Изобретение относитс к.транспортированию полезных .ископаемых и может быть использовано при скреперной доставке в пределах очистного пространства.The invention relates to the transportation of useful minerals and can be used for scraper delivery within the treatment area.
Известны способы навески блочков в очистиом пространстве без захода в него людей путем пропуска цепи (троса) через пробуренные скважины.Known methods of mounting blocks in the cleaned space without people entering it by passing a chain (cable) through the drilled wells.
Предлагаемый способ отличаетс от известных тем, что скважины бур т из выработ ,ки под «екоторым углОМ к ее продольной оси, пропускают цепь (трос), имеющую петли на одном коице, в очистное пространство, захватывают ее устройст1вом и зат гивают в выработку , пр1икрепл ют к ней скреперный блочок с тросом и, выт гава конец цепи из скважины , перемещают блочок в очистное пространство , затем концы цепи жестко креп т. Такой способ навески блочков сокращает нарезные работы н повышает безопасность труда.The proposed method differs from the known ones in that the wells are drilled from a mine under a certain angle to its longitudinal axis, they pass a chain (cable) having loops on one shaft into the cleaning space, capture it with a device and put it in A scraper block with a cable is attached to it and, pulling the end of the chain out of the well, move the block into the cleaning space, then the ends of the chain are rigidly fixed.
На фиг. 1 изображен разрез вкрест простираии рудного тела; «а фиг. 2 - разрез по А-А на фиг. 1; «а фиг. 3 - узел I на фиг. 1.FIG. 1 shows a section across the ore body; “And FIG. 2 is a section along A-A in FIG. one; “And FIG. 3 shows the node I in FIG. one.
При системе разработки со взрыводоставкой руды на.клошшпадающую залежь отрабатывают выемочнылщ участками (блоками), включающими камеру и ограждающие целики . В нижней (по падению) части выемочного участка подготавливают днища, очистные работы продвигают вверх по восстанию.With the development system with the explosive delivery of ore to the tank, a deposit is worked out by excavating areas (blocks) that include a chamber and enclosing pillars. In the lower (by falling) part of the excavation site, bottoms are prepared, the refining works move up the uprising.
99
Подготовительно-нарезные работы заключаютс в проходке откаточных штреков 1, ортов 2, буровых восстающих 3, располол ениых в центре камеры. В нижней часпи блока «а всю мощность рудиого тела оформл ют отрезную щель 4, в ней располагают рудовыпускные воронки. Руду по скреперному щтреку 5 доставл ют до рудоспусков или откаточных сосудов . Дл зачистки камеры из бурового восстающего проход т ходок 6, из него разделывают камеру 7 дл скреперной лебедки 8. Дл навески блочков 9 в очистном пространстве без захода в него людей из выработки бурового восстающего на участке сопр жени его с очистным пространством бур т скважины 10 под некоторым углом к его оси с таким расчетом, чтобы они выщли по кра м камеры в очистное пространство. Из бурового восстающего в скважину пропускают цепь И до тех пор, пока она не достигнет почвы камеры. На концевой части цепи делают петли 12 дл зацеплени . Захват цепи в выработанном пространстве осуществл ют устройством 13, расположенным в восстающем, которое корем захватывает петли 12 цепи. Затем цепь вт гиваетс в восстающий. Таким образом получают замкнутый контур: восстающий-скважина- очистное пространство - восстающий. Первоначально замкнутый контур получают, использу цепь .малого диаметра и веса. Затем ее за-мен ют цепью, удовлетвор ющей услови м скреперовани . К. цепи прикрепл ют блочок со сК репе|р«ым тросом п, выт гива конец цепи из окважины, передвигают блочок поперек камеры в очистное пространство. Затем оба конца цепи жестко закрепл ют в восстающем .Preparatory-rifled works consist of penetrating haulage drifts 1, orts 2, drilling rebels 3, located in the center of the chamber. In the lower part of the block, and the entire thickness of the ore body is formed by a cutting slit 4, ore-release funnels are located in it. The ore is transported by scraper 5 to the ore chutes or haulage vessels. Walker 6 is passed to clean the chamber from the revolver; chamber 7 is cut from it for the scraper winch 8. To hang blocks 9 in the cleaning space without people entering from the drill ascending at the joint site with the drilling well 10 under some angle to its axis in such a way that they are located along the edges of the chamber into the cleaning space. From the drilling rebel to the well, the chain is passed And until it reaches the soil of the chamber. Loops 12 are engaged at the end of the chain to engage. The gripping of the chain in the developed space is carried out by the device 13, located in the rising wall, which locks the chains of the chain 12. The chain is then pulled in to the riser. Thus, a closed loop is obtained: rising - well - cleaning space - rising. Initially, a closed loop is obtained using a chain of small diameter and weight. Then it is replaced with a chain satisfying the conditions of scraping. To the chains, attach a block with a scK reperend wire, pull the end of the chain out of the well, move the block across the chamber to the cleaning space. Then both ends of the chain are rigidly fixed in rebel.
