SU653396A1 - Temporary pneumatic roof support - Google Patents

Temporary pneumatic roof support

Info

Publication number
SU653396A1
SU653396A1 SU762393168A SU2393168A SU653396A1 SU 653396 A1 SU653396 A1 SU 653396A1 SU 762393168 A SU762393168 A SU 762393168A SU 2393168 A SU2393168 A SU 2393168A SU 653396 A1 SU653396 A1 SU 653396A1
Authority
SU
USSR - Soviet Union
Prior art keywords
carriage
air bellows
support
air
pneumatic
Prior art date
Application number
SU762393168A
Other languages
Russian (ru)
Inventor
Юрий Александрович Рыжков
Виктор Евгеньевич Ануфриев
Original Assignee
Кузбасский Политехнический Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Кузбасский Политехнический Институт filed Critical Кузбасский Политехнический Институт
Priority to SU762393168A priority Critical patent/SU653396A1/en
Application granted granted Critical
Publication of SU653396A1 publication Critical patent/SU653396A1/en

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Processing Of Solid Wastes (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

(54) ВРЕМЕННАЯ ПНЕВМАТИЧЕСКАЯ КРЕПК(54) TEMPORAL PNEUMATIC CRACK

одвижную каретку 7 с торцорыми приивами 8, размещенную между эластичыми баллонами 4 и 5 и свободно охатыван цую жесткий цилиндрический корпус 1, дополнительный распорныйпневмобсшл .он 9, установленный на подвижной каретке 7.a movable carriage 7 with buttresses Priivi 8, placed between elastic cylinders 4 and 5 and freely covered with a rigid cylindrical body 1, an additional expansion valve He 9, mounted on the movable carriage 7.

Жесткий цилиндрический корпус 1 имеет продольную прорезь 10, равную рабочему ходу подвижной каретки 7, служащую направл ющей дл  подвижной каретки. Основные эластичные пневмобаллоны и дополнительньлй распорный пневмобаллон имеют штуцеры 11, сообщающиес  с полостью жесткого цилиндрического корпуса 1 и подсоеДиненные к воздухопроводам 12 соответственно каждый к своему. Плоские перегородки 3 раздел ют полость корпуса 1 на вентил ционные Б и грузовое В атделени . Дл  дренировани  отработанной воды из закладочного массива 13 предусмотрены дренажные трубки или канавки.14.The rigid cylindrical body 1 has a longitudinal slot 10, equal to the working stroke of the movable carriage 7, serving as a guide for the movable carriage. The main elastic air bellows and the additional expansion air bellows have fittings 11 which are connected to the cavity of the rigid cylindrical body 1 and connected to the air ducts 12, respectively, each to its own. Flat partitions 3 divide the cavity of body 1 into vent B and cargo compartment B. Drainage pipes or grooves are provided for draining the waste water from the backfill array 13.

Ведение горных работ с применением предлагаемой временной пневматической крепи заключаетс  в следующем ., Конвейерными квершлагами вскрывают пласт, проход т слоевые- штреки до границ выемочного пол  и вынимают один поперечно-наклонный слой илиMining with the use of the proposed temporary pneumatic support is as follows. By means of conveyor crosscuts, the formation is opened, layer-drifts pass to the borders of the excavation floor, and one transversely inclined layer is removed.

полосу. Сооружают водонепроницаемое бетонное основание сводчатой формы, на вертикальные стенки которого . укдадывайт раму, а на раму устанав-, Ливают опорную секцию. К низу бпорной секции креп т коллектор и погрузочный лк/к (бетонное основание, рама, опорна секци  с коллектором и погрузОчным люком не показаны) . на опорную секцию монтируют предлагаемую временную пневматическую репь. После,этого выработанное пространство -з айШНйют гидравлической зайлайкой , например быстротвердеющей, осгаютс  только слоевые штреки. Во врем  твердени  закладки эластичные пневмобаллоны 4,5,6 и дополнительный распорЕЛгй пневмобаллон 9 предла ,гаёмойкрепи, наход тс  под давлением сжатого воздуха, который подаетс  в,нйх через штуцеры 11 по воздухопроводам , .12. Так формируетс  скатlane. Construct a waterproof concrete base of the vaulted shape, on the vertical walls of which. Pack the frame, and set the frame onto the frame, Liv the support section. The collector and loading lx / c are fastened to the bottom of the bore section (the concrete base, frame, support section with the collector and loading box are not shown). on the support section mount the proposed temporary pneumatic turnips. After that, the developed space is made by a hydraulic hitch, for example, fast-hardening, only layer drifts fall. During the hardening of the laying, the elastic air bellows 4,5,6 and the additional air bellows 9 of the precursor jack are under the pressure of compressed air that is fed into the pipe through the nozzles 11 through the air ducts, .12. So the scat is formed

