SU619565A1 - Turbine watercourse - Google Patents

Turbine watercourse

Info

Publication number
SU619565A1
SU619565A1 SU762404318A SU2404318A SU619565A1 SU 619565 A1 SU619565 A1 SU 619565A1 SU 762404318 A SU762404318 A SU 762404318A SU 2404318 A SU2404318 A SU 2404318A SU 619565 A1 SU619565 A1 SU 619565A1
Authority
SU
USSR - Soviet Union
Prior art keywords
turbine
tunnel
trash
watercourse
branches
Prior art date
Application number
SU762404318A
Other languages
Russian (ru)
Inventor
Юрий Павлович Бурцев
Станислав Михайлович Докучаев
Вилен Федорович Корчевский
Original Assignee
Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука filed Critical Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука
Priority to SU762404318A priority Critical patent/SU619565A1/en
Application granted granted Critical
Publication of SU619565A1 publication Critical patent/SU619565A1/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

Изобретение относитс  к области гидротехнических сооружений и предназначаетс  дл  подвода воды от водоприемников до агрегатов гидроэлектростанций. Известен турбинный водовод высоконапорной гидроэлектростанции, включающей подвод щий и сбросной туннели с верховыми и низовыми затворами и сороудерживающие рещетки, установленные перед ответвлени ми к турбинам 1. При этом сороудерживающие решетки могут быть как плоские , установленные на входе в каждое ответвление к агрегату, так и в виде общей цилиндрической рещетки дл  всех ответвлений , установленной на всей длине развилки. Недостатками известного турбинного водовода  вл ютс , во-первых, существенные потери напора на входах в ответвлени  при работе катастрофического водосброса и, во-вторых, то, что сороудерживающие рещетки оказываютс  в зоне неблагопри тных повыщенных скоростей транзитного потока. Цель изобретени  улучшение условий ра боты турбинного водовода путем снижени  потерь напора на сороудерживающих рещетках . Указанна  цель достигаетс  тем, что подвод щий туннель имеет отвод, который выполнен в виде сбросного туннел . Сброс .производитс  в обход участка туннел  с ответвлени ми к турбинам, и.сороудерживающие рещетки оказываютс  изолированными от воздействи  повыщенных, против расчетного , расходов воды. На чертеже изображен продольный разрез турбинного водовода. Турбинный водовод имеет подвод щий туннель 1 с ответвлени ми к турбинам 2, защищенными сороудерживающими решетками 3, сбросной туннель 4, отвод 5, переход щий В сбросной туннель, и в,ерховые и низовые затворы 6, 7, 8. При закрытом низовом затворе 8 в под: вод щий туннель 1 и далее к ответвлени м 2 поступает расчетный расход ГЭС. Излищний расход через отвод 5 уходит на сброс. Затвор 7 опускаетс  при расходах воды, поступаю1Дих на ГЭС, меньщих или равных расчетному. Затвор 8 предусмотрен дл  пропуска промывочных расходов. Снижа  транзитный расход через подвод щий туннель, снижаетс  величина отношени  транзитного расхода к расходу ответвлени  и как следствие, снижаютс  потери напора на входе в ответвление, а также снижаютс  скорости потока в подвод щем туннеле, создава  более благопри тные услови  дл  устойчивости сороудерживающих решеток.The invention relates to the field of hydraulic structures and is intended for the supply of water from water intakes to units of hydroelectric power plants. The turbine water conduit of a high-pressure hydroelectric power station is known, including supply and discharge tunnels with upper and lower gates and trash rags, installed before the branches to the turbines 1. At the same time, the trash grids can be either flat, installed at the entrance to each branch to the unit, or the form of a common cylindrical grid for all branches, installed on the entire length of the fork. The disadvantages of a known turbine duct are, firstly, substantial head losses at the inputs to the branches during the operation of the catastrophic spillway and, secondly, that the trash rags are in the zone of adverse high transit flow rates. The purpose of the invention is to improve the working conditions of the turbine water conduit by reducing the pressure loss on the trash rails. This goal is achieved by the fact that the supply tunnel has a tap, which is designed as a discharge tunnel. The dumping is performed around the tunnel section with branches to the turbines, and the trash grids are isolated from the effects of higher than expected water consumption. The drawing shows a longitudinal section of a turbine conduit. The turbine water conduit has a supply tunnel 1 with branches to the turbines 2 protected by trash racks 3, waste tunnel 4, branch 5, passing into the waste tunnel, and in, ground and downstream gates 6, 7, 8. With the bottom gate closed 8 In the following: the driving tunnel 1 and further to the branches 2 the estimated discharge of the hydroelectric power station is supplied. Extreme flow through the outlet 5 goes to the reset. The shutter 7 is lowered at the flow rates of water supplied to the hydropower plants that are less than or equal to the design value. A shutter 8 is provided for skipping flushing costs. By reducing transit flow through the supply tunnel, the ratio of transit flow to branch flow decreases and, as a result, the pressure loss at the entrance to the branch decreases, and the flow rates in the supply tunnel decrease, creating more favorable conditions for the stability of the trash grids.

