SU485060A1 - Overhead crane - Google Patents

Overhead crane

Info

Publication number
SU485060A1
SU485060A1 SU1973414A SU1973414A SU485060A1 SU 485060 A1 SU485060 A1 SU 485060A1 SU 1973414 A SU1973414 A SU 1973414A SU 1973414 A SU1973414 A SU 1973414A SU 485060 A1 SU485060 A1 SU 485060A1
Authority
SU
USSR - Soviet Union
Prior art keywords
crane
bridge
lifting
overhead crane
moving
Prior art date
Application number
SU1973414A
Other languages
Russian (ru)
Inventor
Александр Филиппович Савенко
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1973414A priority Critical patent/SU485060A1/en
Application granted granted Critical
Publication of SU485060A1 publication Critical patent/SU485060A1/en

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Description

(54) МОСТОВОЙ КРА(54) BRIDGE CRAF

1one

Изобретение относитс  к подъемно- j транспортному оборудованию, используемому в области металлургической промышленности дл  обслуживани  литейных дворов и рабочих площадок доменных печей.The invention relates to a lifting and transportation equipment used in the field of the metallurgical industry for serving foundry yards and blast furnace work sites.

Известен мостовой кран, содержащий двухбалочный мост с перемещающейс  по нему грузовой тележкой и механизмами подьема грузов и перемещени  моста.A bridge crane is known, comprising a double-girder bridge with a loading trolley moving along it and mechanisms for lifting and moving the bridge.

Цель изобретени  - механизаци  трудоемких процессов на литейном дворе.The purpose of the invention is the mechanization of labor-intensive processes in the foundry yard.

Это достигаетс  тем, что в нижней части моста смонтированы кронштейны, несушие подкрановые пути, на которых установлена поперечно мосту крана подвижна  консоль- на  кран-балка с грузовой тележкой.This is achieved by mounting brackets in the lower part of the bridge, bearing the crane runways, on which a mobile cantilever beam crane with a trolley is mounted transversely to the bridge of the crane.

На фиг. 1 показан мостовой кран, общий вид; на фиг. 2 - разрез по А-А на фиг. 1.FIG. 1 shows a bridge crane, general view; in fig. 2 is a section along A-A in FIG. one.

Мостовой кран дл  обслуживани  технологических подъемно-транспортных операций на литейном дворе и рабочей плошадке доменной печи содержит двухбалочный мост 1, мостовые балки (нижние по са) которого снабжены вдоль пролета крон1итейThe bridge crane for servicing technological lifting and transport operations in the casting yard and the working area of the blast furnace contains a double girder bridge 1, the bridge beams (bottom) of which are provided along the crown span

нами 2. На этих кронштейнах монтируют продольные подкрановые пути 3, механизм главного подьема грузов 4, механизм перемещени  моста крана 5. К подкрановым пут м 3 снизу подвещена поперечно мосту крана подвесна  кран-балка 6 с грузовой тележкой 7 и механизмом перемещени  8 кран-балки вдоль длины пролета крана.2. On these brackets we mount longitudinal crane runways 3, the mechanism of the main lifting of loads 4, the mechanism for moving the crane bridge 5. Go to the crane runway 3 from below it is suspended transversely to the crane bridge by the suspended crane beam 6 with the load carriage 7 and the mechanism for moving 8 the crane beam along the length of the span of the crane.

Работа мостового крана дл  обслуживани  технологических non-beMHO-Tpancnopi -ных и погрузочно-разгрузочных операций на литейном дворе и рабочей площадке доменной печи осуществл етс  следующим образом .The operation of the bridge crane for servicing non-beMHO-Tpancnopi technological and loading and unloading operations at the foundry yard and the blast furnace working site is carried out as follows.