Предает и 3 о б р е т е и и Predicts and 3 about and e and
Способ навески блочков в очистном дространстве без захода в него людей путем пропуска цепи (троса) через пробуренные скваЖИНЫ , отличающийс тем, что, с «целью сокращени нарезных работ и повышени безопасности труда, скважины бур т из выработки под некоторым углом к ее продольной оси, П;ропускают цепь (трос), имеющую петли па однол конце, в очистное пространство , захватывают ее устройством и зат гивают в выработку, прикрепл ют к ней скреперный блочок с тросом и, выт гива конецThe method of hanging blocks in the treatment area without people entering it by passing a chain (cable) through drilled wells, characterized in that, in order to reduce cutting work and increase occupational safety, wells are drilled from production at an angle to its longitudinal axis, The chain (cable), having loops at one end, is roped into the cleaning space, captured by the device and pulled into the working, attached to it a scraper block with a cable, and, pulling the end
цепи из скважины, перемещают блочок в очистное пространство, затем концы цепи жестко креп т.chains from the well, move the block into the cleaning space, then the ends of the chain are rigidly attached.
А -АA-A
9и,г. 19i, g. one
узел 1node 1
Ри.г.зDGG
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1326733A SU397660A1 (en) | 1969-04-22 | 1969-04-22 | METHOD HANGING BLOCKS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1326733A SU397660A1 (en) | 1969-04-22 | 1969-04-22 | METHOD HANGING BLOCKS |
Publications (1)
Publication Number | Publication Date |
---|---|
SU397660A1 true SU397660A1 (en) | 1973-09-17 |
Family
ID=20445601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1326733A SU397660A1 (en) | 1969-04-22 | 1969-04-22 | METHOD HANGING BLOCKS |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU397660A1 (en) |
-
1969
- 1969-04-22 SU SU1326733A patent/SU397660A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU397660A1 (en) | METHOD HANGING BLOCKS | |
RU2659292C1 (en) | Method of efficient management of hard-to-break roof in mechanized faces | |
US3776594A (en) | Method for mechanized seam mining | |
RU2477372C1 (en) | Open-pit bench reinforcement method | |
SU581282A1 (en) | Method of mining thick ore bodies | |
RU2193660C1 (en) | Method of underground mining of steeply dipping vein deposits | |
SU1492057A1 (en) | Method of mining mineral deposits | |
SU621879A1 (en) | Method of excavating orebodies | |
RU2477352C1 (en) | Escarpment reinforcement method | |
SU1047265A1 (en) | Device for eliminating hanging of rock in winning workings | |
RU2704061C1 (en) | Method for combined development of flat seams of coal deposits | |
SU107000A1 (en) | Side grouser | |
RU114340U1 (en) | BOARD CAREER | |
SU901535A1 (en) | Method for driving mine shafts | |
SU1002512A1 (en) | Method of purifying drill mud from cuttings while drilling | |
SU899961A1 (en) | Method of delivering ore with mining sloping ore bodies | |
RU2254474C1 (en) | Method for extraction of steep-falling deposits of average massiveness | |
SU829991A1 (en) | Method of filling worked area | |
SU134242A1 (en) | Chamber of mineral development system | |
SU899962A1 (en) | Method of mining mineral deposits | |
SU676737A1 (en) | Method of reducing inflow of water into mine workings | |
SU840364A1 (en) | Method of stripping worked-out blocks | |
SU400703A1 (en) | METHOD OF OPEN DEVELOPMENT OF THE FIELD OF WATERED ROCK BREEDS | |
SU1273560A1 (en) | Method of preventing inflow of water into stoping faces | |
SU723102A1 (en) | Borehole reinforcement method |