by the ground treatment plant G and the traveling crane g to provide the relief device. It is carried to the installation transport vehicle d 2 (refer FIG. 2), and it is transferred to the assembling apparatus c 1 which carries it horizontally and carries it vertically.

조립장치(b)에는 기둥 설치장치(20)가 장비되어 있어 상기 기복장치가 설치된 기둥 운반차(d2)에 의하여 기둥은 기립되어 기둥 설치장치(20)에 부착되어 천장에 설치되어 있는 주행레인(L1∼L3)을 트래버서(Traverser)(d1)를 개재하여 소정 위치에 운반되고(도 3참조), 잭기둥 신축로드(a1)를 일단 퇴축하여 상기 기둥을 세워 넣고, 조립피스(102)에 의하여 가고정하고, 잭기둥 협지장치(a2)에 의하여 기둥 두부를 협지하여 고정되고 기둥 접합부는 후각 용접된다.The assembling device (b) is equipped with a column mounting device 20, the column is standing by the column carrier (d 2 ) with the ups and downs installed, the traveling lane is mounted on the ceiling mounting device 20 is installed on the ceiling (L 1 to L 3 ) are transported to a predetermined position via a traverser (d 1 ) (see FIG. 3), and the jack pillar telescopic rod (a 1 ) is once retracted to erect the column and assemble decided to go by the piece 102, the jack pole sandwiched and fixed by sandwiching the poles by the head device (a 2) column Connections are olfactory welding.

도 7은 실시예의 다음 공정을 나타내고 큰보 조립장치에 의한 큰보설치를 나타내는 건축물 종단면도로서, 큰보 설치는 지상부 처리장(G) 주행크레인(g)에 의하여 트럭으로부터 내려 큰보 운반차(d3)에 이재하고, 처리장(G)위를 수평으로 운반하고 그대로 수직 운반하는 승강가대(c1)에 이승하여 조립장치로 운반된다.7 is a longitudinal cross-sectional view of the building showing the following steps of the embodiment and showing the installation of the beams by the beam assembly device, where the beam beams are displaced from the truck by the driving crane g of the ground treatment plant (G) and transferred to the beam carriage (d 3 ). And, it is transported to the assembling apparatus by moving to the lifting platform (c 1 ) to transport the processing plant (G) horizontally and vertical transport as it is.

조립장치(b)에는 큰보 설치장치(22)가 장비되어 있고, 상기와 같이 처리장(G)으로부터 운반되어 온 큰보(2)가 설치부착되어 천장에 설치되어 있는 주행레인(L1∼L3)에 의하여 트래버서(d1)를 개재하고 소정 위치에 운반되고 상린하는 상기 본 설치 기둥(1)사이에 설치된다.The assembly device (b) is equipped with a girder mounting device 22, and the traveling lanes L 1 to L 3 installed on the ceiling with the girder 2 carried from the processing plant G as described above. By means of the traverser (d 1 ) is installed between the main mounting pillar (1) which is transported and raised at a predetermined position.

도 8은 실시예의 다음 공정을 나타내고 작은보 조립장치에 의한 작은보설치를 나타내는 건축물 종단면도로서, 작은보(3)도 상기 큰보(2)와 마찬가지로 조립장치(b)에 운반된다.Fig. 8 is a longitudinal cross-sectional view of the building showing the next step of the embodiment and showing the beam installation by the beam assembly device, wherein the beam 3 is also conveyed to the assembly device b similarly to the beam 2.

상기 조립장치(b)에는 작은보 설치장치(24)가 장비되어 있고, 작은보 운반차(d)로부터 작은보설치장치(24)에 취입하고, 천장에 설치되어 있는 주행레인(L1∼L3)을 트레버서(d1)를 개재하여 소정 위치에 운반되고 상기 큰보(2) 사이에 설치되어있다.The assembling device (b) is equipped with a beam mounting device (24), which is blown into the beam mounting device (24) from the beam transporting vehicle (d), and runs on the ceiling (L 1 to L). 3 ) is transported to a predetermined position via the treverser (d 1 ) and is provided between the beams (2).

