SU52958A1 - Combine for excavation of mine workings - Google Patents
Combine for excavation of mine workingsInfo
- Publication number
- SU52958A1 SU52958A1 SU52958A1 SU 52958 A1 SU52958 A1 SU 52958A1 SU 52958 A1 SU52958 A1 SU 52958A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- combine
- drum
- rock
- paragraphs
- cutter
- Prior art date
Links
- 230000003245 working Effects 0.000 title claims description 5
- 238000009412 basement excavation Methods 0.000 title claims description 4
- 239000011435 rock Substances 0.000 claims description 9
- 238000003801 milling Methods 0.000 claims description 5
- 239000002965 rope Substances 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims 1
- 239000000725 suspension Substances 0.000 claims 1
- 230000005641 tunneling Effects 0.000 claims 1
- 230000000875 corresponding Effects 0.000 description 3
- 239000010802 sludge Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 101700050118 Gstm7 Proteins 0.000 description 2
- 210000004907 Glands Anatomy 0.000 description 1
- 101700040015 NAPG Proteins 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000149 penetrating Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000036633 rest Effects 0.000 description 1
Description
Предлагаемый комбайн имеет целью осуществл ть проходку горных выработок путем срезывани породы забо при помощи вращающегос фреза . Комбайн представлен в нескольких различных формах выполнени .The proposed harvester aims to excavate the mines by cutting the bottomhole rock using a rotary milling cutter. The combine is presented in several different forms of execution.
Нп схематическом чертеже фиг. 1 и 2 изображают два вертикальных разреза комбайна дл проходки вертккальных uiaxT пр моугольного сечени ; фиг. 3 и 4 - два вертикальных разреза комбайна дл проходки вертикальных шахт круглого сечени ; фиг. 5 и 6--ВИД сбоку и сверху комбайна дл проходки горизонтальных и наклонных горных выработок; фиг. 7 и 8-вид сбоку и сверху иной формы выполнени комбайна дл той же цели.In a schematic drawing of FIG. Figures 1 and 2 depict two vertical sections of a combine for penetrating verticular uiaxTs of rectangular section; FIG. 3 and 4 - two vertical sections of a combine for driving vertical round shafts; FIG. 5 and 6 - VIEW from the side and from above of the combine for driving horizontal and inclined mine workings; FIG. 7 and 8 are side and top views of another embodiment of the combine for the same purpose.
Рабочей частью комбайна вл етс снабженный зубками 2 фрез /, подвещенный на барах 3 и служащий барабаном дл снабженных зубками цепей /. С целью перемещени фреза барабана / во времч работы комбайна от одной стенки выработки до другой бары 3 выполнены поворотными 3 вертикальной плоскости около вала 5, приводимого во вращениеThe working part of the combine is a teeth-equipped 2 milling cutter /, placed on the bars 3 and serving as a drum for the teeth-supplied chains. In order to move the drum cutter / during the combine operation from one wall of the mine to the other, the bars 3 are made of rotary 3 vertical planes about the shaft 5, driven into rotation
штурвалом 6 через посредство зубчатых передач 7, 7 и черв чной передачи 8. Дл вращени фреза-барабана / и баровых цепей 4 служит электродвигатель 9, передающий эго вращение верхним колесам 10 цепей через посредство черв чной передачи //. Вс описанна рабоча часть комбайна укреплена внутри рамы J2, подвешенной внутри направл ющей рамы J3 ни винте //, который дл вертикального перемещени рамы J3 приводитс во вращение через посредство черв чной передачи /5. Дл удалени образующегос при работе фреза шламма породы служат трубки 16, соединенные при помощи гибких шлангов /7 с насосом JS, непосредстзеино соединенным с электродвигателем /Р.wheel 6 through gears 7, 7 and a worm gear 8. To rotate the cutter-drum / and the bar chains 4 there is an electric motor 9, which transmits its rotation to the upper wheels 10 chains through a worm gear //. The fully described working part of the combine is fastened inside frame J2, which is suspended inside screw frame J3 by means of a screw, // which, for vertical movement of frame J3, is rotated via worm gear / 5. To remove the sludge cutter formed during operation of the rock cutter, there are tubes 16 connected by flexible hoses / 7 to a pump JS directly connected to an electric motor / R.
