KR100980806B1 - Temporary construction system for the automation of building projects and construction method using the same - Google Patents

Temporary construction system for the automation of building projects and construction method using the same Download PDF

Info

Publication number
KR100980806B1
KR100980806B1 KR1020080062610A KR20080062610A KR100980806B1 KR 100980806 B1 KR100980806 B1 KR 100980806B1 KR 1020080062610 A KR1020080062610 A KR 1020080062610A KR 20080062610 A KR20080062610 A KR 20080062610A KR 100980806 B1 KR100980806 B1 KR 100980806B1
Authority
KR
South Korea
Prior art keywords
construction
rail
constructed
automated
building
Prior art date
Application number
KR1020080062610A
Other languages
Korean (ko)
Other versions
KR20100002643A (en
Inventor
박형석
권도형
이보형
강경인
안성훈
김대원
Original Assignee
주식회사 씨에스구조엔지니어링
고려대학교 산학협력단
두산건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 씨에스구조엔지니어링, 고려대학교 산학협력단, 두산건설 주식회사 filed Critical 주식회사 씨에스구조엔지니어링
Priority to KR1020080062610A priority Critical patent/KR100980806B1/en
Publication of KR20100002643A publication Critical patent/KR20100002643A/en
Application granted granted Critical
Publication of KR100980806B1 publication Critical patent/KR100980806B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/208Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from the side, e.g. by walls of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/01General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
    • B66C2700/012Trolleys or runways

Abstract

본 발명은 로봇에 의한 자동화건축을 실현할 수 있게 한 가설시스템과 이를 이용한 자동화 건축방법에 관한 것이다.The present invention relates to a hypothetical system that enables to realize automated construction by a robot and an automated construction method using the same.

본 발명의 자동화건축의 가설시스템은 선시공된 코어와 이미 시공완료된 건축부분에 안정적으로 지지될 수 있도록 구성된다는 점과 작업로봇이 시공할 건축부분 구석구석에 자유자재로 이동할 수 있게 구성된다는 점에 기술적 특징이 있다. 이를 위해 본 발명은 수직레일, 레일결속구, 지지프레임, 지지결속구, 수평궤도레일, 수평이동레일, 작업로봇을 필수적인 구성으로 제안한다.The construction system of the automated construction of the present invention is constructed so that it can be stably supported on the pre-built core and the already completed construction part, and the work robot can be freely moved to every corner of the construction part to be constructed. There is a characteristic. To this end, the present invention proposes a vertical rail, rail fasteners, support frames, support fasteners, horizontal track rails, horizontal moving rails, and work robots as essential components.

자동화, 가설, 레일, 로봇, 코어 Automation, Hypothesis, Rail, Robot, Core

Description

자동화건축의 가설시스템 및 이를 이용한 자동화 건축방법{Temporary construction system for the automation of building projects and construction method using the same}Temporary construction system for the automation of building projects and construction method using the same}

본 발명은 로봇에 의한 자동화건축을 실현할 수 있게 한 가설시스템과 이를 이용한 자동화 건축방법에 관한 것으로, 더욱 상세하게는 작업로봇을 시공할 건축부분의 구석구석까지 위치시킬 수 있도록 궤도레일과 수평이동레일을 구성함으로써 더욱더 효과적으로 자동화건축을 실현할 수 있게 한 가설시스템과, 이러한 가설시스템을 선시공된 코어 중앙에 타워크레인을 배치한 상태에 적용함으로써 최소의 건설장비로 효율적으로 작업을 수행할 수 있게 한 자동화 건축방법에 관한 것이다.The present invention relates to a hypothetical system that enables automated construction by a robot and an automated construction method using the same, and more specifically, a track rail and a horizontal movable rail to locate a corner of a construction part where a work robot is to be constructed. Construction system to make automation construction more effective by applying to the construction and automated construction that can efficiently work with the minimum construction equipment by applying the construction system to the tower crane centered in the pre-built core. It is about a method.

자동화건축이란 인력보다는 기계화된 장비를 이용하여 건축물을 시공하는 것을 말하며, 구체적으로 기계화된 장비 센서를 부착하여 사람이 일정한 방법, 규격, 시간을 입력하면 기계가 계속 같은 일을 반복적으로 수행하면서 건축물을 완성해 가는 것을 말한다. 여기서 기계화된 장비는 곧 작업로봇이 되겠다. 이와 같은 자 동화건축을 통해서는 작업로봇에 의한 작업수행으로 건설 인력의 절감뿐만 아니라 균일한 시공품질의 확보가 가능해지고, 나아가 공사기간의 단축효과로 인한 원가절감 등의 효과가 기대된다. Automated construction refers to constructing a building using mechanized equipment rather than manpower. Specifically, by attaching a mechanized equipment sensor, if a person enters a certain method, specification, and time, the machine continues to perform the same work repeatedly. I say to finish it. The mechanized equipment will soon become a working robot. Through such autonomous construction, the work performed by the work robot not only reduces construction manpower but also ensures uniform construction quality, and furthermore, it is expected to reduce costs due to the shortening of construction period.

자동화건축을 실현하기 위해서는 작업로봇의 자유로운 이동이 가능한 가설시스템의 마련이 전제되어야 하는데, 도 1은 자동화건축을 위한 종래의 가설시스템을 보여준다.In order to realize automated construction, the provision of a hypothetical system capable of freely moving work robots is premised. FIG. 1 shows a conventional hypothetical system for automated construction.

도 1(a)는 시공할 건축물의 건축선 밖으로 4개의 타워크레인 포스트를 세우고 4개의 포스트 위로 상승되는 가설지붕을 씌운 후 가설지붕 아래에 작업로봇을 설치하여 한층 한층 순차적으로 공사를 수행할 수 있도록 구성한 예로서, The BIG CANOPY System으로 불리며, 주로 철근콘크리트 공사에 적용되는 방식이다. 이와 같은 가설시스템은 상당규모의 타워크레인 포스트 4개를 가설지지체로 활용하기 때문에 가설시스템은 전체적으로 규모가 거대해질 수밖에 없으며, 가설시스템의 규모 문제는 곧 공사비 문제(고가의 자재비, 설비 및 해체비용의 증대)로 이어진다.Figure 1 (a) is built so that four tower crane posts outside the construction line of the building to be constructed and covered the temporary roof rising above the four posts and then installed a work robot under the temporary roof to perform the construction in order For example, it is called The BIG CANOPY System and is mainly applied to reinforced concrete construction. Since such a temporary system uses 4 tower crane posts of considerable size as temporary supports, the temporary system is inevitably large in size, and the problem of the size of the temporary system is construction cost problem (high cost of material, equipment and dismantling cost). Increase).

도 1(b)는 도 1(a)의 방식을 철골 공사에 적용할 수 있도록 개선한 예로서, 소위 ABCS system으로 불린다. 이와 같은 가설시스템은 전체적으로 The BIG CANOPY System과 동일하며, 다만 건축선 밖의 4개의 타워크레인 포스트 위로 가설지붕 대신에 최상층을 구축하여 최상층을 그 하부층 공사를 위한 작업공간으로 활용할 수 있게 한다는 점에서 차이가 있다. ABCS system은 The BIG CANOPY System과 마찬가지로 건축선 밖의 4개의 타워크레인 포스트를 필수적으로 마련되어야 하 기 때문에, 공사비 문제는 여전히 해결되지 못한 채 남아있다.Figure 1 (b) is an example improved to be applicable to the steel frame construction of the method of Figure 1 (a), so-called ABCS system. This hypothesis system is the same as the BIG CANOPY System as a whole, except that the top floor can be used as a work space for the construction of the lower floor by constructing the top floor instead of the temporary roof over the four tower crane posts outside the construction ship. . As with the BIG CANOPY System, the ABCS system must be equipped with four tower crane posts off the construction line, so the cost problem remains unresolved.

