SU632320A1 - Method of working fertile soil when building hydraulic engineering structure - Google Patents

Method of working fertile soil when building hydraulic engineering structure

Info

Publication number
SU632320A1
SU632320A1 SU742018422A SU2018422A SU632320A1 SU 632320 A1 SU632320 A1 SU 632320A1 SU 742018422 A SU742018422 A SU 742018422A SU 2018422 A SU2018422 A SU 2018422A SU 632320 A1 SU632320 A1 SU 632320A1
Authority
SU
USSR - Soviet Union
Prior art keywords
working
hydraulic engineering
fertile soil
engineering structure
building hydraulic
Prior art date
Application number
SU742018422A
Other languages
Russian (ru)
Inventor
Алексей Матвеевич Бабец
Георгий Васильевич Коротаев
Виктор Владимирович Лосицкий
Original Assignee
Научно-исследовательский институт по проблемам Курской магнитной аномалии им. Л.Д.Шевякова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-исследовательский институт по проблемам Курской магнитной аномалии им. Л.Д.Шевякова filed Critical Научно-исследовательский институт по проблемам Курской магнитной аномалии им. Л.Д.Шевякова
Priority to SU742018422A priority Critical patent/SU632320A1/en
Application granted granted Critical
Publication of SU632320A1 publication Critical patent/SU632320A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

чэского сооружени , включающий съем плодородного грунта, его штабелирование , гидротранспортирование и наV&SS на рекультивируемые участки, о тЛ и Ч а ю ei и и с   тем, что, с целью снижени  затрат на разработку плодородного грунта и ускорени  ввода гидротехнического сооружени  в эксплуатацию, ложе гидротехнического сооружени  заполн ют водой и одновременно производ т разработку штабел The construction of a fertile soil, its stacking, hydrotransporting and V & SS to the recultivated sites, tl and C ei, and with the aim the bed of the hydraulic structure is filled with water and at the same time the development of the stack

плодородного грунта средствами гидромеханизации .fertile soil by means of hydromechanization.

2. Способ ПОП.1, отличающийс  тем, что разработку грунта из штабелей производ т после их частичного затоплени .2. Method POP.1, characterized in that the development of soil from stacks is carried out after their partial flooding.

Источники информации, прин тые во внимание при экспертизе;Sources of information taken into account in the examination;

1, Авторское свидетельство СССР № 380263, кл. А 01 В 79/02, 1973,1, USSR Author's Certificate No. 380263, cl. A 01 B 79/02, 1973,

SU742018422A 1974-04-19 1974-04-19 Method of working fertile soil when building hydraulic engineering structure SU632320A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU742018422A SU632320A1 (en) 1974-04-19 1974-04-19 Method of working fertile soil when building hydraulic engineering structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU742018422A SU632320A1 (en) 1974-04-19 1974-04-19 Method of working fertile soil when building hydraulic engineering structure

Publications (1)

Publication Number Publication Date
SU632320A1 true SU632320A1 (en) 1978-11-15

Family

ID=20582735

Family Applications (1)

Application Number Title Priority Date Filing Date
SU742018422A SU632320A1 (en) 1974-04-19 1974-04-19 Method of working fertile soil when building hydraulic engineering structure

Country Status (1)

Country Link
SU (1) SU632320A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672198A (en) * 2016-03-25 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 Land-building and plowing structure for reservoir inundation and immersion area and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672198A (en) * 2016-03-25 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 Land-building and plowing structure for reservoir inundation and immersion area and construction method thereof

Similar Documents

Publication Publication Date Title
FR2280749A1 (en) SHELTER STRUCTURE EASY TO ERIGATE, AND ITS ERECTION PROCEDURE
FR2286509A1 (en) LAND GENERATOR WITH SOLAR BATTERIES
FR2292726A1 (en) ESTERS POLYMERIZABLE UNDER THE ACTION OF ACTINIC RADIATION, THEIR PREPARATION AND THEIR USES
BE810521A (en) IMPROVEMENTS TO FOUNDATIONS
OA04994A (en) Improvements to prefabricated constructions.
NL190529B (en) FILLABLE IN OUTWARD DIRECTION OF WELVABLE DAM.
IT7923920A0 (en) DOUBLE ACTING HYDRAULIC PRESS TO PRODUCE ARTIFICIAL BRICKS.
SU632320A1 (en) Method of working fertile soil when building hydraulic engineering structure
IT1027344B (en) PROCEDURE AND COMPOSITION FOR THE ACID ATTACK OF THE SUBSOIL CROSSED BY A WELL
AT337105B (en) DRILL GRAPPLE FOR PILE FOUNDATIONS, WELL DRILLING ETC.
IT1207279B (en) HYDRAULIC DEVICE TO PRODUCE LARGE TRACTION FORCES.
CA1014478A (en) Hydraulic excavator driven by more than one type of energy
JPS5235058A (en) Tower crane
JPS5673725A (en) Construction of foundation under water
SU560561A1 (en) Rooster
GB1203893A (en) Method of producing porous light ballast grains
SU594248A1 (en) Pile foundation for earthquake-proof building, structure
JPS51145013A (en) Construction method of tank yard
SU590179A1 (en) Floating crane
SU570673A1 (en) Device for building foundation
ES216490Y (en) FOUNDATION PILE.
SU63683A1 (en) Method of sealing joints of water pipes and other openings in engineering structures in winter
SU666247A1 (en) Method of erecting foundation on unsteady soil
SU675121A1 (en) Device for cementation of building joints
SU536285A1 (en) Foundation for tower structures