Claims (1)

1. За вка № 2150483, кл. Е02В 5/08, 1975, по которой прин то решение о выдаче авторского свидетельства.1. For the number 2150483, cl. Е02В 5/08, 1975, according to which the decision to issue the author's certificate was made. CSpacCSpac
SU762404318A 1976-09-15 1976-09-15 Turbine watercourse SU619565A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762404318A SU619565A1 (en) 1976-09-15 1976-09-15 Turbine watercourse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762404318A SU619565A1 (en) 1976-09-15 1976-09-15 Turbine watercourse

Publications (1)

Publication Number Publication Date
SU619565A1 true SU619565A1 (en) 1978-08-15

Family

ID=20676967

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762404318A SU619565A1 (en) 1976-09-15 1976-09-15 Turbine watercourse

Country Status (1)

Country Link
SU (1) SU619565A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251506A (en) * 2011-04-29 2011-11-23 中国水电顾问集团华东勘测设计研究院 Pressure steel pipe overhaul access passage structure of high-water head hydropower station and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251506A (en) * 2011-04-29 2011-11-23 中国水电顾问集团华东勘测设计研究院 Pressure steel pipe overhaul access passage structure of high-water head hydropower station and construction method thereof
CN102251506B (en) * 2011-04-29 2013-03-20 中国水电顾问集团华东勘测设计研究院 Pressure steel pipe overhaul access passage structure of high-water head hydropower station and construction method thereof

Similar Documents

Publication Publication Date Title
Greer Water Management in the Yellow River Basin of China
US4279539A (en) Dam with transformable hydroenergetic arrangement
WO2012177182A1 (en) Diversion hydropower plant cascade
CN105257454A (en) Diversion type vortex flow power generation system
SU619565A1 (en) Turbine watercourse
CN103114565B (en) River-closure water-diversion system suitable for slope torrent watercourse water-diversion generation and hydropower stations
CN208009531U (en) A kind of forebay of electricity generation with static water
US2169249A (en) Method of and means for effecting downstream migration of fish about dams
CN111801468A (en) Power generation ecological flood control system
RU2514640C1 (en) Method to construct seismic-safe hydraulic power plants that protect rivers and environment
EP1377750B1 (en) Moveable, over-flowable and under-flowable hydro-electric power plant
US2072930A (en) Power house structure
AT205422B (en) River power plant
CN102691282B (en) Non-dam high-power power generation system in big river
CN2118089U (en) Saw tooth shaped head part of obtaining water
CN213596945U (en) Multi-dirt gate dam engineering trash float arrangement structure
CN220150210U (en) River course administers structure
Mukhammadiev et al. The use of micro hydroelectric power plants with existing hydraulic systems
SU874856A1 (en) Hydraulic engineering complex
CN213540605U (en) Circulating ditch hydraulic turbine power generation system
JP4344703B2 (en) Weir for hydroelectric power generation
SU872628A1 (en) Branching-off unit of hydraulic power station spillway duct
Onda et al. Planning of sediment bypass tunnel for hydropower dams
CN202577251U (en) No dam type high power generating system device for large river
RU2671681C1 (en) Hpp generating electric energy from the idle water discharge