도 1에서 도시한 가설시스템 문제(건축선 밖의 4개의 타워크레인 포스트에 기인한 공사비 문제)를 해결하고자 SMART system, Factory Automation, T-UP으로 불리는 방식이 제안되었다. In order to solve the hypothesis system problem (construction cost due to four tower crane posts outside the construction ship) shown in Figure 1, a scheme called SMART system, Factory Automation, T-UP has been proposed.

새롭게 제안된 방식 모두는 ABCS system과 마찬가지로 최상층을 그 하부층 공사를 위한 작업공간으로 활용하면서 최상층에서 완성한 하부층을 최상층 아래로 적층하여 완성하는 방식이라는 점에서 동일하며, 다만 ABCS system은 최상층을 건축선 밖에 마련된 별도의 포스트가 지지하도록 구성되는데 비해 이들 방식(SMART system, Factory Automation, T-UP)은 최상층을 그 아래의 이미 시공완료된 하부층이 지지하도록 구성된다는 점에서 차이가 있다. 다시 말해, 새롭게 제안된 이들 방식은 최상층을 그 아래의 시공완료된 하부층(제1층)의 골조(보 또는 특수 설계된 기둥)에 지지하도록 한 후 최상층에서 시공할 하부층(제2층)을 조립시공하고, 이어 최상층을 제1층의 지지를 받으면서 상승시킨 후 최상층에서 작업된 제2층을 제1층 위에 적층시켜 시공완료하는 것이다. All of the newly proposed methods are the same as the ABCS system in that the top floor is used as a work space for the construction of the lower floor, and the bottom floor completed at the top floor is stacked below the top floor. The difference is that these schemes (SMART system, factory automation, T-UP) are configured to support the top layer underneath and the already completed underlayer. In other words, these newly proposed methods support the top layer to the frame (beam or specially designed column) of the finished lower layer (first layer) below, and then assemble the lower layer (second layer) to be constructed on the top layer. Then, the top layer is raised while being supported by the first layer, and the second layer worked on the top layer is laminated on the first layer to complete the construction.

그런데, 새롭게 제안된 방식은 최상층을 가설시스템으로 구성하면서 가설시스템 내에 크레인을 탑재하기 때문에 가설시스템은 규모가 커지면서 복잡해질 수밖에 없었다. 이는 가설시스템의 상승작업을 어렵게 하며, 나아가 사각지대 없는 작업로봇의 이동경로 확보를 어렵게 하는 문제로 이어진다.By the way, the newly proposed method consists of a crane system in the construction system while constructing the uppermost floor as a construction system. Therefore, the construction system becomes complicated as the scale increases. This makes it difficult to work up the hypothesis system, and furthermore, it leads to a problem that it is difficult to secure the movement path of the work robot without blind spots.

본 발명은 상기한 종래의 문제점을 개선하고자 개발된 것으로서, 전체적인 구조가 간소화되도록 구성함과 아울러 작업로봇을 시공할 건축부분의 구석구석까지 위치시킬 수 있도록 수평궤도레일과 수평이동레일을 적절하게 구성한 자동화건축의 가설시스템을 제공하는데 기술적 과제가 있다.The present invention was developed to improve the above-mentioned problems, and the horizontal track rail and the horizontal movable rail are properly configured to position the corners of the construction part to be constructed as well as to simplify the overall structure. There is a technical problem in providing a temporary construction system for automated construction.

본 발명은 이미 시공완료된 건축부분에 용이하게 구속될 수 있도록 지지결속구를 구성하여 안정적인 설치상태를 유지할 수 있게 한 자동화건축의 가설시스템을 제공하는데 다른 기술적 과제가 있다.The present invention has another technical problem to provide a construction system for automated construction that can maintain a stable installation state by configuring the support binding sphere to be easily constrained to the already completed construction part.

본 발명은 최소의 건설장비로 효율적인 작업을 수행할 수 있는 자동화 건축방법을 제공하는데 또 다른 기술적 과제가 있다.Another object of the present invention is to provide an automated construction method capable of performing efficient work with minimal construction equipment.

상기한 기술적 과제를 해결하기 위해 본 발명은, 선시공된 코어 주변의 건축부분을 로봇에 의한 자동화 건축방법으로 시공하기 위해 설치되는 가설시스템으로서, In order to solve the above technical problem, the present invention is a hypothetical system that is installed to construct a building part around the pre-built core by an automated building method by a robot,

시공할 건축부분과 만나는 코어에 고정설치되는 복수개의 수직레일; 상기 복수개의 수직레일 각각에 슬라이딩 가능하게 결속하는 복수개의 레일결속구; 상기 복수개의 레일결속구를 상호 연결하도록 설치되는 상부보강지지프레임; 일단부가 상기 레일결속구의 상부 또는 상부보강지지프레임의 상부에 결속하고 타단부가 시 공할 건축부분의 건축선 밖에 위치하도록 설치되는 복수개의 루프지지프레임; 상기 복수개의 루프지지프레임 각각의 타단부에 하향 결속하며 시공할 건축부분 아래의 이미 시공된 건축부분까지 내려오도록 마련되는 복수개의 수직지지프레임; 상기 복수개의 수직지지프레임의 하부를 상호 연결하도록 설치되는 하부보강지지프레임; 상기 하부보강지지프레임에 장착되며 시공할 건축부분 아래의 이미 시공된 건축부분에 걸리도록 설치되는 지지결속구; 상기 레일결속구 외측으로 레일결속구 하부에 구속 설치되며 선시공된 코어를 둘러싸도록 연속적으로 설치되는 제1수평궤도레일; 상기 수직지지프레임 내측으로 상기 제1수평궤도레일과 동일한 레벨에서 상기 수직지지프레임에 구속 설치되며 시공할 건축부분의 건축선 밖에서 시공할 건축부분을 둘러싸도록 연속적으로 설치되는 제2수평궤도레일; 상기 제1,2수평궤도레일을 연결하도록 설치되며 제1,2수평궤도레일을 따라 이동 가능하게 제1,2수평궤도레일에 결속하는 수평이동레일; 및, 상기 수평이동레일을 따라 이동 가능하게 수평이동레일에 결속 설치되는 작업로봇;을 포함하여 구성되되,A plurality of vertical rails fixed to a core that meets the construction part to be constructed; A plurality of rail fasteners slidably coupled to each of the plurality of vertical rails; An upper reinforcing support frame installed to interconnect the plurality of rail binding ports; A plurality of loop support frames having one end coupled to an upper portion of the upper or upper reinforcement support frame of the rail fastener and the other end positioned outside the construction line of the building portion to be constructed; A plurality of vertical support frames which are bound to the other end of each of the plurality of loop support frames and are provided to descend to the already constructed building part below the building part to be constructed; A lower reinforcement support frame installed to interconnect lower portions of the plurality of vertical support frames; A support binding hole mounted on the lower reinforcing support frame and installed to be hooked to an already constructed building part under the building part to be constructed; A first horizontal track rail that is restrained and installed below the rail binding hole and surrounds the pre-installed core outside the rail binding hole; A second horizontal track rail which is restrained and installed on the vertical support frame at the same level as the first horizontal track rail inside the vertical support frame and continuously installed to surround the building part to be constructed outside the building line of the building part to be constructed; A horizontal moving rail which is installed to connect the first and second horizontal track rails and is coupled to the first and second horizontal track rails to be movable along the first and second horizontal track rails; And, a working robot which is coupled to the horizontal moving rail to be movable along the horizontal moving rail.

