Device for monitoring the preset pile-sinking level

Info

Publication number
SU586243A1
SU586243A1 SU762326204A SU2326204A SU586243A1 SU 586243 A1 SU586243 A1 SU 586243A1 SU 762326204 A SU762326204 A SU 762326204A SU 2326204 A SU2326204 A SU 2326204A SU 586243 A1 SU586243 A1 SU 586243A1
Authority
SU
USSR - Soviet Union
Prior art keywords
level
pile
ruler
monitoring
contact
Prior art date
Application number
SU762326204A
Other languages
Russian (ru)
Inventor
Виталий Прокопьевич Лопатин
Александр Дмитриевич Козловский
Николай Максимович Аверин
Владислав Васильевич Яковлев
Original Assignee
Научно-Исследовательский Институт Промышленного Строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Институт Промышленного Строительства filed Critical Научно-Исследовательский Институт Промышленного Строительства
Priority to SU762326204A priority Critical patent/SU586243A1/en
Application granted granted Critical
Publication of SU586243A1 publication Critical patent/SU586243A1/en

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

1one

Изобретение относитс  к области автоматизации сваепогружающей техники и предназначено дл  использовани  на копрах при забивке свай до заданной отметки.The invention relates to the field of automation of pile loading equipment and is intended for use on pile drivers when driving piles to a predetermined mark.

Известны устройства дл  контрол  за погружением сваи с контактным преобразователем перемещени  в число импульсов 1.Devices are known for monitoring the immersion of a pile with a contact transducer of displacement into the number of pulses 1.

Однако это устройство не обеспечивает достаточно высокую надежность в работе.However, this device does not provide a sufficiently high reliability in operation.

Известно также устройство дл  контрол  заданного уровн  погружени  сваи, забиваемой с помощью копра, включающее цепь управлени  молотом и резервуар с жидкостью, установленный на станине .It is also known to control a predetermined level of a pile driven by a pile driver, including a hammer control circuit and a fluid reservoir mounted on a bed.

Это устройство выполнено с емкостью, смонтированной на наголовнике сваи и соединенной с другой емкостью, закрепленной на заданном уровне погружени  и имеющей контактные поплавки, которые соединены с механизмом управлени  сваепогружающего оборудовани .This device is made with a tank mounted on a pile head and connected to another tank, fixed at a given immersion level and having contact floats that are connected to the control mechanism of the downhole equipment.

Устройство имеет следующие недостатки, про вл ющиес  в работе:The device has the following disadvantages, which are manifested in the work:

наличие св зи посредством щланга с ранее погруженной сваей снижает маневренность копра;the presence of a link through a hose with a previously immersed pile reduces the maneuverability of the copra;

перед работой с устройством необходимо крепить емкость к наголовнику молота, а после окончани  демонтировать ее;Before working with the device, it is necessary to fasten the container to the hammer head cap, and after finishing dismount it;

дл  установки емкости на другой уровень to set the tank to another level

необходимо специальное подъемное устройство и обслуживающий персонал к нему.you need a special lifting device and attendants to it.

Цель изобретени  - повыщение точности контрол  за погружением сваи.The purpose of the invention is to increase the accuracy of control of the pile driving.

Это достигаетс  тем, что устройство дл  контрол  заданного уровн  погружени  сваи снабжено прозрачными сообщающимис  трубками , соединенными с резервуаром с жидкостью , две из которых установлены на станине, а треть , выполненна  с поплавковым магнитом , переносным репером и линейкой, укрепленной на копре и снабженной задатчиком уровн  и пластинами с магнитоуправл емыми контактами, одна из которых жестко прикреплена к линейке в зоне третьей трубки, а друга  - к задатчику уровн  и снабжена магнитом, укрепленным на наголовнике молота, причем каждый магнитоуправл емый контакт одной пластины соединен с соответствующим магнитоуправл емым контактом другой пластины и включен в цепь управлени  молотом.This is achieved by the fact that the device for monitoring a predetermined level of the pile is equipped with transparent communicating tubes connected to a fluid reservoir, two of which are mounted on the frame, and a third made with a float magnet, a portable frame and a ruler mounted on the scraper and equipped with a level gauge and plates with magnetic contacts, one of which is rigidly attached to the ruler in the area of the third tube, and the other to the level indicator and is equipped with a magnet mounted on the hammer head, with than each magnetically controlled contact of one plate is connected with the corresponding magnetically controlled contact of another plate and is included in the hammer control circuit.

На фиг. 1 изображено предлагаемое устройство , общий вид; на фиг. 2 - измерительна  линейка устройства.FIG. 1 shows the proposed device, a general view; in fig. 2 - measuring device ruler.