Дл установки комбайна на место работы приготовл ют обычным способом шахту в б-8 м глубины с соответствующим сечением и в этой шахте монтируют комбайн. Дл этого на поЕерхности устанавливают одну или несколько лебедок на сооткетствующих канатах, от блт- абана лебедки. НаПг-- азл«ющую раму/JIn order to install the combine into the work site, a mine is prepared in the usual way in b-8 m depth with the corresponding section and a combine is mounted in this mine. To do this, one or several winches are installed on the Surfaces on the corresponding ropes, from the Blant Aban Winch. NaPG - azlu "yuyushchy frame / J
устанавливают в строго отвесном положении и закрепл ют к стенкам выработки нажимами 20 так, чтобы эта рама оставалась неподвижной. Если в забое отсутствует грунтова вода, то в него искусственно напускают воду с поверхности по трубе 2/ до такого уровн , чтобы при работе фреза / в его крайних положени х отсасывающие трубки J6 были погружены в жидкость. Пустив в работу электродвигатель, привод щий в движение цепь 4 с зубками, а следовательно , и фрез-барабан / посредством винта 14, опускают на забой весь укрепленный в раме /2 агрегат на определенную глубину в породу забо , примерно 10-15 см и посредством штурвала 6 начинают водить бары 3 до нужных разиероз выработки . Как только фрез-барабан доолел до своего крайнего положени , HS останавлива его работы, снова посредством винта /7 опускают внутреннюю раму с агрегатом на величину новой зарубки, т. е. на 10- 15 см, после чего фрез-барабан тем же штурвалом вновь двигают в обратном направлении до противоположной стенки выработки. После того, как вс дпина винга 14 израсходована,работу агрегата останавливают и опускают внещнюю раму 13 с одновременным приведением винта 14 в исходное положение (фиг. I и 2). Образующийс в результате работы фреза-барабана .шламм породы удал етс из забо посредством отсасывающих трубок 16, устаь эвленных таким образом, чтобы их концы находились на определенной посто нной высоте над фрезом-барабаном . Эги трубки, будучи св заны с барами, сопровождают фрез-барабан при всех его полом(ени х. В;рхн часть трубок 16 соедин етс с приемом насоса посредством гибких щлангов . Таким образом, действием насоса шламм по трубе 22 выкачиваетс на поверхность. Убывающа из забо вода пополн етс с поверхности по трубе 21. По мере подвигани комбайна производ т временное и посто нное крепление сгвола щахты.set in a strictly vertical position and secured to the walls of the excavation by pressing 20 so that this frame remains stationary. If there is no groundwater in the bottom, then artificially water is introduced into it from the surface through pipe 2 / to such a level that during operation of the mill / in its extreme positions, the suction tubes J6 are immersed in liquid. Having started up the electric motor that drives the chain 4 with teeth, and consequently, the cutter-drum / by means of the screw 14, the whole unit / 2 mounted in the frame / 2 is lowered to the bottom, approximately 10-15 cm, by means of the steering wheel 6 begin to drive the bars 3 to the desired razierosis production. As soon as the cutter-drum has reached its extreme position, HS stops its work, again by means of a screw / 7 lower the inner frame with the unit by the amount of a new notch, i.e. 10-15 cm, after which the cutter-drum with the same steering wheel again move in the opposite direction to the opposite wall of the excavation. After all the engine speeds of the ving 14 have been consumed, the operation of the unit is stopped and the outer frame 13 is lowered and the screw 14 is brought back to its initial position (Fig. I and 2). The sludge of the rock that is formed as a result of the operation of the mill is removed from the bottom by means of suction tubes 16, which are secured in such a way that their ends are at a certain constant height above the mill drum. These tubes, when connected with bars, accompany the cutter-drum with all its floors (x. B; pi; some of the tubes 16 are connected to the pump intake via flexible hoses. Thus, by pumping the sludge through the pipe 22, it is pumped out to the surface. From the intake, water is replenished from the surface through pipe 21. As the combine moves, temporary and permanent fastening of the ground is produced.