상기 선시공된 코어 주변의 건축부분은 외곽부분이 H형강기둥으로 계획되는 철골구조이며, 상기 지지결속구는 하부보강지지프레임에 탈착가능하게 결속하는 결속판부;와, H형강기둥의 웨브에 끼워져 웨브와 플랜지에 동시에 맞닿도록 설치되는 끼움판부;으로 구성된 것임을 특징으로 하는 자동화건축의 가설시스템을 제공한다.The building part around the pre-built core is a steel structure in which the outer part is planned as an H-beam, and the support binding hole is a binding plate portion detachably bound to the lower reinforcing support frame; and, the web is inserted into the web of the H-beam. It provides a temporary construction system for automated construction, characterized in that consisting of; fitting plate portion is installed to abut on the flange at the same time.

본 발명에 따르면, 다음과 같은 효과가 기대된다.According to the present invention, the following effects are expected.

첫째, 작업로봇을 시공할 건축부분의 구석구석까지 위치시킬 수 있도록 수평궤도레일과 수평이동레일을 적절하게 구성하기 때문에 더욱더 효과적으로 자동화건축을 실현할 수 있다. 즉, 수평궤도레일의 연속적인 설치가 가능하고 작업로봇이 결속되는 수평이동레일이 수평궤도레일에 이동가능하게 결속되기 때문에 작업로봇은 사각지대 없이 시공할 건축부분 전구간에 걸쳐 수평이동레일과 수평궤도레일을 따라 이동하면서 작업을 수행할 수 있는 것이다.First, since the horizontal track rail and the horizontal moving rail are properly configured to position the work robot to every corner of the construction part to be constructed, it is possible to realize the automation architecture more effectively. That is, since the horizontal track rails can be continuously installed and the horizontal rails to which the work robot is bound are movably bound to the horizontal rails, the work robot can move horizontally between the horizontal rails and the horizontal tracks throughout the construction part to be constructed without blind spots. You can do it by moving along the rails.

둘째, 이미 시공완료된 건축부분에 용이하게 구속될 수 있도록 지지결속구를 구성하기 때문에 가설시스템의 안정적인 설치상태를 쉽게 유지할 수 있으며, 그 결과 시공상의 안전성을 확보할 수 있다.Second, since the support binding sphere is configured to be easily constrained to the already completed construction part, stable installation of the temporary system can be easily maintained, and as a result, construction safety can be secured.

셋째, 하나의 타워크레인을 이미 시공된 코어 중앙에 배치한 상태로 자동화 건축방법을 수행하기 때문에 최소의 건설장비로 효율적인 작업을 수행할 수 있으며, 그 결과 경제적인 공사가 가능해진다.Third, because the tower construction is carried out in the center of the already constructed core, the automated construction method can be performed efficiently with minimal construction equipment, resulting in economical construction.

이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

1. 자동화건축의 가설시스템1. Temporary system of automated construction

도 2는 본 발명에 따른 자동화건축의 가설시스템의 단면도이고, 도 3 내지 도 5는 각각 도 2의 가설시스템에서 지지프레임, 지지결속구의 설치상세, 수평궤도레일과 수평이동레일의 설치상세를 보여준다.Figure 2 is a cross-sectional view of the construction system of the automated construction according to the present invention, Figures 3 to 5 show the installation details of the support frame, the support fasteners, the installation of the horizontal track rail and the horizontal movable rail in the construction system of Figure 2, respectively .

본 발명의 자동화건축의 가설시스템은 선시공된 코어(C)와 이미 시공완료된 건축부분에 안정적으로 지지될 수 있도록 구성된다는 점과 작업로봇이 시공할 건축부분 구석구석에 자유자재로 이동할 수 있게 구성된다는 점에 기술적 특징이 있다. 이를 위해 본 발명은 수직레일(110), 레일결속구(120), 지지프레임(125, 130, 140, 145), 지지결속구(150), 수평궤도레일(160a, 160b), 수평이동레일(170), 작업로봇(180)을 필수적인 구성으로 제안한다. 이와 같은 구성으로 본 발명의 자동화건축의 가설시스템은 소위 건설공장(construction factory)으로서 건축물의 자동화 시공을 가능케 한다. 다만, 본 발명의 가설시스템은 종래의 자동화건축에서와는 달리 최상층을 구성하는 것이 아니며, 건물 완성 후에는 최종적으로 해체되는 가설구조체이다.Automated construction hypothesis system of the present invention is configured to be stably supported on the pre-constructed core (C) and the already completed construction part, and the work robot is configured to be able to move freely to every corner of the construction part to be constructed There are technical features at this point. To this end, the present invention is a vertical rail 110, rail fasteners 120, support frames 125, 130, 140, 145, support fasteners 150, horizontal track rail (160a, 160b), horizontal moving rail ( 170), the work robot 180 is proposed as an essential configuration. In such a configuration, the construction system of the automated construction of the present invention enables an automated construction of a building as a so-called construction factory. However, the hypothesis system of the present invention does not constitute the uppermost floor unlike the conventional automated construction, and is a temporary structure that is finally dismantled after the completion of the building.

본 발명을 적용하기 위해서는 코어(C)의 시공이 전제된다. 코어(C)는 엘리베이터, 계단 등의 공공부분이 한 곳에 집중되도록 설계된 부분으로, 건축물을 수직으로 관통하며, 보통 전단벽으로 둘러싸이도록 시공되는 부분이다. 본 발명은 이와 같은 코어(C)가 일부 또는 전부 시공된 후에야 적용할 수 있다.In order to apply the present invention, construction of the core C is premised. Core (C) is a part designed to concentrate the public parts such as elevators, stairs, etc., and penetrates the building vertically, and is a part which is usually constructed to be surrounded by a shear wall. The present invention can be applied only after some or all of such cores C are constructed.

철골구조의 건축물에서도 코어(C)는 주로 (철골)철근콘크리트 구조로 시공되기 마련인데, 이를 감안하여 본 발명에서는 주변의 건축부분과 다른 구조로 시공되는 코어(C)를 먼저 시공한 후 선시공된 코어(C)를 가설시스템을 지지하기 위한 1차적인 지지점으로 이용하고 있는 것이다. In the structure of steel structure core (C) is mainly to be constructed as a (steel) reinforced concrete structure, in view of this, in the present invention, the core (C) to be constructed in a different structure from the surrounding building parts first before construction The core (C) is used as the primary support point for supporting the hypothesis system.

수직레일(110)은 복수개가 시공할 건축부분과 만나는 코어(C)에 고정설치되는 구성이다. 코어(C)가 (철골)철근콘크리트 구조로 시공된다면, 수직레일(110)은 코어(C) 시공과정에서 미리 매입시키는 방법으로 설치할 수 있으며, 또는 코어(C) 시공과정에서 수직레일(110)이 설치될 곳에 매입철물을 설치한 후 코어(C)의 시공이 완성되면 매입철물에 연결하는 방법으로 설치할 수 있다.Vertical rail 110 is a configuration that is fixed to the core (C) that meets a plurality of construction parts to be constructed. If the core (C) is constructed of a (steel) reinforced concrete structure, the vertical rail 110 may be installed by pre-buying in the core (C) construction process, or the vertical rail 110 in the core (C) construction process After installing the embedded hardware to be installed where the core (C) construction is completed by connecting to the embedded hardware.

레일결속구(120)는 상기 복수개의 수직레일(110) 각각에 슬라이딩 가능하게 결속하는 구성으로, 이러한 레일결속구(120)는 본 발명에 따른 가설시스템을 적절한 시공위치로 상승시키는 구성이 된다. 상기 레일결속구(120)는 유압잭 등의 작동으로 수직레일(110)을 따라 슬라이딩하면서 상승하게 된다.Rail fasteners 120 are configured to slidably bind to each of the plurality of vertical rails 110, such a rail fasteners 120 is configured to raise the temporary system according to the invention to an appropriate construction position. The rail binding hole 120 is raised while sliding along the vertical rail 110 by the operation of the hydraulic jack.

