SU653396A1 - Temporary pneumatic roof support - Google Patents
Temporary pneumatic roof supportInfo
- Publication number
- SU653396A1 SU653396A1 SU762393168A SU2393168A SU653396A1 SU 653396 A1 SU653396 A1 SU 653396A1 SU 762393168 A SU762393168 A SU 762393168A SU 2393168 A SU2393168 A SU 2393168A SU 653396 A1 SU653396 A1 SU 653396A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- carriage
- air bellows
- support
- air
- pneumatic
- Prior art date
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Processing Of Solid Wastes (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
(54) ВРЕМЕННАЯ ПНЕВМАТИЧЕСКАЯ КРЕПК(54) TEMPORAL PNEUMATIC CRACK
одвижную каретку 7 с торцорыми приивами 8, размещенную между эластичыми баллонами 4 и 5 и свободно охатыван цую жесткий цилиндрический корпус 1, дополнительный распорныйпневмобсшл .он 9, установленный на подвижной каретке 7.a movable carriage 7 with buttresses Priivi 8, placed between elastic cylinders 4 and 5 and freely covered with a rigid cylindrical body 1, an additional expansion valve He 9, mounted on the movable carriage 7.
Жесткий цилиндрический корпус 1 имеет продольную прорезь 10, равную рабочему ходу подвижной каретки 7, служащую направл ющей дл подвижной каретки. Основные эластичные пневмобаллоны и дополнительньлй распорный пневмобаллон имеют штуцеры 11, сообщающиес с полостью жесткого цилиндрического корпуса 1 и подсоеДиненные к воздухопроводам 12 соответственно каждый к своему. Плоские перегородки 3 раздел ют полость корпуса 1 на вентил ционные Б и грузовое В атделени . Дл дренировани отработанной воды из закладочного массива 13 предусмотрены дренажные трубки или канавки.14.The rigid cylindrical body 1 has a longitudinal slot 10, equal to the working stroke of the movable carriage 7, serving as a guide for the movable carriage. The main elastic air bellows and the additional expansion air bellows have fittings 11 which are connected to the cavity of the rigid cylindrical body 1 and connected to the air ducts 12, respectively, each to its own. Flat partitions 3 divide the cavity of body 1 into vent B and cargo compartment B. Drainage pipes or grooves are provided for draining the waste water from the backfill array 13.
Ведение горных работ с применением предлагаемой временной пневматической крепи заключаетс в следующем ., Конвейерными квершлагами вскрывают пласт, проход т слоевые- штреки до границ выемочного пол и вынимают один поперечно-наклонный слой илиMining with the use of the proposed temporary pneumatic support is as follows. By means of conveyor crosscuts, the formation is opened, layer-drifts pass to the borders of the excavation floor, and one transversely inclined layer is removed.
полосу. Сооружают водонепроницаемое бетонное основание сводчатой формы, на вертикальные стенки которого . укдадывайт раму, а на раму устанав-, Ливают опорную секцию. К низу бпорной секции креп т коллектор и погрузочный лк/к (бетонное основание, рама, опорна секци с коллектором и погрузОчным люком не показаны) . на опорную секцию монтируют предлагаемую временную пневматическую репь. После,этого выработанное пространство -з айШНйют гидравлической зайлайкой , например быстротвердеющей, осгаютс только слоевые штреки. Во врем твердени закладки эластичные пневмобаллоны 4,5,6 и дополнительный распорЕЛгй пневмобаллон 9 предла ,гаёмойкрепи, наход тс под давлением сжатого воздуха, который подаетс в,нйх через штуцеры 11 по воздухопроводам , .12. Так формируетс скатlane. Construct a waterproof concrete base of the vaulted shape, on the vertical walls of which. Pack the frame, and set the frame onto the frame, Liv the support section. The collector and loading lx / c are fastened to the bottom of the bore section (the concrete base, frame, support section with the collector and loading box are not shown). on the support section mount the proposed temporary pneumatic turnips. After that, the developed space is made by a hydraulic hitch, for example, fast-hardening, only layer drifts fall. During the hardening of the laying, the elastic air bellows 4,5,6 and the additional air bellows 9 of the precursor jack are under the pressure of compressed air that is fed into the pipe through the nozzles 11 through the air ducts, .12. So the scat is formed
в закладочном ма,ссиве. Затем в каждои ,блоке, отрабатываемом на один ч .скат, нарезают,очистные забои и производ т выемку угл . Отбитый уголь транспортируетс конвейерами в грузозвоё отделение В предлагаемой крепи , по которому самотеком спускаетс до конвейерного квер-шлага, и т.д. После полной зыемки очередного поперечно-наклонного сло или полосы- и затвердени закладки временную пневматическую крепь передвигают вверх. in bookmark ma, ssiv. Then, in each block, worked out for one hour of the skate, cut, clearing faces and make coal dredging. Repulsed coal is transported by conveyors to the cargo compartment in the proposed lining, which descends by gravity to the conveyor curver, etc. After a complete transversely inclined layer or strip has been completely filled, the temporary pneumatic support is moved upwards.
Пёрёдайжка осуществл етс следующим образом.The transfer is carried out as follows.
