SU618308A1 - Method of unloading ships at shore without mooring facilities - Google Patents

Method of unloading ships at shore without mooring facilities

Info

Publication number
SU618308A1
SU618308A1 SU742067199A SU2067199A SU618308A1 SU 618308 A1 SU618308 A1 SU 618308A1 SU 742067199 A SU742067199 A SU 742067199A SU 2067199 A SU2067199 A SU 2067199A SU 618308 A1 SU618308 A1 SU 618308A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pontoons
pontoon
towing
towing cable
cable
Prior art date
Application number
SU742067199A
Other languages
Russian (ru)
Inventor
Анатолий Васильевич Пыжиков
Борис Наумович Одлис
Николай Иванович Александров
Original Assignee
Предприятие П/Я А-1373
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я А-1373 filed Critical Предприятие П/Я А-1373
Priority to SU742067199A priority Critical patent/SU618308A1/en
Application granted granted Critical
Publication of SU618308A1 publication Critical patent/SU618308A1/en

Links

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Description

Изобретение относитс  к водному трансnopiy , в частности к способам рейдовой разгрузки судов.FIELD OF THE INVENTION The invention relates to a water transport, in particular to methods for off-shore unloading of ships.

Известен способ рейдовой разгрузки судов у необорудованного берега, вкпючающий операции погрузки грузов на понтоны, формировани  буксирного состава из поитонов с носовыми и кормовыми клюзами посредством буксирного троса, буксировки состава на буксирном тросе, св занном с пебедкой , за амфибией к берегу и разгрузки грузов из понтонов LlJ .A method is known offshore unloading ships in unequipped beaches, vkpyuchayuschy operation of loading cargoes on the pontoons, forming a tow composition of poitonov with bow and stern fairleads by towline towing composition on the tow rope, binding-bonded with pebedkoy for amphibian to shore and unloading cargo from pontoons Llj.

Однако такой способ требует больших трудозатрат и занимает много времени, так как понтоны отход т друг от друга, и дл  их сбора необходимо маневрировать амфибией. Этот недостаток существенно увеличивает врем  простоев судов под разгрузкой .However, this method requires a lot of labor and takes a lot of time, since the pontoons depart from each other, and it is necessary to maneuver amphibians to collect them. This disadvantage significantly increases the downtime of vessels under unloading.

При погрузке понтонов у борта судна каждый понтон должен иметь грузоподъемность , рассчитанную на максимальный вес штучного перевозимого груза, так как при гибкой сцепке понтонов невозможно перераспределение грузоподъемности между When loading pontoons at the ship’s side, each pontoon must have a load capacity calculated for the maximum weight of piece cargo to be carried, since with a flexible coupling of the pontoons it is not possible to redistribute the load capacity between

ними. Если в сцепке один из понтонов перегружен, а другой недогружен, то перегруженный понтон будет заливатьс  водой , а недогруженный будет двигатьс  с неиспользованным запасом ппавучести.them. If in the coupling one of the pontoons is overloaded and the other is underloaded, then the overloaded pontoon will be flooded with water, and the under loaded will move with unused reserve of conductivity.

Понтоны, рассчитанные на максимальный вес перевозимого штучного груза, имеют большие габариты и вес.The pontoons, designed for the maximum weight of transported piece cargo, have large dimensions and weight.

Claims (1)