지지프레임은 본 발명에 따른 가설시스템에서 골조를 이루는 구성으로, 본 발명에서는 도 3에서와 같이 상부보강지지프레임(125), 루프지지프레임(130), 수직지지프레임(140), 하부보강지지프레임(145)의 조립을 제안한다.The support frame is a structure forming a frame in the hypothesis system according to the present invention, in the present invention, as shown in Figure 3 the upper reinforcement support frame 125, the loop support frame 130, vertical support frame 140, lower reinforcement support frame Propose assembly of 145.

상부보강지지프레임(125)은 복수개의 레일결속구(120)를 상호 연결하도록 설치되는 구성이다. 루프지지프레임(130)은 일단부가 상기 레일결속구(120)의 상부 또는 상부보강지지프레임(125)의 상부에 결속하고 타단부가 시공할 건축부분의 건축선 밖에 위치하도록 설치되는 구성이다. 수직지지프레임(140)은 상기 복수개의 루프지지프레임(130) 각각의 타단부에 하향 결속하며, 하부 끝이 시공할 건축부분 아래의 이미 시공된 건축부분까지 내려오도록 마련되는 구성이다. 하부보강지지프레임(145)은 수직지지프레임(140)의 하부를 상호 연결하도록 설치되는 구성이다.The upper reinforcing support frame 125 is configured to be connected to each other a plurality of rail binding holes (120). The roof support frame 130 is configured such that one end is coupled to the upper portion of the rail binding hole 120 or the upper reinforcement support frame 125 and the other end is positioned outside the construction line of the building part to be constructed. The vertical support frame 140 is downwardly bound to the other end of each of the plurality of loop support frames 130, the lower end is configured to be provided down to the construction part already under construction part to be constructed. The lower reinforcement support frame 145 is a component installed to interconnect the lower portion of the vertical support frame 140.

상기와 같은 지지프레임(125, 130, 140, 145)들은 서로 유기적으로 결합되어 본 발명에 따른 가설시스템을 하나의 체계적인 시스템으로 구현하면서 구조적인 안정성을 보장하는 역할을 한다. 지지프레임(125, 130, 140, 145)은 경량성을 확보할 수 있도록 설계하는 것이 바람직한데, 도 3에서는 트러스구조를 적절히 채택하여 구조적인 안정성과 경량성을 실현하고 있다. 또한, 구체적으로 도시하지는 않았지만 루프지지프레임(130)과 수직지지프레임(140)에는 보호망을 장치할 수 있는데, 상기 보호망은 외부 환경(바람, 빗물 등)으로부터 작업로봇(180)을 보호하고 아울러 건설 작업자들에게 전천후 시공환경을 제공하는 역할을 하게 된다.The support frames 125, 130, 140, and 145 as described above are organically coupled to each other to ensure structural stability while implementing the hypothesis system according to the present invention as one systematic system. The support frames 125, 130, 140, and 145 are preferably designed to ensure light weight. In FIG. 3, the truss structure is appropriately adopted to realize structural stability and lightness. In addition, although not shown in detail, the roof support frame 130 and the vertical support frame 140 may be equipped with a protection net, the protection net to protect the work robot 180 from the external environment (wind, rainwater, etc.) and also construction It will provide workers with an all-weather construction environment.

지지결속구(150)는 상기 하부보강지지프레임(145)에 장착되며, 시공할 건축부분 아래의 이미 시공된 건축부분에 걸리도록 설치되는 구성이다. 이러한 지지결속구(150)는 이미 시공된 건축부분이 본 발명에 따른 가설시스템의 2차 지지점이 되도록 역할한다. 이로써, 본 발명에 따른 가설시스템은 코어(C)에 1차적으로 지지됨과 동시에 이미 시공된 건축부분에 2차적으로 지지되어 안정적인 설치상태를 확보하게 된다. The support binding hole 150 is mounted on the lower reinforcing support frame 145, and is configured to be hooked to an already constructed building part under the building part to be constructed. The support binding sphere 150 serves to be a secondary support point of the construction system according to the present invention already built construction. Thus, the temporary system according to the present invention is primarily supported on the core (C) and at the same time secondary to the building parts already constructed to ensure a stable installation state.

특히, 본 발명에서는 지지결속구(150)에 의한 안정적인 지지점 확보를 위해 도 4와 같은 방식을 제안한다. 즉, 선시공된 코어(C) 주변의 건축부분을 외곽부분이 H형강기둥(H)으로 시공되는 철골구조로 계획하고, 지지결속구(150)를 플레이트 형태로 준비하여 이를 매개로 하부보강지지프레임(145)을 H형강기둥(H)에 구속시키는 것이다. 이를 위해 상기 지지결속구(150)는 하부보강지지프레임(145)에 탈착가 능하게 결속하는 결속판부(151);와, H형강기둥의 웨브(W)에 끼워져 웨브(W)와 플랜지(F)에 동시에 맞닿도록 설치되는 끼움판부(152);으로 구성된다.In particular, the present invention proposes a method as shown in Figure 4 to secure a stable support point by the support binding sphere 150. In other words, the construction part around the pre-installed core (C) to the steel frame structure of the outer portion is constructed by the H-beam (H), and the support binding sphere 150 is prepared in the form of a plate to support the lower reinforcement support frame 145 is to be bound to the H-beam (H). To this end, the support binding port 150 is a binding plate portion 151 which can be detachably attached to the lower reinforcement support frame 145; and is fitted to the web (W) of the H-beams to the web (W) and the flange (F). Consists of the fitting plate portion 152 which is installed to abut at the same time.

도 4(a)는 H형강기둥의 웨브(W)가 하부보강지지프레임(145)과 대면하도록 시공된 상태에서, 지지결속구(150)로 결속판부(151)와 끼움판부(152)가 일체로 형성된 사각 플레이트를 마련한 후 이를 H형강기둥의 웨브(W)에 끼움과 동시에 하부보강지지프레임(145)에 볼트접합한 예를 보여준다. 도 4(b)는 H형강기둥의 플랜지(F)가 하부보강지지프레임(145)과 대면하도록 시공된 상태에서, 지지결속구(150)로 결속판부(151)와 끼움판부(152) 사이에 플랜지홈(153)이 형성된 사각 플레이트 부재 한쌍을 마련한 후 이를 양쪽에서 H형강기둥의 웨브(W)에 끼움과 동시에 하부보강지지프레임(145)에 볼트접합한 예를 보여준다. 4 (a) shows that the binding plate portion 151 and the fitting plate portion 152 are integrally formed with the support binding holes 150 in a state in which the web W of the H-beams is constructed to face the lower reinforcing support frame 145. After providing a rectangular plate formed of the same shows the example of bolted to the lower reinforcing support frame 145 while fitting it to the web (W) of the H-beam. 4 (b) shows that the flange F of the H-beam is constructed so as to face the lower reinforcing support frame 145, between the binding plate portion 151 and the fitting plate portion 152 by the support binding holes 150. After providing a pair of square plate members having a flange groove 153 is formed in both of the web (W) of the H-shaped steel pillar and at the same time shows an example of bolted to the lower reinforcing support frame 145.