в закладочном ма,ссиве. Затем в каждои ,блоке, отрабатываемом на один ч .скат, нарезают,очистные забои и производ т выемку угл . Отбитый уголь транспортируетс  конвейерами в грузозвоё отделение В предлагаемой крепи , по которому самотеком спускаетс  до конвейерного квер-шлага, и т.д. После полной зыемки очередного поперечно-наклонного сло  или полосы- и затвердени  закладки временную пневматическую крепь передвигают вверх. in bookmark ma, ssiv. Then, in each block, worked out for one hour of the skate, cut, clearing faces and make coal dredging. Repulsed coal is transported by conveyors to the cargo compartment in the proposed lining, which descends by gravity to the conveyor curver, etc. After a complete transversely inclined layer or strip has been completely filled, the temporary pneumatic support is moved upwards.

Пёрёдайжка осуществл етс  следующим образом.The transfer is carried out as follows.

Снимаетс  с распора дополнительный пневмобаллон 9, а в пневмобаллонах 4 и 5 создаетс  разность давлени . За счет преобладани  давлени  сжатого воздуха в пневмобаллрне 5 подвижна  каретка 7 под его напором перемещаетс  вверх по жёсткому цилиндрическому корпусу 1 на заданный шаг передвижки. При этом верхний торцовый прилив 8. подвижной каретки 7 выворачивает пневмобаллон 4 внутрь что позвол ет избежать трени  внешней оболочки пневмобаллона 4 о закладочный массив 13. Затем сжатый воздух подаетс  в дополнительный пневмобаллон 9, который ставитс  под распор, а в пневмобаллоне 6 сбрасываетс  давление. Создаетс  противоположна  по знаку разность давлени  в пневмобаллонах 4 и 5. Пневмобаллон 4 с преобладающим давлением сжатого воздуха, упира сь во фланец 2, подает жесткий цилиндрический корпус 1 вверх на шаг передвижки. После этого пневмобаллон 6 распираетс . При стравливании сжатого воздуха пневмобаллоны соедин ютс  с атмосферой. Вслед за передвижкой предлагаемой крепи на шаг закладки производ т оснастку ската,-а затем подают закладочный материал в незабученную часть выработанного пространства и вновь нарезают очистные забои.An additional air spring 9 is removed from the thrust space, and a pressure difference is created in the air pressure tubes 4 and 5. Due to the prevalence of pressure of compressed air in the pneumatic ball 5, the movable carriage 7 under its pressure moves upward along the rigid cylindrical body 1 by a predetermined step of the movement. At the same time, the upper end tide 8. of the movable carriage 7 turns the air bladder 4 inward, thus avoiding friction between the outer casing of the air bladder 4 and the filling mass 13. Then compressed air is supplied to the additional air bladder 9, which is under the thrust, and pressure is released in the air bladder 6. An opposite in sign is created the pressure difference in the air bellows 4 and 5. The air balloon 4, with the prevailing pressure of compressed air, abutted against the flange 2, delivers the rigid cylindrical body 1 upward by a step of shifting. Thereafter, the air bladder 6 is dispensed. When the compressed air is blown off, the air bellows are connected to the atmosphere. Following the movement of the proposed support for the laying step, the ramp is equipped, and then the filling material is fed into the unlearned part of the developed space and the cutting faces are cut again.

Отработанна  вода дренируетс  из закладочного массива по дренажным трубкам или канавкам 14. Waste water is drained from the backfill array through drainage tubes or grooves 14.

Предлагаемое устройство позволит переместить место производства оснастки ската от фронта.возведени  закладки, т.е. сделать эти два процесса независимыми, увеличить скорость возведени  закладки, повысить производительность по добыче угл , снизить расходы на возведение посто нного креплени  ската.The proposed device will allow to move the place of manufacture of the slope equipment from the front of the bookmark, i.e. to make these two processes independent, to increase the speed of erection of the bookmark, to increase the productivity of coal mining, to reduce the cost of erecting the permanent mounting of the slope.