Описанный выще комбайн саужит дл проходки вертикальных шахт пр г- сугольного сечени . Дн проходкиThe above described combine harvests for driving vertical shafts of rectangular section. Day of penetration
шахт круглого сечени и дл срезывани при этом породы по всей площади забо фрез-барабан выполнен поворачивающимс вокруг вертикальной оси (фиг. 3 и 4). С этой целью рабоча часть комбайна, состо ща из фреза-барабг-на / с зубками 2 и цепи 4 с зубками, приводимой в движение электродвигателем 9 через посредство черв чной передачи //, укреплена во внутреннем цилиндре 23, расположенном внутри подвешенного на канатах 24 цилиндра 25 с возможностью вращени в этом последнем. Дл поворачивани внутреннего цилиндра 23 «округ вертикальной оси служит кольцо-гребенка 26. опирающс с через посредство роликов 27 на верхнюю часть внутреннего цилиндра 23 и снабженное приливами, которые захватывают нарун нь Й цилиндр таким образом, что при вращении внутреннего цилиндра кольцо-гребенка 26 не может вращатьс , но может свободно опускатьс вместе с внутренним ЦИЛИНДРОМ 23, на который оно опираетс . Кольцо сцеплено с щестереночной передачей 2S, поддерживаемой укрепленным на внутреннем цилиндре кронштейном 29 и приводимой в действие при помощи электродвигателей . Дл опускани внутреннего барабана служит шестерн гайка 30, сид ща на валу 31. Ч-резбарабан / выполнен в виде двух усеченных конусов (фиг. 3:, обращенных узкими концами к середине барабана . Дл огсасызаии из забо измельченной породы служат трубки /б и насос 18, приводимый в действие электродвигателем 9. Выкидна трубка 22 снабжена сальником 32, служащим дл ее свободного вращени при вращении внутреннего цилиндра 25. Дл установки комбайна на место работы, как и в первом случае, обычным способом приготсвл юг шахту 6-8 .4 глубины с соотнетсгвующим сечгнием и в ней монтируют комбайн, подвешиваемый на канатах и удерживаемый лебедками, установленными на поверхности. Весь агрегат усгангвливают в строго отвесном положении с помощью наружного цилпндро 25 и закрепл ют к стенке шахты прижимами 20. Затем забей ззл;;взют водойmines of circular cross section and for cutting at the same time the rock over the entire area of the bottom of the mill, the drum is made to rotate around a vertical axis (Fig. 3 and 4). To this end, the working part of the combine, consisting of a milling cutter-drum-on / with teeth 2 and a chain 4 with teeth driven by an electric motor 9 through a worm gear //, is fixed in an internal cylinder 23 located inside suspended on ropes 24 cylinder 25 rotatably in this latter. To rotate the inner cylinder 23, the round axis of the vertical axis is a ring comb 26. supported by means of rollers 27 on the upper part of the internal cylinder 23 and provided with tides, which engage the inner cylinder in such a way that when the internal cylinder rotates, the ring comb 26 does not can rotate, but can freely descend along with the internal CYLINDER 23 on which it rests. The ring is engaged with a 2S gear wheel, supported by a bracket 29 fixed on the inner cylinder and driven by electric motors. To lower the inner drum, the gear nut 30 sits on the shaft 31. H-rezabarab / is made in the form of two truncated cones (Fig. 3: facing the middle of the drum with narrow ends. The tubes / b and pump 18, driven by an electric motor 9. The discharge tube 22 is equipped with a gland 32 serving to rotate it freely as the inner cylinder 25 rotates. To install the combine into the work site, as in the first case, prepare the shaft 6-8 .4 in the usual way. with the corresponding sechgniem them therein and mounted harvester is suspended on the ropes and held winches mounted on the surface. The whole assembly usgangvlivayut in a strictly vertical position by an external tsilpndro 25 and secured by clamps to the wall of the shaft 20. Then hammer zzl vzyut water ;;
В остальном устройство комбайна подобно предыдущему комбайну.The rest of the device combine like the previous combine.