도 4(a)에서나 도 4(b)에서나 모두 지지결속구의 끼움판부(151)가 H형강기둥의 웨브(W)에 끼워져 H형강기둥의 웨브(W)와 플랜지(F)에 동시에 맞닿게 설치되므로, 본 발명에 따른 가설시스템에서 수직지지프레임(140) 및 하부보강프레임(145)에 수평하중이 가해지더라도 이때의 수평하중은 지지결속구(150)에 의해 H형강기둥(H)으로 전달되어 H형강기둥(H)이 최종적으로 지지하게 된다. 다만, 본 발명에 따른 가설시스템을 상승 이동시키는 과정에서는 상승 이동에 방해되지 않도록 지지결속구(150)를 해체하도록 한다.In both Fig. 4 (a) and Fig. 4 (b), the fitting plate portion 151 of the support fastener is fitted to the web W of the H-beam and is mounted to abut on the web W and the flange of the H-beam at the same time. Therefore, even if a horizontal load is applied to the vertical support frame 140 and the lower reinforcing frame 145 in the hypothesis system according to the present invention, the horizontal load at this time is transmitted to the H-beam (H) by the support binding holes 150. H-beam column (H) is finally supported. However, in the process of moving up the hypothesis system according to the present invention to dismantle the support binding sphere 150 so as not to interfere with the upward movement.

수평궤도레일(160a, 160b)은 시공할 건축부분을 따라 시공할 건축부분의 건축선 안팎으로 2열로 배치되는 구성이다. 제1수평궤도레일(160a)은 레일결속 구(120) 외측으로 레일결속구(120) 하부에 구속 설치되는 구성으로, 선시공된 코어(C)를 둘러싸도록 연속적으로 설치된다. 제2수평궤도레일(160b)은 수직지지프레임(140) 내측으로 상기 제1수평궤도레일(160a)과 동일한 레벨에서 수직지지프레임(140)에 구속 설치되는 구성으로, 시공할 건축부분의 건축선 밖에서 시공할 건축부분을 둘러싸도록 연속적으로 설치된다. 상기 제1,2수평궤도레일(160a, 160b)은 레일결속구(120)와 수직지지프레임(140)에 직접 고정 설치할 수 있으나(도 5(a) 참고), 도 2에서와 같이 레일결속구(120)와 수직지지프레임(140) 각각에 외측과 내측을 향해 돌출설치된 제1,2브라켓(126, 146) 위에 설치할 수도 있다. 제1,2브라켓(126, 146)을 설치하면 제1,2수평궤도레일(160a, 160b)을 좀더 용이하게 연속성을 확보하면서 설치할 수 있게 된다.Horizontal track rails (160a, 160b) is a configuration that is arranged in two rows in and out of the construction line of the construction portion to be built along the construction portion to be constructed. The first horizontal track rail 160a is constrained to be installed below the rail binding hole 120 to the outside of the rail binding hole 120, and is continuously installed to surround the pre-installed core C. The second horizontal track rail 160b is constrained and installed in the vertical support frame 140 at the same level as the first horizontal track rail 160a inside the vertical support frame 140, and outside the construction line of the building part to be constructed. It is installed continuously to surround the construction part to be constructed. The first and second horizontal track rails (160a, 160b) can be directly fixed to the rail fastener 120 and the vertical support frame 140 (see Fig. 5 (a)), as shown in Figure 2 Each of the 120 and the vertical support frame 140 may be installed on the first and second brackets 126 and 146 protruding toward the outside and the inside. When the first and second brackets 126 and 146 are installed, the first and second horizontal track rails 160a and 160b can be easily installed while ensuring continuity.

수평이동레일(170)은 상기 제1,2수평궤도레일(160a, 160b)을 연결하도록 설치되며, 제1,2수평궤도레일(160a, 160b)을 따라 이동 가능하게 제1,2수평궤도레일(160a, 160b)에 결속하도록 설치된다. 제1,2수평궤도레일(160a, 160b)이 연속적으로 설치되기 때문에 수평이동레일(170)은 제1,2수평궤도레일(160a, 160b)이 설치된 전 구간을 자유롭게 왕복하면서 이동할 수 있게 된다. 도 5는 제1수평궤도레일(160a)이 레일결속구(120)에 직접 고정설치되고, 제1,2수평궤도레일(160a, 160b)에 수평이동레일(170)이 연결 결속된 상태를 보여준다. 한편, 도 5(b)에서는 수평이동레일(170)이 제1,2수평궤도레일(160a, 160b)을 따라 이동가능하게 결속 설치된 상세를 보여주고 있다.The horizontal moving rail 170 is installed to connect the first and second horizontal track rails 160a and 160b, and the first and second horizontal track rails are movable along the first and second horizontal track rails 160a and 160b. It is provided so that it may bind to 160a, 160b. Since the first and second horizontal track rails 160a and 160b are continuously installed, the horizontal moving rail 170 may move freely in all sections provided with the first and second horizontal track rails 160a and 160b. FIG. 5 shows a state in which the first horizontal track rail 160a is directly fixed to the rail fastener 120 and the horizontal moving rail 170 is connected to the first and second horizontal track rails 160a and 160b. . On the other hand, Figure 5 (b) shows the horizontal movable rail 170 is bound to move along the first and second horizontal track rail (160a, 160b) is installed in detail.

작업로봇(180)은 기계화된 건설장비(볼트조립장비, 용접장비 등)로서, 상기 수평이동레일(170)에 결속되어 수평이동레일(170)을 따라 이동하는 구성이다. 즉, 작업로봇(180)은 수평이동레일(170)을 따라 시공할 건축부분의 건축선 안팎으로 이동하게 되는 것이다. 이로써, 작업로봇(180)은 수평이동레일(170)을 따라 이동하고 수평이동레일(170)은 제1,2수평궤도레일(160a ,160b)을 따라 이동하기 때문에, 작업로봇(180)은 사각지대없이 시공할 건축부분의 구석구석까지 이동하는 것이 가능해진다. 나아가, 작업로봇(180)을 수평이동레일 아래에 결속된 시저리프트(scissors lift, 185)에 장치하면 작업로봇(180)은 시저리프트(185)의 수직이동으로 간단하게 수직 위치를 변경시킬 수도 있다.The work robot 180 is a mechanized construction equipment (bolt assembly equipment, welding equipment, etc.), and is configured to be coupled to the horizontal moving rail 170 and move along the horizontal moving rail 170. That is, the working robot 180 is to move in and out of the construction line of the construction portion to be constructed along the horizontal moving rail 170. As a result, the working robot 180 moves along the horizontal moving rail 170 and the horizontal moving rail 170 moves along the first and second horizontal track rails 160a and 160b. It is possible to move to every corner of the part of construction to be built without rent. Furthermore, when the work robot 180 is mounted on a scissor lift 185 bound under the horizontal moving rail, the work robot 180 may simply change the vertical position by vertical movement of the scissor lift 185. .

2. 자동화 건축방법2. Automated Construction Method

도 6은 본 발명에 따른 자동화 건축방법을 보여주는 시공순서도이다. 본 발명의 자동화 건축방법은 저층부와 저층부 위의 기준층(typical floor)으로 설계된 건축물에서 기준층의 시공에 로봇에 의한 자동화 건축방법이 적용되며, 이를 단계적으로 설명하면 다음과 같다. 6 is a construction sequence diagram showing an automated building method according to the present invention. In the automated building method of the present invention, an automated building method by a robot is applied to the construction of a reference floor in a building designed with a lower floor and a typical floor above the floor.