При рейдовой разгрузке судов в услови х резкого увеличени  сопротивлени  движению, когда т гового усили  )ибии становитс  недостаточно, необходимо быст ро рассоединить, а впоследствии соединить элементы буксируемого состава дл  протаскивани  их амфибией по одному. По существующей, технологии дл  преодолени  труднопроходимых участков быстрое расформирование и формирование состава , как вприбрежной зоне, так и на мелководье , осуществить нельз . Поэтому, как следствие, при подходе к берегу грузы переваливают на волокуши. Это существенно увеличивает трудоемкость и временные затраты. При буксировке на гибкой сцепке понтонов с грузом к берегу не исключена возможность повреждени  их от ударов один о другой. Кроме того, при посадке состава на гибкой сцепке на мель трудно рассоединить понтоны, так как буксирный трос при этом сильно нат нут. Цель изобретени  заключаетс  в сок ращении потерь времени и уменьшении трудозатрат. Дл  этого при операции формировани  буксирного состава последовательно пропускают буксирный трос через носовые и кормовые клюзы каждого понтона, поочередно спускают понтоны на воду, закреп-, л юг трос на последн1ем понтоне и ст гивают буксирным тросом между собой понтоны и амфибию. На фиг. 1 показана операци  спуска понтонов на воду в процессе формировани  состава; на фиг. 2 - погрузка грузов на понтоны; на фиг. 3 - операци  заводки буксирного троса в клюзы понтона; на фиг. 4 - буксировка понтонов по мелководью и доставка их на береговой склад. Реализаци  способа осуществл етс  посредством судна 1, грузовой стрелы 2, амфибии 3, снабженной лебедкой 4 и буксирным тросом 5. В понтонах 6 выполнены носовой и кормовой кпюзы 7. Понтон в св зан со стрелой 2 посредством строп Способ осуществл етс  следующим образом . ... У борта сто щего на рейде судна 1 с помощью грузовой стрелы 2 спускают на воду a tфибию 3, оснащенную лебедкой 4 и тросом 5. Затем готов т к спуску понтоны 6. Дл  этого оставшийс  на борту судна конец буксирного троса 5 пропускают через носовой и кормовой клюзы 7 первого понтона и закрепл ют его на палубе судна. Грузовой стрелой поднимают понтон с палубы и перенос т его за бОрт Приэтом понтон скользит по буксирному тросу, соедин ющему судно с амфибией. Когда понтон опуститс  на воду, отсое- дин ют стропы, возвращают стрепу в исходное положение, а понтон занимает мес то позади актфибии. На борту судна завод т конец буксирного троса в носовой, затем в кормовой клюзы очередного .понтона и повтор ют описанные выше операции. Когда все понтоны спущены на воду, закрепл ют конец буксирного троса на корме спущенного последним понтона. Включив лебедку 4, выбирают трос и усилием лебедки ст гивают понтоны друг с другом и с амфибией. Состав загружают и буксируют амфибией к берегу, при достижении которого, когда потребное т говое усилие превььшает т говое усилие амфибии, буксирный трос ослабл ют и закрепл ют на грунте. Амфиби  поочередно.ст гивает понтоны с буксирного троса и по одному или по несколы у т нет их волоком к береговым складам. После разгрузки на складе порожние понтоны; доставленные амфибией к урезу воды, последовательно нанизывают на буксирный трос, пропуска  последний через клюзы. Включив лебедку, ст гивают пон- тоны друг с другом и с амфибией. Сформированный состав направл ют за очередной партией груза к борту судна. Формула изобретени  Способ рейдовой разгрузки судов у необорудованного берега, включак1щий операции погрузки грузов на понтоны, формировани  буксирного состава из по 1тонов с носовыми и кормовыми клюзами посредством буксирного троса, буксировки состава на буксирном тросе, св занном с -лебедкой, за амфибией к берегу и разгрузки грузов из понтонов, отличающийс  тем, что, с целью сокращени  потерь времени и уменьшени  трудозатрат, при операции формировани  буксирного состава последовательно пропускают буксирный трос через носовые и кормовые кпюзы каждого понтона , поочередно спускают понтоны на воду, закрепл ют трос на последнем понтоне и ст гивают буксирным тросом между собой понтоны и амфибию. Источники информации, прин тые во внимание при экспертизе: 1. /Морской флот, 1974, № 5.In case of raid unloading of ships under conditions of a sharp increase in resistance to movement, when the pulling force becomes insufficient, it is necessary to quickly disconnect and then connect the elements of the towed compound to be pulled by amphibians one at a time. According to the existing technology, it is not possible to quickly disband and form the composition in the coastal zone and in shallow water to overcome difficult-to-reach areas. Therefore, as a result, when approaching the shore, the goods are loaded onto scraps. This significantly increases the complexity and time costs. When towing a flexible coupling of pontoons with cargo to the shore, it is possible that they could be damaged by impacts on one another. In addition, when landing on a flexible coupling, the pontoons are difficult to disconnect, since the towing cable is very tight. The purpose of the invention is to reduce time losses and reduce labor costs. To do this, during the formation of the towing structure, the towing cable is successively passed through the bow and stern gates of each pontoon, alternately lowering the pontoons into the water, securing the cable on the last pontoon and pulling the pontoons and the amphibian with the towing cable. FIG. Figure 1 shows the operation of launching the pontoons into the water during the formation of the composition; in fig. 2 - loading cargo on the pontoons; in fig. 3 — operation of hauling a towline into the pontoon cliffs; in fig. 4 - towing pontoons in shallow water and delivering them to the onshore warehouse. The implementation of the method is carried out by the vessel 1, the cargo boom 2, the amphibian 3, equipped with a winch 4 and a towing cable 5. The pontoons 6 are bow and stern 7. The pontoon is connected to the boom 2 by means of lines. The method is as follows. ... At the board of the vessel standing in the roadstead 1, a cargo boom 2 is launched into the water, equipped with a winch 4 and a cable 5. Then the pontoons 6 are prepared for launching. For this, the remaining end of the towing cable 5 is passed through The fore and aft gates 7 of the first pontoon and secure it to the deck of the vessel. The cargo boom lifts the pontoon from the deck and carries it overboard. The pontoon slides along the towing cable connecting the vessel with the amphibian. When the pontoon is lowered onto the water, the lines are removed, they return the strep to its original position, and the pontoon takes up a month behind the actofibi. On board the ship, the end of the towline in the bow is pulled in, then in the stern gates of the next pontoon, and the operations described above are repeated. When all the pontoons are launched, they fix the end of the towing cable at the stern of the last pontoon. Turning on the winch 4, choose a cable and force the winch to pull the pontoons with each other and with amphibian. The compound is loaded and towed to amphibian ashore, upon reaching which, when the required pulling force exceeds the pulling force of the amphibian, the towing cable is loosened and secured to the ground. The amphibi alternately pulls the pontoons from the towing cable one by one or several times, they do not have them dragged to the coastal warehouses. After unloading in stock empty pontoons; Delivered by amphibians to the water's edge, they are successively strung on a towing cable, the latter passing through the clouds. Turning on the winch, they pull pontoons with each other and with amphibians. The formed composition is sent for the next batch of cargo to the side of the vessel. The invention The method of roadside unloading of ships near an unequipped coast, including the operations of loading cargo onto pontoons, forming a tug of 1tones with fore and aft cranes by means of a towing cable, towing a composition on a towing cable connected to the winch, behind the amphibian to the coast and cargo from pontoons, characterized in that, in order to reduce time losses and reduce labor costs, during the operation of the formation of a towing structure, the towing cable is successively passed through the bow and Mobile pontoons of each pontoon, alternately lowering the pontoons into the water, fix the cable on the last pontoon and pull the pontoons and the amphibian together with a towing cable. Sources of information taken into account in the examination: 1. / Navy, 1974, № 5. NN Фиг.11 54 254 2 Фиг. 2FIG. 2
SU742067199A 1974-10-14 1974-10-14 Method of unloading ships at shore without mooring facilities SU618308A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU742067199A SU618308A1 (en) 1974-10-14 1974-10-14 Method of unloading ships at shore without mooring facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU742067199A SU618308A1 (en) 1974-10-14 1974-10-14 Method of unloading ships at shore without mooring facilities