도 9는 실시예의 다음 공정을 나타내고 바닥 조립장치에 의하여 바닥재설치 와, 콘크리트 타설장치에 의하여 바닥 콘크리트 타설과 외장설치장치에 의한 외장설치를 나타내는 건축물 종단면도로서, 덱 플레이트나 보강철근 등의 바닥재(4′)의 상기와 마찬가지로 운반차(d)로 운반되어 조립장치(b) 바닥 설치장치(26)에 의하여 달아 내려져 큰보(2) 및 작은보(3)상에 배설되고 조립장치(b)에 장비된 콘크리트 타설장치(27)(신축하는 콘크리트 공급관(28)과 콘크리트 타설구(29)로 구성)에 콘크리트를 공급하여 바닥에 쿤크리트를 타설한다.Figure 9 shows the next process of the embodiment and flooring installation by floor assembly apparatus And, as a longitudinal section of the building showing the concrete installation by the concrete pouring device and the exterior installation by the exterior installation device, it is transported and assembled in the transportation vehicle d as in the case of the flooring material 4 'such as deck plates or reinforcing bars. Apparatus (b) Concrete placing apparatus 27 (extended concrete supply pipe 28), which is run down by the floor mounting apparatus 26 and disposed on the large beams 2 and the small beams 3 and equipped in the assembling apparatus b. And concrete to the concrete pouring port (29) to pour the concrete on the floor.

다음에 외벽설치장치(f)(상승층 상부에 튀어 나온 수평 보(30)와 수평 보 선단에 가설 기둥(31)이 수직 설치된 수평 보에는 전동체인불럭(32)이 메어 걸리고, 상기 수평 보는 구체 내부에 슬라이드 하도록 되어있다.)에 의하여 지상부로부터 외벽부재(6′)를 전동체인블럭(32)에 의하여 메어 올려 소정 위치에 설치된다.Next, the outer chain mounting device (f) (a horizontal beam 30 protruding from the upper floor and a horizontal beam on which a temporary column 31 is vertically installed at the tip of the horizontal beam is suspended by a chain chain block 32). The outer wall member 6 'is lifted from the ground by the rolling block 32 and installed at a predetermined position.

도면 중의 40(점선)은 상승층을 덮는 가설울타리이다.40 (dotted line) in a figure is a temporary fence which covers a rising layer.

상기한 각 장치는 각 공정수순에 따라 자동제어실(e)에 설치된 제어장치(e1)와 조작장치(e2)를 오퍼레이터가 조작하여 자동적으로 구동·정지 조작을 수행한다.Each of the above devices performs an operation of driving and stopping automatically by an operator operating the control device e 1 and the operating device e 2 provided in the automatic control room e in accordance with each process procedure.

이와같이 하여 상기 공정에 의하여 1층계를 구축하고, 상기 공정을 반복하여 소정 층수를 구축하고, 최종층을 구축한 후에는 잭기둥(a)을 해체철거하여 본 설치 기둥과 교제하여 외장설치장치 수평 들보(30)를 소정위치에 설치하고 각 장치를 해체철거하여 고층 건축물이 구축된다.In this way, the first floor system is constructed by the above steps, and the above steps are repeated to build a predetermined number of floors. After the final floor is constructed, the jack pillar (a) is dismantled and dismantled, and is associated with the present installation column. A high-rise building is constructed by installing 30 at a predetermined position and dismantling and dismantling each device.

도 10은 실시예에 의한 건축물 시공수순을 나타내는 플로우챠트도이다.10 is a flowchart showing the building construction procedure according to the embodiment.