(a)코어 시공단계(a) Core construction stage

코어(C) 중앙에 타워크레인을 위치시킨 채 코어(C)를 시공한다. 통상 코어(C)는 건축물의 중심(중앙)에 설계되기 마련이므로, 코어(C) 중앙에 타워크레인을 위치시키면 타워크레인 하나로 코어(C) 주변의 시공할 건축부분을 포섭하면서 시공할 수 있어 필요한 건설장비의 최소화를 꾀할 수 있게 된다.The core (C) is constructed while the tower crane is positioned at the center of the core (C). Since the core (C) is usually designed in the center (center) of the building, if the tower crane is located in the center of the core (C), one tower crane can be used while the construction part to be built around the core (C) is required. Minimize construction equipment.

(b)저층부 시공단계(b) Low floor construction stage

코어(C) 주변의 건축부분 중 저층부를 시공한다. 저층부는 기준층과 다른 평면 계획으로 이루어진 부분으로 일률적인 시공이 어려우므로 별도 공정으로 진행하도록 한 것이다.Construct the lower floor of the building part around the core (C). The lower floor part is composed of a plan plan different from the reference floor, so uniform construction is difficult.

(c)기준층 하층부의 골조시공단계(c) Frame construction stage under base layer

시공 완료된 저층부 위로 기준층의 하층부 골조를 시공한다. 이때, 기준층의 하층부 골조는 기준층의 외곽부분 기둥을 H형강기둥(H)으로 시공한다.Construct the lower frame of the base layer on the completed lower floor. At this time, the lower frame of the reference layer is constructed of the column of the outer portion of the reference layer as the H-beam (H).

(d)자동화건축의 가설시스템 설치단계(d) Installation of temporary system of automated construction

앞서 설명한 자동화건축의 가설시스템을 기준층의 하층부 골조 위로 설치한다. 본 발명에 따른 자동화건축의 가설시스템에서 지지결속구(150)가 기준층의 하층부 골조로 시공된 H형강기둥(H)에 끼움 결속되기 때문에(도 4 참조), 자동화건축의 가설시스템은 안정적인 설치상태를 유지할 수 있게 된다. 이렇게 설치된 자동화건축의 가설시스템은 기준층 시공을 위한 가설작업대(작업로봇 또는 건설 작업자의 작업공간)가 된다.The hypothesis system of the automated construction described above is installed on the lower frame of the reference floor. In the construction system of automated construction according to the present invention, because the support binding holes 150 are fitted to the H-beams (H) constructed by the lower frame of the reference layer (see Fig. 4), the construction system of the automatic construction is stable Will be able to maintain. The temporary construction system of the automated construction installed in this way becomes a temporary working table (working space of a working robot or a construction worker) for the reference floor construction.

(e)자동화에 의한 기준층 시공단계(e) Reference layer construction step by automation

자동화건축의 가설시스템을 이용하여 기준층의 하층부 골조 위로 기준층을 시공한다. 기준층 시공단계는 구체적으로, (ⅰ)타워크레인으로 기준층의 시공을 위한 건축자재를 양중하면서 설치위치에 위치시키는 양중단계; (ⅱ)상기 자동화건축 가설시스템의 수평이동레일(170)과 작업로봇(180)을 이동시키면서 건축자재를 조립하는 조립단계; (ⅲ)상기 자동화건축의 가설시스템을 시공된 기준층 위로 상승시키는 상승단계; 그리고, (ⅳ)상기 양중단계, 조립단계 및 상승단계를 반복하는 반복단계;로 세분할 수 있다.Using the construction system of automated architecture, the reference layer is constructed over the lower frame of the reference layer. Specifically, the construction of the reference floor includes: (i) a lifting step of placing the building materials for the construction of the reference floor by lifting the crane at the installation position; (Ii) an assembly step of assembling building materials while moving the horizontal moving rail 170 and the working robot 180 of the automated construction temporary system; (Iii) an ascending step of raising the temporary construction system of the automated construction above the constructed reference floor; And, (iii) it may be subdivided into a repeating step of repeating the lifting step, the assembly step and the rising step.

양중단계에서 타워크레인에 의해 양중되는 건축자재들은 자동화건축의 가설시스템에서 루프지지프레임(130) 사이의 개방된 부분을 통해 시공할 건축부분 공간 내로 반입된다. 다만, 건축자재의 반입공간으로 활용되지 않는 부분은 보호망을 덮어 외부 환경(바람, 빗물 등)으로부터 시공공간을 보호하는 것이 바람직하다. 보호망은 수직지지프레임(140)에도 설치하는 것이 바람직하며, 나아가 조립단계와 상승단계와 같이 외부에서 자재반입이 이루어지지 않는 경우라면 본 발명에 따른 가설시스템의 전체를 덮도록 설치하는 것이 바람직하겠다.Building materials being lifted by the tower crane in the lifting phase is brought into the construction part space to be constructed through the open part between the roof support frame 130 in the construction system of the automated construction. However, it is desirable to protect the construction space from the external environment (wind, rainwater, etc.) by covering the protection net of the part not used as a carrying space of building materials. It is preferable to install the protection net in the vertical support frame 140, and furthermore, if the material is not carried out from the outside, such as the assembling step and the ascending step, it is preferable to install so as to cover the entire construction system according to the present invention.

조립단계는 수평궤도레일(160a, 160b)을 따라 수평이동레일(170)을 이동시킴과 동시에 수평이동레일(170)을 따라 작업로봇(180)을 이동시켜 작업로봇(180)이 적절한 시공위치에 도달하면 작업로봇(180)에 의해 수행하게 된다.The assembling step moves the working robot 180 along the horizontal moving rail 170 and simultaneously moves the working robot 180 along the horizontal track rails 160a and 160b so that the working robot 180 is positioned at an appropriate construction position. When it reaches, it is performed by the working robot 180.

상승단계는 유압잭 등에 의해 레일결속구(120)를 수직레일(110)을 따라 상승시키는 과정으로 이루어지며, 다만 본 발명에서는 지지결속구(150)를 해체한 상태에서 상승단계를 진행하도록 한다. 그래야 지지결속구(150)에 의한 간섭을 억제하면서 본 발명에 따른 가설시스템을 자유롭게 상승시킬 수 있을 것이다. 이때 지지 결속구(150)가 해체된 상태라면 가설시스템은 코어(C)에만 지지된 상태에 있게 되는데, 이 경우에는 수평이동레일(170)에 결속된 작업로봇(180)을 최대한 코어(C) 가까이에 위치시키는 것이 바람직하며, 이는 무게중심을 레일결속구(120) 쪽으로 위치시켜 안정적인 상승작업을 도모하기 위함이다.The ascending step is made of a process of raising the rail fastener 120 along the vertical rail 110 by a hydraulic jack, etc., but in the present invention, the ascending step is performed in a state in which the support fastener 150 is dismantled. Thus, it is possible to freely raise the hypothesis system according to the present invention while suppressing the interference by the support binding sphere 150. At this time, if the support binding device 150 is dismantled, the hypothesis system is in a state only supported by the core (C). In this case, the working robot 180 bound to the horizontal moving rail 170 is maximized to the core (C). It is preferable to be located in close proximity, which is to position the center of gravity toward the rail binding hole 120 to achieve a stable ascent operation.

이상에서 본 발명은 실시예를 참조하여 상세히 설명되었으나, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 상기에서 설명된 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 부가 및 변형이 가능할 것임은 당연하며, 이와 같은 변형된 실시 형태들 역시 아래에 첨부한 특허청구범위에 의하여 정하여지는 본 발명의 보호 범위에 속하는 것으로 이해되어야 할 것이다.Although the present invention has been described in detail with reference to the embodiments, those skilled in the art to which the present invention pertains will be capable of various substitutions, additions, and modifications without departing from the technical spirit described above. It is to be understood that such modified embodiments are also within the protection scope of the present invention as defined by the appended claims.

도 1은 자동화건축을 위한 종래의 가설시스템을 보여준다.1 shows a conventional hypothesis system for automated construction.

