Description
1one
t Изобретение относитс к горной промышленности и может быть использовано дл добычи полезного ископаемого при разработке мощных рудных залежей.t The invention relates to the mining industry and can be used for mining in the development of powerful ore deposits.
Известен способ разработки мощных рудных месторождений i, -камерно-столбовой системой с послойной выемкой l.There is a method of developing powerful ore deposits i, chamber-pillar system with a layered excavation l.
Недостатком щанного) способа вл етс сложность и дороговизна рабог и относительно Низка производительность труда забойных рабочих.The disadvantage of this method is the complexity and high cost of work and the relatively low productivity of downhole workers.
Известен также способ разработки моганых рудных месторождений с разделением на слои, выемкой их камерно-столбовой системой и принудительным обрушением 2Х There is also known a method of developing mineral ore deposits with the division into layers, excavation them with a chamber-and-pillar system and a forced collapse of 2X
Недостатком указанного способа влдаотс сравнительно большие потери к разубоживание руды.The disadvantage of this method is a relatively large losses to the dilution of the ore.
Целью изобретени вл етс сн1йкение потерь и разубоживани руды. Достигаетс эт тем, что рудное тело обрабатываютв три сло с «угработкой в Первую очередь среднего сло камерно-столбовой системой, последгошей закладкой выработанного пространстаа камеры твердеющей смесью с оставленном верхней часThe aim of the invention is to reduce losses and dilute ore. This is achieved by the fact that the ore body is treated in three layers with "processing, first of all, the middle layer with a chamber-pillar system, followed by the laying of the developed chamber space with a hardening mixture with the upper part left).
ти камеры незаложенной, затем отрабатывают верхний и нижний слои, причем верхний слой с принудительным. обру1ие1шем, а ниж1шй камерно-сголбовой системой, це«икинижнего сло располага«уг междуде вка /щ среднего опо с последующей выемкой целиков среднего сло и выпуском отбитой руды верхнего сло через образованные отверсти , а также тем, что во вторую очередь отбивают руду верхнего сло , а затем отрабатывают камеру нижнего сло или во вторую очередь отрабатывают камеру нижнего сло , а затем отбивают руду верхнего сло ..These chambers are unencumbered, then the upper and lower layers are worked out, with the upper layer being forced. the lower and lower-level chamber-hollow system, the bottom of the lower layer has a “space between the middle / middle middle” followed by excavation of the middle layer and discharging the broken ore of the upper layer through the holes formed, and also secondarily beat the ore of the upper layer and then they work out the chamber of the lower layer or, in the second place, work out the chamber of the lower layer, and then beat off the ore of the upper layer ..
На фиг. 1 показа, а камера после отработки среднего сло /и закладки его ,разрез; Иа фиг. 2 - го же, после отбойки верхнего сло , разрез; на фиг. 3 - то же, после отработки нижнего опо уразрез.FIG. 1 display, and the camera after working off the middle layer / and laying it, a section; FIG. 2 - the same, after the breaking of the upper layer, the cut; in fig. 3 - the same, after working out the bottom oporazrez.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7101714291A SU569713A1 (en) | 1971-11-15 | 1971-11-15 | Method of mining rich ore deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7101714291A SU569713A1 (en) | 1971-11-15 | 1971-11-15 | Method of mining rich ore deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU569713A1 true SU569713A1 (en) | 1977-08-25 |
Family
ID=20492957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU7101714291A SU569713A1 (en) | 1971-11-15 | 1971-11-15 | Method of mining rich ore deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU569713A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2744499C1 (en) * | 2018-09-04 | 2021-03-10 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method for extraction of coal pulses in chamber development with internal filling |
-
1971
- 1971-11-15 SU SU7101714291A patent/SU569713A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2744499C1 (en) * | 2018-09-04 | 2021-03-10 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method for extraction of coal pulses in chamber development with internal filling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU569713A1 (en) | Method of mining rich ore deposits | |
SU966235A1 (en) | Method of winning thin gently-sloping mineral seams | |
SU711293A1 (en) | Method of working thick gently sloping coal beds | |
SU588376A1 (en) | Method of mining sloping coal beds | |
SU905471A1 (en) | Method of working horizontal and gently sloping mineral beds | |
SU941583A1 (en) | Method of working gently-sloping beds and intelays of minerals | |
SU649845A1 (en) | Method of excavating slightly inclined seams of minerals | |
SU742590A1 (en) | Method of mining sharply ascending ore bodies | |
SU825964A1 (en) | Method of working thick steeply-inclined ore bodies | |
SU711292A1 (en) | Method of working thick gently sloping coal beds | |
SU924378A1 (en) | Method for working steeply sloping ore bodies | |
SU583307A1 (en) | Method of mining steep ore bodies | |
SU1244318A1 (en) | Method of separate excavation of thin steep ore bodies | |
SU1633126A1 (en) | Method of mining ore deposits | |
SU1705574A1 (en) | Method of opencast mining of steep deposits | |
SU693011A1 (en) | Method of excavating thick gently sloping coal seams | |
SU492662A1 (en) | Method for developing steeply dipping ore bodies | |
SU1028845A1 (en) | Method of working thick steep coal seams | |
SU829951A1 (en) | Method of working gently sloping bed deposits of minerals | |
SU711290A1 (en) | Method of working thick gently sloping coal beds | |
SU1301971A1 (en) | Method of mining mineral deposits | |
SU883437A1 (en) | Trenching method | |
SU715797A1 (en) | Method of mining thick sloping coal beds | |
SU825953A1 (en) | Method of open working of mountaineous mineral deposits | |
SU810973A1 (en) | Method of working sloping ore bodies |