본 고안에 관한 고층 건축물 시공장치는, 상기한 바와 같이 구축하여야 할 건축물 최상층에 1층계분을 신축하는 잭기둥이 하층 기둥에 설치되고, 잭기둥과 최상층과 지붕으로 이루어지는 상승층이 구축되며, 상기 상승층 하부에 평면적으로 망라된 주행레인이 설치되고, 상기 레인을 주행이 자유롭게 복수의 조립장치가 현장되며, 상기 잭기둥에 의하여 위 1층계분을 잭업하여 하층을 구축하는 작업공간을 형성하는 잭기둥은 하층 본 설치 기둥마다 설치되고, 상승층을 균등하게 지지되도록 건축물 규모에 따라 설치할 수 있을뿐 만 아니라, 특별한 반력을 필요로 하지 않고, 본 설치 기둥을 설치할 때마다 신축시켜 설치하고, 본 설치 기둥을 잭 지둥을 협지하기 때문에, 지진이나 풍압 등 수평응력에 대하여는 안전하게 작용될 수 있다.The high-rise building factory factory according to the present invention is installed on the lower pillar of the jack pillar to expand the first floor on the top floor of the building to be constructed as described above, and the elevated floor composed of the jack pillar, the top floor and the roof is constructed. A traveling lane covering a planar surface is installed below the rising floor, and a plurality of assembling devices are installed on the lane freely to travel, and a jack is formed to form a lower floor by jacking up the upper floor by the jack pillar. The pillars are installed on each lower pillar, and not only can be installed according to the size of the building to support the elevated floor evenly, but also require no special reaction force. Since the pillars sandwich the jack posts, they can be safely operated against horizontal stresses such as earthquakes and wind pressures.

또한, 1층계 구축시에 각 부재 공급을 수평 운반장치와 수직 운반장치에 의하여 구축하는 조립작업층에 운반하고, 조립장치는 각 부재 설치장치에 의하여 상기와 같이 운반된 건축부재를 공급받아 설치하고, 조립을 별도 공정으로 하기 때문에, 작업효율이 현격히 향상되어 건축공기가 단축된다.In addition, in the construction of the first floor, each member supply is transported to the assembly work floor to be constructed by the horizontal conveying device and the vertical conveying device, and the assembling device receives and installs the building members conveyed as described above by the respective device installation devices. Since the assembly is a separate process, the work efficiency is significantly improved and the construction air is shortened.

그리고, 상기 수평 운반장치 수직 운반장치 조립장치 및 조립장치의 설치장치에 의한 일련의 작업을 자동조작으로 조작함으로써 운반시간이 단축되고 성력화가 도모되며 안전성이 향상된다.Further, by operating the series of operations by the horizontal conveying device vertical conveying device assembling device and the installation device of the assembling device by automatic operation, the transport time is shortened, the performance is enhanced, and the safety is improved.

Claims (6)