도 2는 본 발명에 따른 가설시스템의 단면도를 보여준다.Figure 2 shows a cross-sectional view of the hypothesis system according to the present invention.

도 3은 도 2의 가설시스템에서 지지프레임을 보여준다.3 shows a support frame in the hypothesis system of FIG.

도 4는 도 2의 가설시스템에서 수평궤도레일과 수평이동레일의 설치상세를 보여준다.4 shows the installation details of the horizontal track rail and the horizontal moving rail in the temporary system of FIG.

도 5는 도 2의 가설시스템에서 지지결속구의 설치상세를 보여준다.Figure 5 shows the installation details of the support binding sphere in the hypothesis system of FIG.

도 6은 본 발명에 따른 자동화 건축방법을 보여주는 시공순서도이다.6 is a construction sequence diagram showing an automated building method according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

110: 수직레일 120: 레일결속구110: vertical rail 120: rail binding hole

130: 루프지지프레임 140: 수직지지프레임130: loop support frame 140: vertical support frame

150: 지지결속구 160a, 160b: 제1,2수평궤도레일150: support binding sphere 160a, 160b: 1st, 2nd horizontal track rail

170: 수평이동레일 180: 작업로봇170: horizontal moving rail 180: working robot

C: 코어 H: H형강기둥C: core H: H-beam column

Claims (4)

선시공된 코어(C) 주변의 건축부분을 로봇에 의한 자동화 건축방법으로 시공하기 위해 설치되는 가설시스템으로서,As a temporary system installed to construct the building part around the pre-built core (C) by an automated building method by a robot, 시공할 건축부분과 만나는 코어(C)에 고정설치되는 복수개의 수직레일(110);A plurality of vertical rails 110 fixed to the core C that meets the construction part to be constructed; 상기 복수개의 수직레일 각각에 슬라이딩 가능하게 결속하는 복수개의 레일결속구(120);A plurality of rail binding holes 120 slidably coupled to each of the plurality of vertical rails; 상기 복수개의 레일결속구(120)를 상호 연결하도록 설치되는 상부보강지지프레임(125);An upper reinforcing support frame 125 installed to interconnect the plurality of rail binding ports 120; 일단부가 상기 레일결속구(120)의 상부 또는 상부보강지지프레임(125)의 상부에 결속하는 한편 타단부가 시공할 건축부분의 건축선 밖에 위치하도록 설치되는 복수개의 루프지지프레임(130);A plurality of loop support frames 130 having one end coupled to an upper portion of the upper or upper reinforcement support frame 125 of the rail fastener 120 and the other end positioned outside the construction line of the building part to be constructed; 상기 복수개의 루프지지프레임(130) 각각의 타단부에 하향 결속하며, 시공할 건축부분 아래의 이미 시공된 건축부분까지 내려오도록 마련되는 복수개의 수직지지프레임(140);A plurality of vertical support frames 140 which are bound downwardly to the other end of each of the plurality of loop support frames 130 and are provided to descend to the already constructed building part below the building part to be constructed; 상기 복수개의 수직지지프레임(140)의 하부를 상호 연결하도록 설치되는 하부보강지지프레임(145);A lower reinforcement support frame 145 installed to interconnect lower portions of the plurality of vertical support frames 140; 상기 하부보강지지프레임(145)에 장착되며, 시공할 건축부분 아래의 이미 시공된 건축부분에 걸리도록 설치되는 지지결속구(150);A support binding hole (150) mounted on the lower reinforcing support frame (145) and installed to be hooked to an already constructed building part under the building part to be constructed; 상기 레일결속구(120) 외측으로 레일결속구(120) 하부에 구속 설치되며, 선 시공된 코어(C)를 둘러싸도록 연속적으로 설치되는 제1수평궤도레일(160a);A first horizontal track rail 160a which is restrained and installed under the rail binding hole 120 outside the rail binding hole 120 and continuously installed to surround the pre-constructed core C; 상기 수직지지프레임(140) 내측으로 상기 제1수평궤도레일(160a)과 동일한 레벨에서 상기 수직지지프레임(140)에 구속 설치되며, 시공할 건축부분의 건축선 밖에서 시공할 건축부분을 둘러싸도록 연속적으로 설치되는 제2수평궤도레일(160b);Restrained and installed on the vertical support frame 140 at the same level as the first horizontal track rail 160a inside the vertical support frame 140, and continuously surrounding the building part to be constructed outside the construction line of the building part to be constructed A second horizontal orbit rail 160b installed; 상기 제1,2수평궤도레일(160a, 160b)을 연결하도록 설치되며, 제1,2수평궤도레일을 따라 이동 가능하게 제1,2수평궤도레일(160a, 160b)에 결속하는 수평이동레일(170); 및, It is installed to connect the first and second horizontal orbit rails (160a, 160b), the horizontal movable rail that is coupled to the first and second horizontal orbit rails (160a, 160b) to be movable along the first and second horizontal orbit rail ( 170); And, 상기 수평이동레일(170)을 따라 이동 가능하게 수평이동레일(170)에 결속 설치되는 작업로봇(180);을 포함하여 구성되되,It is configured to include; a work robot 180 that is bound to the horizontal movable rail 170 to be movable along the horizontal movable rail 170; 상기 선시공된 코어(C) 주변의 건축부분은 외곽부분이 H형강기둥(H)으로 계획되는 철골구조이며,The building part around the pre-built core (C) is a steel structure in which the outer part is planned as H-beam (H), 상기 지지결속구(150)는 하부보강지지프레임(145)에 탈착가능하게 결속하는 결속판부(151);와, H형강기둥의 웨브(W)에 끼워져 웨브와 플랜지에 동시에 맞닿도록 설치되는 끼움판부(152);으로 구성된 것임을 특징으로 하는 자동화건축의 가설시스템.The support binding hole 150 is a binding plate portion 151 detachably bound to the lower reinforcement support frame 145; and the fitting plate portion that is fitted to the web (W) of the H-beams to be in contact with the web and the flange at the same time (152); hypothesis system of the automated construction, characterized in that consisting of. 제1항에서,In claim 1, 상기 H형강기둥(H)은 플랜지(F)가 하부보강지지프레임(145)과 대면하도록 시 공되며,The H-beam column (H) is constructed so that the flange (F) facing the lower reinforcing support frame 145, 상기 지지결속구(150)는 결속판부(151)와 끼움판부(152) 사이에 플랜지홈(153)이 형성된 부재 한쌍으로 마련되는 것을 특징으로 하는 자동화건축의 가설시스템. The support binding sphere 150 is a temporary construction system of the automated construction, characterized in that provided with a pair of members having a flange groove 153 is formed between the binding plate 151 and the fitting plate 152. 제1항 또는 제2항에서,The method of claim 1 or 2, 상기 작업로봇(180)은 수평이동레일(170) 아래에 이동가능하게 결속된 시저리프트(scissors lift, 185)에 매달려 설치되는 것을 특징으로 하는 자동화건축의 가설시스템.The work robot 180 is a temporary construction system of the automated construction, characterized in that is installed hanging on the scissor lift (scissors lift, 185) movably bound below the horizontal movement rail (170). 저층부와 저층부 위의 기준층으로 설계된 건축물을 제1항 또는 제2항의 자동화건축의 가설시스템을 이용하여 시공하는 자동화 건축방법으로서,An automated building method for constructing a building designed as a lower floor and a reference layer on the lower floor using a temporary construction system of the automated construction according to claim 1 or 2, (a)코어(C) 중앙에 타워크레인을 위치시킨 채 코어(C)를 시공하는 단계;(A) constructing the core (C) with the tower crane in the center of the core (C); (b)코어(C) 주변의 건축부분 중 저층부를 시공하는 단계;(b) constructing a lower floor of the building part around the core (C); (c)상기 시공 완료된 저층부 위로 기준층의 하층부 골조를 시공하되, 기준층의 외곽부분 기둥을 H형강기둥(H)으로 시공하는 단계;(c) constructing a lower frame of the reference layer onto the completed lower floor portion, constructing an outer pillar of the reference layer with an H-beam (H); (d)상기 자동화건축의 가설시스템을 기준층의 하층부 골조 위로 설치하는 단계; 그리고,(d) installing the temporary construction system of the automated construction onto the lower frame of the reference floor; And, (e)상기 자동화건축의 가설시스템을 이용하여 기준층을 시공하는 단계;를 포함하여 이루어지되,(e) constructing a reference floor using the automated construction hypothesis system; 상기 (e)단계는,In step (e), (ⅰ)타워크레인으로 기준층의 시공을 위한 건축자재를 양중하면서 설치위치에 위치시키는 양중단계;(Iii) a lifting step of lifting the building materials for the construction of the reference floor with the tower lane and placing them in the installation position; (ⅱ)상기 자동화건축 가설시스템의 수평이동레일(170)과 작업로봇(180)을 이동시키면서 건축자재를 조립하는 조립단계;(Ii) an assembly step of assembling building materials while moving the horizontal moving rail 170 and the working robot 180 of the automated construction temporary system; (ⅲ)상기 자동화건축의 가설시스템을 시공된 기준층 위로 상승시키는 상승단계; 그리고,(Iii) an ascending step of raising the temporary construction system of the automated construction above the constructed reference floor; And, (ⅳ)상기 양중단계, 조립단계 및 상승단계를 반복하는 반복단계;(Iii) a repeating step of repeating the lifting step, the assembling step and the rising step; 를 포함하여 이루어지는 것을 특징으로 하는 자동화 건축방법.Automated building method comprising a.
KR1020080062610A 2008-06-30 2008-06-30 Temporary construction system for the automation of building projects and construction method using the same KR100980806B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080062610A KR100980806B1 (en) 2008-06-30 2008-06-30 Temporary construction system for the automation of building projects and construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080062610A KR100980806B1 (en) 2008-06-30 2008-06-30 Temporary construction system for the automation of building projects and construction method using the same

