SU66228A1 SU1512A SU332324A SU66228A1 SU 66228 A1 SU66228 A1 SU 66228A1 SU 1512 A SU1512 A SU 1512A SU 332324 A SU332324 A SU 332324A SU 66228 A1 SU66228 A1 SU 66228A1
Authority
SU
USSR - Soviet Union
Prior art keywords
wire
plumb
orientation
free
vertical shaft
Prior art date
Application number
SU1512A
Other languages
Russian (ru)
Inventor
М.В. Владыкин
Original Assignee
М.В. Владыкин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by М.В. Владыкин filed Critical М.В. Владыкин
Priority to SU1512A priority Critical patent/SU66228A1/en
Application granted granted Critical
Publication of SU66228A1 publication Critical patent/SU66228A1/en

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Description

Предметом насто щего изобретени   вл етс  способ ориентировани  подземньк съемок через одну вертикальную шахту при помощи несвободного отвеса, один конец которого -закрепл етс  у маркшейдерского знака на поверх«ости земли, а второй - у маркшейдерского знака в руднике. На поверхности земли -несвободный отвес отт гивают донолнительной проволочно;й отт жкой, к которой, «ли к от,резку несвободного отшеса, идущему к М1аркшейдеройому знаку на новерхности, под веши1вают свободный отвес. По положении свободнаго отвеса относительно нлоскости несвободного отвеса на уровне теодолита, устанавливаемого у маркшейдерского в -руднике, определ ют ноправочный угол дл  перехода от азимута отрезка несвободного отвеса на поверхность к азимуту отрезка несвободного отвеса в. руднике.The object of the present invention is a method of orienting a submersible survey through one vertical shaft using a non-free plumb, one end of which is fixed at the surveying mark on top of the earth and the other at the survey marker in the mine. On the surface of the earth — an unmounted plummet is pulled away by additional wire, and by a wire, to which, lik to, from, cutting of a not free leg, going to the Mining shark mark on the surface, under a free plumb line. According to the position of the free plumb relative to the height of the non-free plumb at the level of a theodolite installed at the surveyor in the employee, the correcting angle is determined for the transition from the azimuth of the non-free plumb segment to the surface to the azimuth of the non-free plumb segment. mine.

Приемы осуществлени  ориентировани  по предложанвому способу и-ллюстрированы чертежом, где на фиг. 1 и 2 даны варианта расположени  отвесов в шахте, на фиг. 3 - детали креплени  соединительной проволочной огтт жки кOrientation techniques for the proposed method are illustrated in the drawing, where in FIG. 1 and 2 are given variants of the location of the plumbs in the mine; in FIG. 3 - fastening details of the connecting wire to the

проволокам отвесов, на фиг. 4 - вид в плане опорной скобы дл  несвободного отвеса, на фиг. 5 - вид хомутика отт жки, расположенной п руднике, на фиг. 6 - вид угольника дл  замера горизонтальной проекции проволочной отт жки.plumb-wire, fig. 4 is a plan view of a support bracket for a non-free plumb; FIG. 5 is a view of the tie strap located in the mine; FIG. 6 is a view of a square for measuring the horizontal projection of a wire rod.

Проволоку с лебедки И опускают с грузом в шахту. Также с rpyiзом опускают проволоку с лебедки Д. Затем П ровол1оки ст гивают соединительной проволокой БВ. Детали соеденительной проволоч ной отт жки представлены на фиг. 3. Ролики Я из дерева имеют форму цилиадра. Диаметр их пор дка 4 см. Р - две пластинкИ. из кровельного железа или алюмини , между которыми проходит проволока . В каждой пластиике имеютс  три отверсти , два дл  роликов и одно дл  соединительной проволоки . По бо.кам ролИки Я закрепл ютс  шпильками. Чтобы заложить проволоку отвеса надо вынуть средний ролик. Когда проволока будет вдета, следует вложить ролик назад и закрепить шпилькой.The wire from the winch And lowered with a load into the mine. Also, the wire from the winch is lowered with rpyiz. Then the wire is pulled by the connecting wire BV. Details of the connecting wire are shown in FIG. 3. Rollers I made of wood have the shape of a ciladra. Their diameter is about 4 cm. P - two plates. from roofing iron or aluminum, between which the wire passes. In each plastic there are three holes, two for the rollers and one for the connecting wire. On the sides of the roller, I am fastened with pins. To lay the plumb wire, you need to take out the middle roller. When the wire is driven, the roller should be inserted back and secured with a pin.

В тОЧке Л устанавливают теодолит . Со.ЕЭдеща  точки В и Г с вертикальной нитью привод т всю систему проволок в положение, близкое ;к вертикальной плоскости, проход щей .через точта А « Ж (фи:Г. 1 и 2). Это сав1мещение аналогично действи м, производимым при обычном ориентировании ломаным отвесом.In the point L set theodolite. Co-ED points B and G with vertical thread bring the entire system of wires to a position close to the vertical plane passing through the point A & F (phi: H. 1 and 2). This rotation is similar to the actions performed in the usual orientation by a broken plumb line.