Устройство выполнено из трех сообщающихс  прозрачных трубок 1, 2, 3, гидравлически св занных с резервуаром 4 с жидкостью , укрепленным на станине. Две трубки 1 и 2 служат прицелом и размещены на новоротном кронштейне 5, укрепленным На станине кабины оператора, а треть  - индикаторна  3 укреплена на мачте копра 6 на уровне первых двух. На поверхности жидкости индикаторной трубки размещен поплавковый магнит 7 на поплавке 8. На мачте копра, вдоль индикаторной трубки, неподвижно укреплена измерительна  линейка 9 с задатчиком 10 уровн , нижний конец которой находитс  на уровне низа мачты, а длина линейки определ ет высоту контролируемых свай. Задатчик имеет возможность установки в любое положение по длине линейки с помощью руко тки 11 через замкнутую систему тросрулетка, размещенную в корпусе линейки. Началом отсчета линейки  вл етс  рнска 12, проведенна  на корпусе линейки на уровне середины индикаторной трубки.The device is made up of three communicating transparent tubes 1, 2, 3 which are hydraulically connected to the reservoir 4 with the liquid fixed on the frame. Two tubes 1 and 2 serve as a sight and are placed on a novorot bracket 5, reinforced on the bed of the operator’s cab, and a third - indicator 3 is fixed on the mast of the copra 6 at the level of the first two. A float magnet 7 on the float 8 is placed on the surface of the indicator tube liquid. The setter can be installed at any position along the length of the ruler using the handle 11 through a closed loop system placed in the ruler case. The starting point of the ruler is rnska 12, conducted on the body of the ruler at the level of the middle of the indicator tube.

Линейка 9 выполнена с автоматическим совмещением начала отсчета с уровнем жидкости в индикаторной трубке 3, дл  этого она содержит две идентичные пластины 13, 14 с набором магнитоуправл емых контактов 15. Нластина 13 неподвижно прикреплена к линейке вдоль индикаторной трубки, а ее средний контакт находитс  на уровне риски. Пластина 14 укреплена на подвижном задатчике уровн  вдоль линейки симметрично относительно остри  задатчика. Контакты на пластинах размещены с определенным щагом один над другим на длине, равной высоте индикаторной трубки. Каждый контакт неподвижной пластины последовательно соединен с соответствующим контактом подвижной пластины. Набор пар контактов соединен параллельно и включен в цепь управлени  молотом .The ruler 9 is made with automatic alignment of the reference point with the liquid level in the indicator tube 3, for this it contains two identical plates 13, 14 with a set of magnetic contacts 15. Nlastina 13 is fixedly attached to the ruler along the indicator tube, and its average contact is at the level of risks. Plate 14 is mounted on a movable level gauge along the ruler symmetrically with respect to the needle points. Contacts on the plates are placed with a certain schag one above the other at a length equal to the height of the indicator tube. Each contact of the fixed plate is connected in series with the corresponding contact of the movable plate. A set of pairs of contacts is connected in parallel and is included in the hammer control circuit.

Дл  управлени  контактами пластины 14 на наголовнике молота 16, на уровне его дна, укреплен магнит 17.To control the contacts of the plate 14 on the head of the hammer 16, at the level of its bottom, a magnet 17 is fixed.

В комплект устройства входит переносный репер 18 с регулируемой высотой отметки 19.The device includes a portable frame 18 with an adjustable height of 19.

Работает устройство следующим образом.The device works as follows.

Репер 18 устанавливают на рассто нии 15- 20 м от копра. Отметку 19 репера устанавливают на высоту Я от геодезической отметки 20.The bench mark 18 is set at a distance of 15-20 m from the pile head. Mark 19 of the frame is set to a height I from the geodetic mark 20.

Уровень жидкости в сообщающихс  трубках совмещают в одну горизонтальную плоскость с отметкой 19 репера перемещением поршн  резервуара 4.The liquid level in the communicating tubes is combined in one horizontal plane with the reference mark 19 by moving the piston of the reservoir 4.

При установке задани  погружени  задатчик устанавливают на линейке на отметку h выше или ниже начала отсчета в зависимости от того, как будет расположена голова погруженной сваи 21 относительно отметки 19 репера 18.When installing the immersion task, the setpoint gauge is installed on the ruler at the h mark above or below the origin, depending on how the head of the submerged pile 21 is located relative to the mark 19 of the reference frame 18.

После прицеливани  на репер поплавковый магнит 7 замыкает ближайший к нему контакт 22 на неподвижной пластине, которыйAfter aiming at the rapper, the float magnet 7 closes the contact 22 closest to it on a fixed plate, which

подготавливает цепь контакту 23, наход щемус  на пластине задатчика 10 уровн  на рассто нии , равном заданию погружени .It prepares the circuit to contact 23, located on the setpoint plate of level 10, at a distance equal to the immersion task.