Publications (2)

Publication Number Publication Date
KR20100002643A KR20100002643A (en) 2010-01-07
KR100980806B1 true KR100980806B1 (en) 2010-09-10

Family

ID=41812650

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080062610A KR100980806B1 (en) 2008-06-30 2008-06-30 Temporary construction system for the automation of building projects and construction method using the same

Country Status (1)

Country Link
KR (1) KR100980806B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2759162C1 (en) * 2021-04-28 2021-11-09 Публичное акционерное общество "Федеральная гидрогенерирующая компания - РусГидро" Method for automated installation of external fence for gravitational energy storage and system for its implementation
RU2759467C1 (en) * 2021-04-28 2021-11-15 Публичное акционерное общество "Федеральная гидрогенерирующая компания - РусГидро" Method for automated installation of the power structure of a gravitational energy storage device and a set of devices for its implementation
RU2784844C2 (en) * 2020-07-27 2022-11-30 Акционерное общество "Государственный ракетный центр имени академика В.П. Макеева" Monorail attachment device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107686056B (en) * 2017-10-17 2023-12-19 中国建筑第七工程局有限公司 Special lifting platform for lifting and installing assembled concrete building components and application method
CN113479792B (en) * 2021-06-30 2024-01-05 中建七局第一建筑有限公司 Steel tube bundle structure reinforced tower crane attachment system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05321469A (en) * 1992-05-20 1993-12-07 Kumagai Gumi Co Ltd All-weather type automatic construction of building
JPH05340107A (en) * 1992-06-11 1993-12-21 Nippon Steel Corp Working robot
KR200200364Y1 (en) 2000-05-10 2000-10-16 주식회사삼우공간건축사사무소 High building construction apparatus
KR100863592B1 (en) 2007-08-14 2008-10-14 (주)씨.에스 구조 엔지니어링 Temporary construction system for the automation of building projects and construction method using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05321469A (en) * 1992-05-20 1993-12-07 Kumagai Gumi Co Ltd All-weather type automatic construction of building
JPH05340107A (en) * 1992-06-11 1993-12-21 Nippon Steel Corp Working robot
KR200200364Y1 (en) 2000-05-10 2000-10-16 주식회사삼우공간건축사사무소 High building construction apparatus
KR100863592B1 (en) 2007-08-14 2008-10-14 (주)씨.에스 구조 엔지니어링 Temporary construction system for the automation of building projects and construction method using the same

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2784844C2 (en) * 2020-07-27 2022-11-30 Акционерное общество "Государственный ракетный центр имени академика В.П. Макеева" Monorail attachment device
RU2759162C1 (en) * 2021-04-28 2021-11-09 Публичное акционерное общество "Федеральная гидрогенерирующая компания - РусГидро" Method for automated installation of external fence for gravitational energy storage and system for its implementation
RU2759467C1 (en) * 2021-04-28 2021-11-15 Публичное акционерное общество "Федеральная гидрогенерирующая компания - РусГидро" Method for automated installation of the power structure of a gravitational energy storage device and a set of devices for its implementation
WO2022231456A1 (en) * 2021-04-28 2022-11-03 Публичное акционерное общество "Федеральная гидрогенерирующая компания - РусГидро" Method for installing an external enclosure and system for the implementation thereof
WO2022231457A1 (en) * 2021-04-28 2022-11-03 Публичное акционерное общество "Федеральная гидрогенерирующая компания - РусГидро" Method for installing a supporting structure for a gravitational energy storage device
RU2793107C1 (en) * 2022-09-20 2023-03-29 Игорь Викторович Прохоров Method for fastening elements to a metal beam cap (embodiments), assembly (embodiments) and bridge structure (embodiments)

Also Published As

Publication number Publication date
KR20100002643A (en) 2010-01-07

Similar Documents

Publication Publication Date Title
US5088263A (en) Construction apparatus and construction method
EP0480683B1 (en) Erection workbench and construction process
CN105442839A (en) Erecting method of cantilever structure formwork bent
KR100980806B1 (en) Temporary construction system for the automation of building projects and construction method using the same
CN106149868A (en) Prefabricated buildings architectural structure system and assembly method thereof
KR100863592B1 (en) Temporary construction system for the automation of building projects and construction method using the same
JPH08311818A (en) Climbing type lift-up construction method of building and device thereof
KR101041540B1 (en) Temporary construction frame system for the automation of building projects
JPH05133016A (en) Peripheral supporting self-rising type building engineering method
JPH0782897A (en) All weather type building method of building
JPH04237764A (en) Method for constructing high-strorey building
JPH1061193A (en) Method of building steel frame structure and device therefor
KR200200364Y1 (en) High building construction apparatus
JPH08105229A (en) Construction of building
JPH04161565A (en) Construction of large space building
JPH04118438A (en) Method and apparatus for construction of building
JPH0339538A (en) Construction work of wooden building
JPH04237769A (en) Climb-up method and device for constructing building
JPH04146372A (en) Constructing method for frame
JPH07286368A (en) Method and equipment for lifting up uppermost floor frame for constructing structure
JP2003056209A (en) Method and mechanism for constructing tower-like structure with roof
JPH07139042A (en) Construction method for building frame and construction work frame used therefor
JPH11125014A (en) Construction method of building
JPH0586651A (en) Method and apparatus for constructing column and beam
JPH09302936A (en) Construction method of building

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130903

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140822

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150902

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160902

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170904

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190614

Year of fee payment: 10