В точке Г забивают скобу, котора  располагаетс  перпендикул рно плоскости чертежа. Проволока Д, Г, В кладетс  на окобу. На скОбе (фиг. 4) /napieaaiHbi ножовкой бороздки примерно через 0,4 см. Скоба располагаетс  так, чтобы нарезки были по обе стороны от проволоки .At the point D, a bracket that is perpendicular to the plane of the drawing is hammered. Wire D, G, B is put on the shit. On the skoba (fig. 4) / napieaaiHbi with a hacksaw, after approximately 0.4 cm. The staple is positioned so that the cuts are on either side of the wire.

Далее подвешиваютс  нормальные грузы Л, М. Затем от.т гиваетс  проволо.ка ВМ при помющи шнура, одии конец которого проходИ|11 через центр маркшейдерского знака Ж, а на другом имеетс  хомутик (фиг. 5), в который прспускаетс  проволока БЛ и на котором укрепл етс  шкала. СперВа в хомутик задеваетс  через разрез У несвободный отвес, который вкладываетс , между проволокой хомутика , как показано на фиг. 5, а затем и 1свободный отвес.Next, normal weights L, M are suspended. Then, a VM wire is attached to the cord, one end of which passes through the center of the survey marker sign, and on the other there is a collar (Fig. 5), which is connected to the wire BL on which the scale is strengthened. The sperm in the collar is caught through the incision. A non-free plumb that is inserted between the collar wire, as shown in FIG. 5, and then 1 free plumb.

После укреплени  шнура в точке Ж на хомутике перпендикул рно к направлению шнура ЖЕ укрепл ют шкалу при пом;0ши шпилек Т.After fixing the cord at the point G on the clamp, perpendicular to the direction of the cord the SAME strengthens the scale with the help of;

Таким образом шкала совершает колебани  вм1есте с отвесом ВМ.Thus, the scale oscillates vm1este with a plumb VM.

В точке Ж устанавливают теодолит и производ тс  обычным путем шкальные Отсчеты положени  проволоки БЛ относительно проволоки ВМ.At the point Zh, a theodolite is established and produced in the usual way by scale measurements of the position of the BL wire relative to the VM wire.

Положение про волоки ВМ определ етс  как (по-лусумма отсчетов по кра м проволоки. Проволока ВМ неподвижна относительно шкалы.The position of the VM wire is defined as (the sum of readings along the edges of the wire. The wire of the VM is fixed relative to the scale.

После производства шкальных отсчетов, подождав пока отвесы достаточно успоко тс , измер етс  примычный угол IB тОчке А.After the production of scale readings, after waiting for the plumbs to calm down sufficiently, the primitive angle IB to the point A. is measured.

После этого проиавюд т замер проекции БВ, что проще всего сделать с помощью угольника (фиг. 6) с катетом большим, нежели рассто ние БВ, вырезаниым из фанеры , с отвесом, привод щим его в горизонтальное положение.After this, the BV projection is measured, which is easiest to do with the help of a square (Fig. 6) with a leg larger than the BV distance, cut from plywood, with a plumb line leading it to a horizontal position.

С целью контрол  и повышени In order to control and increase

точности конечного результата, о.риентировку следует проделать несколько раз. Примем желательно брать положени  точки В, симметричные относительно вертикальной плоскости, проход щей через точки А и Ж и передвигать при этом шкалу.accuracy of the final result, orientation should be done several times. Let us take it is desirable to take the positions of points B, symmetrical with respect to the vertical plane passing through points A and G, and at the same time moving the scale.

Дл  получени  иового по-ложени  проволок с целью повторной ориентировки , проволоку ДГБ достаточно переложить с одной нарезки на другую.To obtain the wire position for the purpose of re-orientation, it is sufficient to shift the wire from one cut to the other.

Дл  передачи координат надо рулеткой замер ть рассто ние АБ и Ж5, тогда АВ АБ + БВ и ЖВ ЖЗ + БВ.To transfer the coordinates, it is necessary to measure the distance AB and Ж5 with a tape measure, then AB AB + BV and ЖВ ЖЗЗ БВ.