При подходе сваи к заданному уровню погружени  магпит на наголовнике молота проходит возле контактов, наход щихс  на пластине задатчика 10 уровн , которые поочередно замыкаютс . Но сигнал на отключение молота будет цодан тогда, когда замкнетс When a pile approaches a predetermined immersion level, the magpit on the hammer head passes near the contacts on the setpoint plate of level 10, which in turn are closed. But the signal to turn off the hammer will be when the zodan closes

контакт, дл  которого подготовлена цепь контактом неподвижной пластины, что соответствует достижению сваей заданного уровн  погружени . Если на новой точке погружени  копер ос дет, то уровень жидкости в трубкахthe contact for which the circuit is prepared by the contact of the fixed plate, which corresponds to the achievement by the pile of a given level of immersion. If a new driver is installed at a new immersion point, the fluid level in the tubes

необходимо подн ть до совмещени  в одну плоскость с отметкой репера. При этом автоматически подниметс  поплавковый магнит 7 в индикаторной трубке 3, который замкнет контакт 24, наход щийс  выше контакта 22it is necessary to lift up to align with the mark of the bench mark. This will automatically raise the float magnet 7 in the indicator tube 3, which will close the contact 24 located above the contact 22

на величину подъема жидкости. Контакт 24 подготовит цепь контакту 25 на пластине задатчика 10 уровн . При этом одновременно со смещением начала отсчета линейки 9 вверх произойдет параллельный перенос задани by the amount of lifting fluid. Pin 24 will prepare the circuit for pin 25 on the setting plate of level 10. At the same time, simultaneously with the offset of the starting point of the ruler 9, a parallel transfer of the task will occur

погружени  в том же направлении, что обеспечит сохранение точности погружени  сваи до заданного уровн .immersion in the same direction, which will ensure that the accuracy of the pile is maintained to a predetermined level.

Claims (2)

1.Авторское свидетельство СССР №390232, кл. Е 02D 13/06, 1971.1. USSR author's certificate No. 390232, cl. E 02D 13/06, 1971. 2.Авторское свидетельство СС( 178745, 60 кл. Е 02D 7/20, 1963.2. The copyright certificate of the SS (178745, 60 class E 02D 7/20, 1963. Фиг.11 ЛL BaeMijBaemij 1/пра8лени  J5J / 1 //
SU762326204A 1976-02-19 1976-02-19 Device for monitoring the preset pile-sinking level SU586243A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762326204A SU586243A1 (en) 1976-02-19 1976-02-19 Device for monitoring the preset pile-sinking level

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762326204A SU586243A1 (en) 1976-02-19 1976-02-19 Device for monitoring the preset pile-sinking level

Publications (1)

Publication Number Publication Date
SU586243A1 true SU586243A1 (en) 1977-12-30

Family

ID=20649477

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762326204A SU586243A1 (en) 1976-02-19 1976-02-19 Device for monitoring the preset pile-sinking level

Country Status (1)

Country Link
SU (1) SU586243A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116281566A (en) * 2023-05-18 2023-06-23 中铁城建集团第一工程有限公司 Automatic hoisting equipment for bored pile reinforcement cage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116281566A (en) * 2023-05-18 2023-06-23 中铁城建集团第一工程有限公司 Automatic hoisting equipment for bored pile reinforcement cage
CN116281566B (en) * 2023-05-18 2023-08-11 中铁城建集团第一工程有限公司 Automatic hoisting equipment for bored pile reinforcement cage

Similar Documents

Publication Publication Date Title
CN109373972B (en) Pile body verticality detection device
CN105784277B (en) A kind of motor train unit constitution heart measuring device and measuring method
US4584784A (en) Method and device for maintaining tools at a level
SU586243A1 (en) Device for monitoring the preset pile-sinking level
ATE90041T1 (en) AUTOMATIC LEVEL CONTROL.
CN209144797U (en) Filling pile cage of reinforcement places elevation control device
CN208586612U (en) A kind of steel pile casting leading truck
DE59301982D1 (en) DEVICE FOR RAMMING A FOUNDATION PREFERABLY FOR A MAST
US3779084A (en) Means for controlling the working depth of an excavator
SU929783A2 (en) Device for monitoring preset pile-sinking level
SU1002459A1 (en) Device for monitoring pile sinking level
CN209416857U (en) A kind of Weighing Lysimeter underground water buried depth control device
CN210944852U (en) Hydraulic crane pipe device
CN213714315U (en) Marine full-automatic measuring device
CN220366778U (en) Device for monitoring pile top displacement of steel sheet pile cofferdam
CN216483704U (en) Gravity center position measuring device of hydraulic excavator
SU1059065A2 (en) Apparatus for monitoring preselected depth of pile penetration
SU353008A1 (en) SINGLE BUCKET EXCAVATOR
US2863417A (en) Grading indicator
CN218002654U (en) Float liquid level meter field debugging device
CN218238997U (en) Water level monitoring device
CN214066040U (en) Pile sinking elevation measuring device of pile driving ship
CN214831953U (en) Prestressing force intelligence stretch-draw mud jacking monitored control system
CN208968528U (en) For monitoring the device of water-bed sedimentation
CN115561482B (en) Liquid level and flow speed monitoring device