Publications (1)

Publication Number Publication Date
SU618308A1 true SU618308A1 (en) 1978-08-05

Family

ID=20598306

Family Applications (1)

Application Number Title Priority Date Filing Date
SU742067199A SU618308A1 (en) 1974-10-14 1974-10-14 Method of unloading ships at shore without mooring facilities

Country Status (1)

Country Link
SU (1) SU618308A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2616506C1 (en) * 2016-01-28 2017-04-17 Федеральное государственное унитарное предприятие "Крыловский государственный научный центр" Arctic navigation transport vessel, equipped with composed self-propelled ferry based on additional functional mobile modules for work in conditions of extremely shallow water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2616506C1 (en) * 2016-01-28 2017-04-17 Федеральное государственное унитарное предприятие "Крыловский государственный научный центр" Arctic navigation transport vessel, equipped with composed self-propelled ferry based on additional functional mobile modules for work in conditions of extremely shallow water

Similar Documents

Publication Publication Date Title
US7156036B2 (en) Launch and recovery system
US3345970A (en) Boat and barge combination
CZ2002312A3 (en) Autonomous cargo vessel for containers
US6162105A (en) Two-part ship for use in oil transport in arctic waters
CN108674595B (en) Split type shallow-draft large deck surface bearing floating barge and longitudinal split joint method thereof
US2411382A (en) Docking flying boats
US12077249B1 (en) Method and apparatus for unloading fishing vessels
US3897746A (en) Submarine emergency towing rigging system
SU618308A1 (en) Method of unloading ships at shore without mooring facilities
CN100372733C (en) Ship with a detachable hull
CN110406641A (en) The dry defeated floating dress technique of haul of floating production storage offloading
JP2020083289A (en) Series of devices for towing vessel and other boats by drone
JP3383681B2 (en) Method and apparatus for loading and transporting powder cargo
CN107128459B (en) Large-scale marine structure semi-submerged ship floating installation
SU119445A1 (en) The method of transferring cargo from ship to ship or from ship to shore, or from shore to ship using floating waterproof containers
US1931820A (en) Method and apparatus for hauling aircraft upon watercraft
RU2384455C2 (en) Discharging method of various floating loads from ship to non-self propelled waterborne vehicle and transportation of cargo "poplavok" thereof to shore
RU2779970C1 (en) Ship-lift transport system for inland waterways
House Ship Handling: Manoeuvring and Mooring Operations
Pitchersky et al. Handling Problems at the Ocean-Air Interface
JP3004553B2 (en) How to brake a pedestal after landing on a launch ship
RU2245277C2 (en) Method of raising sunken ships
RU2616506C1 (en) Arctic navigation transport vessel, equipped with composed self-propelled ferry based on additional functional mobile modules for work in conditions of extremely shallow water
US3747136A (en) Self-mooring of a ship to a one-point mooring buoy
Wright Tug/Barge Options