Claims (2)

1.Временна  пневматическа  крепь, включающа  жесткий цилиндрический корпус и закрепленные на,нем эластичные пневмобаллоны, отличающа с  тем, что, с целью увеличени  скорости возведени  закладки, она снабжена механизмом передвижки, выполненным из охватывающей корпус каретки, котора  посредством направл ющих в корпусе установлена между эластичными пневмобаллонами с возможностью перемещени  в осевом направлении , и установленного в каретке1. A temporary pneumatic support, comprising a rigid cylindrical body and fixed on it elastic air bellows, characterized in that, in order to increase the speed of erection of the bookmark, it is equipped with a shifting mechanism made of a carriage enclosing the body, which by means of guides in the body is installed between flexible air bellows with the ability to move in the axial direction, and installed in the carriage g распорного пневмобаллона.g expansion air bellows. 2.Крепь - по п.1, о т л и ч а ю щ а   с   тем, что, с целью уменьшени  трени  крайних оболочек эластич ных пневмоба ллонов о стенкИ выработки в процессе передвижки крепи, в торцовых част х каретки выполнены2. A support according to claim 1, so that in order to reduce the friction of the outer shells of elastic pneumoblons on the walls of the production in the process of advancing the support, in the end parts of the carriage 5. 65339665. 6533966 приливы дл  взаимодействи  с пневмо- 1. Авторское свидетельство СССР баллонами., 420786, кл. Е 21D Ь/ОО, 1972..tides for interaction with pneumatic 1. USSR inventor's certificate with balloons., 420786, cl. E 21D b / GS, 1972 .. Источники информации, прин тые2. Авторское свидетельство СССРSources of information taken2. USSR author's certificate во внимание при экспертизе № 318700, кл. Е 21t)5/00, 1969.into account in examination No. 318700, cl. E 21t) 5/00, 1969. ,л« 8й:, l "8th: ШSh Фиг. /FIG. /
SU762393168A 1976-08-01 1976-08-01 Temporary pneumatic roof support SU653396A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762393168A SU653396A1 (en) 1976-08-01 1976-08-01 Temporary pneumatic roof support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762393168A SU653396A1 (en) 1976-08-01 1976-08-01 Temporary pneumatic roof support

Publications (1)

Publication Number Publication Date
SU653396A1 true SU653396A1 (en) 1979-03-25

Family

ID=20672997

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762393168A SU653396A1 (en) 1976-08-01 1976-08-01 Temporary pneumatic roof support

Country Status (1)

Country Link
SU (1) SU653396A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4490076A (en) * 1981-11-14 1984-12-25 Dobson Park Industries Plc. Underground support devices
RU2472935C1 (en) * 2011-07-29 2013-01-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Protection method of reusable development workings

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4490076A (en) * 1981-11-14 1984-12-25 Dobson Park Industries Plc. Underground support devices
RU2472935C1 (en) * 2011-07-29 2013-01-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Protection method of reusable development workings

Similar Documents

Publication Publication Date Title
US2990166A (en) Mining method
CN101929341B (en) Construction method for TBM synchronization lining
CN102444401B (en) Coal mining method by filling on blasting mining face of thin coal seam and relevant equipment
SU653396A1 (en) Temporary pneumatic roof support
CN1056907C (en) Apparatus for movement along an underground passage and method using same
CN108194106B (en) The mobile pouring construction technique of tunnel bolt-spary supports concrete trolley
FI80756B (en) Method for the construction of storage spaces in rock for liquid products
CN202810858U (en) Roadway heading machine
CH613398A5 (en) Installation for producing composite beams
KR101209070B1 (en) A advance sleeve box structure for tunnel construct
SU961978A1 (en) Installation for manufacturing tubular articles
CN111794772A (en) Supporting method for arch of tunnel concrete module
SU1703826A1 (en) Pneumatic support unit
SU866207A1 (en) Slide form for tunnel
CN218467613U (en) Special-shaped heading machine and construction structure system
CN215042786U (en) Novel underground self-moving equipment train
CN219195979U (en) Underground diaphragm wall construction device for weak rock-soil body
CN216342310U (en) Novel robot is transported to colliery tunnelling supporting material
ES442115A1 (en) Method of and apparatus for handling and erecting builtup steel section supporting frames in large section underground roadways or tunnels
CN208122863U (en) Tunnel bolt-spary supports concrete slip-form formula moves pouring forms
SU1078107A1 (en) Method of forming mine workings in setting filling-up mass
SU1079842A1 (en) Method of working steeply sloping ore bodies
SU727863A1 (en) Mobile power-operated form
SU1754908A1 (en) Device for side ore drawing
SU399412A1 (en) BODY VEHICLE