Снимаетс с распора дополнительный пневмобаллон 9, а в пневмобаллонах 4 и 5 создаетс разность давлени . За счет преобладани давлени сжатого воздуха в пневмобаллрне 5 подвижна каретка 7 под его напором перемещаетс вверх по жёсткому цилиндрическому корпусу 1 на заданный шаг передвижки. При этом верхний торцовый прилив 8. подвижной каретки 7 выворачивает пневмобаллон 4 внутрь что позвол ет избежать трени внешней оболочки пневмобаллона 4 о закладочный массив 13. Затем сжатый воздух подаетс в дополнительный пневмобаллон 9, который ставитс под распор, а в пневмобаллоне 6 сбрасываетс давление. Создаетс противоположна по знаку разность давлени в пневмобаллонах 4 и 5. Пневмобаллон 4 с преобладающим давлением сжатого воздуха, упира сь во фланец 2, подает жесткий цилиндрический корпус 1 вверх на шаг передвижки. После этого пневмобаллон 6 распираетс . При стравливании сжатого воздуха пневмобаллоны соедин ютс с атмосферой. Вслед за передвижкой предлагаемой крепи на шаг закладки производ т оснастку ската,-а затем подают закладочный материал в незабученную часть выработанного пространства и вновь нарезают очистные забои.An additional air spring 9 is removed from the thrust space, and a pressure difference is created in the air pressure tubes 4 and 5. Due to the prevalence of pressure of compressed air in the pneumatic ball 5, the movable carriage 7 under its pressure moves upward along the rigid cylindrical body 1 by a predetermined step of the movement. At the same time, the upper end tide 8. of the movable carriage 7 turns the air bladder 4 inward, thus avoiding friction between the outer casing of the air bladder 4 and the filling mass 13. Then compressed air is supplied to the additional air bladder 9, which is under the thrust, and pressure is released in the air bladder 6. An opposite in sign is created the pressure difference in the air bellows 4 and 5. The air balloon 4, with the prevailing pressure of compressed air, abutted against the flange 2, delivers the rigid cylindrical body 1 upward by a step of shifting. Thereafter, the air bladder 6 is dispensed. When the compressed air is blown off, the air bellows are connected to the atmosphere. Following the movement of the proposed support for the laying step, the ramp is equipped, and then the filling material is fed into the unlearned part of the developed space and the cutting faces are cut again.
Отработанна вода дренируетс из закладочного массива по дренажным трубкам или канавкам 14. Waste water is drained from the backfill array through drainage tubes or grooves 14.
Предлагаемое устройство позволит переместить место производства оснастки ската от фронта.возведени закладки, т.е. сделать эти два процесса независимыми, увеличить скорость возведени закладки, повысить производительность по добыче угл , снизить расходы на возведение посто нного креплени ската.The proposed device will allow to move the place of manufacture of the slope equipment from the front of the bookmark, i.e. to make these two processes independent, to increase the speed of erection of the bookmark, to increase the productivity of coal mining, to reduce the cost of erecting the permanent mounting of the slope.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU762393168A SU653396A1 (en) | 1976-08-01 | 1976-08-01 | Temporary pneumatic roof support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU762393168A SU653396A1 (en) | 1976-08-01 | 1976-08-01 | Temporary pneumatic roof support |
Publications (1)
Publication Number | Publication Date |
---|---|
SU653396A1 true SU653396A1 (en) | 1979-03-25 |
Family
ID=20672997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU762393168A SU653396A1 (en) | 1976-08-01 | 1976-08-01 | Temporary pneumatic roof support |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU653396A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4490076A (en) * | 1981-11-14 | 1984-12-25 | Dobson Park Industries Plc. | Underground support devices |
RU2472935C1 (en) * | 2011-07-29 | 2013-01-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" | Protection method of reusable development workings |
-
1976
- 1976-08-01 SU SU762393168A patent/SU653396A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4490076A (en) * | 1981-11-14 | 1984-12-25 | Dobson Park Industries Plc. | Underground support devices |
RU2472935C1 (en) * | 2011-07-29 | 2013-01-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" | Protection method of reusable development workings |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2990166A (en) | Mining method | |
CN101929341B (en) | Construction method for TBM synchronization lining | |
CN102444401B (en) | Coal mining method by filling on blasting mining face of thin coal seam and relevant equipment | |
SU653396A1 (en) | Temporary pneumatic roof support | |
CN1056907C (en) | Apparatus for movement along an underground passage and method using same | |
CN108194106B (en) | The mobile pouring construction technique of tunnel bolt-spary supports concrete trolley | |
FI80756B (en) | Method for the construction of storage spaces in rock for liquid products | |
CN202810858U (en) | Roadway heading machine | |
CH613398A5 (en) | Installation for producing composite beams | |
KR101209070B1 (en) | A advance sleeve box structure for tunnel construct | |
SU961978A1 (en) | Installation for manufacturing tubular articles | |
CN111794772A (en) | Supporting method for arch of tunnel concrete module | |
SU1703826A1 (en) | Pneumatic support unit | |
SU866207A1 (en) | Slide form for tunnel | |
CN218467613U (en) | Special-shaped heading machine and construction structure system | |
CN215042786U (en) | Novel underground self-moving equipment train | |
CN219195979U (en) | Underground diaphragm wall construction device for weak rock-soil body | |
CN216342310U (en) | Novel robot is transported to colliery tunnelling supporting material | |
ES442115A1 (en) | Method of and apparatus for handling and erecting builtup steel section supporting frames in large section underground roadways or tunnels | |
CN208122863U (en) | Tunnel bolt-spary supports concrete slip-form formula moves pouring forms | |
SU1078107A1 (en) | Method of forming mine workings in setting filling-up mass | |
SU1079842A1 (en) | Method of working steeply sloping ore bodies | |
SU727863A1 (en) | Mobile power-operated form | |
SU1754908A1 (en) | Device for side ore drawing | |
SU399412A1 (en) | BODY VEHICLE |