SU47796A1 - The method of assembly of metal masts - Google Patents

The method of assembly of metal masts

Info

Publication number
SU47796A1
SU47796A1 SU155061A SU155061A SU47796A1 SU 47796 A1 SU47796 A1 SU 47796A1 SU 155061 A SU155061 A SU 155061A SU 155061 A SU155061 A SU 155061A SU 47796 A1 SU47796 A1 SU 47796A1
Authority
SU
USSR - Soviet Union
Prior art keywords
link
mast
lift
section
assembly
Prior art date
Application number
SU155061A
Other languages
Russian (ru)
Inventor
А.П. Галанкин
Original Assignee
А.П. Галанкин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by А.П. Галанкин filed Critical А.П. Галанкин
Priority to SU155061A priority Critical patent/SU47796A1/en
Application granted granted Critical
Publication of SU47796A1 publication Critical patent/SU47796A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

В области монтажа высоких металлических мачт  вл етс  известным подъем звеньев мачты при помощи подъемников, укрепл емых на вершине уже собранной части мачты. Насто щее предложение имеет ту особенность, что в нем предусмотрен подъем звена мачты вместе с подъемником, который прикрепл етс  к звену еще на земле. Затем подн тое звено с прикрепленным к нему подъемником устанавливаетс  и закрепл етс  на месте, и этот подъемник позвол ет осуществить подъем следующего звена, снабженного также еще на земле своим подъемником. После подъема звена мачты подъемник, проделавший эту операцию , разбираетс  и может быть снова использован дл  прикреплени  к очередному звену, намеченному к подъему.In the field of mounting high metal masts, it is known to lift the links of the mast with the help of lifts mounted on the top of the already assembled part of the mast. The present proposal has the peculiarity that it provides for the raising of the mast link, together with a lift, which is attached to the link still on the ground. Then the raised link with the lift attached to it is fixed and fixed in place, and this lift allows the lift of the next link, which is also equipped on the ground with its lift. After the mast link has been lifted, the lift that performed this operation is disassembled and can be reused to attach to the next link scheduled for the lift.

Таким образом, при предлагаемом способе избегаетс  монтаж подъемников наверху, на мачте, и замен етс  монтажем их на земле.Thus, with the proposed method, the installation of elevators at the top, on the mast, is avoided and replaced by mounting them on the ground.

На чертеже фиг. 1 представл ет стадию установки звена мачты, когда подъем его закончен и начинаетс  надвижка на место; фиг. 2 представл ет вид мачты после того, как верхнее звено надвинуто на место, но подъемник нижнего звена еще не разобран; фиг. 3 соответствует стадии, изображенной на предыдущей фигуре, и изображает вид на мачту с другой стороны; наконец, наIn FIG. Figure 1 represents the stage of installation of the mast link when it has been lifted and is being pushed into place; FIG. 2 shows the mast view after the upper link has been pulled into place, but the lower link lift has not yet been disassembled; FIG. 3 corresponds to the stage depicted in the previous figure, and depicts a view of the mast on the other side; finally on

фиг. 4 дана деталь конца насадки стрелы подъемника.FIG. 4 given detail of the end of the nozzle boom lift.

Перед подъемом на земле кажда  секци  (фиг. 1,2,3) снабжаетс  по бокам двум  стрелами с с горизонтальными насадками, блоками а и тросами дл  подъема последующей секции, блоком b и тросом дл  верхолаза. Выше центра т жести секции укрепл етс  петл  дл  подъемного троса, а над ней пропускаетс  через решетку мачты ось с двум  боковыми катками d. Высота стрел с должна быть такова, чтобы при прин той точке подвески звеньев каждое из них могло быть подн то во всю высоту над предыдущим звеном (фиг. 1).Before climbing on the ground, each section (Figs. 1, 2, 3) is provided on the sides with two arrows with horizontal nozzles, blocks a and cables for lifting the subsequent section, block b and a cable for a climber. Above the center of gravity of the section, the loop for the lifting cable is strengthened, and over it the axis with two side rollers d passes through the mast grate. The height of the arrows with should be such that at a given point of suspension of links each of them can be raised to the full height above the previous link (Fig. 1).

Секци  поднимаетс  лебедками, укрепленными на земле возле мачты. Когда поднимаема  секци  достигнет своими катками низа насадки и встретит там скошенную поверхность (фиг. 4), то секци  отклонитс  от вертикальной оси, а дойд  до верха насадки займет снова прежнее вертикальное положение, и катки поднимаемой секции л гут на насадку , освободив таким образом тросы.The section is raised by winches fixed on the ground near the mast. When the lifted section reaches its bottom of the nozzle with its rollers and encounters a sloping surface there (Fig. 4), the section deviates from the vertical axis, and going to the top of the nozzle will again occupy the same vertical position, and the rollers of the raised section will lie on the nozzle, thus freeing the cables .

Втора  стади  установки звена заключаетс  в передвижении секции на катках по насадке до центра мачты и в соединении стыка звена, после чего две освободившиес  стрелы спускаютс  на землю и могут быть подн ты наверх со следующей секцией. Так, периодическиThe second stage of the link installation consists in moving the section on the rollers along the nozzle to the center of the mast and at the junction of the link, after which the two free arrows go down to the ground and can be lifted upwards with the next section. So, periodically

SU155061A 1934-10-07 1934-10-07 The method of assembly of metal masts SU47796A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU155061A SU47796A1 (en) 1934-10-07 1934-10-07 The method of assembly of metal masts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU155061A SU47796A1 (en) 1934-10-07 1934-10-07 The method of assembly of metal masts

Publications (1)

Publication Number Publication Date
SU47796A1 true SU47796A1 (en) 1936-07-31

Family

ID=48360832

Family Applications (1)

Application Number Title Priority Date Filing Date
SU155061A SU47796A1 (en) 1934-10-07 1934-10-07 The method of assembly of metal masts

Country Status (1)

Country Link
SU (1) SU47796A1 (en)

Similar Documents

Publication Publication Date Title
CN105226560B (en) A kind of crossing frame and its construction method
CN109502480A (en) The hoisting that high building turns over
SU47796A1 (en) The method of assembly of metal masts
CN110745683A (en) Hoisting device and method for reinforcement cage of underground continuous wall
CN206645694U (en) A kind of box type transformer hoisting bracket
US3945107A (en) Process of erecting vertical rising mast
US4238115A (en) Jacking device
CN203462739U (en) Double-hook upside down type electric chain hoist
SU114804A1 (en) Mobile construction lift
GB1409888A (en) Temporary mast structure
CN215926036U (en) Vertical ladder system for upper and lower wells in sinking construction of open caisson
CN214663121U (en) Liftable sensor hanging bracket perpendicular to roadway for coal mine
CN211521340U (en) Lifting appliance for preventing hanging basket from falling off
JPS5846993B2 (en) Method of constructing a steel tower using a lifting crane
CN215160262U (en) Pile foundation steel reinforcement cage hoisting device
CN216471878U (en) Directional drop-in type portal crane
CN218787103U (en) Lifting rod for online cleaning of oil pumping pipe
CN220352617U (en) Integrated bent cap construction device
CN210064896U (en) Balance hoisting frame for large sheet structure
CN220432076U (en) Conveyer of large-scale steel construction feed bin top cap construction
GB1326694A (en) Construction of elongate vertical structures
US3280519A (en) Slingline arrangement for oil well masts
JPH0431412Y2 (en)
CN208039981U (en) Self-tipping type multisystem shares self-support overhead torch tower
SU950669A1 (en) Arrangement for erecting supports