После сборки всего комбайна в подготовленной выработке (обычным способом) и установки его в определенном направлении устанавливают опорные колонны. Включением электродвигател 9 привод т в движение весь агрегат. Путем посто нного нажима домкрата комбайн подвигаетс к лицу забо и, таким образом, работа комбайна идет без перерыва до полного израсходовани винта 55домкрата , после чего винт вбирают обратно, переставл ют колонны 36, и цикл работ продолжаетс . Штыб, полученный в результате фрезовани , убираетс шнеками, причем фрезованна порода подкидываетс в поперечный шнек 39 при помощи подкидывател 42.After assembling the entire combine in the prepared development (in the usual way) and installing it in a certain direction, the supporting columns are installed. Turning on the electric motor 9 drives the entire unit. By pressing the jack continuously, the combine moves to the face of the slab and, thus, the combine works without interruption until the jack screw is completely used, after which the screw is retracted, the columns 36 are rearranged, and the work cycle continues. The bushing, obtained as a result of milling, is removed by augers, and the milled rock is thrown into the transverse screw 39 with the help of a pick-up 42.
Предмет изобретени .The subject matter of the invention.
Claims (8)
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112253129B (en) | Full-automatic shaft shield constructs equipment | |
CN112253128B (en) | Full-automatic full-section vertical shield tunneling machine | |
JP3996012B2 (en) | Pile construction method and construction equipment | |
US2760766A (en) | Tunnel excavator having rotary cutters mounted upon a rotatable cutting head | |
SU52958A1 (en) | Combine for excavation of mine workings | |
CN201334658Y (en) | Sand-beach marsh ground solidifying machine | |
US2134478A (en) | Tunneling machine | |
CN112854273B (en) | Excavation-free construction process and equipment for green urban underground structures | |
US1380203A (en) | Caisson-dredge | |
CN213775376U (en) | Full-automatic shaft shield constructs machine | |
US2221226A (en) | Shaft sinking and excavating device | |
CN109653266B (en) | Scraper chain type grooving machine | |
JP3660048B2 (en) | Continuous wall excavator | |
CN206647105U (en) | Tunnel descaling machine | |
CN220645826U (en) | Step-by-step rectangular shallow hole drill with haunching horizontal cantilever and suitable for soil stratum | |
JPH0497019A (en) | Trencher for constructing underground continous wall | |
CN220580955U (en) | Step-by-step rectangular deep hole drilling machine with haunched horizontal cantilever and suitable for soil stratum | |
CN220580958U (en) | Rectangular shallow hole drill with horizontal cantilever step by step and suitable for soil stratum | |
CN213899048U (en) | Dredging equipment for preventing and treating water damage of mine | |
CN220580962U (en) | Rotary-cut pore-forming drill bit in rock soil body | |
CN220580957U (en) | Rectangular deep hole drilling machine with horizontal cantilever and step-by-step type structure adapting to soil stratum | |
CN218912904U (en) | Quick construction device of weak surrounding rock subway tunnel | |
CN220580951U (en) | Rectangular slide-resistant pile drilling machine with size-variable synchronous horizontal cantilever | |
CN220580956U (en) | Asynchronous rectangular deep hole drilling machine with haunched horizontal cantilever and suitable for soil stratum | |
JP3035039B2 (en) | Underground drilling rig |