고층 건축물 시공장치에 있어서,In high-rise building construction apparatus, 잭기둥과 최상층 보와 지붕으로 이루어지는 상승층, 상기 상승층의 하부천장에 설치된 주행레인, 상기 주행레인에 자유롭게 이동될 수있도록 현장된 조립장치, 승강로에 설치된 수직승강장치, 지상부에 자유롭게 이동될 수 있도록 위치한 수평운반장치, 가설기둥에 설치된 외장조립장치, 상기 각장치를 제어하는 제어장치로 구성되며, 상기 조립장치에 기둥 설치장치, 큰보 설치장치, 작은보 설치장치, 바닥 설치장치, 콘크리트 타설장치가 부착되어 각 공정을 수행할수 있도록 된 고층 건축물 시공장치An elevated floor consisting of a jack pillar and a top beam and a roof, a traveling lane installed on a lower ceiling of the elevated floor, an on-site assembling device for freely moving on the traveling lane, a vertical lifting device installed on a hoistway, and a freely movable part on the ground. It consists of a horizontal transport device located in such a way, an external assembly device installed on a temporary pillar, a control device for controlling each device, the pillar mounting device, the beam mounting device, small beam mounting device, floor mounting device, concrete placing device High rise building construction equipment 제 1항에 있어서,The method of claim 1, 상기 조립장치에 기둥 설치장치를 설치하는 것을 특징으로 하는 고층 건축물 시공장치.High-rise building construction apparatus characterized in that the installation device to the pole mounting device. 제 1항에 있어서,The method of claim 1, 상기 조립장치에 큰 보 설치장치를 설치하는 것을 특징으로 하는 고층 건축물 시공장치.High-rise building construction apparatus characterized in that the installation of a large beam installation device in the assembly device. 제 1항에 있어서,The method of claim 1, 상기 조립장치에 작은 보 설치장치를 설치하는 것을 특징으로 하는 고층 건축물 시공장치.High-rise building construction apparatus, characterized in that for installing the small beam installation device in the assembly device. 제 1항에 있어서,The method of claim 1, 상기 조립장치에 바닥 설치장치를 설치하는 것을 특징으로 하는 고층 건축물 시공장치.High-rise building construction apparatus characterized in that the installation of the floor installation device in the assembly device. 제 1항에 있어서,The method of claim 1, 상기 조립장치에 콘크리트 타설장치를 설치하는 것을 특징으로 하는 고층 건축물 시공장치.High-rise building construction apparatus characterized in that the concrete installation device is installed in the assembly device.
KR2020000013337U 2000-05-10 2000-05-10 High building construction apparatus KR200200364Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000013337U KR200200364Y1 (en) 2000-05-10 2000-05-10 High building construction apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000013337U KR200200364Y1 (en) 2000-05-10 2000-05-10 High building construction apparatus

Publications (1)

Publication Number Publication Date
KR200200364Y1 true KR200200364Y1 (en) 2000-10-16

Family

ID=19655782

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000013337U KR200200364Y1 (en) 2000-05-10 2000-05-10 High building construction apparatus

Country Status (1)

Country Link
KR (1) KR200200364Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100980806B1 (en) 2008-06-30 2010-09-10 주식회사 씨에스구조엔지니어링 Temporary construction system for the automation of building projects and construction method using the same
KR101794085B1 (en) 2009-02-09 2017-11-20 3엘-이노제니 인코포레이티드 Construction system and method for multi-floor buildings

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100980806B1 (en) 2008-06-30 2010-09-10 주식회사 씨에스구조엔지니어링 Temporary construction system for the automation of building projects and construction method using the same
KR101794085B1 (en) 2009-02-09 2017-11-20 3엘-이노제니 인코포레이티드 Construction system and method for multi-floor buildings

Similar Documents

Publication Publication Date Title
US5255489A (en) Construction apparatus for buildings and constructing method therewith
KR200200364Y1 (en) High building construction apparatus
JPH0483060A (en) Building construction
JP2957328B2 (en) Peripheral holding self-elevating construction method
JPH08333898A (en) Trestle for vertically and horizontally conveying building blocks
JP2003120037A (en) Construction lifting system for multistoried building
JP3212233B2 (en) Power plant construction method using overhead crane
JP7158304B2 (en) Transport system and installation method
JPH09137506A (en) Construction method of building
JPH08120936A (en) Method and device for constructing multistoried building
JPH10245994A (en) Temporary curing body
JPH08333813A (en) Building method of building unit for vertical and horizontal conveying
JPH08326323A (en) Constructing device for multistoried building
JPH11125014A (en) Construction method of building
JPH04131447A (en) Constructing method for building, and carrier device for construction
JPH09302936A (en) Construction method of building
JPH08312143A (en) Temporary frame device for construction
JPH08326321A (en) Construction of multistoried building
JP2835880B2 (en) High-rise building frame construction method
JP2802568B2 (en) Construction method
CN117585589A (en) Gantry type prefabricated part hoisting frame and application method
JPH04155033A (en) Execution method for building
JPH04333776A (en) Construction method for building and construction device used therefor
JPH08312144A (en) Temporary frame device for construction
JPH04231530A (en) Method for constructing main frames of high-rise building

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T601 Decision on revocation of utility model registration
LAPS Lapse due to unpaid annual fee