Контейнер 9 (кюбель), например, с гру зом огнеупорной массы поднимаетс  с по- мошью грузовой тележки 7 с места скла- дировани  огнеупорной массы на литейном дворе и Т1 анспорт фуетс  мостовым краном к месту использовани  огнеупорной массы, к чугуной летке и горновому желобу , с 1федварительной ориентацией кран -б лки 6 на подкрановых пут х 3 против , места назначени  груза (или производстварабРт с помощью навесного (переносного) технологического оборудовани  электровибротрамбовки , рыхлител  и др.) у горна доменной печи. Механизм 4 главного подъема грузов в это врем  находитс  вИContainer 9 (Kubel), for example, with a load of refractory mass, is lifted with the help of a cargo trolley 7 from the storage area of the refractory mass in the foundry yard and T1 is unloaded with a bridge crane to the place of use of the refractory mass, to a cast iron well and mining chute with the first orientation of the crane -blocks 6 on the crane ways x 3 against, the destination of the cargo (or production by means of mounted (portable) technological equipment of electro-vibrorammer, ripper, etc.) at the hearth of the blast furnace. The main load lifting mechanism 4 at this time is VI

одном из крайних положений относительно моста крана в заторможенном положении, Ione of the extreme positions relative to the crane bridge in the inhibited position, I

При проведении подъемно-транспортных операций с применением механизма 4 глав- 10 ;ного подъема грузов подвесна  кран-балка 6 с помощью механизма перемещени  8 ,, устанавливаетс  в заторможенном состо нии в одном из концов пролета подкрановых путей 3 моста 1..15When carrying out hoisting-and-transport operations with the use of the mechanism 4 of the main; 10 load lifting, the suspended beam crane 6 is installed in a decelerated state at one of the spans of the crane runways 3 of the bridge 1..15

Предмет изобретени .The subject matter of the invention.

Мостовой кран, преимущественно дл  обслуживани  литейного двора и рабочей площадки доменной печи, содержащий двухбалочный мост с перемещающейс  по нему грузовой тележкой и механизмами подъема грузов и перемещени  моста, отличающийс  тем, что, с целью механизации трудоемких процессов, в части моста смонтированы кронштейны , несущие подкрановые пути, на которых, установлена поперечно мосту крана подвижна  консольна  кран-балка с грузовой тележкой.An overhead crane, mainly for servicing the casting yard and the blast furnace working platform, containing a double-girder bridge with a loading trolley moving along it and mechanisms for lifting and moving the bridge, characterized in that, for the purpose of mechanization of labor-intensive processes, brackets mounted on the crane are mounted in part of the bridge paths on which, mounted transversely to the bridge of the crane, a movable cantilever girder with a cargo trolley.

VV

SU1973414A 1973-12-03 1973-12-03 Overhead crane SU485060A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1973414A SU485060A1 (en) 1973-12-03 1973-12-03 Overhead crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1973414A SU485060A1 (en) 1973-12-03 1973-12-03 Overhead crane

Publications (1)

Publication Number Publication Date
SU485060A1 true SU485060A1 (en) 1975-09-25

Family

ID=20568585

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1973414A SU485060A1 (en) 1973-12-03 1973-12-03 Overhead crane

Country Status (1)

Country Link
SU (1) SU485060A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4645083A (en) * 1982-02-05 1987-02-24 Nuovo Pignone S.P.A. Overhead travelling crane for power gas turbine bays

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4645083A (en) * 1982-02-05 1987-02-24 Nuovo Pignone S.P.A. Overhead travelling crane for power gas turbine bays

Similar Documents

Publication Publication Date Title
US4360304A (en) Extendable crane trolley and method
SU485060A1 (en) Overhead crane
GB1343042A (en) Vessel transportation lift truck
US3297170A (en) Furnace charger crane
US3487957A (en) Charging apparatus
US3187905A (en) Jibs
US3314550A (en) Furnace charger crane
US2361331A (en) Portable pier crane
US3475779A (en) Cantilever platform extension
US2812863A (en) Portable conveyor
SU670512A1 (en) Arrangement for unloading bulk cargo from railway cars
SU1602875A1 (en) Casting yard of blast furnace
US2997005A (en) Overhead crane frame or bridge
SU1599294A1 (en) Arrangement for handling operations on store-house sites
SU1088967A1 (en) Load-handling vehicle
SU775126A1 (en) Ladle car
SU473834A1 (en) Suspended mine crane
RU2225829C2 (en) Crane for mounting railway bridge framework
US3375945A (en) Furnace charger crane
US3266649A (en) Apparatus for charging scrap into a steelmaking vessel
McLain et al. Progress in Materials Handling: Contributed by the Materials-Handling Division
SU1086016A1 (en) Arrangement for mechanizing operations at casting yard of blast furnace
SU146745A1 (en) The method of production of steel and iron in an unlimited number of buckets
SU503811A1 (en) Bridge crane
SU77838A1 (en) Mobile Scraper Installation