В том случае, если шахта однокрыла  и нет возможности расположить cHCTeMiy проволшс как пока зано на фИГ. 1, но есть возможность расположить первый стан в шахте по ходу полигона, то расположен1йе проволок будет соответствовать фиг. 2. В этом случае принципиальна  схема существенно не мен етс . В первом варианте отвес БЛ был укреплен непосредственно на ходовой стороне (стане)-АВ, по второму же варианту свободный отвес БЛ укреплен вне хода.In the event that the mine is single-winged and it is not possible to arrange cHCTeMiy wires as shown in FIG. 1, but it is possible to locate the first mill in the mine along the landfill, then the located wire will correspond to FIG. 2. In this case, the schematic diagram does not change significantly. In the first variant, the plumb line BL was fixed directly on the running side (mill) -AV, according to the second variant, the free plumb line BL was fixed out of turn.

Дл  передачи дирекционного угла в шахту необходимо определить угол АВЖ, который можно- представить себе как сумм1у 180°-г г/.In order to transfer the directional angle to the mine, it is necessary to determine the angle ABL, which can be imagined as the sum of 180 ° g /.

Пор док работы остаетс  тем же, что и в первом варианте.The order of operation remains the same as in the first embodiment.

Предмет и з р е т е н и  Subject and perusal

Способ ориентировани  подземных съемок через одну вертикальную шахту при помощи несвободного отвеса, один конец которого закрепл ют у маркшейдерского знака на поверхности земли, а второй - у маркшейдерского знака в руднике и отт ги1вают дополнительной проволоч ной отт жкой на поверхности землщ отличающийс   тем, что к этой отт жке или к отрезку несвободного отвеса, идущему к маркшейдерскому знаку на noBepxiHOCTH земли, подвешивают свободный отвес и по положению cвoбoднiaгo отвеса отноаительно плоскости несвободного отвеса на уровне теодолита, устанавливаемого у маркшейдерского знака в руднике , определ ют полраво чный угол дл  перехода от азймута отрезка несвободного отвеса на поверхности земли к азимуту отрезка несвободного отвеса в руднике.The method of orienting underground surveys through one vertical shaft using a non-free plumb line, one end of which is fixed at the surveyor’s mark on the surface of the earth, and the other at the surveyor’s mark in the mine and is drawn by additional wire on the surface, which differs from delay or to a segment of a non-free plumb, going to the surveying sign on the noBepxiHOCTH of the earth, hang the free plumb and on the position of the free plumb relative to the plane of the non-free plumb at theodol level one mounted in a mine surveyor sign is determined polravo-screw angle for the transition from a non-free plumb azymuta segment at the ground surface to the non-free plumb azimuth segment in the mine.

Фиг. 3FIG. 3

Фиг. 4FIG. four

I

SU1512A 1944-04-11 1944-04-11 The method of orientation of underground surveys through a single vertical shaft SU66228A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1512A SU66228A1 (en) 1944-04-11 1944-04-11 The method of orientation of underground surveys through a single vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1512A SU66228A1 (en) 1944-04-11 1944-04-11 The method of orientation of underground surveys through a single vertical shaft

Publications (1)

Publication Number Publication Date
SU66228A1 true SU66228A1 (en) 1945-11-30

Family

ID=51358240

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1512A SU66228A1 (en) 1944-04-11 1944-04-11 The method of orientation of underground surveys through a single vertical shaft

Country Status (1)

Country Link
SU (1) SU66228A1 (en)

Similar Documents

Publication Publication Date Title
CN104328799B (en) A kind of sheltered reverse excavation subway station steel pipe column accurate positioning method
CN109373972A (en) A kind of pile body testing apparatus for verticality
CN108253946A (en) Multi-functional vertical measurement connection survey integrated three-dimensional coordinate transfer device and method
CN106767520A (en) A kind of main rope of suspension bridge linear measurement instrument
CN104674860B (en) Wire holing through survey method in seabed tunnel
CN105649080A (en) Single-pile pile sinking method
US3451136A (en) Method of and means for determining line and grade of sewer pipes and the like
CN107121133A (en) A kind of subway work vertical shaft connection triangle alignment system
SU66228A1 (en) The method of orientation of underground surveys through a single vertical shaft
JP2000258192A (en) Convenient crustal displacement detector
CN108489455B (en) Method for measuring internal structure of sewage open caisson
CN104006798B (en) Pier stud verticality measuring instrument
JP2008020367A (en) Survey pole and survey method using it
SU67858A1 (en) Method and device for orientation underground shooting
KR0149564B1 (en) Indicator of underwater measuring point at embankment
US3507044A (en) Surveying instrument
SU636380A1 (en) Inclinometer
CN114198093B (en) Measuring method for subway shield tunnel
Paterson Part 2 surveys for Tumut 1 power station
Cary Geodetic surveying
SU49282A1 (en) Method and device for measuring tubing when manually laying them in an inclined shaft
SU125900A1 (en) Device for determining the direction of bottom currents
Leonard et al. An underwater measuring device
Kiselev et al. A method of transferring the azimuth and coordinates to the sublevel through a vertical mine working using a laser level
CN205014932U (en) Foundation buried depth measuring apparatu